Prospect of Non Destructive Testing and Condition Monitoring Scope in Bangladesh
1. Prospect of Non Destructive
Testing and Condition
Monitoring Practice in
Bangladesh
Prospect of Non Destructive
Testing and Condition
Monitoring Practice in
Bangladesh
Ferdous Kabir
Marketing Manager
ASNT NDT Level II in Ect,UT,RT,MT,PT
Saj Engineering & Trading Company
5. What is PdM?
Non Destructive Testing and Condition Monitoring is
the part of Predictive Maintenance (PdM).
Predictive maintenance (PdM) techniques are
designed to help determine the condition of in-service
equipment in order to predict when maintenance
should be performed.
Non Destructive Testing and Condition Monitoring is
the part of Predictive Maintenance (PdM).
Predictive maintenance (PdM) techniques are
designed to help determine the condition of in-service
equipment in order to predict when maintenance
should be performed.
6.
7.
8. Types of machines
Motors
Pumps
Fans
Gearboxes
Engines
Compressors
Steam Turbines
Generators
Gas Turbines
Hydro Turbines
Rotating
Or
Reciprocating Machines
Motors
Pumps
Fans
Gearboxes
Engines
Compressors
Steam Turbines
Generators
Gas Turbines
Hydro Turbines
Rotating
Or
Reciprocating Machines
9. EquipmentPerformance
PP Lubrication Excellence
Proactive
Precision Maintenance
Alignment, Balance, etc.
Select Suppliers
Supplier Specifications
Metrics
Equipment Ranking
RCM
Predictive Reactive
We are in
here
EquipmentPerformance
Time
FF
RCM
TPM
RCA/FMEA
RCD
Training Programs
Written Procedures
Job Planning/Scheduling
CMMS System
We are in
here
Machine Condition Chart
10. Condition Monitoring For your Plant
Vibration
Analysis
Oil Analysis
Ultrasound
Analysis
Thermal
Analysis
If you think this is your plant, then your plant is stand on this 4 technologies
11. Machinery Health Monitoring StrategyMachinery Health Monitoring StrategyMachinery Health Monitoring StrategyMachinery Health Monitoring Strategy
~125
Machines
Total # Machines 2,500
Typical Industrial Process Plant
5%5%
CriticalCritical
25%25%
EssentialEssential
30%30%
ImportantImportant
20%20%
SecondarySecondary
20%20%
NonNon--EssentialEssential
Turbines
Generators
Compressors
Motors
Pumps
Fans
Gears
Application at Typical PlantApplication at Typical Plant
Online Solutions forOnline Solutions for
critical machinerycritical machinery
WirelessWireless
TransmittersTransmitters~1375 Machines
~500 Machines
~500 Machines
5%5%
CriticalCritical
25%25%
EssentialEssential
30%30%
ImportantImportant
20%20%
SecondarySecondary
20%20%
NonNon--EssentialEssential
Motors
Pumps
Fans
Gears
WirelessWireless
TransmittersTransmitters
Multi TechnologiesMulti Technologies
Portable SolutionsPortable Solutions
12. NDT and CM Customer in Bangladesh
Power Generation: 200+
Fertilizer Factory: 8
Chemical Plant: 10+
Refinery: 10+
Oil Reserve Tank
Gas Production Field: 23 +
Gas Distribution: 6
Gas Transmission : 1774 KM
Power Generation: 200+
Fertilizer Factory: 8
Chemical Plant: 10+
Refinery: 10+
Oil Reserve Tank
Gas Production Field: 23 +
Gas Distribution: 6
Gas Transmission : 1774 KM
15. Steel Bridge
LPG and LNG :
Germans and Textile : 6000+
Gun Barrel and Shell : 1
Foundry (casting)
Steel Mills
Steel Bridge
LPG and LNG :
Germans and Textile : 6000+
Gun Barrel and Shell : 1
Foundry (casting)
Steel Mills
16.
17. Power System Master Plan in Bangladesh
Present Installation of Power Production Capacity : 12,071
MW
Number of Power Plant : 200 +
Generation of 3/3/2016 : 8,173 MW
Generation Capacity Requirement 2021: 2,400 MW
Generation Capacity Requirement 2030: 39,000 MW
Present Installation of Power Production Capacity : 12,071
MW
Number of Power Plant : 200 +
Generation of 3/3/2016 : 8,173 MW
Generation Capacity Requirement 2021: 2,400 MW
Generation Capacity Requirement 2030: 39,000 MW
18. Date of Inspection : 11 and 14 October, 2012
Generation Capacity: 5 MW
Total Running Time: 40,564.50 Hours
19. Scope of Inspection in Engine
Piston Crown 20 pic (per pic two part)
Piston Skirt 20 pic
Gudgeon Pin 20 pic
Big end bearing shell lower (connecting
rod cap) 20 pic (20x2 =40 points)
Big end bearing shell upper (connecting rod
cap) 20 pic (20x2 =40 points)
Bearing housing for 20 circle
Connecting Rod
Cylinder Liner
Piston Crown 20 pic (per pic two part)
Piston Skirt 20 pic
Gudgeon Pin 20 pic
Big end bearing shell lower (connecting
rod cap) 20 pic (20x2 =40 points)
Big end bearing shell upper (connecting rod
cap) 20 pic (20x2 =40 points)
Bearing housing for 20 circle
Connecting Rod
Cylinder Liner
22. Dye Penetrant Testing
This method is commonly used for detect
the surface cracks or defects. Dye
penetrant Testing (DPT) is one of the most
widely used nondestructive Testing (NDT)
methods. DPT can be used to inspect
almost any material provided that its
surface is not extremely rough.
This method is commonly used for detect
the surface cracks or defects. Dye
penetrant Testing (DPT) is one of the most
widely used nondestructive Testing (NDT)
methods. DPT can be used to inspect
almost any material provided that its
surface is not extremely rough.
23. Dye Penetrant Testing Process
Three liquids are
used in this method.
1. Cleaner
2. Penetrant
3. Developer
Three liquids are
used in this method.
1. Cleaner
2. Penetrant
3. Developer
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37. Applications of RVI
It can be applied to a number of areas including:
– Aerospace
– Power generation
– Oil and Gas
– Chemicals
– Automotive
– Construction
– Security
– Manufacturing
– Pharmaceutical etc.
– Research and education
It is also used for:
•Gas turbine blades
•Blade cooling holes
•Boiler tubes
•Turbine rotor bores
•Steam pipework
•Boiler headers
•Valves
•Steam chests
www.sajetc.com
It can be applied to a number of areas including:
– Aerospace
– Power generation
– Oil and Gas
– Chemicals
– Automotive
– Construction
– Security
– Manufacturing
– Pharmaceutical etc.
– Research and education
It is also used for:
•Gas turbine blades
•Blade cooling holes
•Boiler tubes
•Turbine rotor bores
•Steam pipework
•Boiler headers
•Valves
•Steam chests
41. Turbine Case Study#
GE 9E Gas Turbine is not running due to lack of sufficient fuel pressure.
After a details endoscopy inspection a plastic cap was found.
www.sajetc.com
42. GE 9E Gas Turbine increase temperature faster. After a details
endoscopy inspection a sand and foreign particle blocked water
line
43. Boiler Case Study
This is an Oil Tanker Auxiliary
Boiler. The boiler cant be ran due
to its leaky tube. There were 400
tubes. Two defective tubes found
by Endoscopy Inspection. And then
it is sealed from both side.
44. Turbine Case Study#1
Severe Crack found Turbine Nozzle
of Alstom 34.5MW Turbine after the
Endoscopy Inspection.
50. See the Image
See the Temperature,
See the Temperature
See the Problem.
Infrared & Thermal Testing
See the Image
See the Temperature,
See the Temperature
See the Problem.
64. What is the Difference in Medical Ultrasonogram
and Phased Array Ultrasonic Test?
Nothing Special, Both are Phased Array Ultrasonic Test
Medical Industrial
65.
66. WELDING AREA OF STRUCTUREWELDING AREA OF STRUCTURE
Web Butt Joint
Flange Butt Joint
77. Project Completed by AUT
East West Pipeline Project , Chine
(4,167 km) (www.chinaoilweb.com)
Nord Stream Project (Russia to
Germany (1,212 km) sea base of Baltic
sea
Blue Stream Project (1,213), sea base of
Black sea
East West Pipeline Project , Chine
(4,167 km) (www.chinaoilweb.com)
Nord Stream Project (Russia to
Germany (1,212 km) sea base of Baltic
sea
Blue Stream Project (1,213), sea base of
Black sea
89. Our Completed 70 NDT Service Projects
01. 110MW Power Plant (PDB)
02. Ashugong Power Plant (Unit-2)
03. Rawjan Power Plant
04. Sylhet 150MW Power Plant
05. Katakhale Power Plant
06. Siddirgonj Power Plant…….
07. Ghorasal ST (Gas) : Unit - 2……….
08. Renata Pharmaceuticals Ltd (Mirpur)
01. 110MW Power Plant (PDB)
02. Ashugong Power Plant (Unit-2)
03. Rawjan Power Plant
04. Sylhet 150MW Power Plant
05. Katakhale Power Plant
06. Siddirgonj Power Plant…….
07. Ghorasal ST (Gas) : Unit - 2……….
08. Renata Pharmaceuticals Ltd (Mirpur)
90. 09.Renata Pharmaceuticals Ltd
(Rajandropur)
10. Army Aviation
11. Karnaphuli Steel Mill
12. Modern Erection
13. ACME Pharmaceuticals
14. SK+F Pharmaceuticals
15. HP Chemicals
16.Samuda Chemical
17. Sarker Steel …………………………………
09.Renata Pharmaceuticals Ltd
(Rajandropur)
10. Army Aviation
11. Karnaphuli Steel Mill
12. Modern Erection
13. ACME Pharmaceuticals
14. SK+F Pharmaceuticals
15. HP Chemicals
16.Samuda Chemical
17. Sarker Steel …………………………………
91. SAJ Upcoming Services
i. Ultrasonic Predictive
Maintenance
ii. Laser Alignment
iii. XRF Service
i. Ultrasonic Predictive
Maintenance
ii. Laser Alignment
iii. XRF Service
92. NDT and CM Concept Sharing with Future
User
(PMRE , Department BUET)