IAEA
International Atomic Energy Agency
L4 Concepts for implementing a
quality management system
IAEA
Objectives
•This lecture will present a step by step introduction
into the task of implementing a quality management
system.
2
IAEA
WHY ?
➢ to demonstrate ability to deliver a product that consistently
meets customer and applicable regulatory requirements
and
➢ to address customer satisfaction through the effective
application of the system, including processes for continual
improvement and the prevention of non-conformity.
3
IAEA
Customer
•The concept of „CUSTOMER“ is mainly applied to
EXTERNAL customers: they position orders and bring in
money.
•Never forget the INTERNAL customers in your organization.
They keep the workflow going and support the quality of your
product.
4
IAEA
Understanding the Process Approach
5
IAEA
The advantage of the process approach
6
IAEA
A process
PROCESS
(with interactions)
RESOURCES
Input Output
KPI’s
7
IAEA
Implementation basics
➢ identify the processes needed for the QMS;
➢ determine interaction of these processes;
➢ determine evaluation criteria for these processes;
➢ ensure the availability of information for these processes
and
➢ measure, monitor and analyze the processes, and
implement action necessary to achieve planned results
and continual improvement.
8
IAEA
Implementation process
1. Decision taking
2. Management commitment
3. Implementation team
4. Plan the implementation
5. Identify existing processes
6. Define document structure
7. Write procedures
8. Initial Training of
personnel
9. Implementation
10. Internal Audit
11. Management Review
12. Improve system
9
IAEA
Flowchart
Quality Management
System
needed
Management
commits to
QMS
Collect Input
Customer needs,
Regulations, Laws & Standards
Day-to-day workplace experience
Implementation
Team for QMS
installed
Design Quality Plan
Timetable
Responsibilities
Objectives
Process Identification
Managerial Processes
Workforce
Product Realization
Resource Management
Measurement and Improvement
Designing the Quality
Management System
Quality Manual (Handbook)
Managerial Procedures
Administrative Procedures
Technical Procedures
Document Control
Develop System for
Documentation
Prepare Drafts
Training & Evaluation
Implement
Quality
Management
System
Feedback to Management
Measurement, Analysis and Improvement
PLAN
DO
CHECK
ACT
Improve installed system
10
IAEA
Gap analysis
There are various types of analysis that
will be needed to help you define the
scale, scope and potential impact of the
transition to the 17025 requirements.
GAP analysis is particularly helpful
here:
1. What is point B: Where are you trying
to take the organisation; what does the
new system look like?
2. What is the point A: Where are you
now by comparison with point B?
3. What are the changes needed to
close this gap?
CHANGES
NEEDED
TO CLOSE
THE GAP
3
2
1
B
A
11
IAEA
Make a link between the standards of your choice
e.g. ISO 9001, GSR part 2, ISO/IEC 17025 and
your own documents
Documentary check or an integrated MS (IMS)
ISO 9001 ISO
17025
IAEA
GSR
part 2
Document#
in Quality
System
To Do
§ 4.2 § 5.5.1 § 5.2.5 Ref. Doc #
PO.606
Add § on PPC and
on occupational
limits
12
IAEA
Management commitment
Top management shall:
➢ Take decision to implement a quality management system.
➢ Take the lead and manage the implementation as a TOP DOWN
process.
➢ Show interest in completing the process in time and within the
planned budget.
13
IAEA
Decision
Two different type of factors may govern the decision to
implement a quality management system.
External factors:
➢ demand by customers
➢ requirement by State or Regulatory authorities or
Internal factors:
➢ cost-effectiveness analysis
➢ need to restructure the organization due to mayor
changes in work focus or workforce
14
IAEA
Implementation team
Team members need good knowledge and experience or
need to receive training in:
➢ Structure and workload of the organization;
➢ Applicable standards, laws and regulations;
➢ Internal processes of the organization;
➢ Communication methods within the company;
➢ Team organization and teamwork.
15
IAEA
Implementation planning
➢ Evaluate the workload
➢ Devise quality plan
➢ Identify existing processes
➢ Group processes, according to the action they are
describing:
– (Strategic) management processes;
– Product realization (core) processes;
– Supporting processes;
– Management system processes.
16
IAEA
Management processes examples
➢ Strategic management (quality policy)
➢ Finance management
➢ Risk & Opportunities Management
➢ Management of Change
➢ Knowledge Management
➢ Nuclear Safety
➢ Occupational Health & Safety
➢ Quality Management review
17
IAEA
Product realization processes examples
➢ Individual monitoring
➢ e.g. TLD-dosimetry, OSL-dosimetry,
Fingerdosimetry
➢ Calibration/Irradiation
➢ Workplace monitoring
➢ Container verification
➢ Contamination control
➢ Nuclear transport
18
IAEA
Supporting processes examples
➢ Customer relation
➢ Marketing
➢ Legal support
➢ Procurement
➢ IT support
➢ Human Resources –
Training, Competence
Management
➢ Technical
infrastructure
➢ Transport
➢ House keeping
➢ Maintenance
➢ Waste Management
19
IAEA
Quality system processes
➢ Control of documents and records
➢ Customer complaint management
➢ Corrective and preventive actions
➢ Internal audits
➢ Control of nonconformities
20
IAEA
A quality system has a pyramidal structure
Why? (including
Quality policy)
What (when, where,
who)?
How to do it?
How was it done?
The proof
21
IAEA
A quality manual
22
IAEA
Management system procedures may further be
supplemented with detailed work instructions,
forms, reports etc. termed as Level C documents.
The quantity of documented procedures, work
instructions, forms, reports etc. and the nature of
their format and presentation are to be determined
by the individual functional units. It is preferred that
each of these set of documents are arranged in the
same structure and format so that the users become
familiar with the consistent approach applied to
each requirement.
23
IAEA
Procedure template
providing a procedure
template early during the
implementation process
helps to capture all relevant
information for the operated
processes.
24
IAEA
Procedures
Of great importance:
➢ For later acceptance of quality management system by all members
of the staff
➢ As many staff members as possible should be included in the
authoring process using the approved document template.
➢ Due to better training in the contents of standards and regulations,
the members of the implementation team, should provide
assistance in editing the procedures.
25
IAEA
Procedures
All drafted procedures will have to be reviewed by the
implementation team:
➢ consistency with other procedures
➢ compliance with the management directives and
➢ compliance with the applicable standards
to ensure conformity and integrity of the quality
documentation.
26
IAEA
Training
➢ on applying the documented procedures
➢ on applying quality management principles
Training period may show need to correct the
documentation.
27
IAEA
Implementation
• After the training period:
➢ quality management system may be piloted for
an initial testing period, typically three to six
months
28
IAEA
Internal audit
The first assessment of the newly implemented quality
management system will certainly be carried through by an or
with the help of an external auditor.
This may be the same person that acts as ex/in-ternal advisor
during the creation phase.
29
IAEA
Management review
Assess the status of the quality management system from :
➢ implementation process
➢ staff quality training sessions and
➢ internal audit
Identify still necessary improvements.
30
IAEA
Top-down:
Top Management decides that a system
is needed.
TOP-DOWN support is absolutely necessary
31
IAEA
Bottom-up approach is needed to start
32
IAEA
Pitfalls
33

More Related Content

Similar to DAY_1 L4 Concepts for implementing a quality management system RevPV.pdf

Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioWaqas Ali Tunio
 
ICH Q 10 guidline
ICH Q 10 guidline  ICH Q 10 guidline
ICH Q 10 guidline umeshlove4u
 
Document Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited LaboratoriesDocument Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited Laboratoriesinventionjournals
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptTHULASIMANOHARAN2
 
Lifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptxLifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptxNeeraj Kumar Rai
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptOswaldo Gonzales
 
Tools and Ways of Improving Quality.pptx
Tools and Ways of Improving Quality.pptxTools and Ways of Improving Quality.pptx
Tools and Ways of Improving Quality.pptxAbiolaOgunsanwo
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering departmentPriyanka Kandhare
 
Pharmaceutical validation
Pharmaceutical  validationPharmaceutical  validation
Pharmaceutical validationPavisara
 
New approach to Process Validation 4
New approach to Process Validation 4New approach to Process Validation 4
New approach to Process Validation 4Santosh Singh
 
QA Audit by Signorina Y. Bueno (WMSU-ZC)
QA Audit by Signorina Y. Bueno (WMSU-ZC)QA Audit by Signorina Y. Bueno (WMSU-ZC)
QA Audit by Signorina Y. Bueno (WMSU-ZC)signorina bueno
 

Similar to DAY_1 L4 Concepts for implementing a quality management system RevPV.pdf (20)

Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali Tunio
 
ICH Q 10 guidline
ICH Q 10 guidline  ICH Q 10 guidline
ICH Q 10 guidline
 
Document Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited LaboratoriesDocument Control Effectiveness in ISO 15189 Accredited Laboratories
Document Control Effectiveness in ISO 15189 Accredited Laboratories
 
Unit 3 ce547
Unit 3 ce547Unit 3 ce547
Unit 3 ce547
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
 
ISO 9001 2008 Part I
ISO 9001 2008 Part IISO 9001 2008 Part I
ISO 9001 2008 Part I
 
Lifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptxLifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptx
 
Iso9001training slide
Iso9001training slideIso9001training slide
Iso9001training slide
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
 
Face.ppt
Face.pptFace.ppt
Face.ppt
 
Tools and Ways of Improving Quality.pptx
Tools and Ways of Improving Quality.pptxTools and Ways of Improving Quality.pptx
Tools and Ways of Improving Quality.pptx
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Q10 general presentation
Q10 general presentationQ10 general presentation
Q10 general presentation
 
ISO 9000 & TQM.pptx
ISO 9000 & TQM.pptxISO 9000 & TQM.pptx
ISO 9000 & TQM.pptx
 
Auditing of quality assurance and maintenance of engineering department
Auditing of quality assurance and   maintenance of engineering departmentAuditing of quality assurance and   maintenance of engineering department
Auditing of quality assurance and maintenance of engineering department
 
Pharmaceutical validation
Pharmaceutical  validationPharmaceutical  validation
Pharmaceutical validation
 
New approach to Process Validation 4
New approach to Process Validation 4New approach to Process Validation 4
New approach to Process Validation 4
 
QA Audit by Signorina Y. Bueno (WMSU-ZC)
QA Audit by Signorina Y. Bueno (WMSU-ZC)QA Audit by Signorina Y. Bueno (WMSU-ZC)
QA Audit by Signorina Y. Bueno (WMSU-ZC)
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

DAY_1 L4 Concepts for implementing a quality management system RevPV.pdf

  • 1. IAEA International Atomic Energy Agency L4 Concepts for implementing a quality management system
  • 2. IAEA Objectives •This lecture will present a step by step introduction into the task of implementing a quality management system. 2
  • 3. IAEA WHY ? ➢ to demonstrate ability to deliver a product that consistently meets customer and applicable regulatory requirements and ➢ to address customer satisfaction through the effective application of the system, including processes for continual improvement and the prevention of non-conformity. 3
  • 4. IAEA Customer •The concept of „CUSTOMER“ is mainly applied to EXTERNAL customers: they position orders and bring in money. •Never forget the INTERNAL customers in your organization. They keep the workflow going and support the quality of your product. 4
  • 6. IAEA The advantage of the process approach 6
  • 8. IAEA Implementation basics ➢ identify the processes needed for the QMS; ➢ determine interaction of these processes; ➢ determine evaluation criteria for these processes; ➢ ensure the availability of information for these processes and ➢ measure, monitor and analyze the processes, and implement action necessary to achieve planned results and continual improvement. 8
  • 9. IAEA Implementation process 1. Decision taking 2. Management commitment 3. Implementation team 4. Plan the implementation 5. Identify existing processes 6. Define document structure 7. Write procedures 8. Initial Training of personnel 9. Implementation 10. Internal Audit 11. Management Review 12. Improve system 9
  • 10. IAEA Flowchart Quality Management System needed Management commits to QMS Collect Input Customer needs, Regulations, Laws & Standards Day-to-day workplace experience Implementation Team for QMS installed Design Quality Plan Timetable Responsibilities Objectives Process Identification Managerial Processes Workforce Product Realization Resource Management Measurement and Improvement Designing the Quality Management System Quality Manual (Handbook) Managerial Procedures Administrative Procedures Technical Procedures Document Control Develop System for Documentation Prepare Drafts Training & Evaluation Implement Quality Management System Feedback to Management Measurement, Analysis and Improvement PLAN DO CHECK ACT Improve installed system 10
  • 11. IAEA Gap analysis There are various types of analysis that will be needed to help you define the scale, scope and potential impact of the transition to the 17025 requirements. GAP analysis is particularly helpful here: 1. What is point B: Where are you trying to take the organisation; what does the new system look like? 2. What is the point A: Where are you now by comparison with point B? 3. What are the changes needed to close this gap? CHANGES NEEDED TO CLOSE THE GAP 3 2 1 B A 11
  • 12. IAEA Make a link between the standards of your choice e.g. ISO 9001, GSR part 2, ISO/IEC 17025 and your own documents Documentary check or an integrated MS (IMS) ISO 9001 ISO 17025 IAEA GSR part 2 Document# in Quality System To Do § 4.2 § 5.5.1 § 5.2.5 Ref. Doc # PO.606 Add § on PPC and on occupational limits 12
  • 13. IAEA Management commitment Top management shall: ➢ Take decision to implement a quality management system. ➢ Take the lead and manage the implementation as a TOP DOWN process. ➢ Show interest in completing the process in time and within the planned budget. 13
  • 14. IAEA Decision Two different type of factors may govern the decision to implement a quality management system. External factors: ➢ demand by customers ➢ requirement by State or Regulatory authorities or Internal factors: ➢ cost-effectiveness analysis ➢ need to restructure the organization due to mayor changes in work focus or workforce 14
  • 15. IAEA Implementation team Team members need good knowledge and experience or need to receive training in: ➢ Structure and workload of the organization; ➢ Applicable standards, laws and regulations; ➢ Internal processes of the organization; ➢ Communication methods within the company; ➢ Team organization and teamwork. 15
  • 16. IAEA Implementation planning ➢ Evaluate the workload ➢ Devise quality plan ➢ Identify existing processes ➢ Group processes, according to the action they are describing: – (Strategic) management processes; – Product realization (core) processes; – Supporting processes; – Management system processes. 16
  • 17. IAEA Management processes examples ➢ Strategic management (quality policy) ➢ Finance management ➢ Risk & Opportunities Management ➢ Management of Change ➢ Knowledge Management ➢ Nuclear Safety ➢ Occupational Health & Safety ➢ Quality Management review 17
  • 18. IAEA Product realization processes examples ➢ Individual monitoring ➢ e.g. TLD-dosimetry, OSL-dosimetry, Fingerdosimetry ➢ Calibration/Irradiation ➢ Workplace monitoring ➢ Container verification ➢ Contamination control ➢ Nuclear transport 18
  • 19. IAEA Supporting processes examples ➢ Customer relation ➢ Marketing ➢ Legal support ➢ Procurement ➢ IT support ➢ Human Resources – Training, Competence Management ➢ Technical infrastructure ➢ Transport ➢ House keeping ➢ Maintenance ➢ Waste Management 19
  • 20. IAEA Quality system processes ➢ Control of documents and records ➢ Customer complaint management ➢ Corrective and preventive actions ➢ Internal audits ➢ Control of nonconformities 20
  • 21. IAEA A quality system has a pyramidal structure Why? (including Quality policy) What (when, where, who)? How to do it? How was it done? The proof 21
  • 23. IAEA Management system procedures may further be supplemented with detailed work instructions, forms, reports etc. termed as Level C documents. The quantity of documented procedures, work instructions, forms, reports etc. and the nature of their format and presentation are to be determined by the individual functional units. It is preferred that each of these set of documents are arranged in the same structure and format so that the users become familiar with the consistent approach applied to each requirement. 23
  • 24. IAEA Procedure template providing a procedure template early during the implementation process helps to capture all relevant information for the operated processes. 24
  • 25. IAEA Procedures Of great importance: ➢ For later acceptance of quality management system by all members of the staff ➢ As many staff members as possible should be included in the authoring process using the approved document template. ➢ Due to better training in the contents of standards and regulations, the members of the implementation team, should provide assistance in editing the procedures. 25
  • 26. IAEA Procedures All drafted procedures will have to be reviewed by the implementation team: ➢ consistency with other procedures ➢ compliance with the management directives and ➢ compliance with the applicable standards to ensure conformity and integrity of the quality documentation. 26
  • 27. IAEA Training ➢ on applying the documented procedures ➢ on applying quality management principles Training period may show need to correct the documentation. 27
  • 28. IAEA Implementation • After the training period: ➢ quality management system may be piloted for an initial testing period, typically three to six months 28
  • 29. IAEA Internal audit The first assessment of the newly implemented quality management system will certainly be carried through by an or with the help of an external auditor. This may be the same person that acts as ex/in-ternal advisor during the creation phase. 29
  • 30. IAEA Management review Assess the status of the quality management system from : ➢ implementation process ➢ staff quality training sessions and ➢ internal audit Identify still necessary improvements. 30
  • 31. IAEA Top-down: Top Management decides that a system is needed. TOP-DOWN support is absolutely necessary 31
  • 32. IAEA Bottom-up approach is needed to start 32