SlideShare a Scribd company logo
1 of 9
Download to read offline
ESCOLunch – 31/05/2016
THE PERFORMANCE MODEL FOR COST-
OPTIMAL BUILDINGS
ESCOLunch – 31/05/2016
Fedesco, Building
Agency, Province
Brabant Walloon,
Gemeente Beersel
Facilitation tools and services that helps our customers to make
the most of the ESCO/EPC market, from initial feasibility
assessment to contract implementation and follow-up, including
finance structuring.
SMART Energy
Performance
Contracting
Fedesco, Building
Agency, STIB-MIVB,
Stad Gent,
Hogeschool PXL
Consulting services that delivers our customers with a cost-
optimal and performance based energy, maintenance, comfort,
building value and certification management system.
SMART Building
Performance
Management
ESCO/TPF/FUND
Management
Assistance
Igretec, Infrax, SIEM,
Nederland Energy
Ministery, CCI Nice,
Region Rhones Alpes
Consulting services that helps our customers to set-up an
efficient and successful ESCO/TPF business, from strategic
analysis, business plan development, finance structuring to
operational implementation and follow up.
Innovative
R&D
CITYnvest, ESKIMO,
Caisse des Dépôts
Group
Consulting services that helps our customers to develop
innovative business models in large scale energy efficiency
retrofit programs.
ⅠENERGINVEST SERVICES PORTFOLIO
(Minimize risks and costs, optimize asset value and profits)
ESCOLunch – 31/ 05/ 2016
WHAT IS COST-OPTIMALITY?
(EU EPBD Directive requires property owners to reach the Cost-Opimality design of their
building)
• EU EPBD definition
• the energy performance level
• which leads to the lowest cost
• during the estimated economic lifecycle of a building.
• Energinvest definition
• the energy, comfort, maintenance, building value and certification
performance levels
• which leads to the lowest operational and capital costs
• during the estimated commercial (and/or contractual) lifecycle of the
building(s) (portfolio).
ESCOLunch – 31/ 05/ 2016
Lower design and
construction
costs
WHY A COST-OPTIMAL PERFORMANCE BUILDING?
(Maximalizing value and profits for each stakeholder)
Market
differentiation
Higher selling
price
Faster sales
Slower
depreciation
Increased
occupancy rates
Lower exit yield
Lower
retrofit/renovation
costs
Legislation & CSR
compliance
Lower occupancy
costs
Enhanced
business image
Improved Health
and reduced
absenteism
Tenant/Occupier
Why should I lease a
Cost-Optimal
Performance Building?
Increased staff
productivity
Increased
occupier comfort
Developer
Why should I build a
Cost-Optimal
Performance Building?
Owner
Why should I want a
Cost-Optimal
Performance Building?
ESCOLunch – 31/ 05/ 2016
UNDERSTANDING ENERGY SERVICES
(Energy efficiency services, which may include retrofit works, aiming to realize
sustainable energy performance of a building, an industrial process, infrastructure,…)
Design
Audits & technical studies.
Build
Mechanical, electrical,
architecture.
Operate
Mechanical, electrical,
regulation.
Maintain
Mechanical, electrical.
EPC O&M
On-going commissioning + low
capital improvements.
EPC Systems
Mechanical & electrical, capital
improvements.
CR-EPC light
Cost-effective architecture
capital improvements.
CR-EPC
Deep architecture capital
improvements.
ESCOLunch – 31/ 05/ 2016
WHICH LEVEL OF PERFORMANCE?
(Depends own potential for each project, but performance may be particularly high: 63%!)
Projects Contract type # buildings # m2 Capital improvements Savings rate
Ottignies EPC O&M 4 12.000 0 € 31%
Province of Hainaut EPC Systems 1 16.000 129.752 € 41%
Fedimmo (All) EPC Systems 13 75.000 1.431.405 € 28%
Fedimmo 1 EPC Systems 1 4.123 306.690 € 63%
Fedimmo 2 EPC Systems 1 26.554 647.491 € 47%
0 €
8 €
19 €
74 €
24 €
Ottignies
Province of Hainaut
Fedimmo (All)
Fedimmo 1
Fedimmo 2
Capital improvements/m2
31%
41%
28%
63%
47%
Ottignies
Province of Hainaut
Fedimmo (All)
Fedimmo 1
Fedimmo 2
Savings rate
ESCOLunch – 31/ 05/ 2016
SMART BPM & SMART EPC APPROACH
(Innovative and comprehensive methodology to optimize the total cost of ownership)
Standardized methodology
to improve:
• Energy savings
• Maintenance costs
• Comfort level
• Building value level
• Certification level
Breeam in use rating
(>= values offer)  
Energy cost savings
(>= values offer)  
Bonus/penalty
Breeam in use rating    
Fixed price  
Bonus/penalty
Energy cost savings  
Bonus/penalty
Comfort performance  
Bonus/penalty
Increased building value  
Comfort performance
(>= values offer)  
Basic project requirements
(>= values tender documents)  
Increased building value
(>= values offer)  
EPC-
project
year 1…n
year n
(end)
Fully based on Net Present Value and on international standards: IPMVP,
NEN2767, BREEAM In Use
ESCOLunch – 31/ 05/ 2016
THINKING IN NET PRESENT VALUE!
(The best option is the one that maximizes the overall costs and benefits of the project
over the life of contract!)
ESCOLunch – 31/ 05/ 2016
ⅠContact Information
Ingmar Hermans
Program Manager
EnergInvest
Jospeh Coosemansstraat 107, 1030 Brussel
ihermans@energinvest.be
M + 32 489 329 759

More Related Content

Viewers also liked

W2 Example 1 Answers
W2 Example 1 AnswersW2 Example 1 Answers
W2 Example 1 Answersjcocks
 
W3 Example 4 Answers
W3 Example 4 AnswersW3 Example 4 Answers
W3 Example 4 Answersjcocks
 
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...David Santiago Medina
 
W2 Example 3 Answers
W2 Example 3 AnswersW2 Example 3 Answers
W2 Example 3 Answersjcocks
 
W3 Example 1 Answers
W3 Example 1 AnswersW3 Example 1 Answers
W3 Example 1 Answersjcocks
 
W2 Example 2 Answers
W2 Example 2 AnswersW2 Example 2 Answers
W2 Example 2 Answersjcocks
 
Tester123
Tester123Tester123
Tester123jcocks
 
W2 Example 4 Answers
W2 Example 4 AnswersW2 Example 4 Answers
W2 Example 4 Answersjcocks
 
W2 Example 5 Answers
W2 Example 5 AnswersW2 Example 5 Answers
W2 Example 5 Answersjcocks
 
W3 Example 3 Answers
W3 Example 3 AnswersW3 Example 3 Answers
W3 Example 3 Answersjcocks
 
W1 Example 4 Answers
W1 Example 4 AnswersW1 Example 4 Answers
W1 Example 4 Answersjcocks
 
W1 Example 2 Answers
W1 Example 2 AnswersW1 Example 2 Answers
W1 Example 2 Answersjcocks
 
W1 Example 1 Answers
W1 Example 1 AnswersW1 Example 1 Answers
W1 Example 1 Answersjcocks
 
W2 Example 6 Answers
W2 Example 6 AnswersW2 Example 6 Answers
W2 Example 6 Answersjcocks
 
12349 kegiatan sekolah agar bebas dari narkoba
12349 kegiatan sekolah agar bebas dari narkoba12349 kegiatan sekolah agar bebas dari narkoba
12349 kegiatan sekolah agar bebas dari narkobaZul Karnain
 
FENOTIPOS Y GENOTIPOS
FENOTIPOS Y GENOTIPOS FENOTIPOS Y GENOTIPOS
FENOTIPOS Y GENOTIPOS carlos11161116
 

Viewers also liked (17)

W2 Example 1 Answers
W2 Example 1 AnswersW2 Example 1 Answers
W2 Example 1 Answers
 
W3 Example 4 Answers
W3 Example 4 AnswersW3 Example 4 Answers
W3 Example 4 Answers
 
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...
Linea jurisprudencial-del-derecho-a-la-libertad-religiosa-y-de-culto-en-el-am...
 
W2 Example 3 Answers
W2 Example 3 AnswersW2 Example 3 Answers
W2 Example 3 Answers
 
W3 Example 1 Answers
W3 Example 1 AnswersW3 Example 1 Answers
W3 Example 1 Answers
 
W2 Example 2 Answers
W2 Example 2 AnswersW2 Example 2 Answers
W2 Example 2 Answers
 
Tester123
Tester123Tester123
Tester123
 
W2 Example 4 Answers
W2 Example 4 AnswersW2 Example 4 Answers
W2 Example 4 Answers
 
W2 Example 5 Answers
W2 Example 5 AnswersW2 Example 5 Answers
W2 Example 5 Answers
 
W3 Example 3 Answers
W3 Example 3 AnswersW3 Example 3 Answers
W3 Example 3 Answers
 
W1 Example 4 Answers
W1 Example 4 AnswersW1 Example 4 Answers
W1 Example 4 Answers
 
W1 Example 2 Answers
W1 Example 2 AnswersW1 Example 2 Answers
W1 Example 2 Answers
 
W1 Example 1 Answers
W1 Example 1 AnswersW1 Example 1 Answers
W1 Example 1 Answers
 
W2 Example 6 Answers
W2 Example 6 AnswersW2 Example 6 Answers
W2 Example 6 Answers
 
12349 kegiatan sekolah agar bebas dari narkoba
12349 kegiatan sekolah agar bebas dari narkoba12349 kegiatan sekolah agar bebas dari narkoba
12349 kegiatan sekolah agar bebas dari narkoba
 
Genética
GenéticaGenética
Genética
 
FENOTIPOS Y GENOTIPOS
FENOTIPOS Y GENOTIPOS FENOTIPOS Y GENOTIPOS
FENOTIPOS Y GENOTIPOS
 

Similar to Energinvest

Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Cluster TWEED
 
Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014The Smart Company
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...ARC research group
 
Euggine atinda.cv.2018
Euggine atinda.cv.2018Euggine atinda.cv.2018
Euggine atinda.cv.2018ATINDA EUGGINE
 
ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015Luis Castanheira
 
I.M. tecnics profile
I.M. tecnics profileI.M. tecnics profile
I.M. tecnics profileI.M. tecnics
 
2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’sAlex Ciurana Fenes, CEM, CMVP
 
Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Rémi BANERAS
 
ENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSNour Elhattab
 
ENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSNour Elhattab
 
Building Automation Solutions for Oil & Gas Offshore/Onshore Living Quarters
Building Automation Solutions for Oil & Gas Offshore/Onshore Living QuartersBuilding Automation Solutions for Oil & Gas Offshore/Onshore Living Quarters
Building Automation Solutions for Oil & Gas Offshore/Onshore Living QuartersNour Elhattab
 
REnnovates achievements - Key note end event
REnnovates achievements - Key note end eventREnnovates achievements - Key note end event
REnnovates achievements - Key note end eventHenri Relyveld
 

Similar to Energinvest (20)

CV-M.Hamza-KSA..
CV-M.Hamza-KSA.. CV-M.Hamza-KSA..
CV-M.Hamza-KSA..
 
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
 
Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014Présentation du Cluster Tweed - Energy Day 2014
Présentation du Cluster Tweed - Energy Day 2014
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
 
CAPITAL- ENGINEERING SERVICE PROFILE
CAPITAL- ENGINEERING SERVICE PROFILECAPITAL- ENGINEERING SERVICE PROFILE
CAPITAL- ENGINEERING SERVICE PROFILE
 
sEEnergies – modelling approach linking different efficiency potentials
sEEnergies – modelling approach linking different efficiency potentials sEEnergies – modelling approach linking different efficiency potentials
sEEnergies – modelling approach linking different efficiency potentials
 
Ewen (Portugal) - Your Energy Efficiency Partner
Ewen (Portugal) - Your Energy Efficiency PartnerEwen (Portugal) - Your Energy Efficiency Partner
Ewen (Portugal) - Your Energy Efficiency Partner
 
Euggine atinda.cv.2018
Euggine atinda.cv.2018Euggine atinda.cv.2018
Euggine atinda.cv.2018
 
ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015
 
I.M. tecnics profile
I.M. tecnics profileI.M. tecnics profile
I.M. tecnics profile
 
2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s2013-09-23_Real State Energy Management Strategy’s
2013-09-23_Real State Energy Management Strategy’s
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
GCP Europe leaflet
GCP Europe leafletGCP Europe leaflet
GCP Europe leaflet
 
Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207
 
Overview-vinci-energies
Overview-vinci-energiesOverview-vinci-energies
Overview-vinci-energies
 
ENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERS
 
ENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERSENERGY EFFICIENT LIVING QUARTERS
ENERGY EFFICIENT LIVING QUARTERS
 
Building Automation Solutions for Oil & Gas Offshore/Onshore Living Quarters
Building Automation Solutions for Oil & Gas Offshore/Onshore Living QuartersBuilding Automation Solutions for Oil & Gas Offshore/Onshore Living Quarters
Building Automation Solutions for Oil & Gas Offshore/Onshore Living Quarters
 
REnnovates achievements - Key note end event
REnnovates achievements - Key note end eventREnnovates achievements - Key note end event
REnnovates achievements - Key note end event
 

Energinvest

  • 1. ESCOLunch – 31/05/2016 THE PERFORMANCE MODEL FOR COST- OPTIMAL BUILDINGS
  • 2. ESCOLunch – 31/05/2016 Fedesco, Building Agency, Province Brabant Walloon, Gemeente Beersel Facilitation tools and services that helps our customers to make the most of the ESCO/EPC market, from initial feasibility assessment to contract implementation and follow-up, including finance structuring. SMART Energy Performance Contracting Fedesco, Building Agency, STIB-MIVB, Stad Gent, Hogeschool PXL Consulting services that delivers our customers with a cost- optimal and performance based energy, maintenance, comfort, building value and certification management system. SMART Building Performance Management ESCO/TPF/FUND Management Assistance Igretec, Infrax, SIEM, Nederland Energy Ministery, CCI Nice, Region Rhones Alpes Consulting services that helps our customers to set-up an efficient and successful ESCO/TPF business, from strategic analysis, business plan development, finance structuring to operational implementation and follow up. Innovative R&D CITYnvest, ESKIMO, Caisse des Dépôts Group Consulting services that helps our customers to develop innovative business models in large scale energy efficiency retrofit programs. ⅠENERGINVEST SERVICES PORTFOLIO (Minimize risks and costs, optimize asset value and profits)
  • 3. ESCOLunch – 31/ 05/ 2016 WHAT IS COST-OPTIMALITY? (EU EPBD Directive requires property owners to reach the Cost-Opimality design of their building) • EU EPBD definition • the energy performance level • which leads to the lowest cost • during the estimated economic lifecycle of a building. • Energinvest definition • the energy, comfort, maintenance, building value and certification performance levels • which leads to the lowest operational and capital costs • during the estimated commercial (and/or contractual) lifecycle of the building(s) (portfolio).
  • 4. ESCOLunch – 31/ 05/ 2016 Lower design and construction costs WHY A COST-OPTIMAL PERFORMANCE BUILDING? (Maximalizing value and profits for each stakeholder) Market differentiation Higher selling price Faster sales Slower depreciation Increased occupancy rates Lower exit yield Lower retrofit/renovation costs Legislation & CSR compliance Lower occupancy costs Enhanced business image Improved Health and reduced absenteism Tenant/Occupier Why should I lease a Cost-Optimal Performance Building? Increased staff productivity Increased occupier comfort Developer Why should I build a Cost-Optimal Performance Building? Owner Why should I want a Cost-Optimal Performance Building?
  • 5. ESCOLunch – 31/ 05/ 2016 UNDERSTANDING ENERGY SERVICES (Energy efficiency services, which may include retrofit works, aiming to realize sustainable energy performance of a building, an industrial process, infrastructure,…) Design Audits & technical studies. Build Mechanical, electrical, architecture. Operate Mechanical, electrical, regulation. Maintain Mechanical, electrical. EPC O&M On-going commissioning + low capital improvements. EPC Systems Mechanical & electrical, capital improvements. CR-EPC light Cost-effective architecture capital improvements. CR-EPC Deep architecture capital improvements.
  • 6. ESCOLunch – 31/ 05/ 2016 WHICH LEVEL OF PERFORMANCE? (Depends own potential for each project, but performance may be particularly high: 63%!) Projects Contract type # buildings # m2 Capital improvements Savings rate Ottignies EPC O&M 4 12.000 0 € 31% Province of Hainaut EPC Systems 1 16.000 129.752 € 41% Fedimmo (All) EPC Systems 13 75.000 1.431.405 € 28% Fedimmo 1 EPC Systems 1 4.123 306.690 € 63% Fedimmo 2 EPC Systems 1 26.554 647.491 € 47% 0 € 8 € 19 € 74 € 24 € Ottignies Province of Hainaut Fedimmo (All) Fedimmo 1 Fedimmo 2 Capital improvements/m2 31% 41% 28% 63% 47% Ottignies Province of Hainaut Fedimmo (All) Fedimmo 1 Fedimmo 2 Savings rate
  • 7. ESCOLunch – 31/ 05/ 2016 SMART BPM & SMART EPC APPROACH (Innovative and comprehensive methodology to optimize the total cost of ownership) Standardized methodology to improve: • Energy savings • Maintenance costs • Comfort level • Building value level • Certification level Breeam in use rating (>= values offer)   Energy cost savings (>= values offer)   Bonus/penalty Breeam in use rating     Fixed price   Bonus/penalty Energy cost savings   Bonus/penalty Comfort performance   Bonus/penalty Increased building value   Comfort performance (>= values offer)   Basic project requirements (>= values tender documents)   Increased building value (>= values offer)   EPC- project year 1…n year n (end) Fully based on Net Present Value and on international standards: IPMVP, NEN2767, BREEAM In Use
  • 8. ESCOLunch – 31/ 05/ 2016 THINKING IN NET PRESENT VALUE! (The best option is the one that maximizes the overall costs and benefits of the project over the life of contract!)
  • 9. ESCOLunch – 31/ 05/ 2016 ⅠContact Information Ingmar Hermans Program Manager EnergInvest Jospeh Coosemansstraat 107, 1030 Brussel ihermans@energinvest.be M + 32 489 329 759