1. Hussein Maleh Sayah
Mechanical engineer
Phone No:
E-mail address:
+009647713840525
h.maleh@mahamco.com
Personal
Information
Nationality: Iraqi.
Age: 32
Place of Birth: al Anbar.
Current residential address: Baghdad.
Languages
Arabic(mother language) & English
Work experience
1-Site engineer in samara diesel power plant 350 Mw from -SAS co
3 Mar 2006-4 September, 2007
2- Site engineer in refinery bazian in sulemanya installation storage tanks-
SAS co.
10 Sep 2007- 3 February 2008
3- Site engineer in diesel power plant for kufa cement factory 30 mw -SAS
com.
6 May 2010 - 10 September 2011
4- Site engineer in isomerization unit in refinery baiji–ROSCO co.
10 Feb 2008- 4 May 2010
5-Work Site engineer & construction manager in Basra. Storage-zubair2
install six storage tanks Capacity 58000m3 type floating roof- ROSCO co.
7 Jun 2011 –till now
6-site engineer in PS3 major overhaul for gas turbine frame 3 two units
maham com.
Note:
SAS /shames al-alsbah CO. Iraqi nationality
ROSCO /RAFIDAIN OIL SERVICE CO. Jordan nationality
MAHAM/ Iraqi nationality
Bldg. 8 , Hay Babel, Dist. 923, St. 37
P.O.BOX: 2193 Jadrriah, Baghdad - IRAQ
Tel: +964 780 924 4485, Fax: +964 1 71 999
50 Email: maham@mahamco.com
2. Education B.Sc. in Mechanical Engineering – AL ANBARE University /Iraq 2005.
Recommendation
s & Certifications:
Piping engineer certificate from Chemo Project Company.
Mechanical engineer from SAS company work in samara power plant
project and refinery Bazian storage tanks.
Mechanical engineer from ROSCO company work in isomerization
unit in Baiji refinery.
Arabic (Mother language) & English
Skills:
Computer (micro soft office) &windows & internet.
AutoCAD 2008, 2014 2d, 3D.
Work as operator on automatic heat treatment unit (ANNELING) on
pipes alloy steel.
Work as operator on automatic welding machine (tank welder
double side) & (single side& tractor type ESAB).
I have experience to alignment, pump, gas starter, load gear to gas
turbine.
I have training to install air filter house (intake filter) for turbine GT
From AAF co. Dubai branch jabal ali.
3. History of work
Erected the storage tanks and piping and cladding piping and
equipment and install steel structure for engine house and erected
frame switch yard 11-132 Kv and install the sliding for 20 engines in
samara power plant.
Erected tow tanks 2000m³ double deck floating roof & one tank
4000m³ fixed roofs in refinery Bazian storage tanks project.
Install and erected the steel structure for isomerization unit in Baiji
refinery and erected the piping and work operation on post heating
machine (annealing) for pipes alloy steel P11. DN 18”and erected the
accessories of furnace & reactor for the project and install the
equipment's (Drums).
Erection storage tank capacity 58000m³ type floating roof single
deck
and install the cooling system ,firefighting system for it . In zubair2
depot project.
Major overhaul for GT frame 3 in PS3 , alignment, install new intake
filter self-clean AAF , location Najaf city, client SCOP co. two units.
Mechanical commission engineer to commissioning fuel gas booster
(HOWDEN) to client SHELL (SIPD) company in Majnoon oil field -
Basra