1 of 9
“2008 update”
4th and 5th March, 2008
Coppid Beech, Bracknell
Travel West Midlands
Road Map to the future….
Gavin Harris – Regional Operations Manager – Midlands, Public Safety
Status update on the progress of the Arqiva Public Safety Travel West Midlands
Radio System Upgrade Project
TWM Radio Refresh – Project Background
Project Background
• Contract awarded June 2007
• Duration 7-Year
• £3.5 million contract extension
• Project Deadline 31 March 2009
• Arqiva to replace existing legacy radio:
 Automatic Vehicle Location (AVL)
 Full Voice Traffic recording
 Remote Network Management
 Full Asset Tracking System
TWM Radio Refresh – Project Background
New Radio System
• 1,800 x buses of twenty-six different varieties.
• 11 x TWM Depot sites.
• 200 x hand-portable radios used by inspectors.
• 7 x Hill Top Radio Sites.
Project Make-up
• Arqiva Business Unit is the Client
• Arqiva E&I acting as Project Management
• Arqiva Field Operations is Principal Contractor
– Day-Shift = Hill Top Radio Sites
– Night-Shift = Bus Radio Swaps
TWM Radio Refresh – Coventry Phase (Radio & ACIS)
Radio Replacements at Coventry…
• Phase 1 – Coventry Garage
• Upgrade of over 130+ vehicle mounted radios
• Upgrade the local HTS Radio System
• Garage based Dispatcher Computer
Just to make things more complicated…
• ACIS RTPI vehicle mounted computers
• Arqiva to Install 130+ vehicles with:
– ACIS DT125 Computer
– VHF Flat Panel Aerial on roof
– GPS Dome Aerial on roof
TWM Radio Refresh – Coventry Phase
What Went Well?
• Speed of ACIS Antenna fits!
• Speed of Arqiva Radio Installs!
• Dedication of Night-Shift Team.
• “Can-Do” attitude of Senior Engineer.
• Good support from E&I Team at Romsley.
• Strong Technical fault-finding by Field Ops
Day-Shift team, to resolve System issues.
• Good on-going support from VICoE.
• Good planning prior to start:
– Pre-manufactured Cables
– Radio Brackets & Jigs etc.
TWM Radio Refresh – Coventry Phase
Lessons Learned…?
• Key Radio performance has been inconsistent!
• Key Radios supplied with a 470 Ohm Resistor
which interfered with the TWM RS485 Installation!
• Key Radio slippages have impacted on Field Ops
ability to complete entire project on time.
• A number of UAT/SAT issues which Key Radio
are still trying to resolve.
• Field Ops had to perform two KM3000 swaps-outs
• Quality of ACIS Antenna fits not good enough!
• Patchy Quality of ACIS installations by Field Ops.
TWM Radio Refresh – Summary
What’s left to do…
• Field Operations to exchange all bus Radios again after Coventry SAT
• 6 x Hill Top Radio Sites to be upgraded before end of March 2008
• 10 x Garage Dispatcher PCs to be installed before end March 2008
• 1,600 x Bus Radios to be upgraded in less than 12 months
• Project Completion Deadline – 30 March 2009
When you’re waiting for one, three arrive!
Public Transport Sector – the future’s bright?
Where to now?
Further opportunities within the Public
Transport sector that are on the horizon:
• Travel Midland Metro – Project starts 2008
• Nottingham City Transport
• First Bus Leicester
• First Bus Worcester
• Stagecoach “Super Tram” Sheffield
• Camden Council ….
For these opportunities to be successful
we must learn from the TWM Project and
change the way we approach this work!

More Related Content

What's hot

LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC @ CSUSB
 
CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in BrazilCarlos Pera
 
Olivier Casabianca
Olivier CasabiancaOlivier Casabianca
Olivier CasabiancaJoost Boers
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Devyn Barrie
 
Severn Partnership
Severn Partnership Severn Partnership
Severn Partnership Steve Jones
 
ORBCOMM Reefer Integration with PeopleNet In-Cab Solutions
ORBCOMM Reefer Integration with PeopleNet In-Cab SolutionsORBCOMM Reefer Integration with PeopleNet In-Cab Solutions
ORBCOMM Reefer Integration with PeopleNet In-Cab SolutionsORBCOMM Inc.
 
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleNick Phillips
 
DAB costs and benefits
DAB costs and benefitsDAB costs and benefits
DAB costs and benefitsWorldDAB
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYIbrahim Al-Hudhaif
 
04 02-15 Caltrain Modernization Updates
04 02-15 Caltrain Modernization Updates04 02-15 Caltrain Modernization Updates
04 02-15 Caltrain Modernization UpdatesAdina Levin
 
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming Nyoman Adhiarna
 
Reefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageReefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageORBCOMM Inc.
 
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...Simon Owen
 
BSN Webinar State of Sat and Brilliant - April
BSN Webinar   State of Sat and Brilliant - AprilBSN Webinar   State of Sat and Brilliant - April
BSN Webinar State of Sat and Brilliant - AprilMaureen Donovan
 
Installation & Commisioning References that ICT TELECOM achieved
Installation & Commisioning References that ICT TELECOM achievedInstallation & Commisioning References that ICT TELECOM achieved
Installation & Commisioning References that ICT TELECOM achievedtolgagurleyen
 
Busbar Assembly Line
Busbar Assembly LineBusbar Assembly Line
Busbar Assembly LineShekhar Jambe
 
Franklin Line Meeting - Dec 17, 2019
Franklin Line Meeting - Dec 17, 2019Franklin Line Meeting - Dec 17, 2019
Franklin Line Meeting - Dec 17, 2019Franklin Matters
 
Alastair Gellatly
Alastair GellatlyAlastair Gellatly
Alastair Gellatlycbaacomms
 

What's hot (20)

LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
 
CPDLC - Data Link Services in Brazil
CPDLC -   Data Link Services in BrazilCPDLC -   Data Link Services in Brazil
CPDLC - Data Link Services in Brazil
 
Olivier Casabianca
Olivier CasabiancaOlivier Casabianca
Olivier Casabianca
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017Confederation line quarterly memo to council q1 2017
Confederation line quarterly memo to council q1 2017
 
Severn Partnership
Severn Partnership Severn Partnership
Severn Partnership
 
ORBCOMM Reefer Integration with PeopleNet In-Cab Solutions
ORBCOMM Reefer Integration with PeopleNet In-Cab SolutionsORBCOMM Reefer Integration with PeopleNet In-Cab Solutions
ORBCOMM Reefer Integration with PeopleNet In-Cab Solutions
 
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of PooleSecuring modal shift to bus FINAL - Nick Phillips, Borough of Poole
Securing modal shift to bus FINAL - Nick Phillips, Borough of Poole
 
DAB costs and benefits
DAB costs and benefitsDAB costs and benefits
DAB costs and benefits
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
04 02-15 Caltrain Modernization Updates
04 02-15 Caltrain Modernization Updates04 02-15 Caltrain Modernization Updates
04 02-15 Caltrain Modernization Updates
 
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming
ASPF-5 Indonesia Update on 800 and 1800 MHz 2G Refarming
 
Reefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical AdvantageReefer Tracking - Knowledge is Power: The Analytical Advantage
Reefer Tracking - Knowledge is Power: The Analytical Advantage
 
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...
TATA Steel Projects - Modernising Britains Railways, presentation for CIBSE Y...
 
BSN Webinar State of Sat and Brilliant - April
BSN Webinar   State of Sat and Brilliant - AprilBSN Webinar   State of Sat and Brilliant - April
BSN Webinar State of Sat and Brilliant - April
 
Installation & Commisioning References that ICT TELECOM achieved
Installation & Commisioning References that ICT TELECOM achievedInstallation & Commisioning References that ICT TELECOM achieved
Installation & Commisioning References that ICT TELECOM achieved
 
Busbar Assembly Line
Busbar Assembly LineBusbar Assembly Line
Busbar Assembly Line
 
Franklin Line Meeting - Dec 17, 2019
Franklin Line Meeting - Dec 17, 2019Franklin Line Meeting - Dec 17, 2019
Franklin Line Meeting - Dec 17, 2019
 
Alastair Gellatly
Alastair GellatlyAlastair Gellatly
Alastair Gellatly
 
RAVIS
RAVISRAVIS
RAVIS
 

Similar to Arqiva 2008 Ops Conference - TWM Update by GHarris

UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...
UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...
UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...techUK
 
COMIT Community Day Autumnn 2018 - Trellisworks ipcctv
COMIT Community Day Autumnn 2018 - Trellisworks ipcctvCOMIT Community Day Autumnn 2018 - Trellisworks ipcctv
COMIT Community Day Autumnn 2018 - Trellisworks ipcctvComit Projects Ltd
 
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceWastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceIntelligentManufacturingInstitute
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
Exceltek Broadcasting Services
Exceltek Broadcasting ServicesExceltek Broadcasting Services
Exceltek Broadcasting ServicesDavid Neale
 
Sunsight Antenna Alignment intro
Sunsight Antenna Alignment introSunsight Antenna Alignment intro
Sunsight Antenna Alignment introJohn Vetter
 
Intelligent infrastructure and maintenance on the railway network - Andy Doherty
Intelligent infrastructure and maintenance on the railway network - Andy DohertyIntelligent infrastructure and maintenance on the railway network - Andy Doherty
Intelligent infrastructure and maintenance on the railway network - Andy DohertyKTN
 
Vsat, The Lastest In Technology
Vsat, The Lastest In TechnologyVsat, The Lastest In Technology
Vsat, The Lastest In Technologyguest85b8a7d
 
Underground Mining Communications using Broadband Power Line Modems
Underground Mining Communications using Broadband Power Line ModemsUnderground Mining Communications using Broadband Power Line Modems
Underground Mining Communications using Broadband Power Line ModemsErvinHung
 
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...RadioFrequencySystems
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expandedPaul Burns
 
Telecommunication infrastructure services
Telecommunication infrastructure servicesTelecommunication infrastructure services
Telecommunication infrastructure servicesessafi
 
Challenges and opportunities on testing lte backhaul via satellite
Challenges and opportunities on testing lte backhaul via satelliteChallenges and opportunities on testing lte backhaul via satellite
Challenges and opportunities on testing lte backhaul via satelliteCPqD
 
Advantech sspi vsat_day_2009
Advantech sspi vsat_day_2009Advantech sspi vsat_day_2009
Advantech sspi vsat_day_2009SSPI Brasil
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Satellite Communication
Satellite CommunicationSatellite Communication
Satellite CommunicationParas Gupta
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group
 

Similar to Arqiva 2008 Ops Conference - TWM Update by GHarris (20)

UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...
UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...
UK Spectrum Policy Forum – Trevor Faulkes, HS2 - Railway input to UK Spectrum...
 
COMIT Community Day Autumnn 2018 - Trellisworks ipcctv
COMIT Community Day Autumnn 2018 - Trellisworks ipcctvCOMIT Community Day Autumnn 2018 - Trellisworks ipcctv
COMIT Community Day Autumnn 2018 - Trellisworks ipcctv
 
Services Master
Services MasterServices Master
Services Master
 
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performanceWastewater treatment dcs upgrade adds remote capabilities, improves performance
Wastewater treatment dcs upgrade adds remote capabilities, improves performance
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
Exceltek Broadcasting Services
Exceltek Broadcasting ServicesExceltek Broadcasting Services
Exceltek Broadcasting Services
 
Sunsight Antenna Alignment intro
Sunsight Antenna Alignment introSunsight Antenna Alignment intro
Sunsight Antenna Alignment intro
 
Intelligent infrastructure and maintenance on the railway network - Andy Doherty
Intelligent infrastructure and maintenance on the railway network - Andy DohertyIntelligent infrastructure and maintenance on the railway network - Andy Doherty
Intelligent infrastructure and maintenance on the railway network - Andy Doherty
 
Vsat, The Lastest In Technology
Vsat, The Lastest In TechnologyVsat, The Lastest In Technology
Vsat, The Lastest In Technology
 
Underground Mining Communications using Broadband Power Line Modems
Underground Mining Communications using Broadband Power Line ModemsUnderground Mining Communications using Broadband Power Line Modems
Underground Mining Communications using Broadband Power Line Modems
 
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
How Future-Proof Antenna Systems Help Broadcasters in the U.S. Television Spe...
 
Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016Ousainou Demba Resume_6142016
Ousainou Demba Resume_6142016
 
Safe Resume expanded
Safe Resume expandedSafe Resume expanded
Safe Resume expanded
 
Telecommunication infrastructure services
Telecommunication infrastructure servicesTelecommunication infrastructure services
Telecommunication infrastructure services
 
Challenges and opportunities on testing lte backhaul via satellite
Challenges and opportunities on testing lte backhaul via satelliteChallenges and opportunities on testing lte backhaul via satellite
Challenges and opportunities on testing lte backhaul via satellite
 
Advantech sspi vsat_day_2009
Advantech sspi vsat_day_2009Advantech sspi vsat_day_2009
Advantech sspi vsat_day_2009
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
Satellite Communication
Satellite CommunicationSatellite Communication
Satellite Communication
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
Zinfra Group Australia: Power Brochure
Zinfra Group Australia: Power BrochureZinfra Group Australia: Power Brochure
Zinfra Group Australia: Power Brochure
 

Arqiva 2008 Ops Conference - TWM Update by GHarris

  • 1. “2008 update” 4th and 5th March, 2008 Coppid Beech, Bracknell
  • 2. Travel West Midlands Road Map to the future…. Gavin Harris – Regional Operations Manager – Midlands, Public Safety Status update on the progress of the Arqiva Public Safety Travel West Midlands Radio System Upgrade Project
  • 3. TWM Radio Refresh – Project Background Project Background • Contract awarded June 2007 • Duration 7-Year • £3.5 million contract extension • Project Deadline 31 March 2009 • Arqiva to replace existing legacy radio:  Automatic Vehicle Location (AVL)  Full Voice Traffic recording  Remote Network Management  Full Asset Tracking System
  • 4. TWM Radio Refresh – Project Background New Radio System • 1,800 x buses of twenty-six different varieties. • 11 x TWM Depot sites. • 200 x hand-portable radios used by inspectors. • 7 x Hill Top Radio Sites. Project Make-up • Arqiva Business Unit is the Client • Arqiva E&I acting as Project Management • Arqiva Field Operations is Principal Contractor – Day-Shift = Hill Top Radio Sites – Night-Shift = Bus Radio Swaps
  • 5. TWM Radio Refresh – Coventry Phase (Radio & ACIS) Radio Replacements at Coventry… • Phase 1 – Coventry Garage • Upgrade of over 130+ vehicle mounted radios • Upgrade the local HTS Radio System • Garage based Dispatcher Computer Just to make things more complicated… • ACIS RTPI vehicle mounted computers • Arqiva to Install 130+ vehicles with: – ACIS DT125 Computer – VHF Flat Panel Aerial on roof – GPS Dome Aerial on roof
  • 6. TWM Radio Refresh – Coventry Phase What Went Well? • Speed of ACIS Antenna fits! • Speed of Arqiva Radio Installs! • Dedication of Night-Shift Team. • “Can-Do” attitude of Senior Engineer. • Good support from E&I Team at Romsley. • Strong Technical fault-finding by Field Ops Day-Shift team, to resolve System issues. • Good on-going support from VICoE. • Good planning prior to start: – Pre-manufactured Cables – Radio Brackets & Jigs etc.
  • 7. TWM Radio Refresh – Coventry Phase Lessons Learned…? • Key Radio performance has been inconsistent! • Key Radios supplied with a 470 Ohm Resistor which interfered with the TWM RS485 Installation! • Key Radio slippages have impacted on Field Ops ability to complete entire project on time. • A number of UAT/SAT issues which Key Radio are still trying to resolve. • Field Ops had to perform two KM3000 swaps-outs • Quality of ACIS Antenna fits not good enough! • Patchy Quality of ACIS installations by Field Ops.
  • 8. TWM Radio Refresh – Summary What’s left to do… • Field Operations to exchange all bus Radios again after Coventry SAT • 6 x Hill Top Radio Sites to be upgraded before end of March 2008 • 10 x Garage Dispatcher PCs to be installed before end March 2008 • 1,600 x Bus Radios to be upgraded in less than 12 months • Project Completion Deadline – 30 March 2009 When you’re waiting for one, three arrive!
  • 9. Public Transport Sector – the future’s bright? Where to now? Further opportunities within the Public Transport sector that are on the horizon: • Travel Midland Metro – Project starts 2008 • Nottingham City Transport • First Bus Leicester • First Bus Worcester • Stagecoach “Super Tram” Sheffield • Camden Council …. For these opportunities to be successful we must learn from the TWM Project and change the way we approach this work!