ABEER 32 EXPLOSION/FIRE ACCIDENT
1) Where and when did it Happened?
Date : 9/10/2006
Time : 2010hrs
Location : Udang “Bravo” Platform Natuna
Operation : Cargo transfer from vessel to
Platform (16 bottles of oxygen in a steel rack)
Weather Condition: At the time of accident, the weather is considered
to be fair and calm. The wind speed is about
5knots and swells about 0.5m. The visibility is not
very good due to the haze but there was no sign
of any rain.
WHERE & WHEN DID IT HAPPENED?
Picture Showing Udang “Bravo” Platform
WHERE & WHEN DID IT HAPPENED?
Abeer 32
Air winch
Tugger
Broken Crane
UDANG “B”
PLATFORM Flare
Current to
North – 0,5 knots
Abeer 32
Air winch
Tugger
Broken Crane
UDANG “B”
PLATFORM Flare
Current to
North – 0,5 knots
Wind from
SW – 5 Knots
Picture showing location and direction
N
ACCIDENT DESCRIPTION
2) Accident Description
› On Sunday, 8/10/2006 Abeer 32 departed Batam for Udang “Bravo”
Platform Natuna after loading the cargoes and carrying 25 passengers.
› Abeer 32 arrived in Udang “Bravo” Platform on 9/10/2006 at about
1430hrs and started to transfer the 24 passenger using the “monkey
swing” method with vessel going sternward to passenger landing
platform.
› After completed passenger transfer, at about 1600hrs the cargo transfer
to Bravo platform commences. Whilst transferring the last cargo for Bravo
platform containing 16 bottles of oxygen bottles in a steel rack, at about
2010hrs the oxygen bottle steel rack fell directly onto a box containing
some cans of WD40, utensils and miscellaneous stuff located on the
starboard side of the main deck outside the accommodation of Abeer 32
at a height of about 25m.
› The impact of the fallen oxygen bottles causes an explosion and fire to
engulf the main deck accommodation leading to the lower crew
accommodation and partially the wheelhouse.
ACCIDENT DESCRIPTION
2) Accident Description (Cont’)
› Mr Hendrik Hasan of PT Pan, at the time of accident was sitting on the
port side outside the accommodation (opposite to the fallen oxygen
bottles) unfortunately did not survive.
› The AB Mr Hasbullah who was standing on the midship stbd main deck
assisting in releasing the mooring line managed to escape to the bow
section.
› The C/O Mr Harry who was in the lower accommodation, the 2/E Mr
Ridwan who was sleeping in the crew quarter and the C/E Mr Sofyan
who was in the engine room manage to run out from the lower deck and
escape to the outside of the accommodation on the forward main deck.
› The AB Mr Tommy managed to jump over to Bravo passenger landing
platform where he immediately contacted the platform personnel for
assistance. With the help of the platform using fire hoses from the top of
platform and passenger landing platform that was activated by AB
Tommy and PT Pan Project Leader Mr Sunaryo, the fire managed to
slow down. At this time, Tommy and Mr Sunaryo tried to enter the engine
room to turn off the main engines but without success due to the heavy
smoke. Thereafter about 15minutes later, a tugboat “Citra” arrived to join
in the fire fighting where in joint effort successfully extinguished the fire.
ACCIDENT DESCRIPTION
2) Accident Description (Cont’)
› AB Tommy tried again to enter into the engine room together with one
personnel from Tugboat Citra and eventually managed to turn off the
main engine and shut off the fuel line.
› Immediately after the explosion, the Master mustered the rest of the crew
to the forward section of the vessel, which is considered to be safe at that
time and thereafter Master ordered to lower the rubber boat onboard in
order to evacuate the vessel where he considered to be in a questionable
state that further explosion might occurred.
› The Master made a head count and noted that AB Tommy is already
safely on the passenger landing platform and the AB/Cook Mr Arnoldo
Morong is missing where he immediately reported to the personnel of PT
Pan.
MISSING AB/COOK ARNOLDO MORONG
3) Missing AB/Cook Arnoldo Morong
› The AB/Cook Mr Arnoldo Morong is suspected to be standing on the port
side main deck (midship section) where there is an opening for rescue
zone at the time of accident. He could have been thrown overboard due
to the impact of the explosion on the stbd side.
Picture showing the work vest
belonging to AB/Cook Mr
Arnoldo Morong that was found
in the sea
AB/Cook Arnoldo
could be standing
here
Force of explosion
RECOVERY
4) Recovery after Accident
› The 5 crew excluding AB Tommy who is already safely on the Bravo
platform and the missing AB/Cook Arnold boarded another Crewboat
from Baruna – “Tempoa” where they were later transferred to Bravo
Platform accommodation.
› After fully extinguished the fire onboard Abeer 32 on the same day
(9/10/2006) at about 2100hrs LT, the Tugboat Citra managed to tow
Abeer 32 to an anchor buoy where she is tied up.
› A Search and Rescue (SAR) operation was activated by PT Pan at about
2100hrs on 9/10/2006 using crewboat “Tempoa”. PT Pan calls off the
SAR on 10/10/2006 at about 0400hrs when the crewboat fails to find the
body of Arnoldo.
› EOT engaged a tugboat “Barlian” from ASL to tow back Abeer 32 –
commence on 17/10/2006, 1245hrs LT.
› After persistent request from EOT, PT Pan managed to conduct a diving
operation on the seabed to search for the body of Mr Arnoldo on
16/10/2006 but still fail to locate him.
EXTEND OF DAMAGES
5) EXTEND OF DAMAGES – MAIN DECK
EXTEND OF DAMAGES
5) EXTEND OF DAMAGES – PASSENGER AREA
EXTEND OF DAMAGES
5) EXTEND OF DAMAGES - GALLEY
EXTEND OF DAMAGES
5) EXTEND OF DAMAGES - WHEELHOUSE
EXTEND OF DAMAGES
5) EXTEND OF DAMAGES – BELOW MAIN DECK (CREW
QUARTER)
INVESTIGATION FINDINGS
5) Investigation Findings
› The source of explosion/fire could be due to the impact of the fallen steel
rack that causes sparks (heat source) in contact with the flammable
gases from the damaged cans of WD40 (rust penetrant) resulting in an
explosion. The fire spread further and larger when it mixes with the rich
leaking oxygen from the damaged cylinder heads enriching the
combustion. The fire in mixture with the rich oxygen causes localized
heat melting through the aluminum plate on the main deck (on two
location as seen in the picture) and spreading the fire across the galley
and alleyway of the crew quarters below main deck.
INVESTIGATION FINDINGS
Fire Spreading
thru
ROOT CAUSE
ROOT CAUSE
Failure to
follow proper
procedure
Incorrect
Lifting
Methods
Defective
equipment or
materials
Operating
without
adequate
training
Type of Event
(Cause/Agency)
Falling Object
ROOT CAUSE
6) ROOT CAUSE – Failure to follow procedure
› The crewboat Abeer 32 was moored to the passenger landing platform of
Udang Bravo during time of cargo transfer, which exposes her to various
dangers. Based on interviews, the Master fully understand this fact but
mentioned that if the vessel is not moored to the platform then cargo
transfer cannot take place due to the offshore crane breakdown and PT
Pan is using a simple air driven winch davit for the cargo transfer.
› Prior to the cargo transfer especially with the heavy cargoes, there had
been no Job Safety Analysis or Work Permit conducted
› The Master having the overriding authority does not have knowledge on
the cargo manifest, weight of cargo and hence there is no way he can
ensure safe transfer of the cargo in protection to shipboard personnel
and Company’s property to his best endeavor
ROOT CAUSE
6) ROOT CAUSE – Failure to follow procedure (cont’)
› There is no evidence that proper inspection on the lifting
gears/equipment had been conducted prior to the cargo lift. No proper
identification of the lifting gears were noted to show that it had been
properly tested/inspected to its SWL and proper for use
› The fittings on the 16 bottles of oxygen was not removed during the lift
and there is no proper securing cover on the bottle head
Picture showing the fittings
were not removed during the
lift and there are no protective
covers on the oxygen bottle
head
ROOT CAUSE
6) ROOT CAUSE – Incorrect Lifting Methods
› It is our understanding that the air driven winch davit is certified to SWL
of 1ton although there is no evidence of proper certificate to ascertain the
lift and when it was last tested.
› The overall height from the Bravo platform main deck to the sheave block
of the davit is measured at 2.15m and the overall height of the oxygen
bottles steel rack is measured at 2.25m hence it will be difficult for the
operator to hoist in the steel rack to the main deck considering the
weight. Beside the height constraint, there is also obstruction on the
platform main deck further restricting the hoisting in of the steel rack.
From site inspection there is an angle plate protruding about 20mm from
the main deck
ROOT CAUSE
6) ROOT CAUSE – Incorrect Lifting Methods (Cont’)
2.25m
Approximately 2.5m outreach
arm
Picture showing angle bar on
the main deck that could
probably further restrict
hoisting in the steel rack
containing the oxygen bottles
ROOT CAUSE
6) ROOT CAUSE – Defective Equipment/Material
› There is no evidence that the lifting gears belonging to PT Pan had been
load tested regularly to its proper SWL with proper approved color
identification for use
› There is no evidence of proper planned maintenance system for the
lifting gears and associated equipment carried out by PT Pan
› The lifting wire on the davit is in bad condition
› The lifting hook does not have a safety latch
› It is our understanding that the rack carrying the 16 bottles of oxygen
belongs to a sub contractor in Batam. Although it is stated on the rack
that it’s SWL is 3.6tons but there is no evidence that the welded U bolt on
the top center of the rack is rated to the safe working load of 3.6tons.
ROOT CAUSE
6) ROOT CAUSE – Defective Equipment/Material
Picture showing the lifting hook does not have a
safety latch
and
the damage davit lifting wire – breaking off from
the end of the socket
ROOT CAUSE
6) ROOT CAUSE – Inadequate Training
› It is our understanding that during the time of accident, the air driven
winch davit is control by a worker and supervised by the Project Leader
on the platform where both are employee of PT Pakarti (Sub-contractor
for PT Pan)
› There is no evidence to show that the person operating the crane is an
approved crane operator or had undergone proper rigger training.
LESSON LEARNT
› IF YOU SEE IT YOU OWN IT!
› DO SOMETHING ABOUT IT IF WHAT YOU SEE IS NOT
CORRECT OR IN DOUBT – TELL SOMEBODY! ASK!
› DO NOT ACCEPT SUB-STANDARD SAFETY PERFORMANCE!
› STOP THE WORK IF YOU THINK IT IS NOT RIGHT!
› MASTER MUST EXERCISE HIS OVERRIDING AUTHORITY AND
STOP WORK AUTHORITY
› FOLLOW PROPER PROCEDURE

More Related Content

Similar to Abeer 32 accident

Si visitation machinery education
Si visitation machinery educationSi visitation machinery education
Si visitation machinery educationValentin Bañaco
 
Mt leander sky group
Mt leander sky groupMt leander sky group
Mt leander sky groupDavid Sourdis
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.brian timpson
 
Tripping out automatic
Tripping out automaticTripping out automatic
Tripping out automaticRuba Alsoheil
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Alistair Lamont
 
Deepwater Horizon
Deepwater HorizonDeepwater Horizon
Deepwater Horizonvtsiri
 
Incendio en la plataforma petrolera deepwater horizon
Incendio en la plataforma petrolera deepwater horizonIncendio en la plataforma petrolera deepwater horizon
Incendio en la plataforma petrolera deepwater horizonNelson Hernandez
 
Deepwater Horizon Drilling Rig
Deepwater Horizon Drilling RigDeepwater Horizon Drilling Rig
Deepwater Horizon Drilling RigAlan Bassett
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputGaurav Singh Rajput
 
Observations
Observations Observations
Observations Lyallnz
 
SI visitation machinery education
SI visitation machinery educationSI visitation machinery education
SI visitation machinery educationValentin Bañaco
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDJuan corradi
 
Topic 01 incidents and accidents
Topic 01 incidents and accidentsTopic 01 incidents and accidents
Topic 01 incidents and accidentsBasitali Nevarekar
 

Similar to Abeer 32 accident (20)

Si visitation machinery education
Si visitation machinery educationSi visitation machinery education
Si visitation machinery education
 
Mt leander
Mt leanderMt leander
Mt leander
 
Mt leander
Mt leanderMt leander
Mt leander
 
Hanks 2015 CV-3 updated
Hanks 2015 CV-3 updatedHanks 2015 CV-3 updated
Hanks 2015 CV-3 updated
 
Mt leander sky group
Mt leander sky groupMt leander sky group
Mt leander sky group
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
Tripping out automatic
Tripping out automaticTripping out automatic
Tripping out automatic
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYSDNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYS
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS
 
Horizon[1]
Horizon[1]Horizon[1]
Horizon[1]
 
Deepwater Horizon
Deepwater HorizonDeepwater Horizon
Deepwater Horizon
 
Incendio en la plataforma petrolera deepwater horizon
Incendio en la plataforma petrolera deepwater horizonIncendio en la plataforma petrolera deepwater horizon
Incendio en la plataforma petrolera deepwater horizon
 
Deepwater Horizon Drilling Rig
Deepwater Horizon Drilling RigDeepwater Horizon Drilling Rig
Deepwater Horizon Drilling Rig
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Observations
Observations Observations
Observations
 
Piper alpha disaster 1988
Piper alpha disaster 1988Piper alpha disaster 1988
Piper alpha disaster 1988
 
SI visitation machinery education
SI visitation machinery educationSI visitation machinery education
SI visitation machinery education
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKEND
 
Topic 01 incidents and accidents
Topic 01 incidents and accidentsTopic 01 incidents and accidents
Topic 01 incidents and accidents
 
TERSCV - Link
TERSCV - LinkTERSCV - Link
TERSCV - Link
 

Recently uploaded

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 

Recently uploaded (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

Abeer 32 accident

  • 2. 1) Where and when did it Happened? Date : 9/10/2006 Time : 2010hrs Location : Udang “Bravo” Platform Natuna Operation : Cargo transfer from vessel to Platform (16 bottles of oxygen in a steel rack) Weather Condition: At the time of accident, the weather is considered to be fair and calm. The wind speed is about 5knots and swells about 0.5m. The visibility is not very good due to the haze but there was no sign of any rain. WHERE & WHEN DID IT HAPPENED? Picture Showing Udang “Bravo” Platform
  • 3. WHERE & WHEN DID IT HAPPENED? Abeer 32 Air winch Tugger Broken Crane UDANG “B” PLATFORM Flare Current to North – 0,5 knots Abeer 32 Air winch Tugger Broken Crane UDANG “B” PLATFORM Flare Current to North – 0,5 knots Wind from SW – 5 Knots Picture showing location and direction N
  • 4. ACCIDENT DESCRIPTION 2) Accident Description › On Sunday, 8/10/2006 Abeer 32 departed Batam for Udang “Bravo” Platform Natuna after loading the cargoes and carrying 25 passengers. › Abeer 32 arrived in Udang “Bravo” Platform on 9/10/2006 at about 1430hrs and started to transfer the 24 passenger using the “monkey swing” method with vessel going sternward to passenger landing platform. › After completed passenger transfer, at about 1600hrs the cargo transfer to Bravo platform commences. Whilst transferring the last cargo for Bravo platform containing 16 bottles of oxygen bottles in a steel rack, at about 2010hrs the oxygen bottle steel rack fell directly onto a box containing some cans of WD40, utensils and miscellaneous stuff located on the starboard side of the main deck outside the accommodation of Abeer 32 at a height of about 25m. › The impact of the fallen oxygen bottles causes an explosion and fire to engulf the main deck accommodation leading to the lower crew accommodation and partially the wheelhouse.
  • 5. ACCIDENT DESCRIPTION 2) Accident Description (Cont’) › Mr Hendrik Hasan of PT Pan, at the time of accident was sitting on the port side outside the accommodation (opposite to the fallen oxygen bottles) unfortunately did not survive. › The AB Mr Hasbullah who was standing on the midship stbd main deck assisting in releasing the mooring line managed to escape to the bow section. › The C/O Mr Harry who was in the lower accommodation, the 2/E Mr Ridwan who was sleeping in the crew quarter and the C/E Mr Sofyan who was in the engine room manage to run out from the lower deck and escape to the outside of the accommodation on the forward main deck. › The AB Mr Tommy managed to jump over to Bravo passenger landing platform where he immediately contacted the platform personnel for assistance. With the help of the platform using fire hoses from the top of platform and passenger landing platform that was activated by AB Tommy and PT Pan Project Leader Mr Sunaryo, the fire managed to slow down. At this time, Tommy and Mr Sunaryo tried to enter the engine room to turn off the main engines but without success due to the heavy smoke. Thereafter about 15minutes later, a tugboat “Citra” arrived to join in the fire fighting where in joint effort successfully extinguished the fire.
  • 6. ACCIDENT DESCRIPTION 2) Accident Description (Cont’) › AB Tommy tried again to enter into the engine room together with one personnel from Tugboat Citra and eventually managed to turn off the main engine and shut off the fuel line. › Immediately after the explosion, the Master mustered the rest of the crew to the forward section of the vessel, which is considered to be safe at that time and thereafter Master ordered to lower the rubber boat onboard in order to evacuate the vessel where he considered to be in a questionable state that further explosion might occurred. › The Master made a head count and noted that AB Tommy is already safely on the passenger landing platform and the AB/Cook Mr Arnoldo Morong is missing where he immediately reported to the personnel of PT Pan.
  • 7. MISSING AB/COOK ARNOLDO MORONG 3) Missing AB/Cook Arnoldo Morong › The AB/Cook Mr Arnoldo Morong is suspected to be standing on the port side main deck (midship section) where there is an opening for rescue zone at the time of accident. He could have been thrown overboard due to the impact of the explosion on the stbd side. Picture showing the work vest belonging to AB/Cook Mr Arnoldo Morong that was found in the sea AB/Cook Arnoldo could be standing here Force of explosion
  • 8. RECOVERY 4) Recovery after Accident › The 5 crew excluding AB Tommy who is already safely on the Bravo platform and the missing AB/Cook Arnold boarded another Crewboat from Baruna – “Tempoa” where they were later transferred to Bravo Platform accommodation. › After fully extinguished the fire onboard Abeer 32 on the same day (9/10/2006) at about 2100hrs LT, the Tugboat Citra managed to tow Abeer 32 to an anchor buoy where she is tied up. › A Search and Rescue (SAR) operation was activated by PT Pan at about 2100hrs on 9/10/2006 using crewboat “Tempoa”. PT Pan calls off the SAR on 10/10/2006 at about 0400hrs when the crewboat fails to find the body of Arnoldo. › EOT engaged a tugboat “Barlian” from ASL to tow back Abeer 32 – commence on 17/10/2006, 1245hrs LT. › After persistent request from EOT, PT Pan managed to conduct a diving operation on the seabed to search for the body of Mr Arnoldo on 16/10/2006 but still fail to locate him.
  • 9. EXTEND OF DAMAGES 5) EXTEND OF DAMAGES – MAIN DECK
  • 10. EXTEND OF DAMAGES 5) EXTEND OF DAMAGES – PASSENGER AREA
  • 11. EXTEND OF DAMAGES 5) EXTEND OF DAMAGES - GALLEY
  • 12. EXTEND OF DAMAGES 5) EXTEND OF DAMAGES - WHEELHOUSE
  • 13. EXTEND OF DAMAGES 5) EXTEND OF DAMAGES – BELOW MAIN DECK (CREW QUARTER)
  • 14. INVESTIGATION FINDINGS 5) Investigation Findings › The source of explosion/fire could be due to the impact of the fallen steel rack that causes sparks (heat source) in contact with the flammable gases from the damaged cans of WD40 (rust penetrant) resulting in an explosion. The fire spread further and larger when it mixes with the rich leaking oxygen from the damaged cylinder heads enriching the combustion. The fire in mixture with the rich oxygen causes localized heat melting through the aluminum plate on the main deck (on two location as seen in the picture) and spreading the fire across the galley and alleyway of the crew quarters below main deck.
  • 16. ROOT CAUSE ROOT CAUSE Failure to follow proper procedure Incorrect Lifting Methods Defective equipment or materials Operating without adequate training Type of Event (Cause/Agency) Falling Object
  • 17. ROOT CAUSE 6) ROOT CAUSE – Failure to follow procedure › The crewboat Abeer 32 was moored to the passenger landing platform of Udang Bravo during time of cargo transfer, which exposes her to various dangers. Based on interviews, the Master fully understand this fact but mentioned that if the vessel is not moored to the platform then cargo transfer cannot take place due to the offshore crane breakdown and PT Pan is using a simple air driven winch davit for the cargo transfer. › Prior to the cargo transfer especially with the heavy cargoes, there had been no Job Safety Analysis or Work Permit conducted › The Master having the overriding authority does not have knowledge on the cargo manifest, weight of cargo and hence there is no way he can ensure safe transfer of the cargo in protection to shipboard personnel and Company’s property to his best endeavor
  • 18. ROOT CAUSE 6) ROOT CAUSE – Failure to follow procedure (cont’) › There is no evidence that proper inspection on the lifting gears/equipment had been conducted prior to the cargo lift. No proper identification of the lifting gears were noted to show that it had been properly tested/inspected to its SWL and proper for use › The fittings on the 16 bottles of oxygen was not removed during the lift and there is no proper securing cover on the bottle head Picture showing the fittings were not removed during the lift and there are no protective covers on the oxygen bottle head
  • 19. ROOT CAUSE 6) ROOT CAUSE – Incorrect Lifting Methods › It is our understanding that the air driven winch davit is certified to SWL of 1ton although there is no evidence of proper certificate to ascertain the lift and when it was last tested. › The overall height from the Bravo platform main deck to the sheave block of the davit is measured at 2.15m and the overall height of the oxygen bottles steel rack is measured at 2.25m hence it will be difficult for the operator to hoist in the steel rack to the main deck considering the weight. Beside the height constraint, there is also obstruction on the platform main deck further restricting the hoisting in of the steel rack. From site inspection there is an angle plate protruding about 20mm from the main deck
  • 20. ROOT CAUSE 6) ROOT CAUSE – Incorrect Lifting Methods (Cont’) 2.25m Approximately 2.5m outreach arm Picture showing angle bar on the main deck that could probably further restrict hoisting in the steel rack containing the oxygen bottles
  • 21. ROOT CAUSE 6) ROOT CAUSE – Defective Equipment/Material › There is no evidence that the lifting gears belonging to PT Pan had been load tested regularly to its proper SWL with proper approved color identification for use › There is no evidence of proper planned maintenance system for the lifting gears and associated equipment carried out by PT Pan › The lifting wire on the davit is in bad condition › The lifting hook does not have a safety latch › It is our understanding that the rack carrying the 16 bottles of oxygen belongs to a sub contractor in Batam. Although it is stated on the rack that it’s SWL is 3.6tons but there is no evidence that the welded U bolt on the top center of the rack is rated to the safe working load of 3.6tons.
  • 22. ROOT CAUSE 6) ROOT CAUSE – Defective Equipment/Material Picture showing the lifting hook does not have a safety latch and the damage davit lifting wire – breaking off from the end of the socket
  • 23. ROOT CAUSE 6) ROOT CAUSE – Inadequate Training › It is our understanding that during the time of accident, the air driven winch davit is control by a worker and supervised by the Project Leader on the platform where both are employee of PT Pakarti (Sub-contractor for PT Pan) › There is no evidence to show that the person operating the crane is an approved crane operator or had undergone proper rigger training.
  • 24. LESSON LEARNT › IF YOU SEE IT YOU OWN IT! › DO SOMETHING ABOUT IT IF WHAT YOU SEE IS NOT CORRECT OR IN DOUBT – TELL SOMEBODY! ASK! › DO NOT ACCEPT SUB-STANDARD SAFETY PERFORMANCE! › STOP THE WORK IF YOU THINK IT IS NOT RIGHT! › MASTER MUST EXERCISE HIS OVERRIDING AUTHORITY AND STOP WORK AUTHORITY › FOLLOW PROPER PROCEDURE