FINAL EVALUATION REPORT
Bundibugyo Integrated Development
Programme
People Help Themselves
Belgian Development Agency Republic of Uganda
Bundibugyo District
- UGANDA -
FINAL EVALUATION REPORT
Bundibugyo Integrated Development
Programme (BIDP), June 2011
Republic of Uganda
Bundibugyo District
Bundibugyo Integrated Development
BIDP Final Evaluation Report
DGCD intervention number:
Navision code BTC:
Partner institution:
Duration of intervention:
Duration of Specific Agreement:
Starting date of intervention
End date of the Project:
Belgian contribution:
Intervention sectors:
Project Summary
Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended
year until the end of 2010. The BIDP
strengthening of Bundibugyo local authorities’ capacity to im
population. It was based on the idea that local, elected authorities have a comparative advantage in
designing, managing, supervising and monitoring local development measures and initiatives aiming at
alleviating poverty. In addition to an important capacity building component that
as participatory planning and budgeting, financial management, resource mobilization, public/private
partnership for service delivery, accountability and monitoring, the
and reliable unconditional grants to Bundibugyo District Council and the 10 sub
used on non-wage activities according to development plans and the approved budget. Block grants
made available to support the district and the sub
practically improve their management of infrastructure and public service provision to the communities
of the districts, thereby increasing their legitimacy.
Evaluation Team
Dr. Henry H. Kellam III: Team Leader/FinCorp
Silverius Ssewanyana: Winsor Consult/Socio
Eng. Simon P. Otoi: COWI/Engineer
Rogers Baguma: Tangaza Cinemas Ltd
The BIDP Final Evaluation (FE) was funded out of the Belgo
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
report findings, lessons learned, conclusions, recommendations.
accompanying brochures. Copies can be obtained from
Belgian Development Agency
1942111
0400711
MoLG
5 Years
6 Years
28 April 2005
Dec 2009, Extension granted Dec 2010
EUR 3,500,000
Decentralisation, Rural Development
Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended
until the end of 2010. The BIDP supported the process of decentralization by contributing to the
strengthening of Bundibugyo local authorities’ capacity to improve service delivery to the local
based on the idea that local, elected authorities have a comparative advantage in
designing, managing, supervising and monitoring local development measures and initiatives aiming at
y. In addition to an important capacity building component that focused
as participatory planning and budgeting, financial management, resource mobilization, public/private
partnership for service delivery, accountability and monitoring, the project also made
and reliable unconditional grants to Bundibugyo District Council and the 10 sub-counties of the district
wage activities according to development plans and the approved budget. Block grants
pport the district and the sub-counties enabled Bundibugyo local authorities to
practically improve their management of infrastructure and public service provision to the communities
of the districts, thereby increasing their legitimacy.
eam Leader/FinCorp
Winsor Consult/Socio-economist
COWI/Engineer
Tangaza Cinemas Ltd/FinCorp
was funded out of the Belgo-Ugandan study and consultancy fund.
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
report findings, lessons learned, conclusions, recommendations. This is attached to this Report with
s. Copies can be obtained from Tangaza Cinema.
ii
Extension granted Dec 2010
Development
Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended for one
the process of decentralization by contributing to the
prove service delivery to the local
based on the idea that local, elected authorities have a comparative advantage in
designing, managing, supervising and monitoring local development measures and initiatives aiming at
focused on areas such
as participatory planning and budgeting, financial management, resource mobilization, public/private
made available small
counties of the district
wage activities according to development plans and the approved budget. Block grants
Bundibugyo local authorities to
practically improve their management of infrastructure and public service provision to the communities
and consultancy fund.
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
This is attached to this Report with
BIDP Final Evaluation Report
Acknowledgements
The BIDP FE Team would like to express
mission.
We were provided excellent support and backstopping from
Representative and Mrs. Rose Athieno Kato
logistics and was there for us on a daily bases as well as other BTC staff
appreciate Mr. Vincent Maher (Resident TA for
insights into BIDP.
We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head,
Development Cooperation, Belgian Embassy
We thank Mr. Yasin K. Sendaula, the
Programme facilitator, for providing continuous guidance and inputs for the draft reports and
two staff members of the MoLG, Sophia Kakwezi, Rogers Nayebare
greatly assisted the FE Team. We also thank,
Finance and Administration, Office of the Prime Minister for his time and
Kiracho, TA, Management Information’s Systems, MoLG
documents and statistical information
Last but not least, we greatly appreciate Mr
transparency, and for making himself and all key district staff
Statistician) available at all times during our field mission
leader’s in the sub-counties.
Belgian Development Agency
The BIDP FE Team would like to express our appreciation to a number of people who assisted in their
We were provided excellent support and backstopping from BTC by Mr. Koen Goekint
Rose Athieno Kato, the Programme Officer who managed our mission
for us on a daily bases as well as other BTC staff behind the scenes
Resident TA for BIDP 2005-08) for all of his valuable and practical
We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head,
Development Cooperation, Belgian Embassy for their time, guidance and inputs.
. Sendaula, the MOLG Assistant Commissioner Urban Inspection National
for providing continuous guidance and inputs for the draft reports and
Sophia Kakwezi, Rogers Nayebare to join our field mission
. We also thank, Mr Benjamin Kumumanya, the Under
Finance and Administration, Office of the Prime Minister for his time and advice, and
Kiracho, TA, Management Information’s Systems, MoLG for providing advice, important background
and statistical information.
Last but not least, we greatly appreciate Mr Omulangira David Okuraja’s (District CAO) hospitality and
for making himself and all key district staff (DCAO, Director Heads, the Planner and
during our field mission to the District as well as community groups and
iii
appreciation to a number of people who assisted in their
Goekint, Resident
managed our mission,
behind the scenes. We also
all of his valuable and practical
We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head,
Commissioner Urban Inspection National
for providing continuous guidance and inputs for the draft reports and providing
mission and who
Mr Benjamin Kumumanya, the Under-Secretary of
e, and Mr. Gilbert
important background
) hospitality and
, Director Heads, the Planner and
as well as community groups and
BIDP Final Evaluation Report
ACRONYMS AND ABBREVIATIONS
AAMP Area-Based Agricultural Modernization
AMA Abanya-Rwenzori Mountaineering Association
BFP Budget Framework Paper
BIDP Bundibugyo Integrated Development Programme
BSF Belgian Survival Fund
BTC Belgian Technical Cooperation
CAO Chief Administrative Officer
CBF Capacity Building Fund
CBO Community Based Organization
CRD Community Resilience Dialogue
CRS Catholic Relief Services
DAC Development Assistance Committee (of OECD)
DANIDA Danish International Development Agency
DCDO District Community Development Officer
DDP District Development Plan
DE District Engineer
DEC District Executive Committee
DecSec Decentralization Secretariat
DED German Development Service
DEO District Education Officer
DFID Department for International Development (British Government)
DTPC District Technical Planning Committee
DWO District Water Officer
EDF European Development Fund
EU European Union
FDS Fiscal Decentralization Strategy
FE Final Evaluation
FGD Focus Group Discussion
FY Financial Year
GFS Gravity Flow Scheme
GoU Government of Uganda
G-Tax Graduated Tax
HDPE High Density Polyethylene
HIPC Heavily Indebted Poor Countries
HLG Higher Local Government
HoD Head of Department
IDP Internally Displaced Person
IFAD International Fund for African Development
JLCB Joint Local Consultative Body (Steering Committee)
KDRCDP Kasese District Rural Community Development Programme
LC Local Council
LDF Local Development Fund
LG Local Government
LGA Local Government Act
LGDP Local Government Development Programme
LGFC Local Government Finance Commission
LLG Lower Local Government
M&E Monitoring and Evaluation
MoES Ministry of Education and Sports
MoLG Ministry of Local Government
MTR Mid Term Review
NGO Non-Governmental Organization
NORRACOL North Rwenzori Community Agriculture and Conservation Link
NRM National Resistance Movement
Belgian Development Agency
ACRONYMS AND ABBREVIATIONS
Based Agricultural Modernization Programme
Rwenzori Mountaineering Association Agro forestry project
Budget Framework Paper
Bundibugyo Integrated Development Programme
Belgian Survival Fund
Belgian Technical Cooperation
Chief Administrative Officer (in districts)
Capacity Building Fund
Community Based Organization
Community Resilience Dialogue
Catholic Relief Services
Development Assistance Committee (of OECD)
Danish International Development Agency
t Community Development Officer
District Development Plan
District Executive Committee
Decentralization Secretariat
German Development Service
District Education Officer
International Development (British Government)
District Technical Planning Committee
District Water Officer
European Development Fund
Fiscal Decentralization Strategy
Discussion
Gravity Flow Scheme
Government of Uganda
High Density Polyethylene
Heavily Indebted Poor Countries
Higher Local Government
Head of Department
Displaced Person
International Fund for African Development
Joint Local Consultative Body (Steering Committee)
Kasese District Rural Community Development Programme
Local Development Fund
Local Government Act
Local Government Development Programme
Local Government Finance Commission
Lower Local Government
Monitoring and Evaluation
Ministry of Education and Sports
Ministry of Local Government
Governmental Organization
North Rwenzori Community Agriculture and Conservation Link
National Resistance Movement
iv
BIDP Final Evaluation Report
O&M Operation and Maintenance
OECD Organisation for Economic Cooperation and Development
PAF Poverty Action Fund
PEAP Poverty Eradication Action Policy
PMU Programme Management Unit
PRA Participatory Rural Appraisal
PRSP Poverty Reduction Strategy Paper
P/S Primary School
RC Resistance Council
ROM Result Oriented Management
SATNET Sustainable Agriculture Trainers Network
SCDP Sub-County Development Plan
SDF Sub-County Development Fund
SMC School Management Committee
SNV Netherlands Development Organization
SO Specific Objective
SPSS Statistical Package for the Social Sciences
TA Technical Assistance / Assistant / Advisor (specified as per text)
TC Town Clerk
TFF Technical and Financial File (BTC document)
ToT Training of Trainers
TPC Technical Planning Committee
UNCDF United Nations Capital Development Fund
UNDP United Nations Development Programme
UPHOLD Uganda Programme for Holistic Development
WB World Bank
Belgian Development Agency
Operation and Maintenance
Organisation for Economic Cooperation and Development
Poverty Action Fund
Poverty Eradication Action Policy
Programme Management Unit
Participatory Rural Appraisal
Poverty Reduction Strategy Paper
Resistance Council
Result Oriented Management
tainable Agriculture Trainers Network
County Development Plan
County Development Fund
School Management Committee
Netherlands Development Organization
Statistical Package for the Social Sciences
Technical Assistance / Assistant / Advisor (specified as per text)
Technical and Financial File (BTC document)
Training of Trainers
Technical Planning Committee
United Nations Capital Development Fund
United Nations Development Programme
Uganda Programme for Holistic Development
v
BIDP Final Evaluation Report
Figure 1: Map of Uganda
Belgian Development Agency
vi
BIDP Final Evaluation Report
TABLE OF CONTENTS
1 Executive Summary ................................
2 Introduction................................
2.1 Presentation of the Intervention
2.1.1 Geographical Understanding of Bundibugyo District
2.2 Methodology ................................
3 Background and context ................................
3.1 Historical Context of the Intervention
3.2 Social and Economic Context
3.3 Political and Institutional Context
3.4 Intervention Logic ................................
4 Follow-up of recommendations
4.1 From the Mid-term Review
5 Implementation and achievements
5.1 Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
Mechanisms are operationalized.
5.1.1 BIDP Impact ................................
5.1.2 Result area Specific Recommendations
Final Achievements and Lessons learned
5.2 Results 2: Local Revenue Generation & Mobilization to Sustain Investments &
Cost is Improved.................................
5.2.1 BIDP Impact ................................
5.2.2 Result Area Specific Recommendations
5.2.3 Final Achievements and Lessons learned
5.3 Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery
of Services. ................................................................
5.3.1 BIDP Impact ................................
5.3.2 Result Area Specific Recommendations
5.3.3 Final Achievements and Lessons learned
5.4 Result 4: Public/Community Investments Prioritized in Development Plans are Implemented
with the Provision of Unconditional Block Grants to the District.
5.4.1 BIDP Impact ................................
5.4.2 Result Area Specific Recommendations
5.4.3 Final Achievements and Lessons learned
6 Assessment of the intervention
6.1 Basic criteria ................................
6.1.1 Relevance ................................
6.1.2 Efficiency................................
6.1.3 Effectiveness................................
6.1.4 Sustainability................................
6.1.5 Impact(s) ................................
6.1.6 Coherence................................
6.2 Transversal themes ................................
6.2.1 Gender ................................
6.2.2 Environment................................
6.2.3 Social economy................................
Belgian Development Agency
TABLE OF CONTENTS
................................................................................................
................................................................................................................................
Presentation of the Intervention...............................................................................................
Geographical Understanding of Bundibugyo District................................
............................................................................................................................
................................................................................................
Historical Context of the Intervention................................................................
Social and Economic Context................................................................................................
Political and Institutional Context.............................................................................................
................................................................................................
up of recommendations................................................................................................
term Review ................................................................................................
Implementation and achievements ............................................................................................
Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
Mechanisms are operationalized.................................................................................................
................................................................................................
Result area Specific Recommendations................................................................
Final Achievements and Lessons learned......................................................................................
Results 2: Local Revenue Generation & Mobilization to Sustain Investments &
................................................................................................................................
................................................................................................
Result Area Specific Recommendations................................................................
Final Achievements and Lessons learned ................................................................
Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery
................................................................................................
................................................................................................
Area Specific Recommendations................................................................
Final Achievements and Lessons learned ................................................................
Result 4: Public/Community Investments Prioritized in Development Plans are Implemented
with the Provision of Unconditional Block Grants to the District.........................................................
................................................................................................
Result Area Specific Recommendations................................................................
Final Achievements and Lessons learned ................................................................
Assessment of the intervention................................................................................................
..........................................................................................................................
................................................................................................
.......................................................................................................................
................................................................................................
................................................................................................
.......................................................................................................................
................................................................................................
................................................................................................
..........................................................................................................................
................................................................................................
................................................................................................
vi
........................................................i
.....................................1
...............................1
......................................................2
............................3
...............................................4
.......................................................4
..................................5
.............................6
....................................................7
....................................9
......................................9
............................12
Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
.......................................12
..................................................13
.......................................15
......................15
Results 2: Local Revenue Generation & Mobilization to Sustain Investments & Recurrent
................................17
..................................................18
.......................................18
....................................19
Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery
.........................................19
..................................................21
.......................................21
....................................21
Result 4: Public/Community Investments Prioritized in Development Plans are Implemented
........................23
..................................................23
.......................................23
....................................24
..................................26
..........................26
.....................................................26
.......................29
.................................................30
.................................................31
.......................32
.....................................................34
...............................................35
..........................35
..................................................35
.............................................36
BIDP Final Evaluation Report
6.2.4 Children’s Rights ................................
6.2.5 HIV and Aids ................................
6.3 HARMO-criteria ................................
6.3.1 Harmonisation................................
6.3.2 Alignment ................................
6.3.3 Result-based management
6.3.4 Mutual responsibility
6.3.5 Ownership ................................
7 Practices to retain ................................
7.1 Structure & Staffing of the intervention
7.2 Resource management (financial, human & material)
7.3 Planning & Implementation
7.4 Monitoring & Evaluation................................
7.5 Documentation & Reporting
7.6 Implementation of New Technologies
7.7 Networking................................
8 Lessons learned ................................
8.1 For the Intervention................................
8.2 For the Partner Institution
8.3 For the JLCB................................
8.4 For the Donor................................
9 Conclusions................................
9.1 Recommendations regarding a possible BIDP II
10 Annexes................................................................
Annex 1: Objectives and Context of the Final Evaluation
Annex 2: FE Team Mobilisation................................
Annex 3: People Met/Interviewed for the BIDP FE
Annex 4: Literature (Desk) Review:
Annex 5: Review of Findings from Other Evaluations
BIDP Final Report 2005-09
MoLG Monitoring Report................................
Local Government Sector Investment Plan (LGSIP)
The Harmonized Participatory Planning Process in Bundibugyo
Guidelines for LG M&E Systems Process in Bundibugyo
Review of the Impact of Capacity Development by BIDP
Annex 6: Criteria Themes of the BIDP
Relevance ................................
Efficiency................................
Effectiveness................................
Sustainability................................
Coherence................................
Impact................................................................
Transversal themes................................
HARMO-criteria................................
Annex 7: The BIDU FE Team and Field Strategy:
Quantitative Data Collection
Belgian Development Agency
................................................................................................
................................................................................................
................................................................................................
................................................................................................
......................................................................................................................
ed management...........................................................................................
Mutual responsibility................................................................................................
................................................................................................
........................................................................................................................
Structure & Staffing of the intervention................................................................
Resource management (financial, human & material) ..........................................................
Planning & Implementation................................................................................................
................................................................................................
Documentation & Reporting................................................................................................
Implementation of New Technologies ................................................................
.............................................................................................................................
...........................................................................................................................
................................................................................................
For the Partner Institution ................................................................................................
..........................................................................................................................
.........................................................................................................................
................................................................................................................................
Recommendations regarding a possible BIDP II................................................................
................................................................................................
and Context of the Final Evaluation ................................................................
................................................................................................
Annex 3: People Met/Interviewed for the BIDP FE................................................................
Annex 4: Literature (Desk) Review:................................................................................................
Annex 5: Review of Findings from Other Evaluations ................................................................
................................................................................................
................................................................................................
Government Sector Investment Plan (LGSIP) ................................................................
The Harmonized Participatory Planning Process in Bundibugyo ................................
Guidelines for LG M&E Systems Process in Bundibugyo .........................................................
Review of the Impact of Capacity Development by BIDP..........................................................
Annex 6: Criteria Themes of the BIDP ...............................................................................................
................................................................................................................................
................................................................................................................................
..............................................................................................................................
..............................................................................................................................
................................................................................................................................
................................................................................................
................................................................................................
..........................................................................................................................
Annex 7: The BIDU FE Team and Field Strategy:................................................................
Quantitative Data Collection ................................................................................................
vii
...........................................36
.................................................37
.....................................................37
...............................................37
......................38
...........................38
......................................38
.....................................................38
........................39
..................................................39
..........................39
....................................39
.........................................39
...................................40
...................................................40
.............................40
...........................41
................................................41
......................................41
..........................42
.........................42
..................................42
...................................43
.........................................44
..................................44
..........................................45
.............................................46
....................................48
........................................49
........................................49
............................................49
.................................50
..............................................50
.........................51
..........................52
...............................53
..................................53
....................................53
..............................53
..............................53
..................................53
.........................................54
....................................................54
..........................54
..............................................56
......................................57
BIDP Final Evaluation Report
Video (DVD) of the BIDP................................
BIDP Project Evaluation by the Civil Engineer
Annex 8: Field Findings of the BIDP Attitude Survey
Annex 9: Field Findings of Infrastructure Projec
Annex 10: BIDP FE - Work Plan................................
List of Figures, Charts
FIGURE 1: MAP OF UGANDA................................
FIGURE 2: BIDP SUPPORT & INTERACTI
FIGURE 3: MAP OF THE PROJECT AREA
FIGURE 4: PUBLIC AWARENESS MESSAGES ON BUILDING
FIGURE 5: POVERTY TRENDS IN BUNDIBUGYO
FIGURE 6: A TYPICAL CLASSROOM SITU
FIGURE 7: A WOMAN FORDING A STREAM IN
FIGURE 8: THE SOURCE WORKS FOR ONE OF THE GRAVITY F
FIGURE 9: KNOWLEDGE ABOUT BIDP AMONG RESPONDENTS
FIGURE 10: STORIES OF FRAUD OR BRIBES
FIGURE 11: SATISFACTION WITH UTILISATION OF
FIGURE 12: LEVEL OF SATISFACTION ON
FIGURE 13: COMMUNITY CRITICAL NEEDS AND
FIGURE 14: CHANGE IN COMMUNITY G
FIGURE 15: CRITICAL NEEDS AND PRIORITIES OF
FIGURE 16: NEEDS AND CONCERNS OF
FIGURE 17: NEEDS OF THE ILL ADDRESSED UNDER
FIGURE 18: ENVIRONMENT ISSUES ADDRESSED
FIGURE 19: A DAILY MARKET CONSTRU
FIGURE 20: EFFECTIVE USE OF RESOURCES UNDER
FIGURE 21: PERCEIVED PROJECT IMPACT
FIGURE 22: WATER COVERAGE FOR A
FIGURE 23: DISTANCE TO NEAREST WATER POINT
FIGURE 24: REDUCTION IN WATER BORN
FIGURE 25: IMPLEMENTATION RATE OF DEVELOPMENT PLANS
FIGURE 26: DISTRIBUTION OF WOMEN
FIGURE 27: CHILDREN USING ONE OF THE MANY WATER POINT
FIGURE 28: DISTRIBUTION OF COMMUNITY GROUPS
FIGURE 29: EDUCATION PERFORMANCE
FIGURE 30: EDUCATION ENROLLMENT
FIGURE 31: HIV SEROPREVALENCE................................
FIGURE 32: EXAMPLE OF AN NGO CREATED DURING THE
FIGURE 33: BIDP FE VIDEO TEAM FILMING A
FIGURE 34: SCHOOL FUNDED BY BIDP.
FIGURE 35: A DRAMA GROUP USED BY
List of Tables
TABLE 1: FINDINGS FROM THE MIDTERM
TABLE 2: LESSONS LEARNED UNDER R
TABLE 3: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN
DEFINED.
TABLE 4: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN
DEFINED.
TABLE 5: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN
DEFINED.
TABLE 6: ISSUES ANTICIPATED BY THE
DEFINED.
Belgian Development Agency
................................................................................................
BIDP Project Evaluation by the Civil Engineer ................................................................
Annex 8: Field Findings of the BIDP Attitude Survey ................................................................
Annex 9: Field Findings of Infrastructure Projects................................................................
................................................................................................
Charts & Photos
........................................................................................................................
INTERACTIONS WITH KEY STAKEHOLDERS..........................................................
REA ................................................................................................
AGES ON BUILDING ................................................................
UNDIBUGYO 2005-10................................................................
TUATION IN THE DISTRICT ................................................................
AM IN BUNDIBUGYO ................................................................
ONE OF THE GRAVITY FLOW WATER SUPPLY PROJECTS ...........................
AMONG RESPONDENTS ................................................................
RIBES ................................................................................................
TILISATION OF TAXES PAID TO DISTRICT OFFICIALS................................
ATISFACTION ON PERFORMANCE OF THE HEALTH PROGRAM ................................
EEDS AND PRIORITIES PRIOR TO BIDP................................
GENDER PERCEPTIONS................................................................
RIORITIES OF WOMEN ADDRESSED BY BIDP ................................
ONCERNS OF CHILDREN ......................................................................................
ESSED UNDER BIDP ................................................................
DDRESSED..........................................................................................
DAILY MARKET CONSTRUCTED BY BIDP................................................................
ESOURCES UNDER BIDP................................................................
MPACT ................................................................................................
ATER COVERAGE FOR A UNIT OF POPULATION ................................................................
ATER POINT.......................................................................................
RNE DISEASES IN THE DISTRICT...........................................................
F DEVELOPMENT PLANS ................................................................
GROUPS...........................................................................................
THE MANY WATER POINTS FUNDED BY BIDP................................
NITY GROUPS................................................................
ERFORMANCE ................................................................................................
................................................................................................
................................................................................................
CREATED DURING THE BIDP................................................................
EAM FILMING A VHT MEETING................................................................
BIDP. NOTE THE HANDICAP RAMP ACCESS ................................
DRAMA GROUP USED BY BIDP ..............................................................................................
IDTERM REVIEW ....................................... ERROR! BOOKMARK NOT DEFINED
RESULT AREA 1................................. ERROR! BOOKMARK NOT DEFINED
D LESSONS LEARNED UNDER RESULT AREA 2........ERROR!
D LESSONS LEARNED UNDER RESULT AREA 3........ERROR!
D LESSONS LEARNED UNDER RESULT AREA 4........ERROR!
THE FE TEAM BEFORE GOING TO THE FIELDWORK...ERROR!
viii
............................................58
..........................................58
.........................................60
..............................................71
.........................................77
........................VI
..........................1
........................................2
...............................................4
.................................................5
.......................................6
.............................................7
...........................8
......................................13
................................15
..................................18
....................................21
.................................................26
.......................................27
..........................................27
......................28
............................................28
..........................29
.................................................30
..........................................31
..................................32
........................................33
.......................33
...........................34
......................................34
...........................35
........................................35
.....................................................36
.....................................37
........................................37
............................................37
...................................52
........................................58
................................................58
..............................59
OOKMARK NOT DEFINED.
OOKMARK NOT DEFINED.
BOOKMARK NOT
BOOKMARK NOT
BOOKMARK NOT
BOOKMARK NOT
BIDP Final Evaluation Report
.
Belgian Development Agency
Photos by Henry Kellam, Simon Otoi, Brenda Amanda & Rogers Baguma
ix
& Rogers Baguma
BIDP Final Evaluation Report
1 EXECUTIVE SUMMARY
Before BIDP began, Bundibugyo
bordering the Democratic Republic of
reach and had mostly impassable roads
diseases, including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS.
and sanitation coverage was extremely poor with people either drinking from contaminated rivers or
walking average distances of over 10km to access clean water. The
Index (HDI) was one of the lowest in Uganda. The district f
retain a good human resource base.
The Kingdom of Belgium and Government of Uganda
decentralization process with special emphasis on human resources and institutional developme
together with specific actions for improving the livelihoods of the population. The design
coordination with other donor initiatives to strengthen the capacity of the local authorities and key
stakeholders like local NGO’s/CBO’s to maximize
The evaluation was based on four ‘Result Areas’
Result Area 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
Mechanisms are operationalized
‘Without external assistance’
1. 80% of LGs are able to prepare and approve the budgets within the prescribed period without
external assistance
2. 80% of sub-county budgets approved first time without being referred back
assistance’
3. 60% of the local governments use baseline survey data / information in their planning and
monitoring exercises
4. 70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external
assistance, as checked by the national assessment team.
5. 65% of the data required by LOGICS is available.
6. 50% of the staff and political leaders using the data in management decisions.
The findings from the FE based on
interviews and document review reveal th
(80%+) especially for indicators 1, 2, 3
of LOGICS data due to technical problems such as limited skills, lack of computers, etc. Dis
sub-county officials have the capacity required to prepare budgets within set timelines and without
external assistance. The use of baseline surveys in the development process and compliance to
MOLG guidelines are adhered to.
Result Area 2: Local Revenue Generation & Mobilization to Sustain Investments & Recurrent
Cost is improved
Local revenue collection capacity and downward accountability has been enhanced through preparation
of ordinances for local revenue collection. A data bank for loca
training on local revenue carried out. Downward accountability training was done and notice boards
erected in 33 parishes in the District.
mobilisation aimed up improving the ability of HLGs and LLGs to meet their recurrent costs and co
funding obligations in a sustainable manner.
by 20% for each successive year, HLGs and LLGs meeting co
score of 7+ on communication and accountability.
Findings based on Focus group discussions, key informant interviews and literature review reveal that:
1
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
report findings, lessons learned, conclusions, recommendations.
Belgian Development Agency
EXECUTIVE SUMMARY
Before BIDP began, Bundibugyo was a marginalised district in the western region of Uganda
Democratic Republic of Congo. The district faced challenges of poverty,
impassable roads, very low literacy rates and was at high risk of
including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS.
was extremely poor with people either drinking from contaminated rivers or
walking average distances of over 10km to access clean water. The District Human Development
Index (HDI) was one of the lowest in Uganda. The district faced a very high staff turnover and fail
retain a good human resource base.
and Government of Uganda designed the BIDP to support the
decentralization process with special emphasis on human resources and institutional developme
improving the livelihoods of the population. The design
with other donor initiatives to strengthen the capacity of the local authorities and key
stakeholders like local NGO’s/CBO’s to maximize on local service delivery.
four ‘Result Areas’. The following reveals the BIDP FE key
Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
80% of LGs are able to prepare and approve the budgets within the prescribed period without
county budgets approved first time without being referred back ‘without external
local governments use baseline survey data / information in their planning and
70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external
assistance, as checked by the national assessment team.
data required by LOGICS is available.
50% of the staff and political leaders using the data in management decisions.
the household survey, focus group discussions and key informant
review reveal that BIDP has been able to substantially deliver on result 1
(80%+) especially for indicators 1, 2, 3 and 4 but not on indicator 5 relating to availability and usage
of LOGICS data due to technical problems such as limited skills, lack of computers, etc. Dis
county officials have the capacity required to prepare budgets within set timelines and without
external assistance. The use of baseline surveys in the development process and compliance to
Local Revenue Generation & Mobilization to Sustain Investments & Recurrent
Local revenue collection capacity and downward accountability has been enhanced through preparation
of ordinances for local revenue collection. A data bank for local revenue sources was established and
training on local revenue carried out. Downward accountability training was done and notice boards
erected in 33 parishes in the District. Result area 2 emphasised enhanced revenue generation and
improving the ability of HLGs and LLGs to meet their recurrent costs and co
funding obligations in a sustainable manner. The indicators under result 2 were: local revenue increased
by 20% for each successive year, HLGs and LLGs meeting co-funding obligations and achieve MOLG
score of 7+ on communication and accountability.
Findings based on Focus group discussions, key informant interviews and literature review reveal that:
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
report findings, lessons learned, conclusions, recommendations.
i
a marginalised district in the western region of Uganda
faced challenges of poverty, was hard to
communicable
including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS. Safe water
was extremely poor with people either drinking from contaminated rivers or
Human Development
aced a very high staff turnover and failed to
BIDP to support the
decentralization process with special emphasis on human resources and institutional development,
improving the livelihoods of the population. The design emphasised
with other donor initiatives to strengthen the capacity of the local authorities and key
FE key findings1
:
Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring
80% of LGs are able to prepare and approve the budgets within the prescribed period without
‘without external
local governments use baseline survey data / information in their planning and
70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external
the household survey, focus group discussions and key informant
at BIDP has been able to substantially deliver on result 1
relating to availability and usage
of LOGICS data due to technical problems such as limited skills, lack of computers, etc. District and
county officials have the capacity required to prepare budgets within set timelines and without
external assistance. The use of baseline surveys in the development process and compliance to
Local Revenue Generation & Mobilization to Sustain Investments & Recurrent
Local revenue collection capacity and downward accountability has been enhanced through preparation
l revenue sources was established and
training on local revenue carried out. Downward accountability training was done and notice boards
Result area 2 emphasised enhanced revenue generation and
improving the ability of HLGs and LLGs to meet their recurrent costs and co-
The indicators under result 2 were: local revenue increased
ns and achieve MOLG
Findings based on Focus group discussions, key informant interviews and literature review reveal that:
The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
BIDP Final Evaluation Report
• All ten sub-counties and the HLG are conversant with MOLG assessments on communica
and accountability
• Local revenue collection has improved although revenue mobilization and transparency is still
a challenge despite the above positive findings. FE household survey revealed that 81% of
the respondents were however less satisfied with
district officials.
• Staff capacity building courses were attended and local staff training were customised to meet
knowledge gaps in revenue mobilization and collection
• The social mobilisation strategy was finalis
shall be utilised for similar future projects
Result Area 3: Capacity of LG & Other Local Stakeholders is improved to Ensure Proper
Delivery of Services
Result area 3 of the BIDP focused on strengthening the capacity of local government and other local
stakeholders to ensure proper delivery of services. This result area aimed at improving the social
wellbeing of local people through improved access to bas
reduce the number of people living below the poverty line in Bundibugyo District.
The findings from the focus group discussions, key informant interviews and the household survey
reveal that:
• All responsible staff of LLGs and HLG are familiar with and fully understanding tender and
contract procedures
• All LLGs and HLG largely follow national procedures in the budgeting, tender and contract
process
• The District Service Commission and Council are in place and functio
• The district and budgeting process is realistic, timely and adheres to national guidelines
• The tender and contracts process faced hiccups in its implementation but slowly smoothening
out with the introduction of the sealed
Result Area 4: Public/Community Investments Prioritized in Development Plans are
implemented with the Provision of Unconditional Block Grants to the District
Result area 4 aimed at increasing focus and delivery of public and community investments through
utilisation of the unconditional block grants. The programme worked towards increasing community
access to basic social services at district and sub
investments in the HLG and LLGs development plans. The participatory approach inv
community enabled identification of priority investments some of which were implemented through
approved district and sub-county development plans.
Support to District Development Plan and Sub County Development Plans involved mainly
infrastructure development. Several Gravity flow schemes have been built and this has resulted into
the reduction of water borne diseases which were rampant in the District. Other infrastructure include
construction of teachers houses, roads, fish pods for
and immunization, immunization centers, Functional Adult Literacy class structures, market shelters,
classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment
among others.
FE findings from the key informant interviews, focus group discussions, and the household survey
reveal that:
• There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes,
schools, health units and community hall.
• Community utilisation and maintenance of established projects is over 70% with record
keeping maintained at district and sub
Belgian Development Agency
counties and the HLG are conversant with MOLG assessments on communica
Local revenue collection has improved although revenue mobilization and transparency is still
despite the above positive findings. FE household survey revealed that 81% of
the respondents were however less satisfied with the utilisation of the taxes they pay to
Staff capacity building courses were attended and local staff training were customised to meet
knowledge gaps in revenue mobilization and collection
The social mobilisation strategy was finalised and the experience offered learning to staff that
shall be utilised for similar future projects
Capacity of LG & Other Local Stakeholders is improved to Ensure Proper
Result area 3 of the BIDP focused on strengthening the capacity of local government and other local
stakeholders to ensure proper delivery of services. This result area aimed at improving the social
wellbeing of local people through improved access to basic social services that would eventually
reduce the number of people living below the poverty line in Bundibugyo District.
The findings from the focus group discussions, key informant interviews and the household survey
of LLGs and HLG are familiar with and fully understanding tender and
All LLGs and HLG largely follow national procedures in the budgeting, tender and contract
The District Service Commission and Council are in place and functioning
The district and budgeting process is realistic, timely and adheres to national guidelines
The tender and contracts process faced hiccups in its implementation but slowly smoothening
out with the introduction of the sealed-bids system
Public/Community Investments Prioritized in Development Plans are
implemented with the Provision of Unconditional Block Grants to the District
Result area 4 aimed at increasing focus and delivery of public and community investments through
he unconditional block grants. The programme worked towards increasing community
access to basic social services at district and sub-county levels through inclusion of public
investments in the HLG and LLGs development plans. The participatory approach involving the local
community enabled identification of priority investments some of which were implemented through
county development plans.
Support to District Development Plan and Sub County Development Plans involved mainly
infrastructure development. Several Gravity flow schemes have been built and this has resulted into
the reduction of water borne diseases which were rampant in the District. Other infrastructure include
construction of teachers houses, roads, fish pods for demonstration, cattle crushes used for spraying
and immunization, immunization centers, Functional Adult Literacy class structures, market shelters,
classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment
FE findings from the key informant interviews, focus group discussions, and the household survey
There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes,
schools, health units and community hall.
nity utilisation and maintenance of established projects is over 70% with record
keeping maintained at district and sub-county levels.
ii
counties and the HLG are conversant with MOLG assessments on communication
Local revenue collection has improved although revenue mobilization and transparency is still
despite the above positive findings. FE household survey revealed that 81% of
the utilisation of the taxes they pay to
Staff capacity building courses were attended and local staff training were customised to meet
ed and the experience offered learning to staff that
Capacity of LG & Other Local Stakeholders is improved to Ensure Proper
Result area 3 of the BIDP focused on strengthening the capacity of local government and other local
stakeholders to ensure proper delivery of services. This result area aimed at improving the social
ic social services that would eventually
The findings from the focus group discussions, key informant interviews and the household survey
of LLGs and HLG are familiar with and fully understanding tender and
All LLGs and HLG largely follow national procedures in the budgeting, tender and contract
The district and budgeting process is realistic, timely and adheres to national guidelines
The tender and contracts process faced hiccups in its implementation but slowly smoothening
Public/Community Investments Prioritized in Development Plans are
Result area 4 aimed at increasing focus and delivery of public and community investments through
he unconditional block grants. The programme worked towards increasing community
county levels through inclusion of public
olving the local
community enabled identification of priority investments some of which were implemented through
Support to District Development Plan and Sub County Development Plans involved mainly
infrastructure development. Several Gravity flow schemes have been built and this has resulted into
the reduction of water borne diseases which were rampant in the District. Other infrastructure include
demonstration, cattle crushes used for spraying
and immunization, immunization centers, Functional Adult Literacy class structures, market shelters,
classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment
FE findings from the key informant interviews, focus group discussions, and the household survey
There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes,
nity utilisation and maintenance of established projects is over 70% with record
BIDP Final Evaluation Report
• Village User Committees are in place and through social mobilisation; local communities are
able to maintain the investme
• There has been more than 50% increase in social services enjoyed by local community as
compared to 5 years ago.
The quality of life has improved in as far as access to clean and safe water, access to basic
education, access to health services, access to markets and literacy on environmental protection.
Evaluation of the BIDP using the Basic Criteria
BIDP was very relevant in that it helped equalize
in a marginalized low HDI region
mechanisms BIDP employed to support the decentralisation process through capacity building and
support to projects identified in the District and Sub
The infrastructure investments including water supplies, roads, schools buildings, health centres and
capacity building were relevant to the needs and expectations of the communities in the two districts.
The intervention has addressed only a po
and staff houses and water. Staff houses are particularly significant in the remote mountainous areas
of Bundibugyo District and also in the vast plains of Ntoroko District.
Understaffing and high staff turnover
efficiency. Most inputs were implemented as planned.
weak regarding ‘across the board’ awareness of roles and
Efficiency was also hampered because the National Government did not take all steps to finance the
project according to the Specific Agreement. The district is still understaffed in key departments that
implement the participatory planning and decentralization process. Almost all of the BIDP
implemented inputs were done within the planned timeframe. Efficiency would have been greatly
improved through a sector-wide integrated M&E system that places emphasis on the mon
& responsibilities of all stakeholders.
Efficiency of the infrastructure investments
are in place. The implementation component of
norms of good practice. The community mobilisation for O&M was also done for some of the
infrastructure.
The effectiveness of the BIDP was demonstrated by the f
reveal satisfaction with the investments done in
improved quality of their lives. Community consultation findings, particularly the household survey,
further indicate that BIDP resources were effectively used
of them having been completed more than 12 months before the evaluation. The classrooms and staff
houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10
micro-projects visited and also based on key informant interv
informant), Fisheries Officer, DCDO and the DEO.
mostly satisfied with the delivered results. The micro
projects in all the sectors of the investments.
Capacity building continued to burden the overall
sustain long-term impacts relative to decentralisation by promoting a b
understanding of work practices of local government staff.
Impacts of the BIDP on the District were and remain r
marginalized District. Strong impacts
of access (greater coverage/population)
planning processes, health and education
nearest water points was 5+ km but by
large impacts with the modest investments.
The coherence of BIDP was demonstrated by the fact that it
the Kasese District Poverty Reduction Programme (K
Belgian Development Agency
Village User Committees are in place and through social mobilisation; local communities are
able to maintain the investments like: water supply and markets.
There has been more than 50% increase in social services enjoyed by local community as
The quality of life has improved in as far as access to clean and safe water, access to basic
access to health services, access to markets and literacy on environmental protection.
Evaluation of the BIDP using the Basic Criteria
in that it helped equalize Bundibugyo (and Ntoroko) District and
low HDI region and was in line with the Paris Declaration. The strategy and
mechanisms BIDP employed to support the decentralisation process through capacity building and
support to projects identified in the District and Sub-County Development was very relevant.
including water supplies, roads, schools buildings, health centres and
capacity building were relevant to the needs and expectations of the communities in the two districts.
The intervention has addressed only a portion of the needs, which include primary school classrooms
and staff houses and water. Staff houses are particularly significant in the remote mountainous areas
of Bundibugyo District and also in the vast plains of Ntoroko District.
h staff turnover limited the capacity to fully absorb BIDP, thus limiting its
implemented as planned. The implementation of M&E
‘across the board’ awareness of roles and responsibilities of all stakeholders.
Efficiency was also hampered because the National Government did not take all steps to finance the
project according to the Specific Agreement. The district is still understaffed in key departments that
e participatory planning and decentralization process. Almost all of the BIDP
implemented inputs were done within the planned timeframe. Efficiency would have been greatly
wide integrated M&E system that places emphasis on the mon
& responsibilities of all stakeholders.
infrastructure investments was very good since the large majority of the investments
component of infrastructure was done largely in accordance with t
norms of good practice. The community mobilisation for O&M was also done for some of the
of the BIDP was demonstrated by the findings from the local beneficiaries
reveal satisfaction with the investments done in their community as these directly contributed to
improved quality of their lives. Community consultation findings, particularly the household survey,
further indicate that BIDP resources were effectively used. All of the micro-projects are surviving, most
of them having been completed more than 12 months before the evaluation. The classrooms and staff
houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10
projects visited and also based on key informant interviews with the CAO, Ag. DE (main
informant), Fisheries Officer, DCDO and the DEO. The FE Team found that the communities were
mostly satisfied with the delivered results. The micro-projects contributed to fill a large need for micro
sectors of the investments. The effectiveness of the intervention was therefore high.
Capacity building continued to burden the overall impacts achieved. A BIDP II would be required to
term impacts relative to decentralisation by promoting a better organisational
understanding of work practices of local government staff.
Impacts of the BIDP on the District were and remain relative to the many challenges
marginalized District. Strong impacts were made (directly and indirectly by BIDP support)
(greater coverage/population) to water, reduction to water borne diseases, participatory
health and education. Before 2005 average distance villagers had to walk to
but by 2010 water point distance was less than 1 km, thus achieving
large impacts with the modest investments.
of BIDP was demonstrated by the fact that it was in-line with other BTC programs like
the Kasese District Poverty Reduction Programme (KDPRP) as well as the Belgium Development
iii
Village User Committees are in place and through social mobilisation; local communities are
There has been more than 50% increase in social services enjoyed by local community as
The quality of life has improved in as far as access to clean and safe water, access to basic
access to health services, access to markets and literacy on environmental protection.
District and Communities
in line with the Paris Declaration. The strategy and
mechanisms BIDP employed to support the decentralisation process through capacity building and
levant.
including water supplies, roads, schools buildings, health centres and
capacity building were relevant to the needs and expectations of the communities in the two districts.
rtion of the needs, which include primary school classrooms
and staff houses and water. Staff houses are particularly significant in the remote mountainous areas
, thus limiting its
and O&M was
responsibilities of all stakeholders.
Efficiency was also hampered because the National Government did not take all steps to finance the
project according to the Specific Agreement. The district is still understaffed in key departments that
e participatory planning and decentralization process. Almost all of the BIDP
implemented inputs were done within the planned timeframe. Efficiency would have been greatly
wide integrated M&E system that places emphasis on the monitoring roles
was very good since the large majority of the investments
was done largely in accordance with the
norms of good practice. The community mobilisation for O&M was also done for some of the
indings from the local beneficiaries which
their community as these directly contributed to
improved quality of their lives. Community consultation findings, particularly the household survey,
projects are surviving, most
of them having been completed more than 12 months before the evaluation. The classrooms and staff
houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10
iews with the CAO, Ag. DE (main
The FE Team found that the communities were
projects contributed to fill a large need for micro-
The effectiveness of the intervention was therefore high.
achieved. A BIDP II would be required to
etter organisational
challenges faced in
upport) in the areas
to water, reduction to water borne diseases, participatory
Before 2005 average distance villagers had to walk to
point distance was less than 1 km, thus achieving
line with other BTC programs like
DPRP) as well as the Belgium Development
BIDP Final Evaluation Report
Cooperation support for budget in decentralisation for MoLG. The BIDP is also in
all thematic areas. The BIDP also established coherence with other donor supported (both bi and
multi lateral) programs at the local government level.
Recommendations for a BIDP Follow
In order to improve on the relevance of BIDP, the Fi
program, or better yet a BIDP II (3
capture the momentum built during the period since the MTR
situation has improved as observed in a recent MoLG report
District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement
noted in 2010 presumably as a result of the new administration. This was evidenced by the District
and all LLGs meeting all the Minimum Conditions and none penalized in 2010”.
In the area of investments, relevant sector guidelines need to be followed in implementation of donor
supported projects to avoid conflicting with the sector regulat
include community mobilisation for operation and maintenance well before the implementation of the
infrastructure project. A BIDP II may consider a lower cost component funding of infrastructure and
balance more intensive inputs for capacity building in part
hold regular ‘over-the-border’ training.
If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts
of Bundibugyo and Ntoroko so that each district assumes respo
maintain its share of the investments. The lack of responsibility over these projects by the new district
of Ntoroko will impact negatively on their maintenance.
Further Areas to focus on if there is a Follow
BIDP was affected at some stage with issues of fraud and more safeguards are needed in
procurement, audit functions and improved monitoring/supervision on the implementation of contracts
in the District to ensure that fraud prevention is prioritised.
Not all sector implementation guidelines were followed in the implementation of the education and
water projects; E.g. MoES requires
and kitchen. O&M is critical for the sustainability of th
before construction of the project
supported by BIDP.
The TA support and Belgium Volunteers provided for BIDP
an advisory role. This must be accompanied by capacity building and training of key local government
staff. Emphasis must be made on having appropriate levels of qualified staff in place. The
the most appropriate individuals in key posit
framework with low salaries is critical, i.e. able to work in difficult places, flexible, culturally sensitive,
long-term commitment, etc.
The ability of the Resident Representative to engage with GoU
responsibilities in compliance with the Specific Agreement was critical for the BIDP and a BIDP II.
While including NGOs and CBOs
capacity gaps. Because they are also part of the community and know the needs and have direct
contact with key people to get things done, the investment was well worthwhile and should be a
priority if there is a BIDP II.
A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training
Assessment Survey and an evaluation of current M&E and O&M procedures.
2
The 3-5 year extension was also recommended in
3
The recommendations by the MTR were taken very seriously by the District. Many improvements were realized
through recommended realignments. Moreover, the political situation in the District has improved greatly
4
Annual Assessment of Minimum Conditions
Belgian Development Agency
Cooperation support for budget in decentralisation for MoLG. The BIDP is also in-line with LGSIP in
all thematic areas. The BIDP also established coherence with other donor supported (both bi and
rams at the local government level.
Recommendations for a BIDP Follow-up
In order to improve on the relevance of BIDP, the Final Evaluation (FE) believes an ex
, or better yet a BIDP II (3-5 years)2
, is justifiable and should be undertaken soon so as to
capture the momentum built during the period since the MTR
3
was completed. Moreover, the political
situation has improved as observed in a recent MoLG report
4
- “Although the performance of the
District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement
noted in 2010 presumably as a result of the new administration. This was evidenced by the District
the Minimum Conditions and none penalized in 2010”.
In the area of investments, relevant sector guidelines need to be followed in implementation of donor
supported projects to avoid conflicting with the sector regulatory bodies. These guidelines should
clude community mobilisation for operation and maintenance well before the implementation of the
may consider a lower cost component funding of infrastructure and
balance more intensive inputs for capacity building in partnership with KDRCDP to maximize cost
border’ training.
If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts
of Bundibugyo and Ntoroko so that each district assumes responsibility to complete, operate and
maintain its share of the investments. The lack of responsibility over these projects by the new district
of Ntoroko will impact negatively on their maintenance.
Further Areas to focus on if there is a Follow-up Program
BIDP was affected at some stage with issues of fraud and more safeguards are needed in
and improved monitoring/supervision on the implementation of contracts
in the District to ensure that fraud prevention is prioritised.
sector implementation guidelines were followed in the implementation of the education and
staff houses to include a rainwater harvesting tank, external toilets
is critical for the sustainability of the micro-project and mobilisation must be done
and there should be a review of the O&M of the micro
The TA support and Belgium Volunteers provided for BIDP did a good job and is most appropria
an advisory role. This must be accompanied by capacity building and training of key local government
staff. Emphasis must be made on having appropriate levels of qualified staff in place. The
the most appropriate individuals in key positions and how to achieve this in a weak institutional
critical, i.e. able to work in difficult places, flexible, culturally sensitive,
Resident Representative to engage with GoU to ensure that they carry out their
with the Specific Agreement was critical for the BIDP and a BIDP II.
and CBOs resulted in higher costs for BIDP, they greatly helped fill in the
capacity gaps. Because they are also part of the community and know the needs and have direct
contact with key people to get things done, the investment was well worthwhile and should be a
A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training
Assessment Survey and an evaluation of current M&E and O&M procedures.
5 year extension was also recommended in BIDP Final Report October 2009.
The recommendations by the MTR were taken very seriously by the District. Many improvements were realized
through recommended realignments. Moreover, the political situation in the District has improved greatly
Annual Assessment of Minimum Conditions
iv
line with LGSIP in
all thematic areas. The BIDP also established coherence with other donor supported (both bi and
nal Evaluation (FE) believes an extension of the
taken soon so as to
was completed. Moreover, the political
“Although the performance of the
District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement
noted in 2010 presumably as a result of the new administration. This was evidenced by the District
In the area of investments, relevant sector guidelines need to be followed in implementation of donor
bodies. These guidelines should
clude community mobilisation for operation and maintenance well before the implementation of the
may consider a lower cost component funding of infrastructure and
KDRCDP to maximize cost; E.g.
If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts
nsibility to complete, operate and
maintain its share of the investments. The lack of responsibility over these projects by the new district
BIDP was affected at some stage with issues of fraud and more safeguards are needed in
and improved monitoring/supervision on the implementation of contracts
sector implementation guidelines were followed in the implementation of the education and
rainwater harvesting tank, external toilets
mobilisation must be done
of the micro-projects
is most appropriate as
an advisory role. This must be accompanied by capacity building and training of key local government
staff. Emphasis must be made on having appropriate levels of qualified staff in place. The selection of
ions and how to achieve this in a weak institutional
critical, i.e. able to work in difficult places, flexible, culturally sensitive,
to ensure that they carry out their
with the Specific Agreement was critical for the BIDP and a BIDP II.
for BIDP, they greatly helped fill in the
capacity gaps. Because they are also part of the community and know the needs and have direct
contact with key people to get things done, the investment was well worthwhile and should be a
A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training
The recommendations by the MTR were taken very seriously by the District. Many improvements were realized
through recommended realignments. Moreover, the political situation in the District has improved greatly.
BIDP Final Evaluation Report
2 INTRODUCTION
2.1 Presentation of the
Bundibugyo Integrated Development Programme (BIDP) is a bilateral cooperation intervention
between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda.
A specific Agreement was signed by both parties on 20 December 2003 and ended
2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28
April 2005.The total amount of the budget
Bundibugyo Integrated Development
Programme supported the process of
decentralization by contributing to the
strengthening of Bundibugyo local
authorities’ capacity to improve
service delivery to the local
population. The project was build
upon two main strands: (i) a capacity
building component that focused on
areas such as participatory planning
and budgeting, financial
management, resource mobilization,
public/private partnership for service
delivery, accountability and
monitoring, and, (ii) the provision of
small and reliable unconditional
grants to Bundibugyo District Council
and the 10 sub-counties of the district
used on non-wage activities
according to development plans and
the approved budget. The diagram
shown on the right illustrates how
BIDP coordinated and interacted
with key stakeholders as a
facilitator for implementation
which was based on a co
management arrangement.
BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration
(extended by one year) in which the partie
the development needs and priorities of the people in Bundibugyo district. BIDP was implemented
within the decentralisation policy framework of Government of Uganda. The BIDP program
the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District
Rural Community Development Programme. In 2006 when the Ministry of Local Government
developed the Local Government Sector Investment Plan (LGSIP), Belgi
Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to
support LGSIP basket fund. Further cooperation modalities, links to local government and sector
support areas of Education and Health we
The GoU-BTC five year support to the decentralisation policy through BIDP aimed at improving the
standard of living of people in the Bundibugyo district with an emphasis on those that are most
vulnerable to poverty. The programme aimed at enhancing the capacity of the district to attain
improved and sustainable service delivery at the district and lower local government levels based on
participatory good governance principles. Whereas implementation of BI
and was expected to end in December 2009, it was subsequently extended to December 2010.
Belgian Development Agency
District/Sub-LG
stakeholders, citizens,
CSOs, NGOs Chiefs,
Sub-county officials
CAO, JLCB, BTC/TA
technical officers,
Sector Heads/
Directors.
Embassy & BTC
officials, Government
of Uganda Officials
BIDP
INTRODUCTION
resentation of the Intervention
yo Integrated Development Programme (BIDP) is a bilateral cooperation intervention
between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda.
A specific Agreement was signed by both parties on 20 December 2003 and ended on 19 December
2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28
April 2005.The total amount of the budget was EUR 3,500,000.
Integrated Development
the process of
decentralization by contributing to the
strengthening of Bundibugyo local
authorities’ capacity to improve
service delivery to the local
build
) a capacity
on
areas such as participatory planning
and budgeting, financial
management, resource mobilization,
public/private partnership for service
delivery, accountability and
monitoring, and, (ii) the provision of
l and reliable unconditional
grants to Bundibugyo District Council
counties of the district
wage activities
according to development plans and
The diagram
illustrates how
nd interacted
key stakeholders as a
facilitator for implementation,
which was based on a co-
BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration
in which the parties agreed on a set of interventions aimed at responding to
the development needs and priorities of the people in Bundibugyo district. BIDP was implemented
within the decentralisation policy framework of Government of Uganda. The BIDP program
the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District
Rural Community Development Programme. In 2006 when the Ministry of Local Government
developed the Local Government Sector Investment Plan (LGSIP), Belgium together with
Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to
support LGSIP basket fund. Further cooperation modalities, links to local government and sector
support areas of Education and Health were agreed upon between the GoU and Belgium in 2008.
BTC five year support to the decentralisation policy through BIDP aimed at improving the
standard of living of people in the Bundibugyo district with an emphasis on those that are most
to poverty. The programme aimed at enhancing the capacity of the district to attain
improved and sustainable service delivery at the district and lower local government levels based on
participatory good governance principles. Whereas implementation of BIDP commenced in June 2005
and was expected to end in December 2009, it was subsequently extended to December 2010.
Figure 2: BIDP Support & interactions with key
1
BTC/TA
chnical officers,
Sector Heads/
Directors.
yo Integrated Development Programme (BIDP) is a bilateral cooperation intervention
between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda.
on 19 December
2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28
BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration
s agreed on a set of interventions aimed at responding to
the development needs and priorities of the people in Bundibugyo district. BIDP was implemented
within the decentralisation policy framework of Government of Uganda. The BIDP program drew from
the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District
Rural Community Development Programme. In 2006 when the Ministry of Local Government
um together with UNDP/CDF,
Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to
support LGSIP basket fund. Further cooperation modalities, links to local government and sector
re agreed upon between the GoU and Belgium in 2008.
BTC five year support to the decentralisation policy through BIDP aimed at improving the
standard of living of people in the Bundibugyo district with an emphasis on those that are most
to poverty. The programme aimed at enhancing the capacity of the district to attain
improved and sustainable service delivery at the district and lower local government levels based on
DP commenced in June 2005
and was expected to end in December 2009, it was subsequently extended to December 2010.
upport & interactions with key stakeholders
BIDP Final Evaluation Report
This FE evaluation was therefore commissioned by BTC to specifically examine t
the program enhanced capacity of the district to offer improved service delivery to the Bundibugyo
community in key sectors of:
• Administration, community based organizations and private sector organizations
• Water and sanitation
• Education
• Health and environment
The final evaluation has assessed
shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO
transversal themes criteria.
2.1.1 Geographical Understanding
Bundibugyo District is located in the
western part of Uganda and has a
population of approx. 248,000
people based on annual population
growth rate of 5%. The district is
bordered by Hoima District to the
northeast, Kibale District to the east,
Kabarole District to the south, and
Democratic Republic of Congo to
the west and north. The district
geographical boundaries are: The
Semliki River to the west, the
Rwenzori Mountains to the East
and Lake Albert to the North. The
district lies at coordinates: 00 43N,
30 04E.
The District covers a total area of
2,338 km
2
. Of this area, open
waters, swamps and rivers, cover
570 km2
while 1,243 km2
is covered
by Mountains, forests, National
Parks (Semuliki and Mt. Rwenzori)
and forest reserves, 145 km
2
is
covered by game reserves and 380
km2
is the only area available for
human settlement.
The main economic activity of the
people of Bundibugyo is
subsistence agriculture and animal
husbandry. The main commercial
crops grown are coffee, cocoa, and
palm oil. Others include bananas,
matooke (plantain), rice, beans and
cassava while animal kept include:
cattle, goats, sheep, pigs and mules.
Belgian Development Agency
This FE evaluation was therefore commissioned by BTC to specifically examine the extent to which
enhanced capacity of the district to offer improved service delivery to the Bundibugyo
Administration, community based organizations and private sector organizations
the extent to which the programme achieved set objectives and
shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO
nderstanding of Bundibugyo District
Figure 3: Map of the Project Area
Bundibugyo District is located in the
a
248,000
people based on annual population
growth rate of 5%. The district is
bordered by Hoima District to the
northeast, Kibale District to the east,
Kabarole District to the south, and
Congo to
the west and north. The district
raphical boundaries are: The
to the west, the
to the East
to the North. The
district lies at coordinates: 00 43N,
The District covers a total area of
. Of this area, open
, cover
is covered
National
(Semuliki and Mt. Rwenzori)
is
covered by game reserves and 380
for
The main economic activity of the
people of Bundibugyo is
ubsistence agriculture and animal
husbandry. The main commercial
crops grown are coffee, cocoa, and
palm oil. Others include bananas,
, rice, beans and
cassava while animal kept include:
cattle, goats, sheep, pigs and mules.
2
he extent to which
enhanced capacity of the district to offer improved service delivery to the Bundibugyo
the extent to which the programme achieved set objectives and
shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO-criteria and
: Map of the Project Area
BIDP Final Evaluation Report
2.2 Methodology
The FE Team presented an Inception Report (IR)
understanding of the assignment, the proposed methodology, work
assignment. Also included in the report
Integrated Development Programme (BIDP). Upon presentation of th
made contact with key BIDP stakeholders at national, district, sub
field consultations, i.e. key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to
BIDP (based in Bundibugyo for 3 years), MOLG, MoF, Office of the Prime Minister
Kampala. Their views shaped the FE team’s understanding of the B
designing evaluation tools to review the BIDP that include the following:
Reflect on the situation before BIDP (2005)
have been implemented and
Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability.
Appreciate the achievements made
Analyse the recommendations of the MTR
Reflect on what they consider to be
planning, design, implementation, monitoring and evaluation stages
The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and
quantitative (household survey) data collection and analysis methodologies. In addition the FE
captured the extent to which BIDP achieved its intended objectives and results using Sight Sound and
Motion (SiSoMo) evaluation video capture and media production. A
presented for review before final professional production of the Evaluation DVDs and printed media.
The printed media includes summary pamphlets of selected success areas, pictorials and flyers.
Various categories of works including: roads,
according to the FE criteria.
Information generated through the above process
progress reports already collected and other important documents for cross referencing purposes.
As much as possible, given the challenges in the District, the FE has followed the methodology
outlined in the ToR developed by BTC. The depth and details of the FE depend
availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support
ended in 2010, the FE Team encounter
FE also had a very tight-time schedule considering the logistics problems (remoteness) and the
complexity of BIDP. The Team Leader
communication issues and team bonding dynamics
During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in
regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team
also met with a host of key government officials rele
Office, MoLG.
Detailed Methodology can be found in Annex
Belgian Development Agency
Inception Report (IR) to the MoLG on April 11, 2011 that detailed their
understanding of the assignment, the proposed methodology, work-plan and tools for undertaking the
assignment. Also included in the report were preliminary desk review findings related to Bundibugyo
Integrated Development Programme (BIDP). Upon presentation of the inception report, the FE
e contact with key BIDP stakeholders at national, district, sub-county and community
key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to
BIDP (based in Bundibugyo for 3 years), MOLG, MoF, Office of the Prime Minister and
Kampala. Their views shaped the FE team’s understanding of the BIDP Programme as well as
uation tools to review the BIDP that include the following:
situation before BIDP (2005) in the ten sub-counties where such interventions
have been implemented and analyze the impacts of BIDP on the District at close (2010).
Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability.
Appreciate the achievements made - Four Result Areas.
recommendations of the MTR (2007) and achievements/progress to date.
ect on what they consider to be good practices and vital lessons learnt
planning, design, implementation, monitoring and evaluation stages.
The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and
titative (household survey) data collection and analysis methodologies. In addition the FE
the extent to which BIDP achieved its intended objectives and results using Sight Sound and
Motion (SiSoMo) evaluation video capture and media production. A DVD and other media
presented for review before final professional production of the Evaluation DVDs and printed media.
summary pamphlets of selected success areas, pictorials and flyers.
ing: roads, water and buildings undertaken by BIDP
Information generated through the above process was enriched with secondary data such as
progress reports already collected and other important documents for cross referencing purposes.
As much as possible, given the challenges in the District, the FE has followed the methodology
oped by BTC. The depth and details of the FE depended
availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support
the FE Team encountered problems of ‘intuitional memory’ going back
time schedule considering the logistics problems (remoteness) and the
he Team Leader had to be flexible with the FE Team and try to manage difficult
communication issues and team bonding dynamics, etc.
During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in
regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team
also met with a host of key government officials relevant to the BIDP such as the Prime Minister’s
Detailed Methodology can be found in Annexes 7-9: The BIDU FE Team and Field Strategy.
3
, 2011 that detailed their
plan and tools for undertaking the
preliminary desk review findings related to Bundibugyo
inception report, the FE team
county and community levels for
key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to
and MOFPED in
IDP Programme as well as
counties where such interventions
District at close (2010).
Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability.
(2007) and achievements/progress to date.
lessons learnt from project
The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and
titative (household survey) data collection and analysis methodologies. In addition the FE
the extent to which BIDP achieved its intended objectives and results using Sight Sound and
DVD and other media were
presented for review before final professional production of the Evaluation DVDs and printed media.
summary pamphlets of selected success areas, pictorials and flyers.
undertaken by BIDP were reviewed
enriched with secondary data such as
progress reports already collected and other important documents for cross referencing purposes.
As much as possible, given the challenges in the District, the FE has followed the methodology
greatly on the
availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support
problems of ‘intuitional memory’ going back 5+ years. The
time schedule considering the logistics problems (remoteness) and the
flexible with the FE Team and try to manage difficult
During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in
regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team
vant to the BIDP such as the Prime Minister’s
: The BIDU FE Team and Field Strategy.
BIDP Final Evaluation Report
Figure 4: Public awareness messages on
3 BACKGROUND AND CONTE
3.1 Historical Context of the
Uganda experienced decades of political unrest until the 1990s, since when it has seriously
endeavored to maintain political stability, peace and annual economic growth. Despite the universal
spread of primary education there, literacy rates are still low.
mostly cost-related. Around 20% of Ugandans over 15 years of age have received no formal
education. Some 40% of the population suffers from disease, a rise of 11% compared with the period
2002-2003. Malaria accounts for half of all cases. On average, Ugandans have to travel 27
to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV
In November 2008, Uganda and Belgium signed a new Cooperation Programme
Following the successful implementation of the first Cooperation Programme (2005
committed a budget of €64 million, raising Uganda to
Development Cooperation. Belgium is paying
equality, the environment, social economy and the rights of the child.
Cooperation’s new programme is focusing
• Primary healthcare, especially buildin
management capacity; and
• Education, in particular institutions offering business, technical, vocational and health
training.5
The below photo shows one of the many
and in many instances local authorities do not have the adequate capacity and financial resources
necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of
5
http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/
Belgian Development Agency
: Public awareness messages on building
BACKGROUND AND CONTEXT
ontext of the Intervention
Uganda experienced decades of political unrest until the 1990s, since when it has seriously
endeavored to maintain political stability, peace and annual economic growth. Despite the universal
spread of primary education there, literacy rates are still low. Barriers to education still remain, being
related. Around 20% of Ugandans over 15 years of age have received no formal
education. Some 40% of the population suffers from disease, a rise of 11% compared with the period
ts for half of all cases. On average, Ugandans have to travel 27
to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV
In November 2008, Uganda and Belgium signed a new Cooperation Programme
Following the successful implementation of the first Cooperation Programme (2005-2008), Belgium
€64 million, raising Uganda to the fourth-ranking partner country of Belgian
. Belgium is paying special attention to the cross-cutting issues of gender
equality, the environment, social economy and the rights of the child. Belgian Development
focusing on the following two sectors:
Primary healthcare, especially building the decentralized health services’ leadership and
ducation, in particular institutions offering business, technical, vocational and health
The below photo shows one of the many public awareness art work in the
With Uganda suffering from mismanagement,
violence, destruction of infrastructure, economic
collapse and a high prevalence of HIV/AIDS and
other diseases, a new regime taking over the
political powers aiming at stability, social
development and good governance development,
aid to Uganda was both needed and justified. The
support to improved governance and to
decentralization was one of the four areas of
Belgian support to the Government of Uganda.
Uganda has initiated a major decentralization
process through early assistance by UNDP
has provided local elected authorities with important
areas of responsibilities for poverty reduction such
as primary education, primary health care,
agriculture, feeder roads and water. The
decentralization process also aims at improving
community participation in the decision making
process, increased transparency and accountability
to the citizens in the use of locally managed
resources.
Belgium chose to support the decentralization
process with a special emphasis on human
resources and institutional development, together
with specific actions improving the livelihoods of the
population.
The decentralization process has been quit
and in many instances local authorities do not have the adequate capacity and financial resources
necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of
http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/
4
Uganda experienced decades of political unrest until the 1990s, since when it has seriously
endeavored to maintain political stability, peace and annual economic growth. Despite the universal
Barriers to education still remain, being
related. Around 20% of Ugandans over 15 years of age have received no formal
education. Some 40% of the population suffers from disease, a rise of 11% compared with the period
ts for half of all cases. On average, Ugandans have to travel 27 kilometers
to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV/AIDS.
In November 2008, Uganda and Belgium signed a new Cooperation Programme (2009-2012).
2008), Belgium
ranking partner country of Belgian
cutting issues of gender
Belgian Development
health services’ leadership and
ducation, in particular institutions offering business, technical, vocational and health-related
work in the District.
from mismanagement,
violence, destruction of infrastructure, economic
collapse and a high prevalence of HIV/AIDS and
a new regime taking over the
political powers aiming at stability, social
good governance development,
aid to Uganda was both needed and justified. The
support to improved governance and to
one of the four areas of
Belgian support to the Government of Uganda.
Uganda has initiated a major decentralization
through early assistance by UNDP, which
has provided local elected authorities with important
poverty reduction such
as primary education, primary health care,
agriculture, feeder roads and water. The
ocess also aims at improving
community participation in the decision making
process, increased transparency and accountability
to the citizens in the use of locally managed
Belgium chose to support the decentralization
process with a special emphasis on human
resources and institutional development, together
with specific actions improving the livelihoods of the
The decentralization process has been quite rapid
and in many instances local authorities do not have the adequate capacity and financial resources
necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of
http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11
BIDP FE FINAL REPORT 1_July 11

More Related Content

What's hot

The Budget Process Part 1
The Budget Process Part 1The Budget Process Part 1
The Budget Process Part 1CHYLLPARRO
 
BuB: A Philippine Experiment
BuB: A Philippine ExperimentBuB: A Philippine Experiment
BuB: A Philippine ExperimentRegina Zagala
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
Reforms & District Development [Autosaved]
Reforms & District Development [Autosaved]Reforms & District Development [Autosaved]
Reforms & District Development [Autosaved]Victor lee DANIEL
 
Dbm issuances 2012
Dbm issuances 2012Dbm issuances 2012
Dbm issuances 2012Maki Manalo
 
Building Lgu Alliances For Effective Local Development
Building Lgu Alliances For Effective Local DevelopmentBuilding Lgu Alliances For Effective Local Development
Building Lgu Alliances For Effective Local DevelopmentLibertino ocenar
 
Barangay budgetary process
Barangay budgetary processBarangay budgetary process
Barangay budgetary processRafael Paragas
 
Financial Management in Local Government: A Top 10 Primer
Financial Management in  Local Government: A Top 10 PrimerFinancial Management in  Local Government: A Top 10 Primer
Financial Management in Local Government: A Top 10 PrimerCPLG
 
Approaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine SettingApproaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine Settingethelvera
 
Regional Government
Regional GovernmentRegional Government
Regional GovernmentJaypeeRojas
 
Government budgeting, kerala
Government budgeting, keralaGovernment budgeting, kerala
Government budgeting, keralaGopakumar V S
 
01 Brgy. budget
01 Brgy. budget01 Brgy. budget
01 Brgy. budgetrichskchad
 
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...OECD Governance
 
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-Notes
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-NotesPres195-IP&RforIndustryReform-IPRConferencePortStephens-a-Notes
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-NotesBronwyn Kelly
 

What's hot (20)

The Budget Process Part 1
The Budget Process Part 1The Budget Process Part 1
The Budget Process Part 1
 
BuB: A Philippine Experiment
BuB: A Philippine ExperimentBuB: A Philippine Experiment
BuB: A Philippine Experiment
 
Budget preparation
Budget preparationBudget preparation
Budget preparation
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
Budget legislation
Budget legislationBudget legislation
Budget legislation
 
Reforms & District Development [Autosaved]
Reforms & District Development [Autosaved]Reforms & District Development [Autosaved]
Reforms & District Development [Autosaved]
 
Dbm issuances 2012
Dbm issuances 2012Dbm issuances 2012
Dbm issuances 2012
 
Building Lgu Alliances For Effective Local Development
Building Lgu Alliances For Effective Local DevelopmentBuilding Lgu Alliances For Effective Local Development
Building Lgu Alliances For Effective Local Development
 
Barangay budgetary process
Barangay budgetary processBarangay budgetary process
Barangay budgetary process
 
Financial Management in Local Government: A Top 10 Primer
Financial Management in  Local Government: A Top 10 PrimerFinancial Management in  Local Government: A Top 10 Primer
Financial Management in Local Government: A Top 10 Primer
 
Approaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine SettingApproaches and Techniques of Budgeting: The Philippine Setting
Approaches and Techniques of Budgeting: The Philippine Setting
 
Regional Government
Regional GovernmentRegional Government
Regional Government
 
Government budgeting, kerala
Government budgeting, keralaGovernment budgeting, kerala
Government budgeting, kerala
 
Local partnerships in Rural development eastern europe and the meditteranean,...
Local partnerships in Rural development eastern europe and the meditteranean,...Local partnerships in Rural development eastern europe and the meditteranean,...
Local partnerships in Rural development eastern europe and the meditteranean,...
 
Back to Basics Overview Presentation - North West Provincial Launch 2014
Back to Basics Overview Presentation - North West Provincial Launch 2014Back to Basics Overview Presentation - North West Provincial Launch 2014
Back to Basics Overview Presentation - North West Provincial Launch 2014
 
01 Brgy. budget
01 Brgy. budget01 Brgy. budget
01 Brgy. budget
 
Roll Out of Back to Basics Programme - Western Cape
Roll Out of Back to Basics Programme - Western CapeRoll Out of Back to Basics Programme - Western Cape
Roll Out of Back to Basics Programme - Western Cape
 
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...
DBM showcase on PFM: Putting PFM reforms into action in the budgeting system ...
 
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-Notes
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-NotesPres195-IP&RforIndustryReform-IPRConferencePortStephens-a-Notes
Pres195-IP&RforIndustryReform-IPRConferencePortStephens-a-Notes
 
Rationalized Planning System
Rationalized Planning SystemRationalized Planning System
Rationalized Planning System
 

Similar to BIDP FE FINAL REPORT 1_July 11

Community Investment Funds - CIF Manual Cao Bang
Community Investment Funds - CIF Manual Cao BangCommunity Investment Funds - CIF Manual Cao Bang
Community Investment Funds - CIF Manual Cao BangIFAD Vietnam
 
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCES
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCESLOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCES
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCESSugeng Budiharsono
 
Klaudija Lutovska- IPA CBC & IPARD 2
Klaudija Lutovska- IPA CBC & IPARD 2Klaudija Lutovska- IPA CBC & IPARD 2
Klaudija Lutovska- IPA CBC & IPARD 2Klaudija Lutovska
 
The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...UNICEF Algérie
 
EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014Joost Holleman
 
MSPL presentation of the operational steering committee session of 21 septemb...
MSPL presentation of the operational steering committee session of 21 septemb...MSPL presentation of the operational steering committee session of 21 septemb...
MSPL presentation of the operational steering committee session of 21 septemb...GIZ Moldova
 
GAP_Phase1_Completion_Report
GAP_Phase1_Completion_ReportGAP_Phase1_Completion_Report
GAP_Phase1_Completion_ReportTatjana Muhic
 
5. foreign players wwtp
5. foreign players wwtp5. foreign players wwtp
5. foreign players wwtpGilberte Delva
 
FIN-URB-ACT_Newsletter_FINAL_2011
FIN-URB-ACT_Newsletter_FINAL_2011FIN-URB-ACT_Newsletter_FINAL_2011
FIN-URB-ACT_Newsletter_FINAL_2011Liana Costea
 
2023 Budget Proposal to NCPC.pptx
2023 Budget Proposal to NCPC.pptx2023 Budget Proposal to NCPC.pptx
2023 Budget Proposal to NCPC.pptxAllenLucreReondanga
 
Greener cities Greener europe
Greener cities Greener europeGreener cities Greener europe
Greener cities Greener europePatrickTanz
 
Da net final brosure mttsz
Da net final brosure mttszDa net final brosure mttsz
Da net final brosure mttszMTTSZ
 
EU Budget Belgium 2014-2020 update November 2014
EU Budget Belgium 2014-2020 update November 2014EU Budget Belgium 2014-2020 update November 2014
EU Budget Belgium 2014-2020 update November 2014Joost Holleman
 
Local Support Groups Warsaw March 10 09 Pr
Local Support Groups Warsaw March 10 09 PrLocal Support Groups Warsaw March 10 09 Pr
Local Support Groups Warsaw March 10 09 Prpeterramsden
 

Similar to BIDP FE FINAL REPORT 1_July 11 (20)

Community Investment Funds - CIF Manual Cao Bang
Community Investment Funds - CIF Manual Cao BangCommunity Investment Funds - CIF Manual Cao Bang
Community Investment Funds - CIF Manual Cao Bang
 
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCES
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCESLOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCES
LOCAL ECONOMIC DEVELOPMENT, THE INDONESIAN EXPERIENCES
 
Klaudija Lutovska- IPA CBC & IPARD 2
Klaudija Lutovska- IPA CBC & IPARD 2Klaudija Lutovska- IPA CBC & IPARD 2
Klaudija Lutovska- IPA CBC & IPARD 2
 
The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...The role of the Mozambique and Southern Africa observatories in alleviating p...
The role of the Mozambique and Southern Africa observatories in alleviating p...
 
EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014EU Budget Czech Republic 2014-2020 update November 2014
EU Budget Czech Republic 2014-2020 update November 2014
 
MSPL presentation of the operational steering committee session of 21 septemb...
MSPL presentation of the operational steering committee session of 21 septemb...MSPL presentation of the operational steering committee session of 21 septemb...
MSPL presentation of the operational steering committee session of 21 septemb...
 
GAP_Phase1_Completion_Report
GAP_Phase1_Completion_ReportGAP_Phase1_Completion_Report
GAP_Phase1_Completion_Report
 
5. foreign players wwtp
5. foreign players wwtp5. foreign players wwtp
5. foreign players wwtp
 
A.Babak: Priorities
A.Babak: PrioritiesA.Babak: Priorities
A.Babak: Priorities
 
Mohammed Hourani CV 2016
Mohammed Hourani CV 2016Mohammed Hourani CV 2016
Mohammed Hourani CV 2016
 
Smart village | Strategia EU
Smart village | Strategia EUSmart village | Strategia EU
Smart village | Strategia EU
 
FIN-URB-ACT_Newsletter_FINAL_2011
FIN-URB-ACT_Newsletter_FINAL_2011FIN-URB-ACT_Newsletter_FINAL_2011
FIN-URB-ACT_Newsletter_FINAL_2011
 
2023 Budget Proposal to NCPC.pptx
2023 Budget Proposal to NCPC.pptx2023 Budget Proposal to NCPC.pptx
2023 Budget Proposal to NCPC.pptx
 
Greener cities Greener europe
Greener cities Greener europeGreener cities Greener europe
Greener cities Greener europe
 
LCR REPORT_EN_WEB
LCR REPORT_EN_WEBLCR REPORT_EN_WEB
LCR REPORT_EN_WEB
 
Da net final brosure mttsz
Da net final brosure mttszDa net final brosure mttsz
Da net final brosure mttsz
 
EU Budget Belgium 2014-2020 update November 2014
EU Budget Belgium 2014-2020 update November 2014EU Budget Belgium 2014-2020 update November 2014
EU Budget Belgium 2014-2020 update November 2014
 
Local Support Groups Warsaw March 10 09 Pr
Local Support Groups Warsaw March 10 09 PrLocal Support Groups Warsaw March 10 09 Pr
Local Support Groups Warsaw March 10 09 Pr
 
Mohammed Hourani CV 2016
Mohammed Hourani CV 2016Mohammed Hourani CV 2016
Mohammed Hourani CV 2016
 
Agenda, user-centric service delivery, putting citizens and businesses at the...
Agenda, user-centric service delivery, putting citizens and businesses at the...Agenda, user-centric service delivery, putting citizens and businesses at the...
Agenda, user-centric service delivery, putting citizens and businesses at the...
 

BIDP FE FINAL REPORT 1_July 11

  • 1. Reducing Poverty Assisting the Vulnerable Helping People Help Themselves Belgian Development Agency FINAL EVALUATION REPORT Bundibugyo Integrated Development Programme People Help Themselves Belgian Development Agency Republic of Uganda Bundibugyo District - UGANDA - FINAL EVALUATION REPORT Bundibugyo Integrated Development Programme (BIDP), June 2011 Republic of Uganda Bundibugyo District Bundibugyo Integrated Development
  • 2. BIDP Final Evaluation Report DGCD intervention number: Navision code BTC: Partner institution: Duration of intervention: Duration of Specific Agreement: Starting date of intervention End date of the Project: Belgian contribution: Intervention sectors: Project Summary Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended year until the end of 2010. The BIDP strengthening of Bundibugyo local authorities’ capacity to im population. It was based on the idea that local, elected authorities have a comparative advantage in designing, managing, supervising and monitoring local development measures and initiatives aiming at alleviating poverty. In addition to an important capacity building component that as participatory planning and budgeting, financial management, resource mobilization, public/private partnership for service delivery, accountability and monitoring, the and reliable unconditional grants to Bundibugyo District Council and the 10 sub used on non-wage activities according to development plans and the approved budget. Block grants made available to support the district and the sub practically improve their management of infrastructure and public service provision to the communities of the districts, thereby increasing their legitimacy. Evaluation Team Dr. Henry H. Kellam III: Team Leader/FinCorp Silverius Ssewanyana: Winsor Consult/Socio Eng. Simon P. Otoi: COWI/Engineer Rogers Baguma: Tangaza Cinemas Ltd The BIDP Final Evaluation (FE) was funded out of the Belgo The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main report findings, lessons learned, conclusions, recommendations. accompanying brochures. Copies can be obtained from Belgian Development Agency 1942111 0400711 MoLG 5 Years 6 Years 28 April 2005 Dec 2009, Extension granted Dec 2010 EUR 3,500,000 Decentralisation, Rural Development Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended until the end of 2010. The BIDP supported the process of decentralization by contributing to the strengthening of Bundibugyo local authorities’ capacity to improve service delivery to the local based on the idea that local, elected authorities have a comparative advantage in designing, managing, supervising and monitoring local development measures and initiatives aiming at y. In addition to an important capacity building component that focused as participatory planning and budgeting, financial management, resource mobilization, public/private partnership for service delivery, accountability and monitoring, the project also made and reliable unconditional grants to Bundibugyo District Council and the 10 sub-counties of the district wage activities according to development plans and the approved budget. Block grants pport the district and the sub-counties enabled Bundibugyo local authorities to practically improve their management of infrastructure and public service provision to the communities of the districts, thereby increasing their legitimacy. eam Leader/FinCorp Winsor Consult/Socio-economist COWI/Engineer Tangaza Cinemas Ltd/FinCorp was funded out of the Belgo-Ugandan study and consultancy fund. The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main report findings, lessons learned, conclusions, recommendations. This is attached to this Report with s. Copies can be obtained from Tangaza Cinema. ii Extension granted Dec 2010 Development Bundibugyo Integrated Development Programme (BIDP) was a 5 year program and extended for one the process of decentralization by contributing to the prove service delivery to the local based on the idea that local, elected authorities have a comparative advantage in designing, managing, supervising and monitoring local development measures and initiatives aiming at focused on areas such as participatory planning and budgeting, financial management, resource mobilization, public/private made available small counties of the district wage activities according to development plans and the approved budget. Block grants Bundibugyo local authorities to practically improve their management of infrastructure and public service provision to the communities and consultancy fund. The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main This is attached to this Report with
  • 3. BIDP Final Evaluation Report Acknowledgements The BIDP FE Team would like to express mission. We were provided excellent support and backstopping from Representative and Mrs. Rose Athieno Kato logistics and was there for us on a daily bases as well as other BTC staff appreciate Mr. Vincent Maher (Resident TA for insights into BIDP. We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head, Development Cooperation, Belgian Embassy We thank Mr. Yasin K. Sendaula, the Programme facilitator, for providing continuous guidance and inputs for the draft reports and two staff members of the MoLG, Sophia Kakwezi, Rogers Nayebare greatly assisted the FE Team. We also thank, Finance and Administration, Office of the Prime Minister for his time and Kiracho, TA, Management Information’s Systems, MoLG documents and statistical information Last but not least, we greatly appreciate Mr transparency, and for making himself and all key district staff Statistician) available at all times during our field mission leader’s in the sub-counties. Belgian Development Agency The BIDP FE Team would like to express our appreciation to a number of people who assisted in their We were provided excellent support and backstopping from BTC by Mr. Koen Goekint Rose Athieno Kato, the Programme Officer who managed our mission for us on a daily bases as well as other BTC staff behind the scenes Resident TA for BIDP 2005-08) for all of his valuable and practical We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head, Development Cooperation, Belgian Embassy for their time, guidance and inputs. . Sendaula, the MOLG Assistant Commissioner Urban Inspection National for providing continuous guidance and inputs for the draft reports and Sophia Kakwezi, Rogers Nayebare to join our field mission . We also thank, Mr Benjamin Kumumanya, the Under Finance and Administration, Office of the Prime Minister for his time and advice, and Kiracho, TA, Management Information’s Systems, MoLG for providing advice, important background and statistical information. Last but not least, we greatly appreciate Mr Omulangira David Okuraja’s (District CAO) hospitality and for making himself and all key district staff (DCAO, Director Heads, the Planner and during our field mission to the District as well as community groups and iii appreciation to a number of people who assisted in their Goekint, Resident managed our mission, behind the scenes. We also all of his valuable and practical We thank Mr. H.E. Marc Gedpont, the Belgian Ambassador and Mr. Ludo Rochette, Head, Commissioner Urban Inspection National for providing continuous guidance and inputs for the draft reports and providing mission and who Mr Benjamin Kumumanya, the Under-Secretary of e, and Mr. Gilbert important background ) hospitality and , Director Heads, the Planner and as well as community groups and
  • 4. BIDP Final Evaluation Report ACRONYMS AND ABBREVIATIONS AAMP Area-Based Agricultural Modernization AMA Abanya-Rwenzori Mountaineering Association BFP Budget Framework Paper BIDP Bundibugyo Integrated Development Programme BSF Belgian Survival Fund BTC Belgian Technical Cooperation CAO Chief Administrative Officer CBF Capacity Building Fund CBO Community Based Organization CRD Community Resilience Dialogue CRS Catholic Relief Services DAC Development Assistance Committee (of OECD) DANIDA Danish International Development Agency DCDO District Community Development Officer DDP District Development Plan DE District Engineer DEC District Executive Committee DecSec Decentralization Secretariat DED German Development Service DEO District Education Officer DFID Department for International Development (British Government) DTPC District Technical Planning Committee DWO District Water Officer EDF European Development Fund EU European Union FDS Fiscal Decentralization Strategy FE Final Evaluation FGD Focus Group Discussion FY Financial Year GFS Gravity Flow Scheme GoU Government of Uganda G-Tax Graduated Tax HDPE High Density Polyethylene HIPC Heavily Indebted Poor Countries HLG Higher Local Government HoD Head of Department IDP Internally Displaced Person IFAD International Fund for African Development JLCB Joint Local Consultative Body (Steering Committee) KDRCDP Kasese District Rural Community Development Programme LC Local Council LDF Local Development Fund LG Local Government LGA Local Government Act LGDP Local Government Development Programme LGFC Local Government Finance Commission LLG Lower Local Government M&E Monitoring and Evaluation MoES Ministry of Education and Sports MoLG Ministry of Local Government MTR Mid Term Review NGO Non-Governmental Organization NORRACOL North Rwenzori Community Agriculture and Conservation Link NRM National Resistance Movement Belgian Development Agency ACRONYMS AND ABBREVIATIONS Based Agricultural Modernization Programme Rwenzori Mountaineering Association Agro forestry project Budget Framework Paper Bundibugyo Integrated Development Programme Belgian Survival Fund Belgian Technical Cooperation Chief Administrative Officer (in districts) Capacity Building Fund Community Based Organization Community Resilience Dialogue Catholic Relief Services Development Assistance Committee (of OECD) Danish International Development Agency t Community Development Officer District Development Plan District Executive Committee Decentralization Secretariat German Development Service District Education Officer International Development (British Government) District Technical Planning Committee District Water Officer European Development Fund Fiscal Decentralization Strategy Discussion Gravity Flow Scheme Government of Uganda High Density Polyethylene Heavily Indebted Poor Countries Higher Local Government Head of Department Displaced Person International Fund for African Development Joint Local Consultative Body (Steering Committee) Kasese District Rural Community Development Programme Local Development Fund Local Government Act Local Government Development Programme Local Government Finance Commission Lower Local Government Monitoring and Evaluation Ministry of Education and Sports Ministry of Local Government Governmental Organization North Rwenzori Community Agriculture and Conservation Link National Resistance Movement iv
  • 5. BIDP Final Evaluation Report O&M Operation and Maintenance OECD Organisation for Economic Cooperation and Development PAF Poverty Action Fund PEAP Poverty Eradication Action Policy PMU Programme Management Unit PRA Participatory Rural Appraisal PRSP Poverty Reduction Strategy Paper P/S Primary School RC Resistance Council ROM Result Oriented Management SATNET Sustainable Agriculture Trainers Network SCDP Sub-County Development Plan SDF Sub-County Development Fund SMC School Management Committee SNV Netherlands Development Organization SO Specific Objective SPSS Statistical Package for the Social Sciences TA Technical Assistance / Assistant / Advisor (specified as per text) TC Town Clerk TFF Technical and Financial File (BTC document) ToT Training of Trainers TPC Technical Planning Committee UNCDF United Nations Capital Development Fund UNDP United Nations Development Programme UPHOLD Uganda Programme for Holistic Development WB World Bank Belgian Development Agency Operation and Maintenance Organisation for Economic Cooperation and Development Poverty Action Fund Poverty Eradication Action Policy Programme Management Unit Participatory Rural Appraisal Poverty Reduction Strategy Paper Resistance Council Result Oriented Management tainable Agriculture Trainers Network County Development Plan County Development Fund School Management Committee Netherlands Development Organization Statistical Package for the Social Sciences Technical Assistance / Assistant / Advisor (specified as per text) Technical and Financial File (BTC document) Training of Trainers Technical Planning Committee United Nations Capital Development Fund United Nations Development Programme Uganda Programme for Holistic Development v
  • 6. BIDP Final Evaluation Report Figure 1: Map of Uganda Belgian Development Agency vi
  • 7. BIDP Final Evaluation Report TABLE OF CONTENTS 1 Executive Summary ................................ 2 Introduction................................ 2.1 Presentation of the Intervention 2.1.1 Geographical Understanding of Bundibugyo District 2.2 Methodology ................................ 3 Background and context ................................ 3.1 Historical Context of the Intervention 3.2 Social and Economic Context 3.3 Political and Institutional Context 3.4 Intervention Logic ................................ 4 Follow-up of recommendations 4.1 From the Mid-term Review 5 Implementation and achievements 5.1 Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring Mechanisms are operationalized. 5.1.1 BIDP Impact ................................ 5.1.2 Result area Specific Recommendations Final Achievements and Lessons learned 5.2 Results 2: Local Revenue Generation & Mobilization to Sustain Investments & Cost is Improved................................. 5.2.1 BIDP Impact ................................ 5.2.2 Result Area Specific Recommendations 5.2.3 Final Achievements and Lessons learned 5.3 Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery of Services. ................................................................ 5.3.1 BIDP Impact ................................ 5.3.2 Result Area Specific Recommendations 5.3.3 Final Achievements and Lessons learned 5.4 Result 4: Public/Community Investments Prioritized in Development Plans are Implemented with the Provision of Unconditional Block Grants to the District. 5.4.1 BIDP Impact ................................ 5.4.2 Result Area Specific Recommendations 5.4.3 Final Achievements and Lessons learned 6 Assessment of the intervention 6.1 Basic criteria ................................ 6.1.1 Relevance ................................ 6.1.2 Efficiency................................ 6.1.3 Effectiveness................................ 6.1.4 Sustainability................................ 6.1.5 Impact(s) ................................ 6.1.6 Coherence................................ 6.2 Transversal themes ................................ 6.2.1 Gender ................................ 6.2.2 Environment................................ 6.2.3 Social economy................................ Belgian Development Agency TABLE OF CONTENTS ................................................................................................ ................................................................................................................................ Presentation of the Intervention............................................................................................... Geographical Understanding of Bundibugyo District................................ ............................................................................................................................ ................................................................................................ Historical Context of the Intervention................................................................ Social and Economic Context................................................................................................ Political and Institutional Context............................................................................................. ................................................................................................ up of recommendations................................................................................................ term Review ................................................................................................ Implementation and achievements ............................................................................................ Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring Mechanisms are operationalized................................................................................................. ................................................................................................ Result area Specific Recommendations................................................................ Final Achievements and Lessons learned...................................................................................... Results 2: Local Revenue Generation & Mobilization to Sustain Investments & ................................................................................................................................ ................................................................................................ Result Area Specific Recommendations................................................................ Final Achievements and Lessons learned ................................................................ Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery ................................................................................................ ................................................................................................ Area Specific Recommendations................................................................ Final Achievements and Lessons learned ................................................................ Result 4: Public/Community Investments Prioritized in Development Plans are Implemented with the Provision of Unconditional Block Grants to the District......................................................... ................................................................................................ Result Area Specific Recommendations................................................................ Final Achievements and Lessons learned ................................................................ Assessment of the intervention................................................................................................ .......................................................................................................................... ................................................................................................ ....................................................................................................................... ................................................................................................ ................................................................................................ ....................................................................................................................... ................................................................................................ ................................................................................................ .......................................................................................................................... ................................................................................................ ................................................................................................ vi ........................................................i .....................................1 ...............................1 ......................................................2 ............................3 ...............................................4 .......................................................4 ..................................5 .............................6 ....................................................7 ....................................9 ......................................9 ............................12 Result 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring .......................................12 ..................................................13 .......................................15 ......................15 Results 2: Local Revenue Generation & Mobilization to Sustain Investments & Recurrent ................................17 ..................................................18 .......................................18 ....................................19 Result 3: Capacity of LG & Other Local Stakeholders is Improved to Ensure Proper Delivery .........................................19 ..................................................21 .......................................21 ....................................21 Result 4: Public/Community Investments Prioritized in Development Plans are Implemented ........................23 ..................................................23 .......................................23 ....................................24 ..................................26 ..........................26 .....................................................26 .......................29 .................................................30 .................................................31 .......................32 .....................................................34 ...............................................35 ..........................35 ..................................................35 .............................................36
  • 8. BIDP Final Evaluation Report 6.2.4 Children’s Rights ................................ 6.2.5 HIV and Aids ................................ 6.3 HARMO-criteria ................................ 6.3.1 Harmonisation................................ 6.3.2 Alignment ................................ 6.3.3 Result-based management 6.3.4 Mutual responsibility 6.3.5 Ownership ................................ 7 Practices to retain ................................ 7.1 Structure & Staffing of the intervention 7.2 Resource management (financial, human & material) 7.3 Planning & Implementation 7.4 Monitoring & Evaluation................................ 7.5 Documentation & Reporting 7.6 Implementation of New Technologies 7.7 Networking................................ 8 Lessons learned ................................ 8.1 For the Intervention................................ 8.2 For the Partner Institution 8.3 For the JLCB................................ 8.4 For the Donor................................ 9 Conclusions................................ 9.1 Recommendations regarding a possible BIDP II 10 Annexes................................................................ Annex 1: Objectives and Context of the Final Evaluation Annex 2: FE Team Mobilisation................................ Annex 3: People Met/Interviewed for the BIDP FE Annex 4: Literature (Desk) Review: Annex 5: Review of Findings from Other Evaluations BIDP Final Report 2005-09 MoLG Monitoring Report................................ Local Government Sector Investment Plan (LGSIP) The Harmonized Participatory Planning Process in Bundibugyo Guidelines for LG M&E Systems Process in Bundibugyo Review of the Impact of Capacity Development by BIDP Annex 6: Criteria Themes of the BIDP Relevance ................................ Efficiency................................ Effectiveness................................ Sustainability................................ Coherence................................ Impact................................................................ Transversal themes................................ HARMO-criteria................................ Annex 7: The BIDU FE Team and Field Strategy: Quantitative Data Collection Belgian Development Agency ................................................................................................ ................................................................................................ ................................................................................................ ................................................................................................ ...................................................................................................................... ed management........................................................................................... Mutual responsibility................................................................................................ ................................................................................................ ........................................................................................................................ Structure & Staffing of the intervention................................................................ Resource management (financial, human & material) .......................................................... Planning & Implementation................................................................................................ ................................................................................................ Documentation & Reporting................................................................................................ Implementation of New Technologies ................................................................ ............................................................................................................................. ........................................................................................................................... ................................................................................................ For the Partner Institution ................................................................................................ .......................................................................................................................... ......................................................................................................................... ................................................................................................................................ Recommendations regarding a possible BIDP II................................................................ ................................................................................................ and Context of the Final Evaluation ................................................................ ................................................................................................ Annex 3: People Met/Interviewed for the BIDP FE................................................................ Annex 4: Literature (Desk) Review:................................................................................................ Annex 5: Review of Findings from Other Evaluations ................................................................ ................................................................................................ ................................................................................................ Government Sector Investment Plan (LGSIP) ................................................................ The Harmonized Participatory Planning Process in Bundibugyo ................................ Guidelines for LG M&E Systems Process in Bundibugyo ......................................................... Review of the Impact of Capacity Development by BIDP.......................................................... Annex 6: Criteria Themes of the BIDP ............................................................................................... ................................................................................................................................ ................................................................................................................................ .............................................................................................................................. .............................................................................................................................. ................................................................................................................................ ................................................................................................ ................................................................................................ .......................................................................................................................... Annex 7: The BIDU FE Team and Field Strategy:................................................................ Quantitative Data Collection ................................................................................................ vii ...........................................36 .................................................37 .....................................................37 ...............................................37 ......................38 ...........................38 ......................................38 .....................................................38 ........................39 ..................................................39 ..........................39 ....................................39 .........................................39 ...................................40 ...................................................40 .............................40 ...........................41 ................................................41 ......................................41 ..........................42 .........................42 ..................................42 ...................................43 .........................................44 ..................................44 ..........................................45 .............................................46 ....................................48 ........................................49 ........................................49 ............................................49 .................................50 ..............................................50 .........................51 ..........................52 ...............................53 ..................................53 ....................................53 ..............................53 ..............................53 ..................................53 .........................................54 ....................................................54 ..........................54 ..............................................56 ......................................57
  • 9. BIDP Final Evaluation Report Video (DVD) of the BIDP................................ BIDP Project Evaluation by the Civil Engineer Annex 8: Field Findings of the BIDP Attitude Survey Annex 9: Field Findings of Infrastructure Projec Annex 10: BIDP FE - Work Plan................................ List of Figures, Charts FIGURE 1: MAP OF UGANDA................................ FIGURE 2: BIDP SUPPORT & INTERACTI FIGURE 3: MAP OF THE PROJECT AREA FIGURE 4: PUBLIC AWARENESS MESSAGES ON BUILDING FIGURE 5: POVERTY TRENDS IN BUNDIBUGYO FIGURE 6: A TYPICAL CLASSROOM SITU FIGURE 7: A WOMAN FORDING A STREAM IN FIGURE 8: THE SOURCE WORKS FOR ONE OF THE GRAVITY F FIGURE 9: KNOWLEDGE ABOUT BIDP AMONG RESPONDENTS FIGURE 10: STORIES OF FRAUD OR BRIBES FIGURE 11: SATISFACTION WITH UTILISATION OF FIGURE 12: LEVEL OF SATISFACTION ON FIGURE 13: COMMUNITY CRITICAL NEEDS AND FIGURE 14: CHANGE IN COMMUNITY G FIGURE 15: CRITICAL NEEDS AND PRIORITIES OF FIGURE 16: NEEDS AND CONCERNS OF FIGURE 17: NEEDS OF THE ILL ADDRESSED UNDER FIGURE 18: ENVIRONMENT ISSUES ADDRESSED FIGURE 19: A DAILY MARKET CONSTRU FIGURE 20: EFFECTIVE USE OF RESOURCES UNDER FIGURE 21: PERCEIVED PROJECT IMPACT FIGURE 22: WATER COVERAGE FOR A FIGURE 23: DISTANCE TO NEAREST WATER POINT FIGURE 24: REDUCTION IN WATER BORN FIGURE 25: IMPLEMENTATION RATE OF DEVELOPMENT PLANS FIGURE 26: DISTRIBUTION OF WOMEN FIGURE 27: CHILDREN USING ONE OF THE MANY WATER POINT FIGURE 28: DISTRIBUTION OF COMMUNITY GROUPS FIGURE 29: EDUCATION PERFORMANCE FIGURE 30: EDUCATION ENROLLMENT FIGURE 31: HIV SEROPREVALENCE................................ FIGURE 32: EXAMPLE OF AN NGO CREATED DURING THE FIGURE 33: BIDP FE VIDEO TEAM FILMING A FIGURE 34: SCHOOL FUNDED BY BIDP. FIGURE 35: A DRAMA GROUP USED BY List of Tables TABLE 1: FINDINGS FROM THE MIDTERM TABLE 2: LESSONS LEARNED UNDER R TABLE 3: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN DEFINED. TABLE 4: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN DEFINED. TABLE 5: FINAL ACHIEVEMENTS AND LESSONS LEARNED UN DEFINED. TABLE 6: ISSUES ANTICIPATED BY THE DEFINED. Belgian Development Agency ................................................................................................ BIDP Project Evaluation by the Civil Engineer ................................................................ Annex 8: Field Findings of the BIDP Attitude Survey ................................................................ Annex 9: Field Findings of Infrastructure Projects................................................................ ................................................................................................ Charts & Photos ........................................................................................................................ INTERACTIONS WITH KEY STAKEHOLDERS.......................................................... REA ................................................................................................ AGES ON BUILDING ................................................................ UNDIBUGYO 2005-10................................................................ TUATION IN THE DISTRICT ................................................................ AM IN BUNDIBUGYO ................................................................ ONE OF THE GRAVITY FLOW WATER SUPPLY PROJECTS ........................... AMONG RESPONDENTS ................................................................ RIBES ................................................................................................ TILISATION OF TAXES PAID TO DISTRICT OFFICIALS................................ ATISFACTION ON PERFORMANCE OF THE HEALTH PROGRAM ................................ EEDS AND PRIORITIES PRIOR TO BIDP................................ GENDER PERCEPTIONS................................................................ RIORITIES OF WOMEN ADDRESSED BY BIDP ................................ ONCERNS OF CHILDREN ...................................................................................... ESSED UNDER BIDP ................................................................ DDRESSED.......................................................................................... DAILY MARKET CONSTRUCTED BY BIDP................................................................ ESOURCES UNDER BIDP................................................................ MPACT ................................................................................................ ATER COVERAGE FOR A UNIT OF POPULATION ................................................................ ATER POINT....................................................................................... RNE DISEASES IN THE DISTRICT........................................................... F DEVELOPMENT PLANS ................................................................ GROUPS........................................................................................... THE MANY WATER POINTS FUNDED BY BIDP................................ NITY GROUPS................................................................ ERFORMANCE ................................................................................................ ................................................................................................ ................................................................................................ CREATED DURING THE BIDP................................................................ EAM FILMING A VHT MEETING................................................................ BIDP. NOTE THE HANDICAP RAMP ACCESS ................................ DRAMA GROUP USED BY BIDP .............................................................................................. IDTERM REVIEW ....................................... ERROR! BOOKMARK NOT DEFINED RESULT AREA 1................................. ERROR! BOOKMARK NOT DEFINED D LESSONS LEARNED UNDER RESULT AREA 2........ERROR! D LESSONS LEARNED UNDER RESULT AREA 3........ERROR! D LESSONS LEARNED UNDER RESULT AREA 4........ERROR! THE FE TEAM BEFORE GOING TO THE FIELDWORK...ERROR! viii ............................................58 ..........................................58 .........................................60 ..............................................71 .........................................77 ........................VI ..........................1 ........................................2 ...............................................4 .................................................5 .......................................6 .............................................7 ...........................8 ......................................13 ................................15 ..................................18 ....................................21 .................................................26 .......................................27 ..........................................27 ......................28 ............................................28 ..........................29 .................................................30 ..........................................31 ..................................32 ........................................33 .......................33 ...........................34 ......................................34 ...........................35 ........................................35 .....................................................36 .....................................37 ........................................37 ............................................37 ...................................52 ........................................58 ................................................58 ..............................59 OOKMARK NOT DEFINED. OOKMARK NOT DEFINED. BOOKMARK NOT BOOKMARK NOT BOOKMARK NOT BOOKMARK NOT
  • 10. BIDP Final Evaluation Report . Belgian Development Agency Photos by Henry Kellam, Simon Otoi, Brenda Amanda & Rogers Baguma ix & Rogers Baguma
  • 11. BIDP Final Evaluation Report 1 EXECUTIVE SUMMARY Before BIDP began, Bundibugyo bordering the Democratic Republic of reach and had mostly impassable roads diseases, including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS. and sanitation coverage was extremely poor with people either drinking from contaminated rivers or walking average distances of over 10km to access clean water. The Index (HDI) was one of the lowest in Uganda. The district f retain a good human resource base. The Kingdom of Belgium and Government of Uganda decentralization process with special emphasis on human resources and institutional developme together with specific actions for improving the livelihoods of the population. The design coordination with other donor initiatives to strengthen the capacity of the local authorities and key stakeholders like local NGO’s/CBO’s to maximize The evaluation was based on four ‘Result Areas’ Result Area 1: Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring Mechanisms are operationalized ‘Without external assistance’ 1. 80% of LGs are able to prepare and approve the budgets within the prescribed period without external assistance 2. 80% of sub-county budgets approved first time without being referred back assistance’ 3. 60% of the local governments use baseline survey data / information in their planning and monitoring exercises 4. 70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external assistance, as checked by the national assessment team. 5. 65% of the data required by LOGICS is available. 6. 50% of the staff and political leaders using the data in management decisions. The findings from the FE based on interviews and document review reveal th (80%+) especially for indicators 1, 2, 3 of LOGICS data due to technical problems such as limited skills, lack of computers, etc. Dis sub-county officials have the capacity required to prepare budgets within set timelines and without external assistance. The use of baseline surveys in the development process and compliance to MOLG guidelines are adhered to. Result Area 2: Local Revenue Generation & Mobilization to Sustain Investments & Recurrent Cost is improved Local revenue collection capacity and downward accountability has been enhanced through preparation of ordinances for local revenue collection. A data bank for loca training on local revenue carried out. Downward accountability training was done and notice boards erected in 33 parishes in the District. mobilisation aimed up improving the ability of HLGs and LLGs to meet their recurrent costs and co funding obligations in a sustainable manner. by 20% for each successive year, HLGs and LLGs meeting co score of 7+ on communication and accountability. Findings based on Focus group discussions, key informant interviews and literature review reveal that: 1 The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main report findings, lessons learned, conclusions, recommendations. Belgian Development Agency EXECUTIVE SUMMARY Before BIDP began, Bundibugyo was a marginalised district in the western region of Uganda Democratic Republic of Congo. The district faced challenges of poverty, impassable roads, very low literacy rates and was at high risk of including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS. was extremely poor with people either drinking from contaminated rivers or walking average distances of over 10km to access clean water. The District Human Development Index (HDI) was one of the lowest in Uganda. The district faced a very high staff turnover and fail retain a good human resource base. and Government of Uganda designed the BIDP to support the decentralization process with special emphasis on human resources and institutional developme improving the livelihoods of the population. The design with other donor initiatives to strengthen the capacity of the local authorities and key stakeholders like local NGO’s/CBO’s to maximize on local service delivery. four ‘Result Areas’. The following reveals the BIDP FE key Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring 80% of LGs are able to prepare and approve the budgets within the prescribed period without county budgets approved first time without being referred back ‘without external local governments use baseline survey data / information in their planning and 70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external assistance, as checked by the national assessment team. data required by LOGICS is available. 50% of the staff and political leaders using the data in management decisions. the household survey, focus group discussions and key informant review reveal that BIDP has been able to substantially deliver on result 1 (80%+) especially for indicators 1, 2, 3 and 4 but not on indicator 5 relating to availability and usage of LOGICS data due to technical problems such as limited skills, lack of computers, etc. Dis county officials have the capacity required to prepare budgets within set timelines and without external assistance. The use of baseline surveys in the development process and compliance to Local Revenue Generation & Mobilization to Sustain Investments & Recurrent Local revenue collection capacity and downward accountability has been enhanced through preparation of ordinances for local revenue collection. A data bank for local revenue sources was established and training on local revenue carried out. Downward accountability training was done and notice boards erected in 33 parishes in the District. Result area 2 emphasised enhanced revenue generation and improving the ability of HLGs and LLGs to meet their recurrent costs and co funding obligations in a sustainable manner. The indicators under result 2 were: local revenue increased by 20% for each successive year, HLGs and LLGs meeting co-funding obligations and achieve MOLG score of 7+ on communication and accountability. Findings based on Focus group discussions, key informant interviews and literature review reveal that: The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main report findings, lessons learned, conclusions, recommendations. i a marginalised district in the western region of Uganda faced challenges of poverty, was hard to communicable including outbreaks of the deadly Ebola and a high prevalence of HIV/ AIDS. Safe water was extremely poor with people either drinking from contaminated rivers or Human Development aced a very high staff turnover and failed to BIDP to support the decentralization process with special emphasis on human resources and institutional development, improving the livelihoods of the population. The design emphasised with other donor initiatives to strengthen the capacity of the local authorities and key FE key findings1 : Harmonized and Inclusive Participatory Planning, Budgeting and Monitoring 80% of LGs are able to prepare and approve the budgets within the prescribed period without ‘without external local governments use baseline survey data / information in their planning and 70% of the DDP and SCDP and all PDP are compliant with MoLG guidelines without external the household survey, focus group discussions and key informant at BIDP has been able to substantially deliver on result 1 relating to availability and usage of LOGICS data due to technical problems such as limited skills, lack of computers, etc. District and county officials have the capacity required to prepare budgets within set timelines and without external assistance. The use of baseline surveys in the development process and compliance to Local Revenue Generation & Mobilization to Sustain Investments & Recurrent Local revenue collection capacity and downward accountability has been enhanced through preparation l revenue sources was established and training on local revenue carried out. Downward accountability training was done and notice boards Result area 2 emphasised enhanced revenue generation and improving the ability of HLGs and LLGs to meet their recurrent costs and co- The indicators under result 2 were: local revenue increased ns and achieve MOLG Findings based on Focus group discussions, key informant interviews and literature review reveal that: The BIDP FE has also produced a Video (sights and sounds) supplementary to the report that ‘mirrors’ the main
  • 12. BIDP Final Evaluation Report • All ten sub-counties and the HLG are conversant with MOLG assessments on communica and accountability • Local revenue collection has improved although revenue mobilization and transparency is still a challenge despite the above positive findings. FE household survey revealed that 81% of the respondents were however less satisfied with district officials. • Staff capacity building courses were attended and local staff training were customised to meet knowledge gaps in revenue mobilization and collection • The social mobilisation strategy was finalis shall be utilised for similar future projects Result Area 3: Capacity of LG & Other Local Stakeholders is improved to Ensure Proper Delivery of Services Result area 3 of the BIDP focused on strengthening the capacity of local government and other local stakeholders to ensure proper delivery of services. This result area aimed at improving the social wellbeing of local people through improved access to bas reduce the number of people living below the poverty line in Bundibugyo District. The findings from the focus group discussions, key informant interviews and the household survey reveal that: • All responsible staff of LLGs and HLG are familiar with and fully understanding tender and contract procedures • All LLGs and HLG largely follow national procedures in the budgeting, tender and contract process • The District Service Commission and Council are in place and functio • The district and budgeting process is realistic, timely and adheres to national guidelines • The tender and contracts process faced hiccups in its implementation but slowly smoothening out with the introduction of the sealed Result Area 4: Public/Community Investments Prioritized in Development Plans are implemented with the Provision of Unconditional Block Grants to the District Result area 4 aimed at increasing focus and delivery of public and community investments through utilisation of the unconditional block grants. The programme worked towards increasing community access to basic social services at district and sub investments in the HLG and LLGs development plans. The participatory approach inv community enabled identification of priority investments some of which were implemented through approved district and sub-county development plans. Support to District Development Plan and Sub County Development Plans involved mainly infrastructure development. Several Gravity flow schemes have been built and this has resulted into the reduction of water borne diseases which were rampant in the District. Other infrastructure include construction of teachers houses, roads, fish pods for and immunization, immunization centers, Functional Adult Literacy class structures, market shelters, classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment among others. FE findings from the key informant interviews, focus group discussions, and the household survey reveal that: • There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes, schools, health units and community hall. • Community utilisation and maintenance of established projects is over 70% with record keeping maintained at district and sub Belgian Development Agency counties and the HLG are conversant with MOLG assessments on communica Local revenue collection has improved although revenue mobilization and transparency is still despite the above positive findings. FE household survey revealed that 81% of the respondents were however less satisfied with the utilisation of the taxes they pay to Staff capacity building courses were attended and local staff training were customised to meet knowledge gaps in revenue mobilization and collection The social mobilisation strategy was finalised and the experience offered learning to staff that shall be utilised for similar future projects Capacity of LG & Other Local Stakeholders is improved to Ensure Proper Result area 3 of the BIDP focused on strengthening the capacity of local government and other local stakeholders to ensure proper delivery of services. This result area aimed at improving the social wellbeing of local people through improved access to basic social services that would eventually reduce the number of people living below the poverty line in Bundibugyo District. The findings from the focus group discussions, key informant interviews and the household survey of LLGs and HLG are familiar with and fully understanding tender and All LLGs and HLG largely follow national procedures in the budgeting, tender and contract The District Service Commission and Council are in place and functioning The district and budgeting process is realistic, timely and adheres to national guidelines The tender and contracts process faced hiccups in its implementation but slowly smoothening out with the introduction of the sealed-bids system Public/Community Investments Prioritized in Development Plans are implemented with the Provision of Unconditional Block Grants to the District Result area 4 aimed at increasing focus and delivery of public and community investments through he unconditional block grants. The programme worked towards increasing community access to basic social services at district and sub-county levels through inclusion of public investments in the HLG and LLGs development plans. The participatory approach involving the local community enabled identification of priority investments some of which were implemented through county development plans. Support to District Development Plan and Sub County Development Plans involved mainly infrastructure development. Several Gravity flow schemes have been built and this has resulted into the reduction of water borne diseases which were rampant in the District. Other infrastructure include construction of teachers houses, roads, fish pods for demonstration, cattle crushes used for spraying and immunization, immunization centers, Functional Adult Literacy class structures, market shelters, classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment FE findings from the key informant interviews, focus group discussions, and the household survey There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes, schools, health units and community hall. nity utilisation and maintenance of established projects is over 70% with record keeping maintained at district and sub-county levels. ii counties and the HLG are conversant with MOLG assessments on communication Local revenue collection has improved although revenue mobilization and transparency is still despite the above positive findings. FE household survey revealed that 81% of the utilisation of the taxes they pay to Staff capacity building courses were attended and local staff training were customised to meet ed and the experience offered learning to staff that Capacity of LG & Other Local Stakeholders is improved to Ensure Proper Result area 3 of the BIDP focused on strengthening the capacity of local government and other local stakeholders to ensure proper delivery of services. This result area aimed at improving the social ic social services that would eventually The findings from the focus group discussions, key informant interviews and the household survey of LLGs and HLG are familiar with and fully understanding tender and All LLGs and HLG largely follow national procedures in the budgeting, tender and contract The district and budgeting process is realistic, timely and adheres to national guidelines The tender and contracts process faced hiccups in its implementation but slowly smoothening Public/Community Investments Prioritized in Development Plans are Result area 4 aimed at increasing focus and delivery of public and community investments through he unconditional block grants. The programme worked towards increasing community county levels through inclusion of public olving the local community enabled identification of priority investments some of which were implemented through Support to District Development Plan and Sub County Development Plans involved mainly infrastructure development. Several Gravity flow schemes have been built and this has resulted into the reduction of water borne diseases which were rampant in the District. Other infrastructure include demonstration, cattle crushes used for spraying and immunization, immunization centers, Functional Adult Literacy class structures, market shelters, classroom blocks , health centers, maternity wards and theatre and purchase of medical equipment FE findings from the key informant interviews, focus group discussions, and the household survey There is 100% survival rate of BIDP investments like: markets, roads, gravity flow schemes, nity utilisation and maintenance of established projects is over 70% with record
  • 13. BIDP Final Evaluation Report • Village User Committees are in place and through social mobilisation; local communities are able to maintain the investme • There has been more than 50% increase in social services enjoyed by local community as compared to 5 years ago. The quality of life has improved in as far as access to clean and safe water, access to basic education, access to health services, access to markets and literacy on environmental protection. Evaluation of the BIDP using the Basic Criteria BIDP was very relevant in that it helped equalize in a marginalized low HDI region mechanisms BIDP employed to support the decentralisation process through capacity building and support to projects identified in the District and Sub The infrastructure investments including water supplies, roads, schools buildings, health centres and capacity building were relevant to the needs and expectations of the communities in the two districts. The intervention has addressed only a po and staff houses and water. Staff houses are particularly significant in the remote mountainous areas of Bundibugyo District and also in the vast plains of Ntoroko District. Understaffing and high staff turnover efficiency. Most inputs were implemented as planned. weak regarding ‘across the board’ awareness of roles and Efficiency was also hampered because the National Government did not take all steps to finance the project according to the Specific Agreement. The district is still understaffed in key departments that implement the participatory planning and decentralization process. Almost all of the BIDP implemented inputs were done within the planned timeframe. Efficiency would have been greatly improved through a sector-wide integrated M&E system that places emphasis on the mon & responsibilities of all stakeholders. Efficiency of the infrastructure investments are in place. The implementation component of norms of good practice. The community mobilisation for O&M was also done for some of the infrastructure. The effectiveness of the BIDP was demonstrated by the f reveal satisfaction with the investments done in improved quality of their lives. Community consultation findings, particularly the household survey, further indicate that BIDP resources were effectively used of them having been completed more than 12 months before the evaluation. The classrooms and staff houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10 micro-projects visited and also based on key informant interv informant), Fisheries Officer, DCDO and the DEO. mostly satisfied with the delivered results. The micro projects in all the sectors of the investments. Capacity building continued to burden the overall sustain long-term impacts relative to decentralisation by promoting a b understanding of work practices of local government staff. Impacts of the BIDP on the District were and remain r marginalized District. Strong impacts of access (greater coverage/population) planning processes, health and education nearest water points was 5+ km but by large impacts with the modest investments. The coherence of BIDP was demonstrated by the fact that it the Kasese District Poverty Reduction Programme (K Belgian Development Agency Village User Committees are in place and through social mobilisation; local communities are able to maintain the investments like: water supply and markets. There has been more than 50% increase in social services enjoyed by local community as The quality of life has improved in as far as access to clean and safe water, access to basic access to health services, access to markets and literacy on environmental protection. Evaluation of the BIDP using the Basic Criteria in that it helped equalize Bundibugyo (and Ntoroko) District and low HDI region and was in line with the Paris Declaration. The strategy and mechanisms BIDP employed to support the decentralisation process through capacity building and support to projects identified in the District and Sub-County Development was very relevant. including water supplies, roads, schools buildings, health centres and capacity building were relevant to the needs and expectations of the communities in the two districts. The intervention has addressed only a portion of the needs, which include primary school classrooms and staff houses and water. Staff houses are particularly significant in the remote mountainous areas of Bundibugyo District and also in the vast plains of Ntoroko District. h staff turnover limited the capacity to fully absorb BIDP, thus limiting its implemented as planned. The implementation of M&E ‘across the board’ awareness of roles and responsibilities of all stakeholders. Efficiency was also hampered because the National Government did not take all steps to finance the project according to the Specific Agreement. The district is still understaffed in key departments that e participatory planning and decentralization process. Almost all of the BIDP implemented inputs were done within the planned timeframe. Efficiency would have been greatly wide integrated M&E system that places emphasis on the mon & responsibilities of all stakeholders. infrastructure investments was very good since the large majority of the investments component of infrastructure was done largely in accordance with t norms of good practice. The community mobilisation for O&M was also done for some of the of the BIDP was demonstrated by the findings from the local beneficiaries reveal satisfaction with the investments done in their community as these directly contributed to improved quality of their lives. Community consultation findings, particularly the household survey, further indicate that BIDP resources were effectively used. All of the micro-projects are surviving, most of them having been completed more than 12 months before the evaluation. The classrooms and staff houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10 projects visited and also based on key informant interviews with the CAO, Ag. DE (main informant), Fisheries Officer, DCDO and the DEO. The FE Team found that the communities were mostly satisfied with the delivered results. The micro-projects contributed to fill a large need for micro sectors of the investments. The effectiveness of the intervention was therefore high. Capacity building continued to burden the overall impacts achieved. A BIDP II would be required to term impacts relative to decentralisation by promoting a better organisational understanding of work practices of local government staff. Impacts of the BIDP on the District were and remain relative to the many challenges marginalized District. Strong impacts were made (directly and indirectly by BIDP support) (greater coverage/population) to water, reduction to water borne diseases, participatory health and education. Before 2005 average distance villagers had to walk to but by 2010 water point distance was less than 1 km, thus achieving large impacts with the modest investments. of BIDP was demonstrated by the fact that it was in-line with other BTC programs like the Kasese District Poverty Reduction Programme (KDPRP) as well as the Belgium Development iii Village User Committees are in place and through social mobilisation; local communities are There has been more than 50% increase in social services enjoyed by local community as The quality of life has improved in as far as access to clean and safe water, access to basic access to health services, access to markets and literacy on environmental protection. District and Communities in line with the Paris Declaration. The strategy and mechanisms BIDP employed to support the decentralisation process through capacity building and levant. including water supplies, roads, schools buildings, health centres and capacity building were relevant to the needs and expectations of the communities in the two districts. rtion of the needs, which include primary school classrooms and staff houses and water. Staff houses are particularly significant in the remote mountainous areas , thus limiting its and O&M was responsibilities of all stakeholders. Efficiency was also hampered because the National Government did not take all steps to finance the project according to the Specific Agreement. The district is still understaffed in key departments that e participatory planning and decentralization process. Almost all of the BIDP implemented inputs were done within the planned timeframe. Efficiency would have been greatly wide integrated M&E system that places emphasis on the monitoring roles was very good since the large majority of the investments was done largely in accordance with the norms of good practice. The community mobilisation for O&M was also done for some of the indings from the local beneficiaries which their community as these directly contributed to improved quality of their lives. Community consultation findings, particularly the household survey, projects are surviving, most of them having been completed more than 12 months before the evaluation. The classrooms and staff houses, markets, roads and gravity flow schemes are all in existence, based on the sample of 10 iews with the CAO, Ag. DE (main The FE Team found that the communities were projects contributed to fill a large need for micro- The effectiveness of the intervention was therefore high. achieved. A BIDP II would be required to etter organisational challenges faced in upport) in the areas to water, reduction to water borne diseases, participatory Before 2005 average distance villagers had to walk to point distance was less than 1 km, thus achieving line with other BTC programs like DPRP) as well as the Belgium Development
  • 14. BIDP Final Evaluation Report Cooperation support for budget in decentralisation for MoLG. The BIDP is also in all thematic areas. The BIDP also established coherence with other donor supported (both bi and multi lateral) programs at the local government level. Recommendations for a BIDP Follow In order to improve on the relevance of BIDP, the Fi program, or better yet a BIDP II (3 capture the momentum built during the period since the MTR situation has improved as observed in a recent MoLG report District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement noted in 2010 presumably as a result of the new administration. This was evidenced by the District and all LLGs meeting all the Minimum Conditions and none penalized in 2010”. In the area of investments, relevant sector guidelines need to be followed in implementation of donor supported projects to avoid conflicting with the sector regulat include community mobilisation for operation and maintenance well before the implementation of the infrastructure project. A BIDP II may consider a lower cost component funding of infrastructure and balance more intensive inputs for capacity building in part hold regular ‘over-the-border’ training. If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts of Bundibugyo and Ntoroko so that each district assumes respo maintain its share of the investments. The lack of responsibility over these projects by the new district of Ntoroko will impact negatively on their maintenance. Further Areas to focus on if there is a Follow BIDP was affected at some stage with issues of fraud and more safeguards are needed in procurement, audit functions and improved monitoring/supervision on the implementation of contracts in the District to ensure that fraud prevention is prioritised. Not all sector implementation guidelines were followed in the implementation of the education and water projects; E.g. MoES requires and kitchen. O&M is critical for the sustainability of th before construction of the project supported by BIDP. The TA support and Belgium Volunteers provided for BIDP an advisory role. This must be accompanied by capacity building and training of key local government staff. Emphasis must be made on having appropriate levels of qualified staff in place. The the most appropriate individuals in key posit framework with low salaries is critical, i.e. able to work in difficult places, flexible, culturally sensitive, long-term commitment, etc. The ability of the Resident Representative to engage with GoU responsibilities in compliance with the Specific Agreement was critical for the BIDP and a BIDP II. While including NGOs and CBOs capacity gaps. Because they are also part of the community and know the needs and have direct contact with key people to get things done, the investment was well worthwhile and should be a priority if there is a BIDP II. A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training Assessment Survey and an evaluation of current M&E and O&M procedures. 2 The 3-5 year extension was also recommended in 3 The recommendations by the MTR were taken very seriously by the District. Many improvements were realized through recommended realignments. Moreover, the political situation in the District has improved greatly 4 Annual Assessment of Minimum Conditions Belgian Development Agency Cooperation support for budget in decentralisation for MoLG. The BIDP is also in-line with LGSIP in all thematic areas. The BIDP also established coherence with other donor supported (both bi and rams at the local government level. Recommendations for a BIDP Follow-up In order to improve on the relevance of BIDP, the Final Evaluation (FE) believes an ex , or better yet a BIDP II (3-5 years)2 , is justifiable and should be undertaken soon so as to capture the momentum built during the period since the MTR 3 was completed. Moreover, the political situation has improved as observed in a recent MoLG report 4 - “Although the performance of the District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement noted in 2010 presumably as a result of the new administration. This was evidenced by the District the Minimum Conditions and none penalized in 2010”. In the area of investments, relevant sector guidelines need to be followed in implementation of donor supported projects to avoid conflicting with the sector regulatory bodies. These guidelines should clude community mobilisation for operation and maintenance well before the implementation of the may consider a lower cost component funding of infrastructure and balance more intensive inputs for capacity building in partnership with KDRCDP to maximize cost border’ training. If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts of Bundibugyo and Ntoroko so that each district assumes responsibility to complete, operate and maintain its share of the investments. The lack of responsibility over these projects by the new district of Ntoroko will impact negatively on their maintenance. Further Areas to focus on if there is a Follow-up Program BIDP was affected at some stage with issues of fraud and more safeguards are needed in and improved monitoring/supervision on the implementation of contracts in the District to ensure that fraud prevention is prioritised. sector implementation guidelines were followed in the implementation of the education and staff houses to include a rainwater harvesting tank, external toilets is critical for the sustainability of the micro-project and mobilisation must be done and there should be a review of the O&M of the micro The TA support and Belgium Volunteers provided for BIDP did a good job and is most appropria an advisory role. This must be accompanied by capacity building and training of key local government staff. Emphasis must be made on having appropriate levels of qualified staff in place. The the most appropriate individuals in key positions and how to achieve this in a weak institutional critical, i.e. able to work in difficult places, flexible, culturally sensitive, Resident Representative to engage with GoU to ensure that they carry out their with the Specific Agreement was critical for the BIDP and a BIDP II. and CBOs resulted in higher costs for BIDP, they greatly helped fill in the capacity gaps. Because they are also part of the community and know the needs and have direct contact with key people to get things done, the investment was well worthwhile and should be a A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training Assessment Survey and an evaluation of current M&E and O&M procedures. 5 year extension was also recommended in BIDP Final Report October 2009. The recommendations by the MTR were taken very seriously by the District. Many improvements were realized through recommended realignments. Moreover, the political situation in the District has improved greatly Annual Assessment of Minimum Conditions iv line with LGSIP in all thematic areas. The BIDP also established coherence with other donor supported (both bi and nal Evaluation (FE) believes an extension of the taken soon so as to was completed. Moreover, the political “Although the performance of the District and LLGs had been persistently poor in 2008 and 2009, there was tremendous improvement noted in 2010 presumably as a result of the new administration. This was evidenced by the District In the area of investments, relevant sector guidelines need to be followed in implementation of donor bodies. These guidelines should clude community mobilisation for operation and maintenance well before the implementation of the may consider a lower cost component funding of infrastructure and KDRCDP to maximize cost; E.g. If there is a BIDP II, it should work out modalities of splitting the works and services in the two districts nsibility to complete, operate and maintain its share of the investments. The lack of responsibility over these projects by the new district BIDP was affected at some stage with issues of fraud and more safeguards are needed in and improved monitoring/supervision on the implementation of contracts sector implementation guidelines were followed in the implementation of the education and rainwater harvesting tank, external toilets mobilisation must be done of the micro-projects is most appropriate as an advisory role. This must be accompanied by capacity building and training of key local government staff. Emphasis must be made on having appropriate levels of qualified staff in place. The selection of ions and how to achieve this in a weak institutional critical, i.e. able to work in difficult places, flexible, culturally sensitive, to ensure that they carry out their with the Specific Agreement was critical for the BIDP and a BIDP II. for BIDP, they greatly helped fill in the capacity gaps. Because they are also part of the community and know the needs and have direct contact with key people to get things done, the investment was well worthwhile and should be a A prerequisite to a BIDP would be updating the 2005 Baseline Survey, a Staff Needs/Training The recommendations by the MTR were taken very seriously by the District. Many improvements were realized through recommended realignments. Moreover, the political situation in the District has improved greatly.
  • 15. BIDP Final Evaluation Report 2 INTRODUCTION 2.1 Presentation of the Bundibugyo Integrated Development Programme (BIDP) is a bilateral cooperation intervention between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda. A specific Agreement was signed by both parties on 20 December 2003 and ended 2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28 April 2005.The total amount of the budget Bundibugyo Integrated Development Programme supported the process of decentralization by contributing to the strengthening of Bundibugyo local authorities’ capacity to improve service delivery to the local population. The project was build upon two main strands: (i) a capacity building component that focused on areas such as participatory planning and budgeting, financial management, resource mobilization, public/private partnership for service delivery, accountability and monitoring, and, (ii) the provision of small and reliable unconditional grants to Bundibugyo District Council and the 10 sub-counties of the district used on non-wage activities according to development plans and the approved budget. The diagram shown on the right illustrates how BIDP coordinated and interacted with key stakeholders as a facilitator for implementation which was based on a co management arrangement. BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration (extended by one year) in which the partie the development needs and priorities of the people in Bundibugyo district. BIDP was implemented within the decentralisation policy framework of Government of Uganda. The BIDP program the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District Rural Community Development Programme. In 2006 when the Ministry of Local Government developed the Local Government Sector Investment Plan (LGSIP), Belgi Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to support LGSIP basket fund. Further cooperation modalities, links to local government and sector support areas of Education and Health we The GoU-BTC five year support to the decentralisation policy through BIDP aimed at improving the standard of living of people in the Bundibugyo district with an emphasis on those that are most vulnerable to poverty. The programme aimed at enhancing the capacity of the district to attain improved and sustainable service delivery at the district and lower local government levels based on participatory good governance principles. Whereas implementation of BI and was expected to end in December 2009, it was subsequently extended to December 2010. Belgian Development Agency District/Sub-LG stakeholders, citizens, CSOs, NGOs Chiefs, Sub-county officials CAO, JLCB, BTC/TA technical officers, Sector Heads/ Directors. Embassy & BTC officials, Government of Uganda Officials BIDP INTRODUCTION resentation of the Intervention yo Integrated Development Programme (BIDP) is a bilateral cooperation intervention between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda. A specific Agreement was signed by both parties on 20 December 2003 and ended on 19 December 2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28 April 2005.The total amount of the budget was EUR 3,500,000. Integrated Development the process of decentralization by contributing to the strengthening of Bundibugyo local authorities’ capacity to improve service delivery to the local build ) a capacity on areas such as participatory planning and budgeting, financial management, resource mobilization, public/private partnership for service delivery, accountability and monitoring, and, (ii) the provision of l and reliable unconditional grants to Bundibugyo District Council counties of the district wage activities according to development plans and The diagram illustrates how nd interacted key stakeholders as a facilitator for implementation, which was based on a co- BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration in which the parties agreed on a set of interventions aimed at responding to the development needs and priorities of the people in Bundibugyo district. BIDP was implemented within the decentralisation policy framework of Government of Uganda. The BIDP program the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District Rural Community Development Programme. In 2006 when the Ministry of Local Government developed the Local Government Sector Investment Plan (LGSIP), Belgium together with Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to support LGSIP basket fund. Further cooperation modalities, links to local government and sector support areas of Education and Health were agreed upon between the GoU and Belgium in 2008. BTC five year support to the decentralisation policy through BIDP aimed at improving the standard of living of people in the Bundibugyo district with an emphasis on those that are most to poverty. The programme aimed at enhancing the capacity of the district to attain improved and sustainable service delivery at the district and lower local government levels based on participatory good governance principles. Whereas implementation of BIDP commenced in June 2005 and was expected to end in December 2009, it was subsequently extended to December 2010. Figure 2: BIDP Support & interactions with key 1 BTC/TA chnical officers, Sector Heads/ Directors. yo Integrated Development Programme (BIDP) is a bilateral cooperation intervention between the Government of the Kingdom of Belgium and the Government of the Republic of Uganda. on 19 December 2009. The BIDP was extended until 20 December 2010. Implementation of the project started on 28 BTC support to Bundibugyo District Local Government was an integrated 5 year collaboration s agreed on a set of interventions aimed at responding to the development needs and priorities of the people in Bundibugyo district. BIDP was implemented within the decentralisation policy framework of Government of Uganda. The BIDP program drew from the Belgian support to Uganda’s decentralisation that started in 2001 through the Kasese District Rural Community Development Programme. In 2006 when the Ministry of Local Government um together with UNDP/CDF, Denmark, Ireland, Netherlands, and Austria) agreed on a MoU and Joint Financing Agreement to support LGSIP basket fund. Further cooperation modalities, links to local government and sector re agreed upon between the GoU and Belgium in 2008. BTC five year support to the decentralisation policy through BIDP aimed at improving the standard of living of people in the Bundibugyo district with an emphasis on those that are most to poverty. The programme aimed at enhancing the capacity of the district to attain improved and sustainable service delivery at the district and lower local government levels based on DP commenced in June 2005 and was expected to end in December 2009, it was subsequently extended to December 2010. upport & interactions with key stakeholders
  • 16. BIDP Final Evaluation Report This FE evaluation was therefore commissioned by BTC to specifically examine t the program enhanced capacity of the district to offer improved service delivery to the Bundibugyo community in key sectors of: • Administration, community based organizations and private sector organizations • Water and sanitation • Education • Health and environment The final evaluation has assessed shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO transversal themes criteria. 2.1.1 Geographical Understanding Bundibugyo District is located in the western part of Uganda and has a population of approx. 248,000 people based on annual population growth rate of 5%. The district is bordered by Hoima District to the northeast, Kibale District to the east, Kabarole District to the south, and Democratic Republic of Congo to the west and north. The district geographical boundaries are: The Semliki River to the west, the Rwenzori Mountains to the East and Lake Albert to the North. The district lies at coordinates: 00 43N, 30 04E. The District covers a total area of 2,338 km 2 . Of this area, open waters, swamps and rivers, cover 570 km2 while 1,243 km2 is covered by Mountains, forests, National Parks (Semuliki and Mt. Rwenzori) and forest reserves, 145 km 2 is covered by game reserves and 380 km2 is the only area available for human settlement. The main economic activity of the people of Bundibugyo is subsistence agriculture and animal husbandry. The main commercial crops grown are coffee, cocoa, and palm oil. Others include bananas, matooke (plantain), rice, beans and cassava while animal kept include: cattle, goats, sheep, pigs and mules. Belgian Development Agency This FE evaluation was therefore commissioned by BTC to specifically examine the extent to which enhanced capacity of the district to offer improved service delivery to the Bundibugyo Administration, community based organizations and private sector organizations the extent to which the programme achieved set objectives and shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO nderstanding of Bundibugyo District Figure 3: Map of the Project Area Bundibugyo District is located in the a 248,000 people based on annual population growth rate of 5%. The district is bordered by Hoima District to the northeast, Kibale District to the east, Kabarole District to the south, and Congo to the west and north. The district raphical boundaries are: The to the west, the to the East to the North. The district lies at coordinates: 00 43N, The District covers a total area of . Of this area, open , cover is covered National (Semuliki and Mt. Rwenzori) is covered by game reserves and 380 for The main economic activity of the people of Bundibugyo is ubsistence agriculture and animal husbandry. The main commercial crops grown are coffee, cocoa, and palm oil. Others include bananas, , rice, beans and cassava while animal kept include: cattle, goats, sheep, pigs and mules. 2 he extent to which enhanced capacity of the district to offer improved service delivery to the Bundibugyo the extent to which the programme achieved set objectives and shall offer a detailed analysis of the programme focussing on: basic criteria, HARMO-criteria and : Map of the Project Area
  • 17. BIDP Final Evaluation Report 2.2 Methodology The FE Team presented an Inception Report (IR) understanding of the assignment, the proposed methodology, work assignment. Also included in the report Integrated Development Programme (BIDP). Upon presentation of th made contact with key BIDP stakeholders at national, district, sub field consultations, i.e. key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to BIDP (based in Bundibugyo for 3 years), MOLG, MoF, Office of the Prime Minister Kampala. Their views shaped the FE team’s understanding of the B designing evaluation tools to review the BIDP that include the following: Reflect on the situation before BIDP (2005) have been implemented and Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability. Appreciate the achievements made Analyse the recommendations of the MTR Reflect on what they consider to be planning, design, implementation, monitoring and evaluation stages The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and quantitative (household survey) data collection and analysis methodologies. In addition the FE captured the extent to which BIDP achieved its intended objectives and results using Sight Sound and Motion (SiSoMo) evaluation video capture and media production. A presented for review before final professional production of the Evaluation DVDs and printed media. The printed media includes summary pamphlets of selected success areas, pictorials and flyers. Various categories of works including: roads, according to the FE criteria. Information generated through the above process progress reports already collected and other important documents for cross referencing purposes. As much as possible, given the challenges in the District, the FE has followed the methodology outlined in the ToR developed by BTC. The depth and details of the FE depend availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support ended in 2010, the FE Team encounter FE also had a very tight-time schedule considering the logistics problems (remoteness) and the complexity of BIDP. The Team Leader communication issues and team bonding dynamics During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team also met with a host of key government officials rele Office, MoLG. Detailed Methodology can be found in Annex Belgian Development Agency Inception Report (IR) to the MoLG on April 11, 2011 that detailed their understanding of the assignment, the proposed methodology, work-plan and tools for undertaking the assignment. Also included in the report were preliminary desk review findings related to Bundibugyo Integrated Development Programme (BIDP). Upon presentation of the inception report, the FE e contact with key BIDP stakeholders at national, district, sub-county and community key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to BIDP (based in Bundibugyo for 3 years), MOLG, MoF, Office of the Prime Minister and Kampala. Their views shaped the FE team’s understanding of the BIDP Programme as well as uation tools to review the BIDP that include the following: situation before BIDP (2005) in the ten sub-counties where such interventions have been implemented and analyze the impacts of BIDP on the District at close (2010). Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability. Appreciate the achievements made - Four Result Areas. recommendations of the MTR (2007) and achievements/progress to date. ect on what they consider to be good practices and vital lessons learnt planning, design, implementation, monitoring and evaluation stages. The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and titative (household survey) data collection and analysis methodologies. In addition the FE the extent to which BIDP achieved its intended objectives and results using Sight Sound and Motion (SiSoMo) evaluation video capture and media production. A DVD and other media presented for review before final professional production of the Evaluation DVDs and printed media. summary pamphlets of selected success areas, pictorials and flyers. ing: roads, water and buildings undertaken by BIDP Information generated through the above process was enriched with secondary data such as progress reports already collected and other important documents for cross referencing purposes. As much as possible, given the challenges in the District, the FE has followed the methodology oped by BTC. The depth and details of the FE depended availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support the FE Team encountered problems of ‘intuitional memory’ going back time schedule considering the logistics problems (remoteness) and the he Team Leader had to be flexible with the FE Team and try to manage difficult communication issues and team bonding dynamics, etc. During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team also met with a host of key government officials relevant to the BIDP such as the Prime Minister’s Detailed Methodology can be found in Annexes 7-9: The BIDU FE Team and Field Strategy. 3 , 2011 that detailed their plan and tools for undertaking the preliminary desk review findings related to Bundibugyo inception report, the FE team county and community levels for key persons at the BTC’s Offices, Belgium Embassy, previous BTC Advisor to and MOFPED in IDP Programme as well as counties where such interventions District at close (2010). Assesses BIDP’s relevance, effectiveness, efficiency, impact created and sustainability. (2007) and achievements/progress to date. lessons learnt from project The FE approach utilized both qualitative (Key Informant Interviews, Focus Group discussions) and titative (household survey) data collection and analysis methodologies. In addition the FE the extent to which BIDP achieved its intended objectives and results using Sight Sound and DVD and other media were presented for review before final professional production of the Evaluation DVDs and printed media. summary pamphlets of selected success areas, pictorials and flyers. undertaken by BIDP were reviewed enriched with secondary data such as progress reports already collected and other important documents for cross referencing purposes. As much as possible, given the challenges in the District, the FE has followed the methodology greatly on the availability of key stakeholders, both at the MoLG and the District. Particularly since the BIDP support problems of ‘intuitional memory’ going back 5+ years. The time schedule considering the logistics problems (remoteness) and the flexible with the FE Team and try to manage difficult During the first week of the FE, the Team undertook briefings at BTC and Embassy of Belgium in regarding the ‘bigger picture’ of the Government of Belgium’s aid modalities in Uganda. The FE Team vant to the BIDP such as the Prime Minister’s : The BIDU FE Team and Field Strategy.
  • 18. BIDP Final Evaluation Report Figure 4: Public awareness messages on 3 BACKGROUND AND CONTE 3.1 Historical Context of the Uganda experienced decades of political unrest until the 1990s, since when it has seriously endeavored to maintain political stability, peace and annual economic growth. Despite the universal spread of primary education there, literacy rates are still low. mostly cost-related. Around 20% of Ugandans over 15 years of age have received no formal education. Some 40% of the population suffers from disease, a rise of 11% compared with the period 2002-2003. Malaria accounts for half of all cases. On average, Ugandans have to travel 27 to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV In November 2008, Uganda and Belgium signed a new Cooperation Programme Following the successful implementation of the first Cooperation Programme (2005 committed a budget of €64 million, raising Uganda to Development Cooperation. Belgium is paying equality, the environment, social economy and the rights of the child. Cooperation’s new programme is focusing • Primary healthcare, especially buildin management capacity; and • Education, in particular institutions offering business, technical, vocational and health training.5 The below photo shows one of the many and in many instances local authorities do not have the adequate capacity and financial resources necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of 5 http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/ Belgian Development Agency : Public awareness messages on building BACKGROUND AND CONTEXT ontext of the Intervention Uganda experienced decades of political unrest until the 1990s, since when it has seriously endeavored to maintain political stability, peace and annual economic growth. Despite the universal spread of primary education there, literacy rates are still low. Barriers to education still remain, being related. Around 20% of Ugandans over 15 years of age have received no formal education. Some 40% of the population suffers from disease, a rise of 11% compared with the period ts for half of all cases. On average, Ugandans have to travel 27 to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV In November 2008, Uganda and Belgium signed a new Cooperation Programme Following the successful implementation of the first Cooperation Programme (2005-2008), Belgium €64 million, raising Uganda to the fourth-ranking partner country of Belgian . Belgium is paying special attention to the cross-cutting issues of gender equality, the environment, social economy and the rights of the child. Belgian Development focusing on the following two sectors: Primary healthcare, especially building the decentralized health services’ leadership and ducation, in particular institutions offering business, technical, vocational and health The below photo shows one of the many public awareness art work in the With Uganda suffering from mismanagement, violence, destruction of infrastructure, economic collapse and a high prevalence of HIV/AIDS and other diseases, a new regime taking over the political powers aiming at stability, social development and good governance development, aid to Uganda was both needed and justified. The support to improved governance and to decentralization was one of the four areas of Belgian support to the Government of Uganda. Uganda has initiated a major decentralization process through early assistance by UNDP has provided local elected authorities with important areas of responsibilities for poverty reduction such as primary education, primary health care, agriculture, feeder roads and water. The decentralization process also aims at improving community participation in the decision making process, increased transparency and accountability to the citizens in the use of locally managed resources. Belgium chose to support the decentralization process with a special emphasis on human resources and institutional development, together with specific actions improving the livelihoods of the population. The decentralization process has been quit and in many instances local authorities do not have the adequate capacity and financial resources necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/ 4 Uganda experienced decades of political unrest until the 1990s, since when it has seriously endeavored to maintain political stability, peace and annual economic growth. Despite the universal Barriers to education still remain, being related. Around 20% of Ugandans over 15 years of age have received no formal education. Some 40% of the population suffers from disease, a rise of 11% compared with the period ts for half of all cases. On average, Ugandans have to travel 27 kilometers to reach their nearest hospital, and 15% of children under 18 are orphans, mostly due to HIV/AIDS. In November 2008, Uganda and Belgium signed a new Cooperation Programme (2009-2012). 2008), Belgium ranking partner country of Belgian cutting issues of gender Belgian Development health services’ leadership and ducation, in particular institutions offering business, technical, vocational and health-related work in the District. from mismanagement, violence, destruction of infrastructure, economic collapse and a high prevalence of HIV/AIDS and a new regime taking over the political powers aiming at stability, social good governance development, aid to Uganda was both needed and justified. The support to improved governance and to one of the four areas of Belgian support to the Government of Uganda. Uganda has initiated a major decentralization through early assistance by UNDP, which has provided local elected authorities with important poverty reduction such as primary education, primary health care, agriculture, feeder roads and water. The ocess also aims at improving community participation in the decision making process, increased transparency and accountability to the citizens in the use of locally managed Belgium chose to support the decentralization process with a special emphasis on human resources and institutional development, together with specific actions improving the livelihoods of the The decentralization process has been quite rapid and in many instances local authorities do not have the adequate capacity and financial resources necessary to implement their mandates. Therefore, Belgium has chosen, under the overall guidance of http://diplomatie.belgium.be/en/policy/development_cooperation/countries/partner_countries/uganda/