SlideShare a Scribd company logo
1 of 36
Download to read offline
(H.P Govt Energy Development Agency)
Block 8-A SDA Complex Kasumpti Shimla-171009
Telephone 0177- 2621783 Fax 0177-2622635 Website:- Himurja.nic.in
TENDER DOCUMENT
No. HIMURJA (F-7)/SPV Plant/JNNSM/2014-15-Part-II
SUPPLY, INSTALLATION AND COMMISSIONING OF SOLAR
PHOTO VOLTAIC POWER PLANTS AT HP VIDHAN SABHA,
SHIMLA OF 20 KWP
Issued By: Name of the firm
Dated: Date of opening: ---- 20.08.2014
Time of opening: ---- 15.00 Hrs.
Price of document ---- Rs. 5,000/-
Note: - Only technical Bids will be opened on the said date. The date of opening of the Price
Bids of the successful bidders will be intimated separately after technical evaluation.
PART-I SECTION- I to VI
PART-II FINANCIAL BID
(H.P Govt Energy Development Agency)
Block 8-A SDA Complex Kasumpti Shimla-171009
Telephone 0177- 2621783 Fax 0177-2622635 Website:- Himurja.nic.in
TENDER NOTICE
Sealed tenders are hereby invited for Supply, Installation and Commissioning of SPV power plants of 20
kWp at Himachal Pradesh Vidhan Sabha ,Shimla after thorough testing as per MNRE guidelines under
JNNSM programme. The tender document can be purchased from the office of the undersigned by paying Rs.
5,000/- only in the shape of demand draft drawn in favour of Director, HIMURJA and payable at Shimla from
01.08.2014 to 19.08.2014. The tender document is also available on the website of HIMURJA i.e. himurja.nic.in
which can be downloaded. The cost of downloaded tender document can be deposited with the tender. The
tender complete in all respect shall be received up to 2 PM on 20.08.2014 and shall be opened on the same
date at 3 PM in the presence of tenderers or their authorized representatives who wish to be present at the time of
opening of tenders.
Tender Document
No.
Name of work. Completion
time
Earnest Money
No. HIMURJA
(F-7)/SPV Plant/
JNNSM/
2014-15-Part-II
Supply, installation and commissioning
of SPV power plants of 20 kWp at
Himachal Pradesh Vidhan Sabha,
Shimla
3 months Rs.70,000/-
Terms and Conditions:
i) Tenders without earnest money will not be considered.
ii) HIMURJA reserves the right to reject any or all the tenders without assigning any reason.
iii) MNRE approved System Integrators under JNNSM of SPV systems or manufacturers of SPV Systems,
having sufficient experience of installation and commissioning of minimum 10 kWp capacity SPV
Power Plant are eligible. Bidders may submit the proof of their eligibility in the shape of work order,
commissioning and satisfactory operation reports along with the bid.
iv) The bidder should have income tax/sale tax clearance, CST/ VAT registration etc. as required under the
rules.
v) The annual turnover of the firm should be Rs 20 Lacs for the each preceding three years
i.e. 2011-2012, 2012-13 & 2013-14.
Sr Executive Engineer (E)
HIMURJA, Urja Bhawan,
Shimla-171009.
SECTION - I
INSTRUCTIONS TO BIDDERS
A. Introduction
1. Source of Funds
1.1 The Project has been jointly funded by MNRE, Govt of India and HP Govt.
2. Bidders Eligibility and Qualification
2.1 MNRE approved System Integrators under JNNSM of SPV systems or manufacturers of SPV
Systems, having sufficient experience of installation and commissioning of minimum 10 kWp
capacity SPV Power Plant are eligible for tendering. The bidder should have income
tax/sale tax clearance and CST/ VAT registration etc. as required under the rules. The
annual turnover of the firm should be minimum Rs 20 Lacs for the each preceding three
years i.e. 2011-2012, 2012-13 & 2013-14. Bidder may submit proof of their eligibility in
the shape of work orders, commissioning and satisfactory operational reports along with
the bid. In absence of sufficient experience the tender can be rejected straight way.
3. Bid Form
3.1 The Bidder shall complete the Bid Form and the appropriate Price Schedule furnished in
the Bidding Documents, indicating the goods to be supplied, a brief description of the
goods, quantity and prices. The rate should be quoted strictly as per scope of work and
price bid.
4. Documents Establishing Bidder's Eligibility and Qualifications
4.1 The Bidder shall furnish, as part of its bid, documents establishing the bidder's eligibility
to bid and its qualifications to perform the Contract if its bid is accepted.
5. The documentary evidence of the Bidder's qualifications to perform the Contract if
its bid is accepted, shall establish to the HIMURJA's satisfaction.
(a) that, in the case of a Bidder offering to supply goods under the contract which the
Bidder did not manufacture or otherwise produce, the Bidder has been duly
authorized by the goods' manufacturer or producer to supply the goods in the
purchaser’s country. In support party will provide the documentary proof of
infrastructure support for the same.
(b) that the Bidder has the financial, technical, and production capability necessary to
perform the Contract.
6. The documentary evidence of conformity of the goods and services to the bidding
documents may be in the form of literature, drawings and data, and shall consist of:
(a) a detailed description of the essential technical and performance characteristics of
the goods;
(b) a list giving full particulars, including available sources and current prices, of all
spare parts, special tools, etc., necessary for the proper and continued functioning
of the goods for a period to be specified in the Bid Data Sheet, following
commencement of the goods by HIMURJA.
(c) a item-by-item commentary on the HIMURJA's Technical Specifications
demonstrating the goods and services to those specification, or a statement of
deviations and exceptions to the provisions of the Technical Specifications.
7. Earnest Money
7.1 Tender accompanied by earnest money of Rs. 70,000/- (Seventy Thousands only) in the
name of Director, HIMURJA, Shimla through demand draft only shall be accepted.
7.2 The earnest money is required to protect the HIMURJA against risk of Bidder's conduct
which would warrant the security's forfeiture. No interest will be paid on Earnest Money.
7.3 Unsuccessful Bidder's earnest money will be discharged/returned as promptly as possible
as but not later than thirty (30) days after the expiration of the period of bid validity
prescribed by the HIMURJA subject to receipt of request letter and pre-receipt from the
bidder’s.
7.4 The successful Bidder's earnest money will be adjusted in the performance security.
7.5 The earnest money may be forfeited:
a) If a Bidder withdraws its bid during the period of bid validity specified by the
Bidder on the Bid Form.
b) In case of successful Bidder fails to sign the Contract or to furnish required
performance security.
8. Period of Validity of Bids
Bids shall remain valid for the period of six (6) months from the date of opening of
technical bid.
9. Format and Signing of Bid
9.1 The Bidder shall submit an original and one duplicate copy clearly marking each
"Original Bid" and "Copy of Bid", as appropriate. In the event of any discrepancy
between them, the original shall govern.
9.2 The original and duplicate copy of the bid shall be typed or written in indelible ink and
shall be signed by the Bidder or a person duly authorized to bind the Bidder to the
Contract. All pages of the bid, except for un-amended printed literature, shall be initialed
by the person signing the bid.
9.3 Any interlineations, erasures, or overwriting shall be valid only if they are initialed by the
person or persons signing the bid.
B Submission of Bids
10. Sealing and Marking of Bids
The bidders shall submit their bids in duplicate i.e. in original and duplicate in the
following manner:
10.1 The first envelope (A) must contain the requisite E.M.D. and it must be super scribed as
the EMD on the envelope and must be properly sealed.
10.2 The second envelope (B) must contain the Technical bid and it must be super scribed as
the Technical Bid on the envelope and must be properly sealed.
10.3 The third envelope (C) must contain the requisite Price Bid and it must be super scribed
as the Price bid on the envelope and must be properly sealed.
10.4 All the above three envelopes ( A,B,C) must be duly sealed in a single envelope duly
marked as the original copy and the duplicate along with date of opening.
10.5 Every envelope should contain the name and address of the firm with the Number of the
NIT, Technical Bid and Price Bid.
10.6 The technical bid in all circumstances should not contain any reference to the prices
quoted.
11. Deadline for Submission of Bids
11.1 Bids must be submitted in the office in time i.e upto 2:00 P.M. on 20.08.2014.
12. Late Bids
12.1 Any bid received by the HIMURJA after the deadline for submission of bids prescribed
by the HIMURJA, will be rejected and/or returned unopened to the Bidder.
C Bid Opening and Evaluation
13. Opening of Technical Bids by HIMURJA
13.1 The HIMURJA will open the technical bids, in the presence of Bidders' representatives
who wants to be present, at the time, on the date, and at the place specified in the Bid
Data Sheet. The bidder’s representatives who are present shall sign a register evidencing
their attendance.
13.2 The Bidders' names, the presence or absence of the requisite bid security and such other
details as the HIMURJA, at its discretion, may consider appropriate will be announced at
the opening, except for late bids, which shall be returned unopened to the Bidder.
13.3 The technical bids shall be evaluated by the HIMURJA for assessing responsiveness,
bidders qualification and technical confirmation.
13.4 The bidders whose technical bids are declared as technically responsive and qualified
shall be informed accordingly and their Price Bids shall be opened.
13.5 The bidders whose technical bids do not qualify, their Price Bids shall not be opened and
the same shall be returned to the Bidders.
13.6 Price Bids opening date shall be conveyed subsequently.
14. Clarification of Bids
14.1 During evaluation of the bids, the HIMURJA may, at its discretion, ask the Bidder for a
clarification of its bid. The request for clarification and the response shall be in writing,
and no change in the prices or substance of the bid shall be sought, offered, or permitted.
If the firm does not respond to the clarification, the firm will be considered as non-
responsive and the tender shall be rejected out rightly.
14.2 At any time prior to the submission of the tender or prior to the opening of the financial
bid HIMURJA may for any reason whether at its own initiative or in response to a
clarification requested by the tenderers may modify the tender document by amendments.
The amendment will be notified in writing or by fax to all prospective tenderers who have
received the tender documents and will be binding on them. HIMURJA will bear no
responsibility or liability arising out of non receipt of the same in time or otherwise.
15. Evaluation and Comparison of Bids
15.1 The HIMURJA will evaluate and compare bids which have been determined to be
substantially responsive.
15.2 The detailed techno-commercial analysis of the bid shall be carried out by the HIMURJA.
16. Contacting the HIMURJA
16.1 From the time of bid opening to the time of contract award, if any bidder wishes to
contact the HIMURJA on any matter related to the bid, it should do so in writing.
16.2 Any effort by a Bidder to influence the HIMURJA in its decision on bid evaluation, bid
comparison or contract award decisions may result in rejection of the Bidder's bid.
D Award of Contract
17. Award Criteria
17.1 The HIMURJA will award the Contract to the successful Bidder whose bid has been
determined to be substantially responsive and has been determined as the lowest
evaluated bid, provided further that the Bidder is determined to be qualified to perform
the Contract satisfactorily.
18. HIMURJA's Right to Accept Any Bid and to Reject Any or All Bids
18.1 The HIMURJA reserves the right to accept or reject any bid, and to cancel the bidding
process and reject all bids at any time prior to award of Contract, without thereby
incurring any liability to the affected Bidder or Bidders or any obligation to inform the
affected Bidder or Bidders.
19. Signing of Contract
19.1 The successful Bidder will sign the contract within fifteen (15) days from the issue of
award letter.
20. Bid Security:-
20.1 The successful bidder shall deposit with the Director, HIMURJA Bid security equal to
10% of the contract value within 15 days from the date of issue of the award letter in the
form of demand draft for the faithful execution of the contract. No claim shall made
against the purchaser in respect of interest on security deposit.
20.2 The Earnest money deposit in the form of bank draft shall be adjusted against the Bid
security, later on the same shall be adjusted against the performance security.
20.3 The bid security shall be released immediately after the successful commissioning of the
project.
21. Performance Security:-
21.1 Before the commissioning of the project the supplier shall furnish the performance
security equivalent to 10% of the total contract value, valid for a period of five years
beyond the date of commissioning of the project in the form of cash/demand draft in the
name of Director, HIMURJA, Shimla. However the firms can substitute the Performance
Security by submitting a Bank Guarantee of equivalent amount valid for the remaining
warranty period after six months from the successful installation of the systems. The
purchaser shall be entitled and it shall be lawful on his part to forfeit the performance
security deposit as per the contract in whole or in part in the event of any fault, failure of
performance in all respects of the contract under reference or any other contract with the
purchaser and purchaser shall also be entitled to deduct from the said deposit any loss or
damage which the purchaser may suffer or be put to by reason of or due to any act or
other default recoverable by the purchaser from the contract.
21.2 The Earnest Money Deposit adjusted against the Bid security shall be further adjusted
against the performance security. The balance amount of the performance security shall
be recovered from the bills of the supplier.
21.3 The Performance Security shall be denominated in the currency of the Contract.
21.4 The Performance Security shall be valid upto the warranty period and shall be released
only after expiry of warranty period.
SECTION - II
GENERAL CONDITIONS OF CONTRACT
Brief History
The Solar Photovoltaic Power Plant is proposed to be installed at H.P. Vidhan Sabha. 20
Kwp SPV Power Plant will be with battery backup and will augment the energy
requirement of the institution.
Accordingly, HIMURJA has prepared Tender Document No. HIMURJA (F-7)/SPV
Plant/IPH/JNNSM/ 2014-15-Part-II for the supply, installation and commissioning of 20
kWp SPV power plant at Himachal Pradesh Vidhan Sabha ,Shimla. As per site feasibility
the capacity of SPV plants can be increased/ decreased accordingly.
The components of systems such as PV modules , battery, PCU( charge controller and
inverter) supplied under the project will be picked randomly from the supplied lots by
Ministry for testing at SEC at manufacturers cost. In case any system / component fail,
whole lot will be rejected and no payment will be released.
1 General Scope of Work:
The general scope under this contract includes verification of site feasibility, design,
engineering, manufacture, shop testing, inspection, packing & forwarding, transportation
upto project site, loading & unloading, storage , erection, preliminary testing at site,
installation, commissioning, performance testing & handing over of SPV power plants
at HP Vidhan Sabha Shimla (HP) in the presence of HIMURJA. The firm will have to
visit the site and discuss the locations where the plant is to be installed and capacity of
the SPV Power plant with the representative of HIMURJA and submit report with the
tender verified by concerned Project Officer. The scope of the work will also include the
following:--
a) Warranty period of five years which will commence from the date of successful
commissioning and acceptance by the HIMURJA. During warranty period, the supplier
will carry out preventive, routine and breakdown maintenance of all the plants including
replacement of any components including DC battery , PCU etc. which goes bad free of
cost.
b) It includes mounting of modules, structure required for mounting the modules, Stand for
DC battery and control panels and other miscellaneous works required for successful
installation and commissioning and synchronizing of the plant.
c) Provision will be made for automatic shift to conventional electric supply in case of
failure of supply from SPV system.
d) The firm will make provision for online monitoring of the SPV Power plant to be
installed at HP Vidhan Sabha.
e) The firm will give undertaking of the performance of SPV Power plant to generate the
required installed capacity on the attached Annexure VIII. The tenderers may quote
their rates along with minimum requirement if any.
The Bidder has to ensure as under after consultation with HP Vidhan Sabha authorities:-
i) The availability of shadow free area for the installation of SPV Modules on roof
top or on ground.
ii) Indoor space for housing of batteries, control panel and facilitation for internal
and external wiring as per site conditions.
f) The quantum of the job can be increased or decreased and the bidder cannot
claim any compensation on that part.
2. Incidental Services
2.1 The supplier may be required to provide any or all of the following compulsory services
(a) Performance or supervision of the on-site assembly and/or start-up of the supplied
Goods;
(b) Furnishing of sufficient T&P and tools required for assembly and/or maintenance
of the supplied Goods;
(c) Detailed operations and maintenance manual will be supplied to different units
as under:-
i) Two sets to HIMURJA H/Q
ii) One set to consignee
(d) Performance or supervision or maintenance and/or repair of the supplied Goods,
for a period of ten years or for time as agreed by the parties, provided that this
service shall not relieve the Supplier of any warranty obligations under this
Contract.
(e) Training of the Vidhan Sabha Personnel handling the SPV Power Plant at the
Supplier's plant and/or on site, in assembly, start-up, operation, maintenance
and/or repair of the supplied Goods.
3. Payment
Payment shall be made in the currency specified in the Contract in the following manner:
Payment for Goods and services
(i) On delivery: Fifty percent (50%) of the contract price shall be paid on receipt of the
goods and upon submission of bills duly verified by concerned Sr. Project Officer,
Shimla, HIMURJA, H.P.
(ii) On Final Acceptance: Fifty percent (50%) of the contract price shall be paid after
completion of the following formalities :-
• Erection, testing and successful commissioning of the power plant
• Receipt of test report of MNRE testing centre, in case samples collected from site by the
MNRE representative.
• Completion of training of concerned department personal for operation & maintenance.
• The balance payment will be released after submission of consolidated commissioning
certificates to be issued by the concerned department beneficiary and duly verified by the
Sr Project Officer, HIMURJA, Shimla, H.P.
4. Subcontracts
The Supplier shall obtain approval of the HIMURJA in writing of all subcontracts to be
awarded under the Contract if not already specified in his bid. Such notification, in his
original bid or later, shall not relieve the Supplier from any liability or obligation under
the Contract. The Performa of manufacturer authorization is as per Annexure IX.
5. Completion Time Period
Delivery, installation and commissioning of the equipments should commence
immediately after issue of Award letter, the supply should be completed within 2 (Two)
months and installation & commissioning within 3 (Three ) months from the date of
issue of Award letter. The whole work is to be completed within Three months from the
date of issue of Award Letter.
6. Liquidate Damages
The time period is the essence of the contract and the supplier is bound to adhere to the
time period stipulated in the contract agreement. The extension in the stipulated time
period can be granted by the HIMURJA (Engineer in Charge) without liquidated
damages in case of force majeure conditions only. However failure to complete the job
within the stipulated time period, the liquidated damage @ 1% of the cost of left out work
for every week of delay or part there of depending upon the causes of delay subject to a
maximum of 10% of the total contract shall be recovered from the supplier. In case the
Engineer in charge observes that the intentional delay is being caused by the supplier and
he has failed to comply with the directions of HIMURJA, the contract shall be liable to
be rescinded without assigning any notice thereof.
All disputes relating to this contract shall be subject to the jurisdiction of courts in Shimla
and Chief Executive Officer, HIMURJA shall be the sole Arbitrator.
7. Inspection and Tests
The Himurja authorized representative shall have access to the supplier work
place at any time during working hours for purpose of inspecting the
manufacturer of the equipment and the supplier shall provide all necessary
facilities for such inspection. No supply shall be dispatched without prior
inspection and approval by the Himurja and the charges on account of inspection
shall be borne by the supplier
Inspection and tests prior to shipment of Goods and at final acceptance are as
follows:
7.1 The inspection of the Goods shall be carried out to check whether the goods are in
conformity with the technical specifications attached to the purchase order form
and shall be in line with the inspection/test procedures laid down in the schedule
of specifications and the contract conditions.
7.2 Manufacturer must have suitable facilities at their works for carrying out various
routine and performance tests on the equipment.
7.3 All tests specified in the technical specifications approved by MNRE under
JNNSM.
7.4 Approved supplier’s drawings shall not be changed as provided in the bidding
document without prior approval of the competent authority.
7.5 The HIMURJA shall have the right to inspect the supplier’s premises and any part
of the work at any time.
7.6 The supplier shall submit, within the time stated in the contract or in the
programme, drawings showing how the plants are to be designed and any other
information required for approval to HIMURJA.
7.7 Before the goods and equipment are taken over by the HIMURJA, the supplier
shall supply operation and maintenance manuals together with drawings of the
goods and equipment as built. These shall contain such details which will enable
the HIMURJA to operate, maintain, adjust and repair all parts of the works as
stated in the specifications. The manuals and drawings shall be in the ruling
language (English) and in such form and numbers as stated in the contract. Unless
and otherwise agreed, the goods and equipment shall not be considered to be
completed for the purposes of taking over until such manuals and drawings have
been supplied to the HIMURJA.
7.8 If the goods/services or any section fails to pass the Tests, the supplier may
require such tests to be repeated on the same terms and conditions. All costs to
which the HIMURJA may incur by the repetition of the tests under this sub-clause
shall be deducted from the contract price.
7.9 If the HIMURJA and the supplier disagree on the interpretation of the test results
each shall give a statement of his views to the other within 14 days after such
disagreement arises. The statement shall be accompanied by all relevant evidence.
The HIMURJA will review both the statements and render a final decision which
shall be binding on the supplier.
For the System & Other Software, the following will apply:
The Supplier shall provide complete and legal documentation of hardware, all
subsystems, operating systems, compiler, system software and the other software.
The Supplier shall also provide licensed software for all software products, along
with the software manuals whether developed by it or acquired from others. The
supplier shall also indemnify the HIMURJA against any levies/penalties on
account of any default in this regard.
8. Acceptance Certificate:
8.1 On successful completion of acceptability test, receipt of deliverables etc, and
after the HIMURJA is satisfied with the working on the plant, the acceptance
certificate signed by the supplier and the representative of the HIMURJA will be
issued. The date on which such certificate is signed shall be deemed to be the date
of successful commissioning of the systems. If HIMURJA desires third party
inspection can be carried out on the expenses of supplier before acceptance.
8.2 The training shall be imparted for seven days after successful commissioning of
project to the officials of HP Vidhan Sabha & HIMURJA at H /Q level for
operation and routine maintenance.
9. Spare Parts
Supplier shall carry sufficient inventories to assure ex-stock supply of consumable
spares such as Cable lugs, Nut & bolts, Screws, Switches, fuses, indicating lamps
& blocking diodes lights/bulbs, spare modules, battery spares etc. sufficient for
five year operation and maintenance at individual sites / at service centre. List of
consumable spares and mandatory spare parts and components shall have to be
supplied with the bid.
10. Maintenance Service
A During warranty period
Free maintenance services shall be provided by the supplier during the warranty
period of five years. No payment will be made on this account as it is included
in the cost of main equipment. This Maintenance
Service will include:-
a) Preventive & Routine Maintenance:-
It includes minimum two visits of site which shall be done at least once in
every six months and shall include activities such as cleaning of modules ,
checking of connections of panels, electric connections of arrays , control
panels, inverter , charge controllers, DC battery connections , specific gravity of
battery and any other activity that may be required for proper functioning of the
System as a whole. Proper record will be maintained by the firm on this account
in the HP Vidhan Sabha SPV Power Plant. Any spare and consumable required
during period of five years will be supplied free of cost by the firm including
replacement of any components which require replacement.
b) Breakdown and corrective maintenance:
Whenever a complaint is lodged by the user in the service centre , the firm shall
attend to the complaint within a reasonable period of time and in any case the
breakdown shall be corrected within a period not exceeding three days from
the date of lodging of complaint. Failure to arrange for the immediate
repair/replacement will be liable for penalty and the amount of penalty will be
recovered from the performance security or any money lying with HIMURJA @
Rs. 2,000/- only per day.
11. Right to use defective equipment
If after delivery, acceptance and installation and within the warranty period, the
operation or use of the equipment proves to be unsatisfactory, the HIMURJA shall
have the right to continue to operate or use such equipment until rectifications of
defects, errors or omissions by repair or by partial or complete replacement is
made.
12 Operation & Maintenance
The firm will train the concerned staff of HP Vidhan Sabha after commissioning,
for the operation and routine maintenance of plant.
13 Site Visit
a) The Tenderer in own interest will conduct free visit to the site to study the
preliminary feasibility and scope of work before quoting the rates otherwise it
will be assumed that they have visited the site. The firm is required to submit the
certificate that the site has been inspected. The firm can contact the local Sr.
Project Officer, HIMURJA, Shimla (Mobile No 94184 56377) and discuss the
details of the installation sites. The Tenderers shall offer their complete design
along with drawings for the plants in their bids.
b) The approved bidder will visit the site after issue of Award letter and submit
final feasibility report duly signed by concerend authorities and representative of
HIMURJA. In case of deficiency in successful commissioning of plant,
HIMURJA may impose penalty and forfeit the bid security. The design and
drawing of site will be submitted for the approval of HIMURJA within 15 days of
issue of Award letter.
14 Packing
The Supplier shall provide such packing of the Goods as is required to prevent
damage or deterioration during transit to their final destination as indicated in the
Contract. The packing shall be sufficient to withstand, without limitation, rough
handling during transit and exposure to extreme temperatures, salt and
precipitation during transit and open storage. Packing case size and weights shall
be taken into consideration, where appropriate, the remoteness of the Goods’ final
destination and the absence of heavy handling facilities at all points in transit.
15. Price Low Clause
If at any time during the supply period, the Firm offers similar SPV Power Plant
of same capacity to some other customers on similar terms and conditions and
technical specifications at reduced rates in respect of items contained in this order,
then such reduced rates will also be applicable to this organization and the benefit
will have to be passed on to HIMURJA.
16. Location of Power Plant.
Sr.
No.
Name of site Capacity
1. HP Vidhan Sabha, Shimla 20 kWp with battery back up
SECTION – III
SCHEDULE OF REQUIREMENT
S.
No.
Brief Description Units Make
1 SPV modules of 200 Wp or above for a total capacity of 20
kWp with RF identification tag.
1 Set
2 SPV module mounting structure suitable for accommodating
the required capacity SPV modules including any other
structure as per site conditions.
1 Set
3 PCU as per specification for 20 kWp 1 set
4 Array Junction Boxes 1 Set
5 Main Junction Boxes 1 Set
6 DC Distribution units as per specifications 1 No.
7 AC Distribution unit as per specifications including Mains
Changeover
1 No.
8 Cables/Wiring requirement
All cable trays including covers to be provided
As per
requirement
of site
BIS
marked
9 Lightning arrestor complete set as per specification 1 Set
10 Earthing set as per specification 1 Set
11 Battery bank complete as per specifications 240 Volts, 300 AH
at C/10 rate, VRLA tubular plate gel batteries for 20 kWp
1 Set
12 Spares, tools for 5 years operation and maintenance of plant As per list
13 Engineering, electrical drawings and installations and O&M
manuals
3 Sets
14 Energy meter for measurement of solar energy 1 No.
15 Any miscellaneous work required for the installation of plant L/S
16 Internal and external wiring L/S
17 Data Logger 1 set
Note :
i) The requirement for the plant and machinery is indicative and the supplier is required to
include and quote for any other item left out in the schedule for successful working
during warranty period. Any spare, consumable or any other item which goes bad will be
replaced by the firm free of cost during warranty period.
ii) Suppliers shall offer their complete design along with drawings for the plant in their bids
after conducting site visit.
iii) Alternate makes can be offered for the equipment/ items and approval by HIMURJA.
The specification of all the components including modules will conform strictly to the
specification as prescribed in JNNSM by MNRE.
TECHNICAL SPECIFICATION
The PV modules and other components of SPV plants to be offered shall perform
satisfactorily in humidity up to 100 % with ambient temperature in between - 30
degree centigrade to + 55 degree centigrade.
I. Solar PV Module
1. Solar PV module array to be of high efficiency Solar Modules utilizing Crystalline
Silicon (Multi/Mono crystalline) Solar PV cells. Individual Solar module rating
should not be less than 200 Wp @ STC. each .
Since the modules would be used in high voltage circuit, the High Voltage Insulation test
shall be carried out on each modules and a test certificate to that effect will have to be
provided.
Power output Guarantee offered for the SPV Module shall be :
i) 12 years (with less than 10% degradation)
ii) 25 years (with less than 20% degradation)
Solar PV module offered should meet following minimum requirement.
1. Efficiency of module, Eff, m ≥ 14 %
2. IV curve of each PV module with Sl Nos. should be submitted along with
Modules.
Solar PV Modules shall conform to IEC 61215 Ed 2 and IEC 61730 standard. Test
certificates to be submitted along with the bid with other requirements of JNNSM.
With RFID on the module ,following details to be provided:
• Maximum Power, Pmax
• Open Circuit Voltage, Voc
• Short Circuit Current ,Isc
• Voltage at Max Power Vmp
• Current at Max power Imp
• Efficiency of cell, Ef, c
• Efficiency of module, Ef, m
3. Solar PV Module should conform to following mechanical requirement:
• Toughened, low iron content, high transmissivity front glass.
• Anodized Aluminum Frame.
• Ethyl Vinyl Acetate (EVA) encapsultant.
• Silicon edge sealant around laminate.
• Tedlar / Polyester trilainate back surface.
• ABS plastic terminal box for the module output termination with gasket to prevent water
moisture.
• Resistant to water, abrasion, hail impact, humidity & other environment factor for the
worst situation at site.
• By pass diode.
Type of Solar PV Modules offered should have proven Performance Track record in
Indian climatic conditions.
II. Module Mounting Structure / Array
• Structure shall be designed for simple mechanical and electrical installation. It shall
support SPV modules at a given orientation, absorb and transfer the mechanical loads to
the ground properly.
The mounting structure should be Galvanized & with anticorrosive paint. The array
structure shall be so designed that it will occupy minimum space without sacrificing the
output from SPV panels & shall with stand heavy winds. Support structure design
and foundation or fixation mounting arrangements should with stand minimum
horizontal wind speed of 140 kmps / hr (Design devalue shall be greater than 140
kmps /hr) on the roof of Vidhan Sabha.
• Tilt angle adjustment:- Fixed as per roof available at site.
III. Array Junction Box:
• The junction boxes shall be dust vermin and water proof and made of FRP / Thermo
Plastic with IP65 protection.
• The terminals shall be connected to copper bus bar arrangement of proper sizes.
• The junction boxes shall have suitable cable entry points fitted with cable glands of
appropriate sizes for both incoming and outgoing cables.
• Suitable markings shall be provided on the bus bar for easy identification and cable
ferrules shall be fitted at the cable termination points for identification.
• The rating of the JB’s shall be suitable with adequate safety factor to interconnect the
Solar PV array.
• Metal oxide arrestors shall be provided inside the Array Junction Boxes.
IV. Battery Bank:
The battery Bank of the solar system shall be VRLA type tubular Gel batteries. The
Performance Warranty of the Battery Bank should not be less than 5 (Five) Years. In case
any battery gets defective, during the warranty period of five years the firm will have to
replace the same with new one free of cost. The battery to be supplied must be approved
from authorized test centers of MNRE. The firm will submit an undertaking alongwith
IEC certificate from the manufacturer of the battery that the batteries supplied are
warranted for a period of five years.
Main features of the battery (as applicable)
• The batteries shall comprise 2V Cells with suitable capacity at C10 rate.
• Polypropylene/Hard Rubber Container.
• Terminals: Of lead alloy, suitable for bolted connection.
• Recharge ability: at very low rates charging rates as low as 0.05% of the normal charging
current.
• High charging efficiencies: Ah efficiency; In excess of 90%.
• Low rate of self discharge: less than 3% per month at 27°C.
• Capacity to sustain partial state of charge should with stand partial state of charge up to
six months.
• Very Low maintenance.
• Service life of 8 -10 years under normal operating conditions.
V. Battery Rack:
A suitable battery rack with interconnections & end connector shall be
provided to suitably house the batteries in the bank. Battery interconnecting links shall be
provided for interconnecting in series and in parallel as per requirement. Connectors for
inter cell connection (series/parallel) shall be maintenance free screws. Insulated terminal
covers shall be provided.
VI. PCU (Power Conditioning Unit)
The power conditioning unit shall include charge controller, inverter and grid charger in
one enclosure and should be as per the IEC Standard IEC 61683/IS 61683. The firm
must submit test certificate from any of the NABL/IEC Accredited Testing Laboratories
or MNRE approved test centre.
1)
Nominal DC Array Input
Voltage
240 V DC for 20 kWp
2)
Solar Charge Controller
Capacity
20 kWp
3) Charger Type MPPT Based Solar Charge Controller
4) Battery Type VRLA type tubular Gel batteries
5)
Solar Charge Controller
efficiency
> 95%
6) Inverter Type Bidirectional
7) Continuous Output Rating 25 KVA
8) Output Wave Form Sine Wave Output
9) Total Harmonic Distortion < 3%
10) Output Voltage 415 V ± 1%
11) Output Frequency 50 Hz. ± 0.5 Hz.
12) Power Factor 0.8
13) Inverter efficiency
> 85% at full load and nominal battery input
voltage
14) Regulation Line regulation & Load regulation – 2 %
15) AC Battery Charger Capacity
Minimum 100 % of Solar Charge Controller
Capacity
16)
AC Battery Charger Input
Voltage
415 V AC ± 15%, 50 Hz. Three Phase AC
Input
17) Overload Features 150% for 1 minute
18) Control Type Microprocessor based Control.
19) Operation mode
PCU must be designed to work in
1. Stand Alone Mode
2. Hybrid Mode
3. OFFLINE Mode
20) Cooling Forced Air cooling
21) Operating temperature - 30 degree C to + 50 degree C
22) Relative Humidity 100 % Maximum
23) Indications
Inverter ON
Grid ON
Array ON
Inverter under/over voltage
Inverter Overload
Battery Low
24) Protections
Input over voltage / Input under voltage
Short circuit / Over Current/over load
Load surge current
Battery Low trip
Battery reverse polarity
25) MCB’s / MCCB’s
Suitable rating MCB’s / MCCB’s of reputed
make must be provided for Array, Battery &
Load isolation.
26) Manual bypass switch
To bypass grid power to load directly. Under
this condition, solar charge controller shall
continue to charge the battery at its full
capacity as per requirement of battery.
27) Assembly & Mounting As per normal industry practice.
28) Cable Entry From rear, 200mm above ground level
29) Potential Free Contact
Potential free contact must be provided for
battery low pre alarm
VII. Cables and accessories
All the cables shall be supplied conforming to IS 694 & shall be of 650 V /1 .1 kV grade
as per requirement .Only PVC Copper cables shall be used. The size of the cables
between array interconnections, array to junction boxes, junction boxes to PCU etc shall
be so selected to keep the voltage drop and losses to the minimum. All installation
accessories, which are required to install and successfully commission the power plant,
are to be provided.
Cabling :
Cabling in the Pump House shall be carried out as per IE Rules. Cabling inside control
room and array area should be in cable pipes with proper water/moisture protection
sealing. All other cabling above ground should be suitably mounted on cable trays with
proper covers. For underground cables, cable trenches should be provided covered with
RCC slabs.
Wires:
Only copper wires of appropriate size and of reputed make shall have to be used.
Cables Ends :
All connections are to be made through suitable cable/lug/terminals; crimped properly
& with use of Cable Glands.
Cable Marking :
All cable/wires are to be marked with proper manner by good quality ferule or by other
means so that the cable can be easily identified.
All the cables required for the plant will be provided by the manufacturer.
VIII. Earthing and protection
Lightning Protection
There shall be the required number of suitable lightning arrestors installed in the array
area at least one at each site. Protection shall meet the safety rules as per Indian
Electricity Act
Earthing Protection
Each array structure of the PV yard should be grounded properly as per IS:3043-1987. In
addition to it, the lightning arrester/masts should also be provided inside the array field.
Provision should be kept for shorting and grounding of the PV array at the time of
maintenance work. All metal casing/shielding of the plant should be thoroughly grounded
in accordance with Indian electricity Act./IE Rules. Earth Resistance should be tested in
presence of the representative of HIMURJA after earthing by calibrated earth tester. PCU
ACDB and DCDB should also be earthed properly.
Danger Boards
Danger boards should be provided as and where necessary as per IE Act./IE rules as
amended up to date. A warning board showing warning for non use of heating load
from the system is required to avoid misuse.
IX. System Functioning
The system should be compatible with Solar & Mains with Energy Management
function. Priority should always be given to the Solar Energy .Depending upon
specified battery state of charge ,the system should intelligently decide whether mains
supply is to be used or in case of situation so warrants , alarm for starting of backup
generator should be generated.
The grid charging is switched on only when battery reaches a specified SOC (State of
Charge) /Volt (user defined) and stopped when battery has reached a specified SOC
/Volt again, thus ensuring solar energy is fully utilized .i.e. after grid charging has
stopped, solar will have to do the end charging.
When Solar and mains are available and battery is fully charged, the load shall be
supplied by solar energy.
When solar is not available but grid is available, AC mains will supply the load along
with charging the battery bank. The set points should be freely programmable as per user
requirement.
The Following features are essential:
1 The set points for Energy Management like Battery Voltage or battery SOC (State
of Charge) to be Programmable as per user requirement.
2 The entire functioning is to be automatic without any user intervention required.
X. After Sales Services:
The tenderer shall ensure 5 (five) years after sales service on site on chargeable basis
which include routine and preventive maintenance after the expiry of warranty period on
mutually agreed terms.
XI. Factory Testing:
A) Preparation of all controls, protective and instrumentation circuits shall be
demonstrated by direct tests, if feasible or by simulation operation conditions for
all parameters that cannot be directly tested.
B) Operation of start up, disconnect and shutdown controls shall also be tested and
demonstrated. Stable operation of the PCU containing inverter and charge
controller and response to control signals shall also be tested and demonstrated.
C) Factory testing shall include measurement of phase currents, efficiencies,
harmonic content and power factor.
D) A factory Test Report (FTR) shall be supplied with the unit after all tests. The
FTR shall include detailed description of all parameters tested qualified and
warranted.
Factory testing of the PCU should be carried out and witnessed by the
HIMURJA’s Engineers at the manufacturers premises. Other routine tests on modules
including HV test on all modules , PCU and other BoS items will be carried out by the
suppliers at works free of cost in the presence of representative of HIMURJA.
XII. Other Conditions
Technical description for all components & electronics along with block diagram, layout,
drawing is to be submitted with the tender. Insulation mat in front of plant controlling
unit, Inverter are to be provided. Suitable cooling arrangement in the control room for
cooling of the PCU is to be arranged, if required.
XIII Tools & Tackles and Spares :
After completion of installation & commissioning of the power plant, necessary tools &
tackles are to be provided free of cost by the contractor for maintenance purpose in HP
Vidhan Sabha.
XIV. Operation & Maintenance of Power Plant
Operation of SPV power plants will be done by concerned staff of Vidhan Sabha, but
training will be imparted by the firm for operation and routine maintenance. Following
will be ensured by the concerned firm during warranty period of five years.
XV. Spare Parts to be kept at Vidhan Sabha (SPV Power Plant Site)
S No Item Description Quantity ( No.)
1 SPV Module 1 % of total numbers of modules to be kept at
the site.
2 Battery Battery replacement to be carried out as and
when required within warranty period if there is
any defect in the battery.
3 Power Conditioning Systems Necessary spares for 5 years of operation with
min. 1 set of spares to be kept at plant site.
4 Miscellaneous( cable, fuses,
screws, soldering material,
lugs etc )
Required for 5 years of operation
XVI. Tools and Measuring instruments for Vidhan Sabha
S No Item Description Quantity (nos.)
1 Digital Multimeter 1
2 Screw Driver set 1
3 Spanner set 1
4 Cutting Plier 1
5 Soldering Iron 1
6 Battery Float meter or any other item if
required
SECTION -IV
Annexure- I
TENDER FORM
1. Tender No:
2. Name of the work:
3. Last date and time of submission of the documents:
4. Amount of Earnest Money Deposit:
DD and Date
5. Date and time of opening of the tender:
6. Place of opening of the tender:
7. Name and status of firm/company
individual to whom the tender document
is issued :
8 Validity of tender
7 Name of the authorized representative to
Sign the tender
(Signature of Tenderer)
with designation
• All the columns must be filled by the tenderer.
Annexure- II
GENERAL PARTICULARS OF THE TENDERER
1. Name of tenderer:
2 Address for correspondence:
3. Telephone No. and Fax No.
4 Name and Designation of the
Authorized Representative of the tenderer
to whom all the references shall
be made:
5 Amount and reference of E.M.D.
Deposited (Drawn on Bank & D.D. No.& date)
6 Financial capability of the contractor/
Firm for carrying out the work:
7 Has the firm ever been
debarred by any Govt. Deptt/Agency/organization
for undertaking any work:
8 Details of offer (Mention No of pages):
9. Reference of any other information
attached by the tenderer:
10. Authorized representative for any correspondence
11. Whether service center for after sales service
set up in the state, give address
(Signature of Tenderer)
with designation
Annexure- III
EXPERIENCE OF THE TENDERER
Please fill in the information about the similar projects undertaken over the last five years
1. Name of organization by whom work was awarded. Please give Project wise detail of
projects installed/ commissioned:-
2. Name and location of the works.
3. Total amount of Contract.
4. Year of Award.
5. Detail of involvement in
work as an individual or as a
company.
6. Was the work completed satisfactorily
and within the stipulated time period.
7. Particulars of evidence enclosed in token of above
8. Whether list of past supplies enclosed as per Annexure V
9. Whether past performance obtained from HIMURJAs / utilities enclosed
------------------------------------------------------------------------------------------
(Signature of Tenderer)
with designation
Annexure- IV
DECLARATION BY THE TENDERER
I/We______________________________________
(herein after referred to as the tenderer) being desirous of tendering for the design, manufacture,
supply, erection, testing , installation and commissioning of SPV power plants of 20 kWp at HP
Vidhan Sabha, Shimla in H.P including warranty period of 5 years as shown in scope of tender
specification . We have fully understood the nature of the work and carefully noted all the terms
and conditions, specifications etc. as mentioned in the tender documents, hereby declare that:-
1 The tenderer is fully aware of all the requirements of the tender documents and agrees with
all the provisions of the tender documents.
2 The tenderer is capable of executing and completing the work as required in the tender.
3 The tenderer accepts all risks and responsibilities directly or indirectly connected with the
performance of the tender.
4 The tenderer is financially solvent and sound to execute the tender.
5 The tenderer is sufficiently experienced and competent to perform the contract to the
satisfaction of HIMURJA.
6 The information and statements submitted with the tender are true.
7 The tenderer has not been debarred from similar type of work by any Govt
Dept./Agency/Organization.
8 This offer will remain valid for acceptance for 6 (six) months from the date of opening of the
tender.
9 The tenderer gives the assurance to execute the tendered work as per the specifications, terms
and conditions and in exact configuration of the sample submitted on award of the work.
(Signature of Tenderer)
with designation
Annexure- V
SCHEDULE OF PAST SUPPLIES OF LAST FIVE YEARS
S No Description Supply order
No. and date
Name of
HIMURJA /
Agency
Date of
Supply/
completion
as per order
Actual date of
supply/
commissioning
on
(Signature of Tenderer)
with designation
Note:-
Performance certificate from the concerned utilities along with their communication address, e- mail
and FAX No. is required for authentication of certificates.
Annexure- VI
GUARANTEED TECHNICAL PARAMETRS
S.No. ITEM PARTICULARS
1 SOLAR PHOTOVOLTAIC MODULES
1.1 MANUFACTURER
1.2 SIZE
1.3 Type
1.4 P nom
1.5 P max
1.6 I mp
1.7 V mp
1.8 Module EFFICIENCY
1.9 No. of cells in a module
1.10 Whether meets IEC- 61215 2nd
edition and
IEC 61730 standard.
Whether Test certificates submitted along
with the bid
1.11 Warranty of modules
2 PCU
2.1 TYPE / Make
2.2 AC Output Voltage
2.3 DC input voltage range
2.4 DC operating voltage
2.5 Continuous rating
2.6 Efficiency
2.7 Operating temperature range
2.8 Power control
2.9 Protection features
2.10 Overload capacity
2.14 DC input overload capacity
3 Battery
3.1 Type
3.2 Manufacturers name
3.3 Capacity Ah at C/10 rate
3.4 DOD %
3.5 Rated normal voltage
3.6 Rated maximum voltage
3.7 Rated minimum voltage
3.8 Applicable standard
3.9 Ampere hour efficiency
3.10 Whether meets IEC / IS standards
Signature of the Bidder ___________________________
Annexure –VII
FORMAT FOR BANK GUARANTEE AGAINST PERFORMANCE SECURITY
(To be stamped in accordance with Stamp Act if any, of the Country of the Issuing Bank)
Bank Guarantee No. : …………………………………….
Date:…………………………..
To …………………………………………. (Name of the HIMURJA)
Whereas ………………………………….. ------- (Name of the HIMURJA)
hereinafter called “The supplier” has undertaken, in pursuance of Contract
No……………………….. -----------------------------------dated ……… 20…….. to supply
……………………………………………………. (Description of Goods and Services)
hereinafter called “the contract”.
AND WHEREAS it has been stipulated by you in the said contract that the supplier shall furnish
you with a Bank Guarantee by a recognized Bank for the sum specified therein as security for
compliance with the Supplier’s performance obligations under the contract for Operation,
Maintenance and Repairs of the entire system including cost of spares for a period of 5 years
from the date of issue of acceptance certificate by the HIMURJA.
AND WHEREAS we have agreed to give the Supplier a Guarantee
THEREFORE WE hereby affirm that we are Guarantors and responsible to you on behalf of the
Supplier, up to a total of Rs………………………. (Amount of guarantee in words and figures)
being 10% of the total cost of contract value and we undertake to pay you, upon your first
written demand declaring the Supplier to be in default under the contract and without cavil or
argument, any sum or sums within the limit of Rs…………………………….. (Amount of
guarantee) as aforesaid, without your needing to prove or to show grounds or reasons for your
demand or the sum specified therein.
This guarantee is valid until………………… day of…………….20………
Signature and Seal of Guarantors
……………………….
……………………….
Date:…………20…...
Note :
1. SUPPLIER SHOULD ENSURE THAT SEAL AND CODE No. OF THE SIGNATORY
IS PUT BY THE BANKERS, BEFORE SUBMISSION OF THE BANK
GUARANTEES.
Annexure-VIII
UNDERTAKING TO BE FURNISHED BY BIDDERS
We, M/S ……………………………………………………………………………… with
Registered office at ………………………………………………………………… undertake to
ensure generation of electrical energy from the Solar Power Plant of 20 kWp to be installed by us
as per the details / technical specifications given in Tender document.
Authorized Signatory
Name of the Company with stamp
Annexure -IX
MANUFACTURERS' AUTHORIZATION FORM
No. dated
To
Tender No. Tender document No. HIMURJA (F-7)/SPV Plant/IPH/JNNSM/ 2014-15- Part-II
Dear Sir:
We who are established and reputable manufacturers
of ________________________ (name & descriptions of goods offered) having factories at
(address of factory) do hereby authorize M/s ___________________ (Name and address of
Agent) to submit a bid, and sign the contract with you for the goods manufactured by us against
the above NIT.
We hereby extend our full guarantee and warranty for the goods and services
offered for supply by the above firm against their project.
Yours faithfully,
(Name)
(Name of manufacturers)
Note: Their letter of authority should be on the letterhead of the manufacturer and should be
signed by a person competent and having the power of attorney to legally bind the
manufacturer. It should be included by the Bidder in its technical bid.
SECTION-V
Price Schedule of Main Equipment
Annexure F-1
S.No. Description Qty Rate Amount
1 FOR cost of 20 kWp Power Plant with
battery system complete in all respect as per
clause No. 1 of GCC & Technical
Specifications including design,
engineering, manufacturing , shop testing,
inspection, supply, installation,
commissioning at HP Vidhan Sabha, Shimla
&. warranty period of five years after
successful commissioning.
Note:-
i) FOR cost will be quoted including all applicable taxes, duties, and entry tax @ 3 %.
ii) Bill of material will be supplied separately.
iii) Cost breakup of the power plant is as per Annexure-F-2 (attached).
Signature
COST BREAK-UP OF POWER PLANT
Annexure F-2
S
No.
FOR cost of Qty Rate
(Rs.)
Amount (Rs.)
1 SPV modules of 200 Wp or above with RF
identification tag.
1 Set
2` Mounting structure for above as per specs. 1 set
3 PCU as per specification 1 set
4 Array Junction Boxes/ Main Junction Boxes 1 Set
5 DC Distribution units as per specifications 1 No.
6 AC Distribution unit as per specifications including
Mains Changeover
1 No.
7 Cables/Wiring (As per requirement of site) L/S
8 Lightning arrestor complete set as per specification 1 Set
9 Earthing set as per specification 1 Set
10 Battery bank complete as per specifications
240 Volts , 300 AH at C/10 rate
1 Set
12 Data Logger 1 set
13 Spares, tools for 5 (five) years operation and
maintenance of plant
As per
list
14 Engineering, electrical drawings and installations
and O&M manuals
3 Sets
15 Any miscellaneous work required for the
installation of plant
L/S
Total
Note: - Above break up is only indicative and for billing purpose.
Signature

More Related Content

What's hot

Haryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHaryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHeadway Solar
 
1324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-13654943321324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-1365494332Dayanand Sonawane
 
03 11-capillaryrheometer
03 11-capillaryrheometer03 11-capillaryrheometer
03 11-capillaryrheometerslideseeing
 
Bid document for Solar Plant at J&K
Bid document for Solar Plant at J&KBid document for Solar Plant at J&K
Bid document for Solar Plant at J&KHeadway Solar
 
Ipds volume i.35-39
Ipds volume i.35-39Ipds volume i.35-39
Ipds volume i.35-39Sanjay Kumar
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1Joy Irman
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1Joy Irman
 
Sbd procurement of goods 4 submission and opening of bids
Sbd procurement of goods   4 submission and opening of bidsSbd procurement of goods   4 submission and opening of bids
Sbd procurement of goods 4 submission and opening of bidsJoy Irman
 
Sbd procurement of goods 6 award of contract
Sbd procurement of goods   6 award of contractSbd procurement of goods   6 award of contract
Sbd procurement of goods 6 award of contractJoy Irman
 
Guideline for public issue of units of reits
Guideline for public issue of units of reitsGuideline for public issue of units of reits
Guideline for public issue of units of reitsGAURAV KR SHARMA
 
Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb aJoy Irman
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2Joy Irman
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation servicesabenyeung1
 

What's hot (20)

Haryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHaryana Solar Bid Document RFS
Haryana Solar Bid Document RFS
 
1324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-13654943321324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-1365494332
 
medium
mediummedium
medium
 
03 11-capillaryrheometer
03 11-capillaryrheometer03 11-capillaryrheometer
03 11-capillaryrheometer
 
Document samples
Document samplesDocument samples
Document samples
 
Bid document for Solar Plant at J&K
Bid document for Solar Plant at J&KBid document for Solar Plant at J&K
Bid document for Solar Plant at J&K
 
Ipds volume i.35-39
Ipds volume i.35-39Ipds volume i.35-39
Ipds volume i.35-39
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1
 
tendering
 tendering tendering
tendering
 
Adb procurement guidelines icb-c1
Adb procurement guidelines   icb-c1Adb procurement guidelines   icb-c1
Adb procurement guidelines icb-c1
 
Sbd procurement of goods 4 submission and opening of bids
Sbd procurement of goods   4 submission and opening of bidsSbd procurement of goods   4 submission and opening of bids
Sbd procurement of goods 4 submission and opening of bids
 
Grinding & drilling machines bid
Grinding & drilling machines   bidGrinding & drilling machines   bid
Grinding & drilling machines bid
 
Sbd procurement of goods 6 award of contract
Sbd procurement of goods   6 award of contractSbd procurement of goods   6 award of contract
Sbd procurement of goods 6 award of contract
 
Guideline for public issue of units of reits
Guideline for public issue of units of reitsGuideline for public issue of units of reits
Guideline for public issue of units of reits
 
Determination of enginer sbd2
Determination of enginer sbd2Determination of enginer sbd2
Determination of enginer sbd2
 
Oht tender
Oht tenderOht tender
Oht tender
 
Wb procurement icb a
Wb procurement icb aWb procurement icb a
Wb procurement icb a
 
Bid document reverse tendering
Bid document reverse tenderingBid document reverse tendering
Bid document reverse tendering
 
Adb procurement guidelines icb-c2
Adb procurement guidelines   icb-c2Adb procurement guidelines   icb-c2
Adb procurement guidelines icb-c2
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
 

Viewers also liked

Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draftHeadway Solar
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013Headway Solar
 
National Solar Jobs Census 2013
National Solar Jobs Census 2013National Solar Jobs Census 2013
National Solar Jobs Census 2013GW Solar Institute
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeGW Solar Institute
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Headway Solar
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictThe Solar Foundation
 
Depreciation- depreciation methods, Income Taxes
Depreciation- depreciation methods, Income TaxesDepreciation- depreciation methods, Income Taxes
Depreciation- depreciation methods, Income TaxesAdvance Business Consulting
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationThe Solar Foundation
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - ReferenceShivendra Kumar
 
The Role of Municipal Utilities in Driving Solar Development
The Role of Municipal Utilities in Driving Solar DevelopmentThe Role of Municipal Utilities in Driving Solar Development
The Role of Municipal Utilities in Driving Solar DevelopmentThe Solar Foundation
 
Sustaining the Solar Industry’s Tremendous Growth
Sustaining the Solar Industry’s Tremendous GrowthSustaining the Solar Industry’s Tremendous Growth
Sustaining the Solar Industry’s Tremendous GrowthThe Solar Foundation
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosBSI
 

Viewers also liked (18)

Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
 
UP Solar Power Policy 2013
UP Solar Power Policy 2013UP Solar Power Policy 2013
UP Solar Power Policy 2013
 
National Solar Jobs Census 2013
National Solar Jobs Census 2013National Solar Jobs Census 2013
National Solar Jobs Census 2013
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax Code
 
Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013Uttarakhand solar power policy 2013
Uttarakhand solar power policy 2013
 
Solar Schools: Potential Savings by District
Solar Schools: Potential Savings by DistrictSolar Schools: Potential Savings by District
Solar Schools: Potential Savings by District
 
National Solar Jobs Census 2012
National Solar Jobs Census 2012National Solar Jobs Census 2012
National Solar Jobs Census 2012
 
Depreciation- depreciation methods, Income Taxes
Depreciation- depreciation methods, Income TaxesDepreciation- depreciation methods, Income Taxes
Depreciation- depreciation methods, Income Taxes
 
Different Types of Dance Rhythms
Different Types of Dance RhythmsDifferent Types of Dance Rhythms
Different Types of Dance Rhythms
 
Fact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice AggregationFact Sheet: Community Choice Aggregation
Fact Sheet: Community Choice Aggregation
 
Philips Solar Installation - Reference
Philips Solar Installation -  ReferencePhilips Solar Installation -  Reference
Philips Solar Installation - Reference
 
Minnesota Solar Jobs Census 2013
Minnesota Solar Jobs Census 2013Minnesota Solar Jobs Census 2013
Minnesota Solar Jobs Census 2013
 
Solar panels
Solar panelsSolar panels
Solar panels
 
The Role of Municipal Utilities in Driving Solar Development
The Role of Municipal Utilities in Driving Solar DevelopmentThe Role of Municipal Utilities in Driving Solar Development
The Role of Municipal Utilities in Driving Solar Development
 
4 Steps to Install Solar Panels
4 Steps to Install Solar Panels4 Steps to Install Solar Panels
4 Steps to Install Solar Panels
 
Sustaining the Solar Industry’s Tremendous Growth
Sustaining the Solar Industry’s Tremendous GrowthSustaining the Solar Industry’s Tremendous Growth
Sustaining the Solar Industry’s Tremendous Growth
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
 

Similar to Tender Document for Solar Project in Himachal Pradesh

Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxswarnavet05
 
1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdfEphremZeleke3
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTADVj NiroSh
 
NOTICE INVITING TENDER
NOTICE INVITING TENDERNOTICE INVITING TENDER
NOTICE INVITING TENDERLaxman Chaldas
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfPSENTHILMURUGAN2
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”RCREEE
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Headway Solar
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdfssusera91051
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdfssusera91051
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Rishi Srivastava
 
Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Headway Solar
 
1015 instructions to tenderers (itt) (0
1015 instructions to tenderers (itt)  (01015 instructions to tenderers (itt)  (0
1015 instructions to tenderers (itt) (0sanakasa
 
1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdfAMITTRIPATHI182
 

Similar to Tender Document for Solar Project in Himachal Pradesh (20)

Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docx
 
scope - CCTV Tender.pdf
scope - CCTV Tender.pdfscope - CCTV Tender.pdf
scope - CCTV Tender.pdf
 
1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf
 
CIDA SBD 03.pdf
CIDA SBD 03.pdfCIDA SBD 03.pdf
CIDA SBD 03.pdf
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 
NOTICE INVITING TENDER
NOTICE INVITING TENDERNOTICE INVITING TENDER
NOTICE INVITING TENDER
 
Notes unit 2A.ppt
Notes unit 2A.pptNotes unit 2A.ppt
Notes unit 2A.ppt
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdf
 
Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”Mechanisms to implement wind energy projects “egyptian experience”
Mechanisms to implement wind energy projects “egyptian experience”
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015Rajasthan Solar Roof Top tender 2014-2015
Rajasthan Solar Roof Top tender 2014-2015
 
Tendernotice_1 (1).pdf
Tendernotice_1 (1).pdfTendernotice_1 (1).pdf
Tendernotice_1 (1).pdf
 
Tendernotice_1.pdf
Tendernotice_1.pdfTendernotice_1.pdf
Tendernotice_1.pdf
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
Presentation
PresentationPresentation
Presentation
 
Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02Andhrapradesh 500mwsolartender-140820170057-phpapp02
Andhrapradesh 500mwsolartender-140820170057-phpapp02
 
Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...Request for selection document for grid connected solar photo voltaic project...
Request for selection document for grid connected solar photo voltaic project...
 
1015 instructions to tenderers (itt) (0
1015 instructions to tenderers (itt)  (01015 instructions to tenderers (itt)  (0
1015 instructions to tenderers (itt) (0
 
dgs&d
dgs&ddgs&d
dgs&d
 
1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf1658466483_Supply_of_Stationery_Items_English.pdf
1658466483_Supply_of_Stationery_Items_English.pdf
 

More from Headway Solar

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Headway Solar
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Headway Solar
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014Headway Solar
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Headway Solar
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesHeadway Solar
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalHeadway Solar
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandHeadway Solar
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshHeadway Solar
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Headway Solar
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Headway Solar
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Headway Solar
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanHeadway Solar
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Headway Solar
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012Headway Solar
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013Headway Solar
 

More from Headway Solar (20)

Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
Tender Document for Procurement of 150MW of Solar Power from Grid Connected S...
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015Draft MERC Net Metering for Solar Rooftop Regulations,2015
Draft MERC Net Metering for Solar Rooftop Regulations,2015
 
DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014DERC Renewable energy Net Metering Regulations 2014
DERC Renewable energy Net Metering Regulations 2014
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
 
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft GuidelinesFinal draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
Final draft 3000 MW Phase 2 Batch 2 Tranche 1 Draft Guidelines
 
Renewable policy 2012 of West Bengal
Renewable policy 2012 of West BengalRenewable policy 2012 of West Bengal
Renewable policy 2012 of West Bengal
 
Tender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, UttarakhandTender document for solar in Dehradun, Uttarakhand
Tender document for solar in Dehradun, Uttarakhand
 
RFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar PradeshRFP Documents for Solar Plant in Uttar Pradesh
RFP Documents for Solar Plant in Uttar Pradesh
 
Telangana solar RFS Document 2014
Telangana solar RFS Document 2014Telangana solar RFS Document 2014
Telangana solar RFS Document 2014
 
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
 
Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012Tamilnadu solar energy policy 2012
Tamilnadu solar energy policy 2012
 
RFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project RajasthanRFP Document for solar PV Project Rajasthan
RFP Document for solar PV Project Rajasthan
 
Rajasthan solar policy of 2014
Rajasthan solar policy of 2014Rajasthan solar policy of 2014
Rajasthan solar policy of 2014
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012New and renewable sources of energy (NRSE) policy – 2012
New and renewable sources of energy (NRSE) policy – 2012
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013
 

Recently uploaded

Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...narwatsonia7
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbaisonalikaur4
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfyalehistoricalreview
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxHenryBriggs2
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageTechSoup
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 

Recently uploaded (20)

Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
No.1 Call Girls in Basavanagudi ! 7001305949 ₹2999 Only and Free Hotel Delive...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service MumbaiHigh Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
High Class Call Girls Mumbai Tanvi 9910780858 Independent Escort Service Mumbai
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdfYHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
YHR Fall 2023 Issue (Joseph Manning Interview) (2).pdf
 
productionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptxproductionpost-productiondiary-240320114322-5004daf6.pptx
productionpost-productiondiary-240320114322-5004daf6.pptx
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized Storage
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
Model Town (Delhi)  9953330565 Escorts, Call Girls ServicesModel Town (Delhi)  9953330565 Escorts, Call Girls Services
Model Town (Delhi) 9953330565 Escorts, Call Girls Services
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

Tender Document for Solar Project in Himachal Pradesh

  • 1. (H.P Govt Energy Development Agency) Block 8-A SDA Complex Kasumpti Shimla-171009 Telephone 0177- 2621783 Fax 0177-2622635 Website:- Himurja.nic.in TENDER DOCUMENT No. HIMURJA (F-7)/SPV Plant/JNNSM/2014-15-Part-II SUPPLY, INSTALLATION AND COMMISSIONING OF SOLAR PHOTO VOLTAIC POWER PLANTS AT HP VIDHAN SABHA, SHIMLA OF 20 KWP Issued By: Name of the firm Dated: Date of opening: ---- 20.08.2014 Time of opening: ---- 15.00 Hrs. Price of document ---- Rs. 5,000/- Note: - Only technical Bids will be opened on the said date. The date of opening of the Price Bids of the successful bidders will be intimated separately after technical evaluation. PART-I SECTION- I to VI PART-II FINANCIAL BID
  • 2. (H.P Govt Energy Development Agency) Block 8-A SDA Complex Kasumpti Shimla-171009 Telephone 0177- 2621783 Fax 0177-2622635 Website:- Himurja.nic.in TENDER NOTICE Sealed tenders are hereby invited for Supply, Installation and Commissioning of SPV power plants of 20 kWp at Himachal Pradesh Vidhan Sabha ,Shimla after thorough testing as per MNRE guidelines under JNNSM programme. The tender document can be purchased from the office of the undersigned by paying Rs. 5,000/- only in the shape of demand draft drawn in favour of Director, HIMURJA and payable at Shimla from 01.08.2014 to 19.08.2014. The tender document is also available on the website of HIMURJA i.e. himurja.nic.in which can be downloaded. The cost of downloaded tender document can be deposited with the tender. The tender complete in all respect shall be received up to 2 PM on 20.08.2014 and shall be opened on the same date at 3 PM in the presence of tenderers or their authorized representatives who wish to be present at the time of opening of tenders. Tender Document No. Name of work. Completion time Earnest Money No. HIMURJA (F-7)/SPV Plant/ JNNSM/ 2014-15-Part-II Supply, installation and commissioning of SPV power plants of 20 kWp at Himachal Pradesh Vidhan Sabha, Shimla 3 months Rs.70,000/- Terms and Conditions: i) Tenders without earnest money will not be considered. ii) HIMURJA reserves the right to reject any or all the tenders without assigning any reason. iii) MNRE approved System Integrators under JNNSM of SPV systems or manufacturers of SPV Systems, having sufficient experience of installation and commissioning of minimum 10 kWp capacity SPV Power Plant are eligible. Bidders may submit the proof of their eligibility in the shape of work order, commissioning and satisfactory operation reports along with the bid. iv) The bidder should have income tax/sale tax clearance, CST/ VAT registration etc. as required under the rules. v) The annual turnover of the firm should be Rs 20 Lacs for the each preceding three years i.e. 2011-2012, 2012-13 & 2013-14. Sr Executive Engineer (E) HIMURJA, Urja Bhawan, Shimla-171009.
  • 3. SECTION - I INSTRUCTIONS TO BIDDERS A. Introduction 1. Source of Funds 1.1 The Project has been jointly funded by MNRE, Govt of India and HP Govt. 2. Bidders Eligibility and Qualification 2.1 MNRE approved System Integrators under JNNSM of SPV systems or manufacturers of SPV Systems, having sufficient experience of installation and commissioning of minimum 10 kWp capacity SPV Power Plant are eligible for tendering. The bidder should have income tax/sale tax clearance and CST/ VAT registration etc. as required under the rules. The annual turnover of the firm should be minimum Rs 20 Lacs for the each preceding three years i.e. 2011-2012, 2012-13 & 2013-14. Bidder may submit proof of their eligibility in the shape of work orders, commissioning and satisfactory operational reports along with the bid. In absence of sufficient experience the tender can be rejected straight way. 3. Bid Form 3.1 The Bidder shall complete the Bid Form and the appropriate Price Schedule furnished in the Bidding Documents, indicating the goods to be supplied, a brief description of the goods, quantity and prices. The rate should be quoted strictly as per scope of work and price bid. 4. Documents Establishing Bidder's Eligibility and Qualifications 4.1 The Bidder shall furnish, as part of its bid, documents establishing the bidder's eligibility to bid and its qualifications to perform the Contract if its bid is accepted. 5. The documentary evidence of the Bidder's qualifications to perform the Contract if its bid is accepted, shall establish to the HIMURJA's satisfaction. (a) that, in the case of a Bidder offering to supply goods under the contract which the Bidder did not manufacture or otherwise produce, the Bidder has been duly authorized by the goods' manufacturer or producer to supply the goods in the purchaser’s country. In support party will provide the documentary proof of infrastructure support for the same. (b) that the Bidder has the financial, technical, and production capability necessary to perform the Contract. 6. The documentary evidence of conformity of the goods and services to the bidding documents may be in the form of literature, drawings and data, and shall consist of:
  • 4. (a) a detailed description of the essential technical and performance characteristics of the goods; (b) a list giving full particulars, including available sources and current prices, of all spare parts, special tools, etc., necessary for the proper and continued functioning of the goods for a period to be specified in the Bid Data Sheet, following commencement of the goods by HIMURJA. (c) a item-by-item commentary on the HIMURJA's Technical Specifications demonstrating the goods and services to those specification, or a statement of deviations and exceptions to the provisions of the Technical Specifications. 7. Earnest Money 7.1 Tender accompanied by earnest money of Rs. 70,000/- (Seventy Thousands only) in the name of Director, HIMURJA, Shimla through demand draft only shall be accepted. 7.2 The earnest money is required to protect the HIMURJA against risk of Bidder's conduct which would warrant the security's forfeiture. No interest will be paid on Earnest Money. 7.3 Unsuccessful Bidder's earnest money will be discharged/returned as promptly as possible as but not later than thirty (30) days after the expiration of the period of bid validity prescribed by the HIMURJA subject to receipt of request letter and pre-receipt from the bidder’s. 7.4 The successful Bidder's earnest money will be adjusted in the performance security. 7.5 The earnest money may be forfeited: a) If a Bidder withdraws its bid during the period of bid validity specified by the Bidder on the Bid Form. b) In case of successful Bidder fails to sign the Contract or to furnish required performance security. 8. Period of Validity of Bids Bids shall remain valid for the period of six (6) months from the date of opening of technical bid. 9. Format and Signing of Bid 9.1 The Bidder shall submit an original and one duplicate copy clearly marking each "Original Bid" and "Copy of Bid", as appropriate. In the event of any discrepancy between them, the original shall govern. 9.2 The original and duplicate copy of the bid shall be typed or written in indelible ink and shall be signed by the Bidder or a person duly authorized to bind the Bidder to the
  • 5. Contract. All pages of the bid, except for un-amended printed literature, shall be initialed by the person signing the bid. 9.3 Any interlineations, erasures, or overwriting shall be valid only if they are initialed by the person or persons signing the bid. B Submission of Bids 10. Sealing and Marking of Bids The bidders shall submit their bids in duplicate i.e. in original and duplicate in the following manner: 10.1 The first envelope (A) must contain the requisite E.M.D. and it must be super scribed as the EMD on the envelope and must be properly sealed. 10.2 The second envelope (B) must contain the Technical bid and it must be super scribed as the Technical Bid on the envelope and must be properly sealed. 10.3 The third envelope (C) must contain the requisite Price Bid and it must be super scribed as the Price bid on the envelope and must be properly sealed. 10.4 All the above three envelopes ( A,B,C) must be duly sealed in a single envelope duly marked as the original copy and the duplicate along with date of opening. 10.5 Every envelope should contain the name and address of the firm with the Number of the NIT, Technical Bid and Price Bid. 10.6 The technical bid in all circumstances should not contain any reference to the prices quoted. 11. Deadline for Submission of Bids 11.1 Bids must be submitted in the office in time i.e upto 2:00 P.M. on 20.08.2014. 12. Late Bids 12.1 Any bid received by the HIMURJA after the deadline for submission of bids prescribed by the HIMURJA, will be rejected and/or returned unopened to the Bidder.
  • 6. C Bid Opening and Evaluation 13. Opening of Technical Bids by HIMURJA 13.1 The HIMURJA will open the technical bids, in the presence of Bidders' representatives who wants to be present, at the time, on the date, and at the place specified in the Bid Data Sheet. The bidder’s representatives who are present shall sign a register evidencing their attendance. 13.2 The Bidders' names, the presence or absence of the requisite bid security and such other details as the HIMURJA, at its discretion, may consider appropriate will be announced at the opening, except for late bids, which shall be returned unopened to the Bidder. 13.3 The technical bids shall be evaluated by the HIMURJA for assessing responsiveness, bidders qualification and technical confirmation. 13.4 The bidders whose technical bids are declared as technically responsive and qualified shall be informed accordingly and their Price Bids shall be opened. 13.5 The bidders whose technical bids do not qualify, their Price Bids shall not be opened and the same shall be returned to the Bidders. 13.6 Price Bids opening date shall be conveyed subsequently. 14. Clarification of Bids 14.1 During evaluation of the bids, the HIMURJA may, at its discretion, ask the Bidder for a clarification of its bid. The request for clarification and the response shall be in writing, and no change in the prices or substance of the bid shall be sought, offered, or permitted. If the firm does not respond to the clarification, the firm will be considered as non- responsive and the tender shall be rejected out rightly. 14.2 At any time prior to the submission of the tender or prior to the opening of the financial bid HIMURJA may for any reason whether at its own initiative or in response to a clarification requested by the tenderers may modify the tender document by amendments. The amendment will be notified in writing or by fax to all prospective tenderers who have received the tender documents and will be binding on them. HIMURJA will bear no responsibility or liability arising out of non receipt of the same in time or otherwise. 15. Evaluation and Comparison of Bids 15.1 The HIMURJA will evaluate and compare bids which have been determined to be substantially responsive. 15.2 The detailed techno-commercial analysis of the bid shall be carried out by the HIMURJA.
  • 7. 16. Contacting the HIMURJA 16.1 From the time of bid opening to the time of contract award, if any bidder wishes to contact the HIMURJA on any matter related to the bid, it should do so in writing. 16.2 Any effort by a Bidder to influence the HIMURJA in its decision on bid evaluation, bid comparison or contract award decisions may result in rejection of the Bidder's bid. D Award of Contract 17. Award Criteria 17.1 The HIMURJA will award the Contract to the successful Bidder whose bid has been determined to be substantially responsive and has been determined as the lowest evaluated bid, provided further that the Bidder is determined to be qualified to perform the Contract satisfactorily. 18. HIMURJA's Right to Accept Any Bid and to Reject Any or All Bids 18.1 The HIMURJA reserves the right to accept or reject any bid, and to cancel the bidding process and reject all bids at any time prior to award of Contract, without thereby incurring any liability to the affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders. 19. Signing of Contract 19.1 The successful Bidder will sign the contract within fifteen (15) days from the issue of award letter. 20. Bid Security:- 20.1 The successful bidder shall deposit with the Director, HIMURJA Bid security equal to 10% of the contract value within 15 days from the date of issue of the award letter in the form of demand draft for the faithful execution of the contract. No claim shall made against the purchaser in respect of interest on security deposit. 20.2 The Earnest money deposit in the form of bank draft shall be adjusted against the Bid security, later on the same shall be adjusted against the performance security. 20.3 The bid security shall be released immediately after the successful commissioning of the project.
  • 8. 21. Performance Security:- 21.1 Before the commissioning of the project the supplier shall furnish the performance security equivalent to 10% of the total contract value, valid for a period of five years beyond the date of commissioning of the project in the form of cash/demand draft in the name of Director, HIMURJA, Shimla. However the firms can substitute the Performance Security by submitting a Bank Guarantee of equivalent amount valid for the remaining warranty period after six months from the successful installation of the systems. The purchaser shall be entitled and it shall be lawful on his part to forfeit the performance security deposit as per the contract in whole or in part in the event of any fault, failure of performance in all respects of the contract under reference or any other contract with the purchaser and purchaser shall also be entitled to deduct from the said deposit any loss or damage which the purchaser may suffer or be put to by reason of or due to any act or other default recoverable by the purchaser from the contract. 21.2 The Earnest Money Deposit adjusted against the Bid security shall be further adjusted against the performance security. The balance amount of the performance security shall be recovered from the bills of the supplier. 21.3 The Performance Security shall be denominated in the currency of the Contract. 21.4 The Performance Security shall be valid upto the warranty period and shall be released only after expiry of warranty period.
  • 9. SECTION - II GENERAL CONDITIONS OF CONTRACT Brief History The Solar Photovoltaic Power Plant is proposed to be installed at H.P. Vidhan Sabha. 20 Kwp SPV Power Plant will be with battery backup and will augment the energy requirement of the institution. Accordingly, HIMURJA has prepared Tender Document No. HIMURJA (F-7)/SPV Plant/IPH/JNNSM/ 2014-15-Part-II for the supply, installation and commissioning of 20 kWp SPV power plant at Himachal Pradesh Vidhan Sabha ,Shimla. As per site feasibility the capacity of SPV plants can be increased/ decreased accordingly. The components of systems such as PV modules , battery, PCU( charge controller and inverter) supplied under the project will be picked randomly from the supplied lots by Ministry for testing at SEC at manufacturers cost. In case any system / component fail, whole lot will be rejected and no payment will be released. 1 General Scope of Work: The general scope under this contract includes verification of site feasibility, design, engineering, manufacture, shop testing, inspection, packing & forwarding, transportation upto project site, loading & unloading, storage , erection, preliminary testing at site, installation, commissioning, performance testing & handing over of SPV power plants at HP Vidhan Sabha Shimla (HP) in the presence of HIMURJA. The firm will have to visit the site and discuss the locations where the plant is to be installed and capacity of the SPV Power plant with the representative of HIMURJA and submit report with the tender verified by concerned Project Officer. The scope of the work will also include the following:-- a) Warranty period of five years which will commence from the date of successful commissioning and acceptance by the HIMURJA. During warranty period, the supplier will carry out preventive, routine and breakdown maintenance of all the plants including replacement of any components including DC battery , PCU etc. which goes bad free of cost. b) It includes mounting of modules, structure required for mounting the modules, Stand for DC battery and control panels and other miscellaneous works required for successful installation and commissioning and synchronizing of the plant.
  • 10. c) Provision will be made for automatic shift to conventional electric supply in case of failure of supply from SPV system. d) The firm will make provision for online monitoring of the SPV Power plant to be installed at HP Vidhan Sabha. e) The firm will give undertaking of the performance of SPV Power plant to generate the required installed capacity on the attached Annexure VIII. The tenderers may quote their rates along with minimum requirement if any. The Bidder has to ensure as under after consultation with HP Vidhan Sabha authorities:- i) The availability of shadow free area for the installation of SPV Modules on roof top or on ground. ii) Indoor space for housing of batteries, control panel and facilitation for internal and external wiring as per site conditions. f) The quantum of the job can be increased or decreased and the bidder cannot claim any compensation on that part. 2. Incidental Services 2.1 The supplier may be required to provide any or all of the following compulsory services (a) Performance or supervision of the on-site assembly and/or start-up of the supplied Goods; (b) Furnishing of sufficient T&P and tools required for assembly and/or maintenance of the supplied Goods; (c) Detailed operations and maintenance manual will be supplied to different units as under:- i) Two sets to HIMURJA H/Q ii) One set to consignee (d) Performance or supervision or maintenance and/or repair of the supplied Goods, for a period of ten years or for time as agreed by the parties, provided that this service shall not relieve the Supplier of any warranty obligations under this Contract. (e) Training of the Vidhan Sabha Personnel handling the SPV Power Plant at the Supplier's plant and/or on site, in assembly, start-up, operation, maintenance and/or repair of the supplied Goods.
  • 11. 3. Payment Payment shall be made in the currency specified in the Contract in the following manner: Payment for Goods and services (i) On delivery: Fifty percent (50%) of the contract price shall be paid on receipt of the goods and upon submission of bills duly verified by concerned Sr. Project Officer, Shimla, HIMURJA, H.P. (ii) On Final Acceptance: Fifty percent (50%) of the contract price shall be paid after completion of the following formalities :- • Erection, testing and successful commissioning of the power plant • Receipt of test report of MNRE testing centre, in case samples collected from site by the MNRE representative. • Completion of training of concerned department personal for operation & maintenance. • The balance payment will be released after submission of consolidated commissioning certificates to be issued by the concerned department beneficiary and duly verified by the Sr Project Officer, HIMURJA, Shimla, H.P. 4. Subcontracts The Supplier shall obtain approval of the HIMURJA in writing of all subcontracts to be awarded under the Contract if not already specified in his bid. Such notification, in his original bid or later, shall not relieve the Supplier from any liability or obligation under the Contract. The Performa of manufacturer authorization is as per Annexure IX. 5. Completion Time Period Delivery, installation and commissioning of the equipments should commence immediately after issue of Award letter, the supply should be completed within 2 (Two) months and installation & commissioning within 3 (Three ) months from the date of issue of Award letter. The whole work is to be completed within Three months from the date of issue of Award Letter. 6. Liquidate Damages The time period is the essence of the contract and the supplier is bound to adhere to the time period stipulated in the contract agreement. The extension in the stipulated time period can be granted by the HIMURJA (Engineer in Charge) without liquidated damages in case of force majeure conditions only. However failure to complete the job within the stipulated time period, the liquidated damage @ 1% of the cost of left out work for every week of delay or part there of depending upon the causes of delay subject to a maximum of 10% of the total contract shall be recovered from the supplier. In case the
  • 12. Engineer in charge observes that the intentional delay is being caused by the supplier and he has failed to comply with the directions of HIMURJA, the contract shall be liable to be rescinded without assigning any notice thereof. All disputes relating to this contract shall be subject to the jurisdiction of courts in Shimla and Chief Executive Officer, HIMURJA shall be the sole Arbitrator. 7. Inspection and Tests The Himurja authorized representative shall have access to the supplier work place at any time during working hours for purpose of inspecting the manufacturer of the equipment and the supplier shall provide all necessary facilities for such inspection. No supply shall be dispatched without prior inspection and approval by the Himurja and the charges on account of inspection shall be borne by the supplier Inspection and tests prior to shipment of Goods and at final acceptance are as follows: 7.1 The inspection of the Goods shall be carried out to check whether the goods are in conformity with the technical specifications attached to the purchase order form and shall be in line with the inspection/test procedures laid down in the schedule of specifications and the contract conditions. 7.2 Manufacturer must have suitable facilities at their works for carrying out various routine and performance tests on the equipment. 7.3 All tests specified in the technical specifications approved by MNRE under JNNSM. 7.4 Approved supplier’s drawings shall not be changed as provided in the bidding document without prior approval of the competent authority. 7.5 The HIMURJA shall have the right to inspect the supplier’s premises and any part of the work at any time. 7.6 The supplier shall submit, within the time stated in the contract or in the programme, drawings showing how the plants are to be designed and any other information required for approval to HIMURJA. 7.7 Before the goods and equipment are taken over by the HIMURJA, the supplier shall supply operation and maintenance manuals together with drawings of the goods and equipment as built. These shall contain such details which will enable the HIMURJA to operate, maintain, adjust and repair all parts of the works as stated in the specifications. The manuals and drawings shall be in the ruling language (English) and in such form and numbers as stated in the contract. Unless
  • 13. and otherwise agreed, the goods and equipment shall not be considered to be completed for the purposes of taking over until such manuals and drawings have been supplied to the HIMURJA. 7.8 If the goods/services or any section fails to pass the Tests, the supplier may require such tests to be repeated on the same terms and conditions. All costs to which the HIMURJA may incur by the repetition of the tests under this sub-clause shall be deducted from the contract price. 7.9 If the HIMURJA and the supplier disagree on the interpretation of the test results each shall give a statement of his views to the other within 14 days after such disagreement arises. The statement shall be accompanied by all relevant evidence. The HIMURJA will review both the statements and render a final decision which shall be binding on the supplier. For the System & Other Software, the following will apply: The Supplier shall provide complete and legal documentation of hardware, all subsystems, operating systems, compiler, system software and the other software. The Supplier shall also provide licensed software for all software products, along with the software manuals whether developed by it or acquired from others. The supplier shall also indemnify the HIMURJA against any levies/penalties on account of any default in this regard. 8. Acceptance Certificate: 8.1 On successful completion of acceptability test, receipt of deliverables etc, and after the HIMURJA is satisfied with the working on the plant, the acceptance certificate signed by the supplier and the representative of the HIMURJA will be issued. The date on which such certificate is signed shall be deemed to be the date of successful commissioning of the systems. If HIMURJA desires third party inspection can be carried out on the expenses of supplier before acceptance. 8.2 The training shall be imparted for seven days after successful commissioning of project to the officials of HP Vidhan Sabha & HIMURJA at H /Q level for operation and routine maintenance. 9. Spare Parts Supplier shall carry sufficient inventories to assure ex-stock supply of consumable spares such as Cable lugs, Nut & bolts, Screws, Switches, fuses, indicating lamps & blocking diodes lights/bulbs, spare modules, battery spares etc. sufficient for five year operation and maintenance at individual sites / at service centre. List of consumable spares and mandatory spare parts and components shall have to be supplied with the bid.
  • 14. 10. Maintenance Service A During warranty period Free maintenance services shall be provided by the supplier during the warranty period of five years. No payment will be made on this account as it is included in the cost of main equipment. This Maintenance Service will include:- a) Preventive & Routine Maintenance:- It includes minimum two visits of site which shall be done at least once in every six months and shall include activities such as cleaning of modules , checking of connections of panels, electric connections of arrays , control panels, inverter , charge controllers, DC battery connections , specific gravity of battery and any other activity that may be required for proper functioning of the System as a whole. Proper record will be maintained by the firm on this account in the HP Vidhan Sabha SPV Power Plant. Any spare and consumable required during period of five years will be supplied free of cost by the firm including replacement of any components which require replacement. b) Breakdown and corrective maintenance: Whenever a complaint is lodged by the user in the service centre , the firm shall attend to the complaint within a reasonable period of time and in any case the breakdown shall be corrected within a period not exceeding three days from the date of lodging of complaint. Failure to arrange for the immediate repair/replacement will be liable for penalty and the amount of penalty will be recovered from the performance security or any money lying with HIMURJA @ Rs. 2,000/- only per day. 11. Right to use defective equipment If after delivery, acceptance and installation and within the warranty period, the operation or use of the equipment proves to be unsatisfactory, the HIMURJA shall have the right to continue to operate or use such equipment until rectifications of defects, errors or omissions by repair or by partial or complete replacement is made. 12 Operation & Maintenance The firm will train the concerned staff of HP Vidhan Sabha after commissioning, for the operation and routine maintenance of plant.
  • 15. 13 Site Visit a) The Tenderer in own interest will conduct free visit to the site to study the preliminary feasibility and scope of work before quoting the rates otherwise it will be assumed that they have visited the site. The firm is required to submit the certificate that the site has been inspected. The firm can contact the local Sr. Project Officer, HIMURJA, Shimla (Mobile No 94184 56377) and discuss the details of the installation sites. The Tenderers shall offer their complete design along with drawings for the plants in their bids. b) The approved bidder will visit the site after issue of Award letter and submit final feasibility report duly signed by concerend authorities and representative of HIMURJA. In case of deficiency in successful commissioning of plant, HIMURJA may impose penalty and forfeit the bid security. The design and drawing of site will be submitted for the approval of HIMURJA within 15 days of issue of Award letter. 14 Packing The Supplier shall provide such packing of the Goods as is required to prevent damage or deterioration during transit to their final destination as indicated in the Contract. The packing shall be sufficient to withstand, without limitation, rough handling during transit and exposure to extreme temperatures, salt and precipitation during transit and open storage. Packing case size and weights shall be taken into consideration, where appropriate, the remoteness of the Goods’ final destination and the absence of heavy handling facilities at all points in transit. 15. Price Low Clause If at any time during the supply period, the Firm offers similar SPV Power Plant of same capacity to some other customers on similar terms and conditions and technical specifications at reduced rates in respect of items contained in this order, then such reduced rates will also be applicable to this organization and the benefit will have to be passed on to HIMURJA. 16. Location of Power Plant. Sr. No. Name of site Capacity 1. HP Vidhan Sabha, Shimla 20 kWp with battery back up
  • 16. SECTION – III SCHEDULE OF REQUIREMENT S. No. Brief Description Units Make 1 SPV modules of 200 Wp or above for a total capacity of 20 kWp with RF identification tag. 1 Set 2 SPV module mounting structure suitable for accommodating the required capacity SPV modules including any other structure as per site conditions. 1 Set 3 PCU as per specification for 20 kWp 1 set 4 Array Junction Boxes 1 Set 5 Main Junction Boxes 1 Set 6 DC Distribution units as per specifications 1 No. 7 AC Distribution unit as per specifications including Mains Changeover 1 No. 8 Cables/Wiring requirement All cable trays including covers to be provided As per requirement of site BIS marked 9 Lightning arrestor complete set as per specification 1 Set 10 Earthing set as per specification 1 Set 11 Battery bank complete as per specifications 240 Volts, 300 AH at C/10 rate, VRLA tubular plate gel batteries for 20 kWp 1 Set 12 Spares, tools for 5 years operation and maintenance of plant As per list 13 Engineering, electrical drawings and installations and O&M manuals 3 Sets 14 Energy meter for measurement of solar energy 1 No. 15 Any miscellaneous work required for the installation of plant L/S 16 Internal and external wiring L/S 17 Data Logger 1 set Note : i) The requirement for the plant and machinery is indicative and the supplier is required to include and quote for any other item left out in the schedule for successful working during warranty period. Any spare, consumable or any other item which goes bad will be replaced by the firm free of cost during warranty period. ii) Suppliers shall offer their complete design along with drawings for the plant in their bids after conducting site visit. iii) Alternate makes can be offered for the equipment/ items and approval by HIMURJA. The specification of all the components including modules will conform strictly to the specification as prescribed in JNNSM by MNRE.
  • 17. TECHNICAL SPECIFICATION The PV modules and other components of SPV plants to be offered shall perform satisfactorily in humidity up to 100 % with ambient temperature in between - 30 degree centigrade to + 55 degree centigrade. I. Solar PV Module 1. Solar PV module array to be of high efficiency Solar Modules utilizing Crystalline Silicon (Multi/Mono crystalline) Solar PV cells. Individual Solar module rating should not be less than 200 Wp @ STC. each . Since the modules would be used in high voltage circuit, the High Voltage Insulation test shall be carried out on each modules and a test certificate to that effect will have to be provided. Power output Guarantee offered for the SPV Module shall be : i) 12 years (with less than 10% degradation) ii) 25 years (with less than 20% degradation) Solar PV module offered should meet following minimum requirement. 1. Efficiency of module, Eff, m ≥ 14 % 2. IV curve of each PV module with Sl Nos. should be submitted along with Modules. Solar PV Modules shall conform to IEC 61215 Ed 2 and IEC 61730 standard. Test certificates to be submitted along with the bid with other requirements of JNNSM. With RFID on the module ,following details to be provided: • Maximum Power, Pmax • Open Circuit Voltage, Voc • Short Circuit Current ,Isc • Voltage at Max Power Vmp • Current at Max power Imp • Efficiency of cell, Ef, c • Efficiency of module, Ef, m 3. Solar PV Module should conform to following mechanical requirement: • Toughened, low iron content, high transmissivity front glass. • Anodized Aluminum Frame.
  • 18. • Ethyl Vinyl Acetate (EVA) encapsultant. • Silicon edge sealant around laminate. • Tedlar / Polyester trilainate back surface. • ABS plastic terminal box for the module output termination with gasket to prevent water moisture. • Resistant to water, abrasion, hail impact, humidity & other environment factor for the worst situation at site. • By pass diode. Type of Solar PV Modules offered should have proven Performance Track record in Indian climatic conditions. II. Module Mounting Structure / Array • Structure shall be designed for simple mechanical and electrical installation. It shall support SPV modules at a given orientation, absorb and transfer the mechanical loads to the ground properly. The mounting structure should be Galvanized & with anticorrosive paint. The array structure shall be so designed that it will occupy minimum space without sacrificing the output from SPV panels & shall with stand heavy winds. Support structure design and foundation or fixation mounting arrangements should with stand minimum horizontal wind speed of 140 kmps / hr (Design devalue shall be greater than 140 kmps /hr) on the roof of Vidhan Sabha. • Tilt angle adjustment:- Fixed as per roof available at site.
  • 19. III. Array Junction Box: • The junction boxes shall be dust vermin and water proof and made of FRP / Thermo Plastic with IP65 protection. • The terminals shall be connected to copper bus bar arrangement of proper sizes. • The junction boxes shall have suitable cable entry points fitted with cable glands of appropriate sizes for both incoming and outgoing cables. • Suitable markings shall be provided on the bus bar for easy identification and cable ferrules shall be fitted at the cable termination points for identification. • The rating of the JB’s shall be suitable with adequate safety factor to interconnect the Solar PV array. • Metal oxide arrestors shall be provided inside the Array Junction Boxes. IV. Battery Bank: The battery Bank of the solar system shall be VRLA type tubular Gel batteries. The Performance Warranty of the Battery Bank should not be less than 5 (Five) Years. In case any battery gets defective, during the warranty period of five years the firm will have to replace the same with new one free of cost. The battery to be supplied must be approved from authorized test centers of MNRE. The firm will submit an undertaking alongwith IEC certificate from the manufacturer of the battery that the batteries supplied are warranted for a period of five years. Main features of the battery (as applicable) • The batteries shall comprise 2V Cells with suitable capacity at C10 rate. • Polypropylene/Hard Rubber Container. • Terminals: Of lead alloy, suitable for bolted connection. • Recharge ability: at very low rates charging rates as low as 0.05% of the normal charging current. • High charging efficiencies: Ah efficiency; In excess of 90%. • Low rate of self discharge: less than 3% per month at 27°C. • Capacity to sustain partial state of charge should with stand partial state of charge up to six months. • Very Low maintenance. • Service life of 8 -10 years under normal operating conditions. V. Battery Rack: A suitable battery rack with interconnections & end connector shall be provided to suitably house the batteries in the bank. Battery interconnecting links shall be provided for interconnecting in series and in parallel as per requirement. Connectors for inter cell connection (series/parallel) shall be maintenance free screws. Insulated terminal covers shall be provided.
  • 20. VI. PCU (Power Conditioning Unit) The power conditioning unit shall include charge controller, inverter and grid charger in one enclosure and should be as per the IEC Standard IEC 61683/IS 61683. The firm must submit test certificate from any of the NABL/IEC Accredited Testing Laboratories or MNRE approved test centre. 1) Nominal DC Array Input Voltage 240 V DC for 20 kWp 2) Solar Charge Controller Capacity 20 kWp 3) Charger Type MPPT Based Solar Charge Controller 4) Battery Type VRLA type tubular Gel batteries 5) Solar Charge Controller efficiency > 95% 6) Inverter Type Bidirectional 7) Continuous Output Rating 25 KVA 8) Output Wave Form Sine Wave Output 9) Total Harmonic Distortion < 3% 10) Output Voltage 415 V ± 1% 11) Output Frequency 50 Hz. ± 0.5 Hz. 12) Power Factor 0.8 13) Inverter efficiency > 85% at full load and nominal battery input voltage 14) Regulation Line regulation & Load regulation – 2 % 15) AC Battery Charger Capacity Minimum 100 % of Solar Charge Controller Capacity 16) AC Battery Charger Input Voltage 415 V AC ± 15%, 50 Hz. Three Phase AC Input 17) Overload Features 150% for 1 minute 18) Control Type Microprocessor based Control. 19) Operation mode PCU must be designed to work in 1. Stand Alone Mode 2. Hybrid Mode 3. OFFLINE Mode 20) Cooling Forced Air cooling 21) Operating temperature - 30 degree C to + 50 degree C 22) Relative Humidity 100 % Maximum
  • 21. 23) Indications Inverter ON Grid ON Array ON Inverter under/over voltage Inverter Overload Battery Low 24) Protections Input over voltage / Input under voltage Short circuit / Over Current/over load Load surge current Battery Low trip Battery reverse polarity 25) MCB’s / MCCB’s Suitable rating MCB’s / MCCB’s of reputed make must be provided for Array, Battery & Load isolation. 26) Manual bypass switch To bypass grid power to load directly. Under this condition, solar charge controller shall continue to charge the battery at its full capacity as per requirement of battery. 27) Assembly & Mounting As per normal industry practice. 28) Cable Entry From rear, 200mm above ground level 29) Potential Free Contact Potential free contact must be provided for battery low pre alarm VII. Cables and accessories All the cables shall be supplied conforming to IS 694 & shall be of 650 V /1 .1 kV grade as per requirement .Only PVC Copper cables shall be used. The size of the cables between array interconnections, array to junction boxes, junction boxes to PCU etc shall be so selected to keep the voltage drop and losses to the minimum. All installation accessories, which are required to install and successfully commission the power plant, are to be provided. Cabling : Cabling in the Pump House shall be carried out as per IE Rules. Cabling inside control room and array area should be in cable pipes with proper water/moisture protection sealing. All other cabling above ground should be suitably mounted on cable trays with proper covers. For underground cables, cable trenches should be provided covered with RCC slabs. Wires: Only copper wires of appropriate size and of reputed make shall have to be used.
  • 22. Cables Ends : All connections are to be made through suitable cable/lug/terminals; crimped properly & with use of Cable Glands. Cable Marking : All cable/wires are to be marked with proper manner by good quality ferule or by other means so that the cable can be easily identified. All the cables required for the plant will be provided by the manufacturer. VIII. Earthing and protection Lightning Protection There shall be the required number of suitable lightning arrestors installed in the array area at least one at each site. Protection shall meet the safety rules as per Indian Electricity Act Earthing Protection Each array structure of the PV yard should be grounded properly as per IS:3043-1987. In addition to it, the lightning arrester/masts should also be provided inside the array field. Provision should be kept for shorting and grounding of the PV array at the time of maintenance work. All metal casing/shielding of the plant should be thoroughly grounded in accordance with Indian electricity Act./IE Rules. Earth Resistance should be tested in presence of the representative of HIMURJA after earthing by calibrated earth tester. PCU ACDB and DCDB should also be earthed properly. Danger Boards Danger boards should be provided as and where necessary as per IE Act./IE rules as amended up to date. A warning board showing warning for non use of heating load from the system is required to avoid misuse. IX. System Functioning The system should be compatible with Solar & Mains with Energy Management function. Priority should always be given to the Solar Energy .Depending upon specified battery state of charge ,the system should intelligently decide whether mains supply is to be used or in case of situation so warrants , alarm for starting of backup generator should be generated. The grid charging is switched on only when battery reaches a specified SOC (State of Charge) /Volt (user defined) and stopped when battery has reached a specified SOC
  • 23. /Volt again, thus ensuring solar energy is fully utilized .i.e. after grid charging has stopped, solar will have to do the end charging. When Solar and mains are available and battery is fully charged, the load shall be supplied by solar energy. When solar is not available but grid is available, AC mains will supply the load along with charging the battery bank. The set points should be freely programmable as per user requirement. The Following features are essential: 1 The set points for Energy Management like Battery Voltage or battery SOC (State of Charge) to be Programmable as per user requirement. 2 The entire functioning is to be automatic without any user intervention required. X. After Sales Services: The tenderer shall ensure 5 (five) years after sales service on site on chargeable basis which include routine and preventive maintenance after the expiry of warranty period on mutually agreed terms. XI. Factory Testing: A) Preparation of all controls, protective and instrumentation circuits shall be demonstrated by direct tests, if feasible or by simulation operation conditions for all parameters that cannot be directly tested. B) Operation of start up, disconnect and shutdown controls shall also be tested and demonstrated. Stable operation of the PCU containing inverter and charge controller and response to control signals shall also be tested and demonstrated. C) Factory testing shall include measurement of phase currents, efficiencies, harmonic content and power factor. D) A factory Test Report (FTR) shall be supplied with the unit after all tests. The FTR shall include detailed description of all parameters tested qualified and warranted. Factory testing of the PCU should be carried out and witnessed by the HIMURJA’s Engineers at the manufacturers premises. Other routine tests on modules including HV test on all modules , PCU and other BoS items will be carried out by the suppliers at works free of cost in the presence of representative of HIMURJA.
  • 24. XII. Other Conditions Technical description for all components & electronics along with block diagram, layout, drawing is to be submitted with the tender. Insulation mat in front of plant controlling unit, Inverter are to be provided. Suitable cooling arrangement in the control room for cooling of the PCU is to be arranged, if required. XIII Tools & Tackles and Spares : After completion of installation & commissioning of the power plant, necessary tools & tackles are to be provided free of cost by the contractor for maintenance purpose in HP Vidhan Sabha. XIV. Operation & Maintenance of Power Plant Operation of SPV power plants will be done by concerned staff of Vidhan Sabha, but training will be imparted by the firm for operation and routine maintenance. Following will be ensured by the concerned firm during warranty period of five years. XV. Spare Parts to be kept at Vidhan Sabha (SPV Power Plant Site) S No Item Description Quantity ( No.) 1 SPV Module 1 % of total numbers of modules to be kept at the site. 2 Battery Battery replacement to be carried out as and when required within warranty period if there is any defect in the battery. 3 Power Conditioning Systems Necessary spares for 5 years of operation with min. 1 set of spares to be kept at plant site. 4 Miscellaneous( cable, fuses, screws, soldering material, lugs etc ) Required for 5 years of operation
  • 25. XVI. Tools and Measuring instruments for Vidhan Sabha S No Item Description Quantity (nos.) 1 Digital Multimeter 1 2 Screw Driver set 1 3 Spanner set 1 4 Cutting Plier 1 5 Soldering Iron 1 6 Battery Float meter or any other item if required
  • 26. SECTION -IV Annexure- I TENDER FORM 1. Tender No: 2. Name of the work: 3. Last date and time of submission of the documents: 4. Amount of Earnest Money Deposit: DD and Date 5. Date and time of opening of the tender: 6. Place of opening of the tender: 7. Name and status of firm/company individual to whom the tender document is issued : 8 Validity of tender 7 Name of the authorized representative to Sign the tender (Signature of Tenderer) with designation • All the columns must be filled by the tenderer.
  • 27. Annexure- II GENERAL PARTICULARS OF THE TENDERER 1. Name of tenderer: 2 Address for correspondence: 3. Telephone No. and Fax No. 4 Name and Designation of the Authorized Representative of the tenderer to whom all the references shall be made: 5 Amount and reference of E.M.D. Deposited (Drawn on Bank & D.D. No.& date) 6 Financial capability of the contractor/ Firm for carrying out the work: 7 Has the firm ever been debarred by any Govt. Deptt/Agency/organization for undertaking any work: 8 Details of offer (Mention No of pages): 9. Reference of any other information attached by the tenderer: 10. Authorized representative for any correspondence 11. Whether service center for after sales service set up in the state, give address (Signature of Tenderer) with designation
  • 28. Annexure- III EXPERIENCE OF THE TENDERER Please fill in the information about the similar projects undertaken over the last five years 1. Name of organization by whom work was awarded. Please give Project wise detail of projects installed/ commissioned:- 2. Name and location of the works. 3. Total amount of Contract. 4. Year of Award. 5. Detail of involvement in work as an individual or as a company. 6. Was the work completed satisfactorily and within the stipulated time period. 7. Particulars of evidence enclosed in token of above 8. Whether list of past supplies enclosed as per Annexure V 9. Whether past performance obtained from HIMURJAs / utilities enclosed ------------------------------------------------------------------------------------------ (Signature of Tenderer) with designation
  • 29. Annexure- IV DECLARATION BY THE TENDERER I/We______________________________________ (herein after referred to as the tenderer) being desirous of tendering for the design, manufacture, supply, erection, testing , installation and commissioning of SPV power plants of 20 kWp at HP Vidhan Sabha, Shimla in H.P including warranty period of 5 years as shown in scope of tender specification . We have fully understood the nature of the work and carefully noted all the terms and conditions, specifications etc. as mentioned in the tender documents, hereby declare that:- 1 The tenderer is fully aware of all the requirements of the tender documents and agrees with all the provisions of the tender documents. 2 The tenderer is capable of executing and completing the work as required in the tender. 3 The tenderer accepts all risks and responsibilities directly or indirectly connected with the performance of the tender. 4 The tenderer is financially solvent and sound to execute the tender. 5 The tenderer is sufficiently experienced and competent to perform the contract to the satisfaction of HIMURJA. 6 The information and statements submitted with the tender are true. 7 The tenderer has not been debarred from similar type of work by any Govt Dept./Agency/Organization. 8 This offer will remain valid for acceptance for 6 (six) months from the date of opening of the tender. 9 The tenderer gives the assurance to execute the tendered work as per the specifications, terms and conditions and in exact configuration of the sample submitted on award of the work. (Signature of Tenderer) with designation
  • 30. Annexure- V SCHEDULE OF PAST SUPPLIES OF LAST FIVE YEARS S No Description Supply order No. and date Name of HIMURJA / Agency Date of Supply/ completion as per order Actual date of supply/ commissioning on (Signature of Tenderer) with designation Note:- Performance certificate from the concerned utilities along with their communication address, e- mail and FAX No. is required for authentication of certificates.
  • 31. Annexure- VI GUARANTEED TECHNICAL PARAMETRS S.No. ITEM PARTICULARS 1 SOLAR PHOTOVOLTAIC MODULES 1.1 MANUFACTURER 1.2 SIZE 1.3 Type 1.4 P nom 1.5 P max 1.6 I mp 1.7 V mp 1.8 Module EFFICIENCY 1.9 No. of cells in a module 1.10 Whether meets IEC- 61215 2nd edition and IEC 61730 standard. Whether Test certificates submitted along with the bid 1.11 Warranty of modules 2 PCU 2.1 TYPE / Make 2.2 AC Output Voltage 2.3 DC input voltage range 2.4 DC operating voltage 2.5 Continuous rating 2.6 Efficiency 2.7 Operating temperature range 2.8 Power control 2.9 Protection features 2.10 Overload capacity 2.14 DC input overload capacity 3 Battery 3.1 Type 3.2 Manufacturers name 3.3 Capacity Ah at C/10 rate 3.4 DOD % 3.5 Rated normal voltage 3.6 Rated maximum voltage 3.7 Rated minimum voltage 3.8 Applicable standard 3.9 Ampere hour efficiency 3.10 Whether meets IEC / IS standards
  • 32. Signature of the Bidder ___________________________ Annexure –VII FORMAT FOR BANK GUARANTEE AGAINST PERFORMANCE SECURITY (To be stamped in accordance with Stamp Act if any, of the Country of the Issuing Bank) Bank Guarantee No. : ……………………………………. Date:………………………….. To …………………………………………. (Name of the HIMURJA) Whereas ………………………………….. ------- (Name of the HIMURJA) hereinafter called “The supplier” has undertaken, in pursuance of Contract No……………………….. -----------------------------------dated ……… 20…….. to supply ……………………………………………………. (Description of Goods and Services) hereinafter called “the contract”. AND WHEREAS it has been stipulated by you in the said contract that the supplier shall furnish you with a Bank Guarantee by a recognized Bank for the sum specified therein as security for compliance with the Supplier’s performance obligations under the contract for Operation, Maintenance and Repairs of the entire system including cost of spares for a period of 5 years from the date of issue of acceptance certificate by the HIMURJA. AND WHEREAS we have agreed to give the Supplier a Guarantee THEREFORE WE hereby affirm that we are Guarantors and responsible to you on behalf of the Supplier, up to a total of Rs………………………. (Amount of guarantee in words and figures) being 10% of the total cost of contract value and we undertake to pay you, upon your first written demand declaring the Supplier to be in default under the contract and without cavil or argument, any sum or sums within the limit of Rs…………………………….. (Amount of guarantee) as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein. This guarantee is valid until………………… day of…………….20……… Signature and Seal of Guarantors ………………………. ………………………. Date:…………20…... Note : 1. SUPPLIER SHOULD ENSURE THAT SEAL AND CODE No. OF THE SIGNATORY IS PUT BY THE BANKERS, BEFORE SUBMISSION OF THE BANK GUARANTEES.
  • 33. Annexure-VIII UNDERTAKING TO BE FURNISHED BY BIDDERS We, M/S ……………………………………………………………………………… with Registered office at ………………………………………………………………… undertake to ensure generation of electrical energy from the Solar Power Plant of 20 kWp to be installed by us as per the details / technical specifications given in Tender document. Authorized Signatory Name of the Company with stamp
  • 34. Annexure -IX MANUFACTURERS' AUTHORIZATION FORM No. dated To Tender No. Tender document No. HIMURJA (F-7)/SPV Plant/IPH/JNNSM/ 2014-15- Part-II Dear Sir: We who are established and reputable manufacturers of ________________________ (name & descriptions of goods offered) having factories at (address of factory) do hereby authorize M/s ___________________ (Name and address of Agent) to submit a bid, and sign the contract with you for the goods manufactured by us against the above NIT. We hereby extend our full guarantee and warranty for the goods and services offered for supply by the above firm against their project. Yours faithfully, (Name) (Name of manufacturers) Note: Their letter of authority should be on the letterhead of the manufacturer and should be signed by a person competent and having the power of attorney to legally bind the manufacturer. It should be included by the Bidder in its technical bid.
  • 35. SECTION-V Price Schedule of Main Equipment Annexure F-1 S.No. Description Qty Rate Amount 1 FOR cost of 20 kWp Power Plant with battery system complete in all respect as per clause No. 1 of GCC & Technical Specifications including design, engineering, manufacturing , shop testing, inspection, supply, installation, commissioning at HP Vidhan Sabha, Shimla &. warranty period of five years after successful commissioning. Note:- i) FOR cost will be quoted including all applicable taxes, duties, and entry tax @ 3 %. ii) Bill of material will be supplied separately. iii) Cost breakup of the power plant is as per Annexure-F-2 (attached). Signature
  • 36. COST BREAK-UP OF POWER PLANT Annexure F-2 S No. FOR cost of Qty Rate (Rs.) Amount (Rs.) 1 SPV modules of 200 Wp or above with RF identification tag. 1 Set 2` Mounting structure for above as per specs. 1 set 3 PCU as per specification 1 set 4 Array Junction Boxes/ Main Junction Boxes 1 Set 5 DC Distribution units as per specifications 1 No. 6 AC Distribution unit as per specifications including Mains Changeover 1 No. 7 Cables/Wiring (As per requirement of site) L/S 8 Lightning arrestor complete set as per specification 1 Set 9 Earthing set as per specification 1 Set 10 Battery bank complete as per specifications 240 Volts , 300 AH at C/10 rate 1 Set 12 Data Logger 1 set 13 Spares, tools for 5 (five) years operation and maintenance of plant As per list 14 Engineering, electrical drawings and installations and O&M manuals 3 Sets 15 Any miscellaneous work required for the installation of plant L/S Total Note: - Above break up is only indicative and for billing purpose. Signature