1. PROFESSIONAL
WORK
EXPERIENCE
From - To Project / Employer Position Project Profile
From September
28, 2009
STRATEGIC TUNNEL ENHNCEMENT
PROGRAMME
Chief
Surveyor
26 Km, 7 M dia excavation of Sewer
Machines using the latest
to Date ABU DHABI (U.A.E) tunnel guiding system VMT and Gy
Employer: Impregilo Contractors, Italy 10 Nos Vertical shafts excavation h
26 Km concrete tunnel lining 5 M to
Surface monitoring of rods, bridges
From November
10, 2008
INGULA PUMPED STORAGE
SCHEME
Chief
Surveyor
Traditional Drilling and Blasting Tun
to July 04, 2009 SOUTH AFRICA Intake and Outlet Structures
Employer: C.M.C-Impregilo
Contractors, Italy
From JULY 28,
2003
KARAHNJUIKAR HYDROELECTRIC Chief
Surveyor
Project includes 50 KM Tunnel with
successful breakthrough
to 13 September
2008
Project, Iceland and 10 Km Traditional Drilling / Blas
Employer: Impregilo Contractors, Italy The Dam with 10 Millions M3 of Fill
and Bottom outlet and
Diversion Tunnels T1 and T2.
Using Tunnel Guidance System (ZE
Measurements of
Profiles Setting outs, GPS 500 for p
processing of Data
on the computer using Different Su
Instrument interface
From November
04, 1996
Ghazi Barotha Hydropower Project Chief
Surveyor
Project includes Barrage with Stand
Regulator, Guide Banks
to July 25, 2003 with 52 Km Long 100 M wide Concr
Service Road Approach
Employer: Ghazi Barotha Contractors Roads, Superpassages, bridges an
[ A j. v. of Impregilo spA.,
Ed-Zublin, Nazir & Company & Developed and used system to Con
trimming Machines (Line and
Sadullah Khan & Brothers] Grade ) using latest instruments, se
Bridges and processing of
Data on the computer using Differe
PC Instrument interface
From - To Project / Employer Position Project Profile
From December
28, 1992
West Sumatera Indonesia Chief
Surveyor
Project included 22 KM Tunnel with
Successful Breakthrough,
To October 15,
1996
Traditional Drilling and Blasting and
with 6 units,
Employer: Dumez , Impregilo spA, PT
Istaka Karya
Spillway and Intake Structures
From Jan 12,
1992
Pakistan Motorway Project M2
Pakistan
Chief
Surveyor
Project Included 333 km Long Moto
Underpasses and
to November 31,
1992
Approach Roads from Lahore to Isl
executed by M/S Daewoo
2. Employer: Snowy Mountains
Engineering Corporation
Corporation South Korea
Australia Consultant
Survey Checking and Control of all
Contractor, Traversing,
Setting outs and Survey Checking o
on the Motorway
From June 1,
1991
SADUC Chief
Surveyor
Project Included Chamber of Comm
to November 13,
1991
Building Project, Dhahran, Saudi Ar
Employer: Dumez Saudia Arabian
Division
All the Survey related tasks using t
From October 15,
1988
Makkah Road Project Chief
Surveyor
Project Included Urban Road (5 Km
to May 31, 1991 Including 5 Flyovers, 5 underpasse
Employer: Dumez Saudia Arabian
Division
Saudi Arabia
All the Survey related tasks using t
From November 3,
1985
SHARACO HOTEL Project Sr. Land
Surveyor
Construction of 6 Stories 5 Star Ho
to November 19,
1996
Family Suits, Exhibition Hall, and 99
Employer: Dumez Saudia Arabian
Division
Saudi Arabia
All the Survey related tasks using t
From July 2, 1979 PUBLIC BUILDINGS Projects Land
Surveyor
Project included Construction of 1
Supermarkets, Roads
to September 22,
1985
Community Centers , Theatres, Sch
Dumez Saudia Arabian Division Saudi Arabia
All the Survey related tasks using t
From August 6,
1978
SHURGAZ - ZAHEDAN - MIRGAWAH
Road
Land
Surveyor
Project included Construction of 15
Zehedan - Mirjawah
to January 29,
1979
Iran
Employer: MARPAL RIDGWAY Ltd
U.K.
All the Survey related tasks using t
From June 6,
1976
10 Berths Extension (Harber) Surveyor 10 Berth Harber Construction inclu
to May 25, 1978 Employer: Dumez , HADISH,
HAMOON
Iran
Bandar Shahpur Iran All the Survey related tasks using t