2. LAND ENVIROMENT
• Land use examination as per master plan
• Land use within around 10 km radius of the project site
• Satellite imagery shall be used for the study
• Check on flood plain of any river
• Details of Environmentally Sensitive Places, Land Acquisition Status,
Rahabilitation
3. LAND ENVIRONMENT
• Contour Plan with Slope
• Drainage pattern of the site and surrounding area
• Any obstruction by the proposed project on the above
• Present land use and permission required for any conversion such as forest or
agricultural land
4. BASELINE MONITORING
• Land
• Ground Water
• Surface Water
• Air
• Biodiversity
• Noise and Vibration
• Socio Economic and Health
5. BIODIVERSITY
• Details of the existing number of trees in the core area
• Type of trees in the buffer area
• Number of trees will be felled for the project
7. WATER ENVIRONMENT
• Source of Water
• Water Requirement
• Wastewater Treatment and Reuse
• Water Balance for the project
• Rain Water Harvesting
• Soil Characteristic and depth of ground water for Harvesting
8. SOLID WASTE MANAGMENT
• Quantification of Solid Waste
• Source of Generation
• Method of Treatment and Disposal of Solid Waste
9. ENERGY CONSERVATION
• Use of solar energy or alternate source of energy
• Other energy conservation measures as ECBC guidelines
11. TRAFFIC
• Road rail connectivity to the project
• Impact on present traffic due to this project
• Detailed traffic and transportation study for existing and project scenario
• Transport of material for construction