The New Leader in Global Copper
                                 April 2013




    Global   Diversified




                           TSX: FM; LSE: FQM
Disclaimer
Certain statements and information contained in this presentation, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of
applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to the anticipated commencement, completion and terms of the
proposed offer and the anticipated strategic and operational benefits of the offer. Often, but not always, forward-looking statements or information can be identified by the use of words such as “plans”,
“expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “projects”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or
statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.
With respect to forward-looking statements and information contained in this presentation, First Quantum has made numerous assumptions including among other things, assumptions about the price of
copper, gold, cobalt, nickel, PGE, and sulphuric acid, anticipated costs and expenditures, and First Quantum's ability to achieve its goals. Although management of First Quantum believes that the
assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be
accurate. Forward-looking statements and information by their nature involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or
industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These risks, uncertainties and other
factors include, but are not limited to, uncertainties surrounding the ability to realize operational synergies following completion of the offer, reliance on Inmet’s publicly available information which may not fully
identify all risks related to its performance, success in integrating the retail distribution systems, and the integration of supply chain management processes, future production volumes and costs, costs for
inputs such as oil, power and sulphur, political stability in Zambia, Peru, Mauritania, Finland, Turkey, Spain, Panama and Australia, adverse weather conditions in any of the foregoing countries, labor
disruptions, mechanical failures, water supply, procurement and delivery of parts and supplies to the operations and the production of off-spec material.
See First Quantum’s annual information form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. Although we have attempted to
identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking statements or information, there may be other factors, many of which are
beyond the control of First Quantum, that might cause actual results, performances, achievements or events not to be anticipated, estimated or intended. Accordingly, readers should not place undue reliance
on forward-looking statements or information.
While First Quantum may elect to update the forward-looking statements at any time, First Quantum does not undertake to update them at any particular time or in response to any particular event, other than
as may be required by applicable securities laws. Investors and others should not assume that any forward-looking statement contained in this presentation represents management's estimate as of any date
other than the date of this presentation.
Neither First Quantum nor any of its directors or officers has verified the accuracy or completeness of information or statements contained herein which are made by or derived from third-party sources
(including any projections or estimates made by third-party research analysts). Such third-party sources may have failed to identify events or facts which may have occurred or which may affect the
significance or accuracy of any such information or statements. First Quantum has no means of verifying the accuracy or completeness of such information or statements made by or derived from third-party
sources or whether there has been any failure by such sources to identify events that may have occurred or may affect the significance or accuracy of any information or statements.
This presentation does not constitute an offer to buy or an invitation to sell, or the solicitation of an offer to buy or invitation to sell, any securities of First Quantum or Inmet. Such an offer may only be made
pursuant to the offer and takeover bid circular First Quantum has filed with the Canadian securities regulators and pursuant to registration or qualification under the securities laws of any other such jurisdiction.
In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates disclosed herein have been prepared in accordance with Canadian National
Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), classified in accordance with Canadian Institute of Mining Metallurgy and Petroleum's "CIM Standards on Mineral Resources
and Reserves Definitions and Guidelines" (the "CIM Guidelines"). The terms "mineral resources", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" are recognized
by Canadian securities regulatory authorities, however, they may not be recognized by the securities regulatory authorities of other jurisdictions. Pursuant to the CIM Guidelines, mineral resources have a
higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources, when compared with measured or indicated mineral
resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result
of continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis, including any feasibility study. Accordingly, readers are cautioned not to assume
that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered.
Note: all dollar amounts in US dollars unless otherwise indicated; C$ indicates Canadian dollars




                                                                                                                                                                                                                  2
Creating the New Leader in Global Copper

    First Quantum is one of the world’s leading copper producers, with a geographically diversified portfolio of high-quality
     operations and projects


    Uniquely positioned to deliver Cobre Panama more effectively by leveraging our global project development expertise
        –   Maximize our in-house project development capability with prudent use of consultants and third party contractors
        –   Robust liquidity and balance sheet strength, to support development of future large scale mining projects with
            cost efficiency and discipline
        –   Long standing commitment to operational, social and environmental excellence


    The acquisition brings together the best talents of each company to create significant shareholder value

    First Quantum presents an opportunity for investors to maintain / gain exposure to multiple transformational re-rating
     events over the next five years with a base asset portfolio of high quality low cost assets in both emerging and
     developed countries




                                                                                                                              3
A Premier Base Metals Company
Seven producing mines and six world class projects across eight countries and five continents


Unmatched Portfolio of World                                                         Solid Platform of Diversified,
Class Development Projects                                                                      Stable Operations


 Kansanshi Expansion and                                                                 Las Cruces, Spain          Cu
                           Cu Au
 Smelter, Zambia

                                                                                         Kevitsa, Finland          Ni Cu

 Sentinel, Zambia           Cu

                                                                                         Pyhäsalmi, Finland        Cu Zn

 Enterprise, Zambia         Ni
                                                                                         Çayeli, Turkey            Cu Zn


                           Cu Au
 Cobre Panama, Panama                                                                    Guelb Moghrein,
                           Ag Mo                                                                                   Cu Au
                                                                                         Mauritania



                                                                                         Ravensthorpe, Australia   Ni Co


 Haquira, Peru              Cu
                                                                                         Kansanshi, Zambia         Cu Au




                                                                                                                   4
High Quality Operations
Asset            Location           Ownership (1)                2012 Production                      2012 Cash Cost     Mine Life   Reserves & Resources (Contained)

                                                                                                                                     Reserves            5,782 kt Cu, 3.3 Moz Au
                                                                       261 kt Cu
Kansanshi         Zambia                   80%                                                        US$1.49 / lb Cu      2037      M&I Resources       6,252 kt Cu, 3.3 Moz Au
                                                                      136 koz Au
                                                                                                                                     Inferred            2,593 kt Cu, 1.3 Moz Au
                                                                                                                                     Reserves            768 kt Cu
Las Cruces         Spain                  100%                          68 kt Cu                      US$1.16 / lb Cu      2022      M&I Resources       768 kt Cu
                                                                                                                                     Inferred            424 kt Cu
                                                                                                                                     Reserves            306 kt Cu, 0.7 Moz Au
                                                                        38 kt Cu
Guelb Moghrein   Mauritania               100%                                                        US$1.48 / lb Cu      2019      M&I Resources       369 kt Cu, 0.8 Moz Au
                                                                       61 koz Au
                                                                                                                                     Inferred            73 kt Cu, 0.2 Moz Au
                                                                                                                                     Reserves            216 kt Cu, 258 kt Zn
                                                                        31 kt Cu
Çayeli            Turkey                  100%                                                        US$0.88 / lb Cu     2019+      M&I Resources       421 kt Cu, 414 kt Zn
                                                                        41 kt Zn
                                                                                                                                     Inferred            21 kt Cu, 52 kt Zn
                                                                                                                                     Reserves            91 kt Cu, 157 kt Zn
                                                                        13 kt Cu
Pyhäsalmi         Finland                 100%                                                       US$(0.68) / lb Cu     2018      M&I Resources       142 kt Cu, 198 kt Zn
                                                                        26 kt Zn


                                                                                                                                     Reserves (2)        1,357 kt Ni
Ravensthorpe     Australia                100%                          33 kt Ni                       US$5.97 / lb Ni     2049      M&I Resources       1,642 kt Ni
                                                                                                                                     Inferred            605 kt Ni
                                                                                                                                     Reserves            486 kt Ni, 643 kt Cu
                                                                         8 kt Cu                      US$5.47 / lb Ni
Kevitsa           Finland                 100%                                                                             2033      M&I Resources       712 kt Ni, 973 kt Cu
                                                                         4 kt Ni                      US$1.28 / lb Cu
                                                                                                                                     Inferred            101 kt Ni, 125 kt Cu

                              (1)    Ownership of Inmet’s assets shown pro-forma for acquisition of 100% of Inmet
                              (2)    Measured and indicated recoverable resources

                                                                                                                                                                                 5
Unmatched Portfolio of Development Projects
Expansion Projects

                                                                             Target
Asset                 Location               Ownership                                                 Completion
                                                                           Production

Kansanshi Expansion                           80%
                      Zambia                                                400 kt Cu                 Mid – 2014
and Copper Smelter                        (100% smelter)



Greenfield Projects

                                                                             Target
Asset                 Location              Ownership (1)                                              Completion   Reserves & Resources (Contained)
                                                                           Production

                                                                                                                    Reserves         3,870 kt Cu

Sentinel              Zambia                     100%                   270-300 kt Cu                      2014     M&I Resources    5,238 kt Cu

                                                                                                                    Inferred         697 kt Cu

                                                                                                                    Reserves         363 kt Ni

Enterprise            Zambia                     100%                      38-60 kt Ni                     2014     M&I Resources    431 kt Ni

                                                                                                                    Inferred         50 kt Ni

                                                                                                                    Reserves         11,813 kt Cu, 192 kt Mo, 7.3 Moz Au, 131.0 Moz Ag

Cobre Panama          Panama                      80%                       266 kt Cu                      2016     M&I Resources    14,820 kt Cu, 239 kt Mo, 9.0 Moz Au, 170.0 Moz Ag

                                                                                                                    Inferred         8,318 kt Cu, 125 kt Mo, 3.5 Moz Au, 92.0 Moz Ag

                                                                                                                    M&I Resources    3,418 kt Cu, 0.6 Moz Au

Haquira                Peru                      100%                           N/A                         N/A     Inferred         2,030 kt Cu, 0.3 Moz Au




                              (1)   Ownership of Inmet’s assets shown pro-forma for acquisition of 100% of Inmet

                                                                                                                                                                                  6
A World Class Growth Profile
                      Proven Track Record of Developing & Operating Mines                                                                Unmatched Project Pipeline

ktpa Cu production                                                                                                                                                    ktpa Ni production
                                                                                                    Well-positioned to deliver                           Cobre                Haquira
1,200                                                                                               industry-leading growth                              Panama                         90

                                                                                                                                                         Enterprise
                                                                                                                                                                                        80
                                                                                                                                                Sentinel

                                                                                                                                                                                        70
                                                                                                                                         Kansanshi
                                                                                                                                         Expansion
 800                               Successfully Commissioned 6 mines                                                                     and Smelter                                    60

                                   in 12 Years Across 5 Countries
                                                                                                                 Kevitsa (1)                                                            50
                                                                                                                 2012
                                                                                                                                                                                        40

                                                                                                   Ravensthorpe
 400                                                                    Frontier                   2011                                                                                 30
                                                                        2007
                                                             Guelb Moghrein
                                                                                                                                                                                        20
                                                             2006
                                   Kansanshi
         Bwana Lonshi
                                   2004
         2001                                                                                                                                                                           10



   --                                                                                                                                                                                   0
          2001
        2001       2002
                 2002       2003
                          2003         2004
                                    2004            2005
                                                 2005             2006
                                                               2006         2007 2008
                                                                         2007        2008 200920092010 2010
                                                                                                          2011 2011
                                                                                                                  2012 2012
                                                                                                                          2013 2013
                                                                                                                                 2014 2014
                                                                                                                                        2015               2015
                                                                                                                                                             2016     2016
                                                                                                                                                                       2017   2017
                                                                                                                                                                              2018+
                             Mufulira & Nkana                Bwana / Lonshi        Frontier          Kansanshi                 Guelb Moghrein          Kevitsa
                             Sentinel                        Cayeli                Las Cruces        Pyhasalmi                 Cobre Panama            Nickel


                                        (1)   Nickel and copper mine

                                                                                                                                                                                  7
Freeport-McMoRan




                                                                                                1.8
                          Glencore Xstrata




                                                                                          1.5
                                  Codelco
                                                                                          1.5
                                                                                                      2018E Copper Production, Mt




                             First Quantum                                          1.3




    Source: BrookHunt
                               BHP Billiton
                                                                              1.2
                                                                                                                                    Leading Copper Growth




                          Southern Copper
                                                                        0.9




                                 Rio Tinto
                                                                   0.8




                           Anglo American
                                                                  0.8




                                    KGHM
                                                            0.6




                               Kazakhmys
                                                      0.5




                           Teck Resources
                                                      0.5




                                      Vale
                                                     0.5




                               Antofagasta
                                                     0.4




                                    Norilsk
                                                    0.4




                        First Quantum 2012
                                              0.3




8
Cobre Panama – A Tier-One Project
  Cobre Panama is the world’s largest copper project currently under construction            Major Copper Development Projects (Contained Cu Mt)
        –   Over 50 Blbs of contained copper, and 13 Moz of contained gold resources
                                                                                                              0           10                20                30
        –   Commercial production is expected to commence in 2016, with an
            estimated mine life of over 40 years
                                                                                            Cobre Panama
        –   Average life-of-mine production of 266 ktpa of copper, with significant gold,   (First Quantum)
            silver and molybdenum by-products
  We are currently assessing potential cost savings and design specification
    changes to the existing engineering study completed by in 2012                           Ministro Hales
                                                                                               (Codelco)
        –   Current estimated a total capital cost of US$6.2 Bn



                         Copper Production Profile (kt)                                        Las Bambas
                                                                                                                                                       Construction
                                                                                                 (Xstrata)
                                                                                                                                                       Stage Assets

  400

                                                                                              Sierra Gorda
                                                                                                (KGHM)
  300


                                                                                                Toromocho
                                                                                                (Chinalco)
  200



                                                                                             Konkola North
  100
                                                                                                (Vale)

                                                                                                                                                        Feasibility
                                                                                                                                                       Stage Assets
    --
                                                                                                Tampakan
     2015    2019   2023    2027   2031   2035    2039   2043     2047   2051   2055
                                                                                                 (Xstrata)


                                                                                                                  M&I Resources   Inferred Resources

                                                                                                                                                                      9
Building Cobre Panama Using the First Quantum Project
Philosophy
         Our Project Development Philosophy                                Outcomes


 • A finished project must perform to
   expectations

     –   Set ambitious targets for schedule, cost   • Industry leading performance
         and performance
                                                         –   Lowest capital intensity achieved
     –   Adhere to time schedule

     –   Adhere to capital cost budget


    Traditional Project                             First Quantum Project Model

                                                                                         Engineering &
                                                                                            Design
                                  Owner



                          EPCM Engineer
                                                                         By FQM




                                                                                                         10
Sentinel – On-Schedule and On-Budget

Key Project Developments


 Total project progress to date is ~27% on a cumulative basis


 Construction
  57% concrete poured (total of 41,920 m3)
    – Continued works on pipe rack, surge area, e-buildings and
       concentrate area concrete
  Mill assemblies and installations well underway                           Mill area, 31 March 2013
  Continued steel works: Pipe rack, mill building. thickener tanks, floor
    gore and side walls
  4 environmental containment areas on site completed
  Commenced excavation for the Mine Service Administration building
  Assembled Mill 110 Ton Gantry Crane segments

 Labour
  Current workforce : 2,062 people
  3,000,000 man-hours without a lost time incident as of 31 March
    2013
                                                                             Rougher flotation, 31 March 2013




                                                                                                                11
The New Global Copper Leader

   The New Go-To Copper Producer

   Attractive Diverse Geographic Exposure

   A Long-Standing Commitment to Social and Environmental Excellence

   Creating Value with Our Project Development Expertise



                              An Exciting Future Ahead




                                                                        12

More Related Content

Viewers also liked

Teknik pengukuran transistor
Teknik pengukuran transistorTeknik pengukuran transistor
Teknik pengukuran transistorsaeful_4h13
 
Pengukuran Transistor
Pengukuran TransistorPengukuran Transistor
Pengukuran Transistorsaeful_4h13
 
Pengukuran transistor ea
Pengukuran transistor eaPengukuran transistor ea
Pengukuran transistor easaeful_4h13
 
Uni junction transistor
Uni junction transistorUni junction transistor
Uni junction transistorsaeful_4h13
 
Teknik pengukuran transistor ea
Teknik pengukuran transistor eaTeknik pengukuran transistor ea
Teknik pengukuran transistor easaeful_4h13
 
Addestramento PCI 2011
Addestramento PCI 2011Addestramento PCI 2011
Addestramento PCI 2011mircobova
 
First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014FirstQuantum
 
Konsep pembelajaran seni terpadu (lengkap) ok 1
Konsep pembelajaran seni terpadu (lengkap) ok 1Konsep pembelajaran seni terpadu (lengkap) ok 1
Konsep pembelajaran seni terpadu (lengkap) ok 1saeful_4h13
 

Viewers also liked (13)

Teknik pengukuran transistor
Teknik pengukuran transistorTeknik pengukuran transistor
Teknik pengukuran transistor
 
Pengukuran Transistor
Pengukuran TransistorPengukuran Transistor
Pengukuran Transistor
 
Pengukuran transistor ea
Pengukuran transistor eaPengukuran transistor ea
Pengukuran transistor ea
 
Tema 6
Tema  6Tema  6
Tema 6
 
Fet2
Fet2Fet2
Fet2
 
Uni junction transistor
Uni junction transistorUni junction transistor
Uni junction transistor
 
M uas
M uasM uas
M uas
 
Teknik pengukuran transistor ea
Teknik pengukuran transistor eaTeknik pengukuran transistor ea
Teknik pengukuran transistor ea
 
Addestramento PCI 2011
Addestramento PCI 2011Addestramento PCI 2011
Addestramento PCI 2011
 
First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014First Quantum Minerals Corporate Presentation - January, 2014
First Quantum Minerals Corporate Presentation - January, 2014
 
Mosfet
MosfetMosfet
Mosfet
 
Powerpoint voor slideshare
Powerpoint voor slidesharePowerpoint voor slideshare
Powerpoint voor slideshare
 
Konsep pembelajaran seni terpadu (lengkap) ok 1
Konsep pembelajaran seni terpadu (lengkap) ok 1Konsep pembelajaran seni terpadu (lengkap) ok 1
Konsep pembelajaran seni terpadu (lengkap) ok 1
 

Similar to Roadshow april

Aerecura Kuya | Silver Presentation MINEXPO 2018
Aerecura Kuya | Silver Presentation MINEXPO 2018 Aerecura Kuya | Silver Presentation MINEXPO 2018
Aerecura Kuya | Silver Presentation MINEXPO 2018 David Stein, CFA, MSc.
 
Trevali kallpa sab.
Trevali kallpa sab.Trevali kallpa sab.
Trevali kallpa sab.gro77
 
Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirstQuantum
 
Falco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentationFalco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentationVincent Metcalfe
 
Aura minerals third_quarter_sf_slides-webcast_final
Aura minerals third_quarter_sf_slides-webcast_finalAura minerals third_quarter_sf_slides-webcast_final
Aura minerals third_quarter_sf_slides-webcast_finalauraminerals
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013Western Areas Ltd
 
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015Montan Mining
 
PAAS investor presentation June 2020
PAAS investor presentation June 2020PAAS investor presentation June 2020
PAAS investor presentation June 2020SirenFisekci
 
GoviEx Corporate Presentation (October 2021)
GoviEx Corporate Presentation (October 2021)GoviEx Corporate Presentation (October 2021)
GoviEx Corporate Presentation (October 2021)Adnet Communications
 

Similar to Roadshow april (20)

Building the Premier Central African gold producer
Building the Premier Central African gold producerBuilding the Premier Central African gold producer
Building the Premier Central African gold producer
 
Aerecura Kuya | Silver Presentation MINEXPO 2018
Aerecura Kuya | Silver Presentation MINEXPO 2018 Aerecura Kuya | Silver Presentation MINEXPO 2018
Aerecura Kuya | Silver Presentation MINEXPO 2018
 
Trevali kallpa sab.
Trevali kallpa sab.Trevali kallpa sab.
Trevali kallpa sab.
 
Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013Corporate Presentation_June 21, 2013
Corporate Presentation_June 21, 2013
 
Copper Flat Project Deck
Copper Flat Project DeckCopper Flat Project Deck
Copper Flat Project Deck
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
First Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor PresentationFirst Quantum Minerals Q2 2014 Investor Presentation
First Quantum Minerals Q2 2014 Investor Presentation
 
Falco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentationFalco Resources - March 2016 investor presentation
Falco Resources - March 2016 investor presentation
 
08 09 12
08 09 1208 09 12
08 09 12
 
08 09 12
08 09 1208 09 12
08 09 12
 
Aura minerals third_quarter_sf_slides-webcast_final
Aura minerals third_quarter_sf_slides-webcast_finalAura minerals third_quarter_sf_slides-webcast_final
Aura minerals third_quarter_sf_slides-webcast_final
 
Developing an integrated approach in Tanzania
Developing an integrated approach in TanzaniaDeveloping an integrated approach in Tanzania
Developing an integrated approach in Tanzania
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015
Presentation: Montan Mining Corp. Toll Mill & Mine Acquisition Q2 - May 2015
 
PAAS investor presentation June 2020
PAAS investor presentation June 2020PAAS investor presentation June 2020
PAAS investor presentation June 2020
 
GoviEx Corporate Presentation (October 2021)
GoviEx Corporate Presentation (October 2021)GoviEx Corporate Presentation (October 2021)
GoviEx Corporate Presentation (October 2021)
 
Aura Minerals March 2010
Aura Minerals   March 2010Aura Minerals   March 2010
Aura Minerals March 2010
 
Aura Minerals March 2010
Aura Minerals   March 2010Aura Minerals   March 2010
Aura Minerals March 2010
 
Aura Minerals March 2010
Aura Minerals   March 2010Aura Minerals   March 2010
Aura Minerals March 2010
 
Aura Minerals March 2010
Aura Minerals   March 2010Aura Minerals   March 2010
Aura Minerals March 2010
 

More from FirstQuantum

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 finalFirstQuantum
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3FirstQuantum
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - finalFirstQuantum
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - finalFirstQuantum
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november finalFirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - finalFirstQuantum
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate PresentationFirstQuantum
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - finalFirstQuantum
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - finalFirstQuantum
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - finalFirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - finalFirstQuantum
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - finalFirstQuantum
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2FirstQuantum
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015FirstQuantum
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - finalFirstQuantum
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - finalFirstQuantum
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015FirstQuantum
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - finalFirstQuantum
 

More from FirstQuantum (20)

Presentation may 3 final
Presentation may 3   finalPresentation may 3   final
Presentation may 3 final
 
Presentation may-3
Presentation may-3Presentation may-3
Presentation may-3
 
Presentation bmo - final
Presentation   bmo - finalPresentation   bmo - final
Presentation bmo - final
 
Presentation january 2018 - final
Presentation   january 2018 - finalPresentation   january 2018 - final
Presentation january 2018 - final
 
Presentation november final
Presentation   november finalPresentation   november final
Presentation november final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation march - final
Presentation   march - finalPresentation   march - final
Presentation march - final
 
February 2017 Corporate Presentation
February 2017 Corporate PresentationFebruary 2017 Corporate Presentation
February 2017 Corporate Presentation
 
Presentation november - final
Presentation   november - finalPresentation   november - final
Presentation november - final
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Presentation june - final
Presentation   june - finalPresentation   june - final
Presentation june - final
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation april - final
Presentation   april - finalPresentation   april - final
Presentation april - final
 
Presentation december - final
Presentation   december - finalPresentation   december - final
Presentation december - final
 
Presentation september - fina lv2
Presentation   september - fina lv2Presentation   september - fina lv2
Presentation september - fina lv2
 
Corporate Presentation September 2015
Corporate Presentation September 2015Corporate Presentation September 2015
Corporate Presentation September 2015
 
Presentation may - final
Presentation   may - finalPresentation   may - final
Presentation may - final
 
Presentation february - final
Presentation   february - finalPresentation   february - final
Presentation february - final
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 

Recently uploaded

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Recently uploaded (20)

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Roadshow april

  • 1. The New Leader in Global Copper April 2013 Global Diversified TSX: FM; LSE: FQM
  • 2. Disclaimer Certain statements and information contained in this presentation, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. Such forward-looking statements or information include but are not limited to statements or information with respect to the anticipated commencement, completion and terms of the proposed offer and the anticipated strategic and operational benefits of the offer. Often, but not always, forward-looking statements or information can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “projects”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. With respect to forward-looking statements and information contained in this presentation, First Quantum has made numerous assumptions including among other things, assumptions about the price of copper, gold, cobalt, nickel, PGE, and sulphuric acid, anticipated costs and expenditures, and First Quantum's ability to achieve its goals. Although management of First Quantum believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that a forward-looking statement or information herein will prove to be accurate. Forward-looking statements and information by their nature involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These risks, uncertainties and other factors include, but are not limited to, uncertainties surrounding the ability to realize operational synergies following completion of the offer, reliance on Inmet’s publicly available information which may not fully identify all risks related to its performance, success in integrating the retail distribution systems, and the integration of supply chain management processes, future production volumes and costs, costs for inputs such as oil, power and sulphur, political stability in Zambia, Peru, Mauritania, Finland, Turkey, Spain, Panama and Australia, adverse weather conditions in any of the foregoing countries, labor disruptions, mechanical failures, water supply, procurement and delivery of parts and supplies to the operations and the production of off-spec material. See First Quantum’s annual information form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. Although we have attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking statements or information, there may be other factors, many of which are beyond the control of First Quantum, that might cause actual results, performances, achievements or events not to be anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. While First Quantum may elect to update the forward-looking statements at any time, First Quantum does not undertake to update them at any particular time or in response to any particular event, other than as may be required by applicable securities laws. Investors and others should not assume that any forward-looking statement contained in this presentation represents management's estimate as of any date other than the date of this presentation. Neither First Quantum nor any of its directors or officers has verified the accuracy or completeness of information or statements contained herein which are made by or derived from third-party sources (including any projections or estimates made by third-party research analysts). Such third-party sources may have failed to identify events or facts which may have occurred or which may affect the significance or accuracy of any such information or statements. First Quantum has no means of verifying the accuracy or completeness of such information or statements made by or derived from third-party sources or whether there has been any failure by such sources to identify events that may have occurred or may affect the significance or accuracy of any information or statements. This presentation does not constitute an offer to buy or an invitation to sell, or the solicitation of an offer to buy or invitation to sell, any securities of First Quantum or Inmet. Such an offer may only be made pursuant to the offer and takeover bid circular First Quantum has filed with the Canadian securities regulators and pursuant to registration or qualification under the securities laws of any other such jurisdiction. In accordance with applicable Canadian securities regulatory requirements, all mineral reserve and mineral resource estimates disclosed herein have been prepared in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), classified in accordance with Canadian Institute of Mining Metallurgy and Petroleum's "CIM Standards on Mineral Resources and Reserves Definitions and Guidelines" (the "CIM Guidelines"). The terms "mineral resources", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" are recognized by Canadian securities regulatory authorities, however, they may not be recognized by the securities regulatory authorities of other jurisdictions. Pursuant to the CIM Guidelines, mineral resources have a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources, when compared with measured or indicated mineral resources, have the least certainty as to their existence, and it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Pursuant to NI 43-101, inferred mineral resources may not form the basis of any economic analysis, including any feasibility study. Accordingly, readers are cautioned not to assume that all or any part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered. Note: all dollar amounts in US dollars unless otherwise indicated; C$ indicates Canadian dollars 2
  • 3. Creating the New Leader in Global Copper  First Quantum is one of the world’s leading copper producers, with a geographically diversified portfolio of high-quality operations and projects  Uniquely positioned to deliver Cobre Panama more effectively by leveraging our global project development expertise – Maximize our in-house project development capability with prudent use of consultants and third party contractors – Robust liquidity and balance sheet strength, to support development of future large scale mining projects with cost efficiency and discipline – Long standing commitment to operational, social and environmental excellence  The acquisition brings together the best talents of each company to create significant shareholder value  First Quantum presents an opportunity for investors to maintain / gain exposure to multiple transformational re-rating events over the next five years with a base asset portfolio of high quality low cost assets in both emerging and developed countries 3
  • 4. A Premier Base Metals Company Seven producing mines and six world class projects across eight countries and five continents Unmatched Portfolio of World Solid Platform of Diversified, Class Development Projects Stable Operations Kansanshi Expansion and Las Cruces, Spain Cu Cu Au Smelter, Zambia Kevitsa, Finland Ni Cu Sentinel, Zambia Cu Pyhäsalmi, Finland Cu Zn Enterprise, Zambia Ni Çayeli, Turkey Cu Zn Cu Au Cobre Panama, Panama Guelb Moghrein, Ag Mo Cu Au Mauritania Ravensthorpe, Australia Ni Co Haquira, Peru Cu Kansanshi, Zambia Cu Au 4
  • 5. High Quality Operations Asset Location Ownership (1) 2012 Production 2012 Cash Cost Mine Life Reserves & Resources (Contained) Reserves 5,782 kt Cu, 3.3 Moz Au 261 kt Cu Kansanshi Zambia 80% US$1.49 / lb Cu 2037 M&I Resources 6,252 kt Cu, 3.3 Moz Au 136 koz Au Inferred 2,593 kt Cu, 1.3 Moz Au Reserves 768 kt Cu Las Cruces Spain 100% 68 kt Cu US$1.16 / lb Cu 2022 M&I Resources 768 kt Cu Inferred 424 kt Cu Reserves 306 kt Cu, 0.7 Moz Au 38 kt Cu Guelb Moghrein Mauritania 100% US$1.48 / lb Cu 2019 M&I Resources 369 kt Cu, 0.8 Moz Au 61 koz Au Inferred 73 kt Cu, 0.2 Moz Au Reserves 216 kt Cu, 258 kt Zn 31 kt Cu Çayeli Turkey 100% US$0.88 / lb Cu 2019+ M&I Resources 421 kt Cu, 414 kt Zn 41 kt Zn Inferred 21 kt Cu, 52 kt Zn Reserves 91 kt Cu, 157 kt Zn 13 kt Cu Pyhäsalmi Finland 100% US$(0.68) / lb Cu 2018 M&I Resources 142 kt Cu, 198 kt Zn 26 kt Zn Reserves (2) 1,357 kt Ni Ravensthorpe Australia 100% 33 kt Ni US$5.97 / lb Ni 2049 M&I Resources 1,642 kt Ni Inferred 605 kt Ni Reserves 486 kt Ni, 643 kt Cu 8 kt Cu US$5.47 / lb Ni Kevitsa Finland 100% 2033 M&I Resources 712 kt Ni, 973 kt Cu 4 kt Ni US$1.28 / lb Cu Inferred 101 kt Ni, 125 kt Cu (1) Ownership of Inmet’s assets shown pro-forma for acquisition of 100% of Inmet (2) Measured and indicated recoverable resources 5
  • 6. Unmatched Portfolio of Development Projects Expansion Projects Target Asset Location Ownership Completion Production Kansanshi Expansion 80% Zambia 400 kt Cu Mid – 2014 and Copper Smelter (100% smelter) Greenfield Projects Target Asset Location Ownership (1) Completion Reserves & Resources (Contained) Production Reserves 3,870 kt Cu Sentinel Zambia 100% 270-300 kt Cu 2014 M&I Resources 5,238 kt Cu Inferred 697 kt Cu Reserves 363 kt Ni Enterprise Zambia 100% 38-60 kt Ni 2014 M&I Resources 431 kt Ni Inferred 50 kt Ni Reserves 11,813 kt Cu, 192 kt Mo, 7.3 Moz Au, 131.0 Moz Ag Cobre Panama Panama 80% 266 kt Cu 2016 M&I Resources 14,820 kt Cu, 239 kt Mo, 9.0 Moz Au, 170.0 Moz Ag Inferred 8,318 kt Cu, 125 kt Mo, 3.5 Moz Au, 92.0 Moz Ag M&I Resources 3,418 kt Cu, 0.6 Moz Au Haquira Peru 100% N/A N/A Inferred 2,030 kt Cu, 0.3 Moz Au (1) Ownership of Inmet’s assets shown pro-forma for acquisition of 100% of Inmet 6
  • 7. A World Class Growth Profile Proven Track Record of Developing & Operating Mines Unmatched Project Pipeline ktpa Cu production ktpa Ni production Well-positioned to deliver Cobre Haquira 1,200 industry-leading growth Panama 90 Enterprise 80 Sentinel 70 Kansanshi Expansion 800 Successfully Commissioned 6 mines and Smelter 60 in 12 Years Across 5 Countries Kevitsa (1) 50 2012 40 Ravensthorpe 400 Frontier 2011 30 2007 Guelb Moghrein 20 2006 Kansanshi Bwana Lonshi 2004 2001 10 -- 0 2001 2001 2002 2002 2003 2003 2004 2004 2005 2005 2006 2006 2007 2008 2007 2008 200920092010 2010 2011 2011 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 2017 2017 2018+ Mufulira & Nkana Bwana / Lonshi Frontier Kansanshi Guelb Moghrein Kevitsa Sentinel Cayeli Las Cruces Pyhasalmi Cobre Panama Nickel (1) Nickel and copper mine 7
  • 8. Freeport-McMoRan 1.8 Glencore Xstrata 1.5 Codelco 1.5 2018E Copper Production, Mt First Quantum 1.3 Source: BrookHunt BHP Billiton 1.2 Leading Copper Growth Southern Copper 0.9 Rio Tinto 0.8 Anglo American 0.8 KGHM 0.6 Kazakhmys 0.5 Teck Resources 0.5 Vale 0.5 Antofagasta 0.4 Norilsk 0.4 First Quantum 2012 0.3 8
  • 9. Cobre Panama – A Tier-One Project  Cobre Panama is the world’s largest copper project currently under construction Major Copper Development Projects (Contained Cu Mt) – Over 50 Blbs of contained copper, and 13 Moz of contained gold resources 0 10 20 30 – Commercial production is expected to commence in 2016, with an estimated mine life of over 40 years Cobre Panama – Average life-of-mine production of 266 ktpa of copper, with significant gold, (First Quantum) silver and molybdenum by-products  We are currently assessing potential cost savings and design specification changes to the existing engineering study completed by in 2012 Ministro Hales (Codelco) – Current estimated a total capital cost of US$6.2 Bn Copper Production Profile (kt) Las Bambas Construction (Xstrata) Stage Assets 400 Sierra Gorda (KGHM) 300 Toromocho (Chinalco) 200 Konkola North 100 (Vale) Feasibility Stage Assets -- Tampakan 2015 2019 2023 2027 2031 2035 2039 2043 2047 2051 2055 (Xstrata) M&I Resources Inferred Resources 9
  • 10. Building Cobre Panama Using the First Quantum Project Philosophy Our Project Development Philosophy Outcomes • A finished project must perform to expectations – Set ambitious targets for schedule, cost • Industry leading performance and performance – Lowest capital intensity achieved – Adhere to time schedule – Adhere to capital cost budget Traditional Project First Quantum Project Model Engineering & Design Owner EPCM Engineer By FQM 10
  • 11. Sentinel – On-Schedule and On-Budget Key Project Developments Total project progress to date is ~27% on a cumulative basis Construction  57% concrete poured (total of 41,920 m3) – Continued works on pipe rack, surge area, e-buildings and concentrate area concrete  Mill assemblies and installations well underway Mill area, 31 March 2013  Continued steel works: Pipe rack, mill building. thickener tanks, floor gore and side walls  4 environmental containment areas on site completed  Commenced excavation for the Mine Service Administration building  Assembled Mill 110 Ton Gantry Crane segments Labour  Current workforce : 2,062 people  3,000,000 man-hours without a lost time incident as of 31 March 2013 Rougher flotation, 31 March 2013 11
  • 12. The New Global Copper Leader  The New Go-To Copper Producer  Attractive Diverse Geographic Exposure  A Long-Standing Commitment to Social and Environmental Excellence  Creating Value with Our Project Development Expertise An Exciting Future Ahead 12