From - To Project / Employer Position Project Profile
From September
28, 2009
STRATEGIC TUNNEL ENHNCEMENT
PROGRAMME
Chief
Surveyor
26 Km, 7 M dia excavation of Sewer
Machines using the latest
to Date ABU DHABI (U.A.E) tunnel guiding system VMT and Gy
Employer: Impregilo Contractors, Italy 10 Nos Vertical shafts excavation h
26 Km concrete tunnel lining 5 M to
Surface monitoring of rods, bridges
From November
10, 2008
INGULA PUMPED STORAGE
SCHEME
Chief
Surveyor
Traditional Drilling and Blasting Tun
to July 04, 2009 SOUTH AFRICA Intake and Outlet Structures
Employer: C.M.C-Impregilo
Contractors, Italy
From JULY 28,
2003
KARAHNJUIKAR HYDROELECTRIC Chief
Surveyor
Project includes 50 KM Tunnel with
successful breakthrough
to 13 September
2008
Project, Iceland and 10 Km Traditional Drilling / Blas
Employer: Impregilo Contractors, Italy The Dam with 10 Millions M3 of Fill
and Bottom outlet and
Diversion Tunnels T1 and T2.
Using Tunnel Guidance System (ZE
Measurements of
Profiles Setting outs, GPS 500 for p
processing of Data
on the computer using Different Su
Instrument interface
From November
04, 1996
Ghazi Barotha Hydropower Project Chief
Surveyor
Project includes Barrage with Stand
Regulator, Guide Banks
to July 25, 2003 with 52 Km Long 100 M wide Concr
Service Road Approach
Employer: Ghazi Barotha Contractors Roads, Superpassages, bridges an
[ A j. v. of Impregilo spA.,
Ed-Zublin, Nazir & Company & Developed and used system to Con
trimming Machines (Line and
Sadullah Khan & Brothers] Grade ) using latest instruments, se
Bridges and processing of
Data on the computer using Differe
PC Instrument interface
From - To Project / Employer Position Project Profile
From December
28, 1992
West Sumatera Indonesia Chief
Surveyor
Project included 22 KM Tunnel with
Successful Breakthrough,
To October 15,
1996
Traditional Drilling and Blasting and
with 6 units,
Employer: Dumez , Impregilo spA, PT
Istaka Karya
Spillway and Intake Structures
From Jan 12,
1992
Pakistan Motorway Project M2
Pakistan
Chief
Surveyor
Project Included 333 km Long Moto
Underpasses and
to November 31,
1992
Approach Roads from Lahore to Isl
executed by M/S Daewoo
Employer: Snowy Mountains
Engineering Corporation
Corporation South Korea
Australia Consultant
Survey Checking and Control of all
Contractor, Traversing,
Setting outs and Survey Checking o
on the Motorway
From June 1,
1991
SADUC Chief
Surveyor
Project Included Chamber of Comm
to November 13,
1991
Building Project, Dhahran, Saudi Ar
Employer: Dumez Saudia Arabian
Division
All the Survey related tasks using t
From October 15,
1988
Makkah Road Project Chief
Surveyor
Project Included Urban Road (5 Km
to May 31, 1991 Including 5 Flyovers, 5 underpasse
Employer: Dumez Saudia Arabian
Division
Saudi Arabia
All the Survey related tasks using t
From November 3,
1985
SHARACO HOTEL Project Sr. Land
Surveyor
Construction of 6 Stories 5 Star Ho
to November 19,
1996
Family Suits, Exhibition Hall, and 99
Employer: Dumez Saudia Arabian
Division
Saudi Arabia
All the Survey related tasks using t
From July 2, 1979 PUBLIC BUILDINGS Projects Land
Surveyor
Project included Construction of 1
Supermarkets, Roads
to September 22,
1985
Community Centers , Theatres, Sch
Dumez Saudia Arabian Division Saudi Arabia
All the Survey related tasks using t
From August 6,
1978
SHURGAZ - ZAHEDAN - MIRGAWAH
Road
Land
Surveyor
Project included Construction of 15
Zehedan - Mirjawah
to January 29,
1979
Iran
Employer: MARPAL RIDGWAY Ltd
U.K.
All the Survey related tasks using t
From June 6,
1976
10 Berths Extension (Harber) Surveyor 10 Berth Harber Construction inclu
to May 25, 1978 Employer: Dumez , HADISH,
HAMOON
Iran
Bandar Shahpur Iran All the Survey related tasks using t

More Related Content

What's hot (20)

Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Cv inglese it
Cv inglese itCv inglese it
Cv inglese it
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
 
J D Smith resume 2016
J D Smith resume 2016J D Smith resume 2016
J D Smith resume 2016
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
Cv Update_resume
Cv Update_resumeCv Update_resume
Cv Update_resume
 
Purechem Construction Group Presentation
Purechem Construction Group PresentationPurechem Construction Group Presentation
Purechem Construction Group Presentation
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Abhishek Resume
Abhishek ResumeAbhishek Resume
Abhishek Resume
 
MRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CVMRITYUNJOY_MAJUMDAR-_CV
MRITYUNJOY_MAJUMDAR-_CV
 
Mahmoud
MahmoudMahmoud
Mahmoud
 
CV Richard Furuhovde
CV Richard FuruhovdeCV Richard Furuhovde
CV Richard Furuhovde
 
Hee Resume & CV 2016
Hee Resume & CV 2016Hee Resume & CV 2016
Hee Resume & CV 2016
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
CV WAQAR.
CV WAQAR.CV WAQAR.
CV WAQAR.
 

Similar to ALI (20)

Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
Resume
ResumeResume
Resume
 
AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015AHMED YEHIA MARCH 2015
AHMED YEHIA MARCH 2015
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14Iain Cameron CV presentation oct14
Iain Cameron CV presentation oct14
 
MCV
MCVMCV
MCV
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
ACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORTACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORT
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Updated CV of Satheeshkumar
Updated CV of SatheeshkumarUpdated CV of Satheeshkumar
Updated CV of Satheeshkumar
 
Loco Drill – Example of Good Collaboration
Loco Drill – Example of Good CollaborationLoco Drill – Example of Good Collaboration
Loco Drill – Example of Good Collaboration
 
Resume
ResumeResume
Resume
 
Cv presentation jun13
Cv presentation jun13Cv presentation jun13
Cv presentation jun13
 
Muru
MuruMuru
Muru
 

ALI

  • 1. PROFESSIONAL WORK EXPERIENCE From - To Project / Employer Position Project Profile From September 28, 2009 STRATEGIC TUNNEL ENHNCEMENT PROGRAMME Chief Surveyor 26 Km, 7 M dia excavation of Sewer Machines using the latest to Date ABU DHABI (U.A.E) tunnel guiding system VMT and Gy Employer: Impregilo Contractors, Italy 10 Nos Vertical shafts excavation h 26 Km concrete tunnel lining 5 M to Surface monitoring of rods, bridges From November 10, 2008 INGULA PUMPED STORAGE SCHEME Chief Surveyor Traditional Drilling and Blasting Tun to July 04, 2009 SOUTH AFRICA Intake and Outlet Structures Employer: C.M.C-Impregilo Contractors, Italy From JULY 28, 2003 KARAHNJUIKAR HYDROELECTRIC Chief Surveyor Project includes 50 KM Tunnel with successful breakthrough to 13 September 2008 Project, Iceland and 10 Km Traditional Drilling / Blas Employer: Impregilo Contractors, Italy The Dam with 10 Millions M3 of Fill and Bottom outlet and Diversion Tunnels T1 and T2. Using Tunnel Guidance System (ZE Measurements of Profiles Setting outs, GPS 500 for p processing of Data on the computer using Different Su Instrument interface From November 04, 1996 Ghazi Barotha Hydropower Project Chief Surveyor Project includes Barrage with Stand Regulator, Guide Banks to July 25, 2003 with 52 Km Long 100 M wide Concr Service Road Approach Employer: Ghazi Barotha Contractors Roads, Superpassages, bridges an [ A j. v. of Impregilo spA., Ed-Zublin, Nazir & Company & Developed and used system to Con trimming Machines (Line and Sadullah Khan & Brothers] Grade ) using latest instruments, se Bridges and processing of Data on the computer using Differe PC Instrument interface From - To Project / Employer Position Project Profile From December 28, 1992 West Sumatera Indonesia Chief Surveyor Project included 22 KM Tunnel with Successful Breakthrough, To October 15, 1996 Traditional Drilling and Blasting and with 6 units, Employer: Dumez , Impregilo spA, PT Istaka Karya Spillway and Intake Structures From Jan 12, 1992 Pakistan Motorway Project M2 Pakistan Chief Surveyor Project Included 333 km Long Moto Underpasses and to November 31, 1992 Approach Roads from Lahore to Isl executed by M/S Daewoo
  • 2. Employer: Snowy Mountains Engineering Corporation Corporation South Korea Australia Consultant Survey Checking and Control of all Contractor, Traversing, Setting outs and Survey Checking o on the Motorway From June 1, 1991 SADUC Chief Surveyor Project Included Chamber of Comm to November 13, 1991 Building Project, Dhahran, Saudi Ar Employer: Dumez Saudia Arabian Division All the Survey related tasks using t From October 15, 1988 Makkah Road Project Chief Surveyor Project Included Urban Road (5 Km to May 31, 1991 Including 5 Flyovers, 5 underpasse Employer: Dumez Saudia Arabian Division Saudi Arabia All the Survey related tasks using t From November 3, 1985 SHARACO HOTEL Project Sr. Land Surveyor Construction of 6 Stories 5 Star Ho to November 19, 1996 Family Suits, Exhibition Hall, and 99 Employer: Dumez Saudia Arabian Division Saudi Arabia All the Survey related tasks using t From July 2, 1979 PUBLIC BUILDINGS Projects Land Surveyor Project included Construction of 1 Supermarkets, Roads to September 22, 1985 Community Centers , Theatres, Sch Dumez Saudia Arabian Division Saudi Arabia All the Survey related tasks using t From August 6, 1978 SHURGAZ - ZAHEDAN - MIRGAWAH Road Land Surveyor Project included Construction of 15 Zehedan - Mirjawah to January 29, 1979 Iran Employer: MARPAL RIDGWAY Ltd U.K. All the Survey related tasks using t From June 6, 1976 10 Berths Extension (Harber) Surveyor 10 Berth Harber Construction inclu to May 25, 1978 Employer: Dumez , HADISH, HAMOON Iran Bandar Shahpur Iran All the Survey related tasks using t