Critical Path Methods
(CPM)
Presented by
Manoj Kumar Rout
Assistant Professor
BIITM, Bhubaneswar
CPM
• The critical path method (CPM) is a
technique which is used for planning
and coordinating large project.
• A critical path in project management
is the longest sequence of activities
that must be finished on time in order
for the entire project to be complete.
• Application area are construction
project such as bridges, building,
dams , canals etc.
Objectives of CPM
1) Complete the job at the earliest to
avoid rising cost.
2) Ensure logical discipline in
planning, scheduling and
controlling projects.
3) Encourage more long range and
detailed planning of projects.
4) Provide management with
periodic reports as the project
progress.
5) Identify the most critical element
of the plan.
Procedure to Drawing a CPM
Network
Structure Analysis:
 Draw up list of Activities
 Draft of Structure /Network
 Numbering of Events
Time Analysis:
 Assessment of the duration of the Activities.
 Progressive time Calculation (Forward Pass &
Backward Pass)
 Assessment of the Critical Path
 Assessment of the Float/ Slack
Forward Pass
(Progressive Computation)
 Forward Pass used to compute
Earliest Event Time.
 Sequence of activity start from left
to right of the network.
 It usually start with zero (first
activity) i.e. ES (Earliest start) to
EF (earliest finish)
 Zero be the staring time for the
Project.
Backward Pass
(Retrogressive Computation)
 Backward Pass used to calculate
latest Event Time.
 Sequence of activity start from
Right to left right of the network.
 For finding event consider E = L
Assessment of Critical Path
 In every network EE = LE
Or Earliest time of event (EE) = Latest time of event (LE)
 An activity is said to b critical, if the total float (TFij) for any activity is zero.
 Critical path Condition
• ESi = LFi
• ESj = LFj
• ESj-ESi= LFj-LFi= tij
Assessment of Float/Slack
Slack/ Float:
 It is the time by which occurrence of an event can be delayed. It
is denoted as “S”
[S= L-E ]of the event
 It is other wisely known as allowable slippage for a path.
 The Slack analysis is done for each activity path to identify the
sub critical path.
 It is of two types;
1. Event Slack
2. Activity Slack
Event Slack
• Event slack is the difference between latest event
time and earliest event time.
• Event Slack= LE- EE
= Latest event time- Earliest event time
Activity Slack
Activity Slack= (LEA- ESA)-D
where; LEA = latest ending time
ESA = earliest starting time
D = Duration of the activities
In network (CPM), three types of activity slacks or foat are identified;
Total Float/Slack: it is the difference between maximum available to
perform the activity and activity duration.
(TF)ij = LEj - EEi -D
Free Float/Slack: it is the time by which completion of an activity can be
delay without delaying its immediate succession.
(FF)ij = EEj - EEi -D
Independent Float/Slack: it is the portion of total float within which an
activity can be delay for start with effecting the float of preceding
activity.
(IF)ij = EEj - LEi -D
Example-1
• A project schedule has the following characteristics;
• Construct Network Diagram.
• Compute the earliest event time and latest event time.
• Determine the critical path and total project duration.
• Compute the total and free float for each activity.
Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10
Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
Example-1
• Construct Network Diagram.
Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10
Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
Example-1
• Construct Network Diagram.
Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10
Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
Computation of Forward Pass
Computation of Backward Pass
Computation of Earliest Event &
Latest Event time
Table
Activit
y
Time
(Days)
(tij)
Earliest Latest Total Float
TF= LS-ES
Free Float
FF= Ej –Ei - tij
Ej
Start
(ES)
(Ei)
Finish
(EF)
EF =
(Ei+ tij)
Start
(LS)
LS =
(Lj - tij)
Finish
(LF)
(Lj)
1-2 4 0 0+4=4 9-4=5 9 5-0= 5
1-3 1 0 0+1=1 1-1=0 1 0-0= 0
2-4 1 4 5 9 10 5
3-4 1 1 2 9 10 8
3-5 6 1 7 1 7 0
4-9 5 5 10 10 15 5
5-6 4 7 11 12 16 5
5-7 8 7 15 7 15 0
6-8 1 11 12 16 17 5
7-8 2 15 17 15 17 0
8-10 5 17 22 17 22 0
9-10 7 10 17 15 22 5
Critical path
= 1-3-5-7-8-10
S0
Total project duration
=1+6+8+2+5
=22 Days
Table
Activit
y
Time
(Days)
(tij)
Earliest Latest Total Float
TF= LS-ES
Free Float
FF= Ej –Ei - tij
Ej
Start
(ES)
(Ei)
Finish
(EF)
EF =
(Ei+ tij)
Start
(LS)
LS =
(Lj - tij)
Finish
(LF)
(Lj)
1-2 4 0 0+4=4 9-4=5 9 5-0= 5 4-0-4= 0 4
1-3 1 0 0+1=1 1-1=0 1 0-0= 0 0 1
2-4 1 4 5 9 10 5 0 5
3-4 1 1 2 9 10 8 3 5
3-5 6 1 7 1 7 0 0 7
4-9 5 5 10 10 15 5 0 10
5-6 4 7 11 12 16 5 0 11
5-7 8 7 15 7 15 0 0 15
6-8 1 11 12 16 17 5 5 17
7-8 2 15 17 15 17 0 0 17
8-10 5 17 22 17 22 0 0 22
9-10 7 10 17 15 22 5 5 22
PERT
• Program (Project) Evaluation and Review Technique (PERT)
is an activity to understand the planning, arranging,
scheduling, coordinating and governing of a project.
• This program helps to understand the technique of a study
taken to complete a project, identify the least and
minimum time taken to complete the whole project.
• PERT was developed in the 1950s, with the aim of the cost
and time of a project.
How to make PERT Chart?
Recognize particular projects and milestones.
Decide the precise sequence of the project.
Create a network diagram.
Determine the time needed for each project activity.
Manage the critical path.
Update the PERT chart as the project progresses.
PERT
PERT is a probabilistic method, where the activity times are
represented by probability distribution. This distribution of
activity is based on three different time estimate made for each
activity, which are as follows;
• Optimistic time estimate
• Most likely time estimate
• Pessimistic time estimate
PERT
Optimistic time estimate:
• This is the fastest time an activity can be
completed. For this, the assumption is made that
all the necessary resources are available and all
predecessor activities are completed as planned.
Most likely time estimate:
• Most of the times, project managers are asked
only to submit one estimate. In that case, this is
the estimate that goes to the upper
management.
Pessimistic time estimate:
• This is the maximum time required to complete
an activity. In this case, it is assumed that many
things go wrong related to the activity. A lot of
rework and resource unavailability are assumed
when this estimation is derived.
Calculation of PERT
Expected Completion Time (te) =
𝑡𝑜+4𝑡𝑚+𝑡𝑝
6
Possible Variance of the Activity 𝜎 2 = {
𝑡𝑝−𝑡𝑜
6
}2
Where;
Optimistic time estimate (to)
Most likely time estimate (tm)
Pessimistic time estimate (tp)
Example
• The following table shows the job of a network along with
their time estimates
Activity Estimated Duration (Weeks)
Optimistic
time (to)
Most Likely
time (tm)
Pessimistic
time (tp)
1-2 1 7 13
1-6 2 5 14
2-3 2 14 26
2-4 2 5 8
3-5 7 10 19
4-5 5 5 17
6-7 5 8 29
5-8 3 3 9
7-8 8 17 32
1) Draw the Project Network
2) Find the expected duration and
variance of each activity.
3) Calculate the earliest and latest
occurrence of each event.
4) Calculate the variance and standard
deviation of project length.
5) Find the probability of the project
completing in 40 days.
Draw the Network Diagram
Example
Activity Estimated Duration
(Weeks)
te σ2
Optimist
ic time
(to)
Most
Likely
time (tm)
Pessimistic
time (tp)
1-2 1 7 13 7 4
1-6 2 5 14 6 4
2-3 2 14 26 14 16
2-4 2 5 8 5 1
3-5 7 10 19 11 4
4-5 5 5 17 7 4
6-7 5 8 29 11 16
5-8 3 3 9 4 1
7-8 8 17 32 18 16
Calculation of Earliest Time (Forward Pass)
Calculation of Latest Time (Backward Pass)
Example
Critical path = 1-2-3-5-8
So, Total project duration
=7+14+11+4=36 Weeks
Project length variance (σ2)= 4+16+4+1= 25
Project length standard deviation (σ) = 5 weeks
Calculation of Standard Normal Variable
𝑍 =
𝑇𝑠 − 𝑇𝑒
σ
Where,
Ts= Schedule time to complete the project
Te= Normal expected project length
σ =expected standard deviation of the project length
The probability that the project will be complete in 40
days is given by P (Z ≤ D )
So D =
𝑇𝑠−𝑇𝑒
σ
= 0.8
P (Z ≤ 0.8) = 0.7881 or 87.81% (Ans)
CPM.pptx
CPM.pptx

More Related Content

Similar to CPM.pptx

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering EconomicsDeepak Paithankar
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii referenceahsanrabbani
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementAmit Kumbar
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxSession 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxAlRashedinKawser2
 
Network Techniques for Project Management
Network Techniques for Project ManagementNetwork Techniques for Project Management
Network Techniques for Project ManagementIshan Gandhi
 
Pb602 operation management chapter 7
Pb602  operation management chapter 7Pb602  operation management chapter 7
Pb602 operation management chapter 7Akihisa Akimoto
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1adeelmunir158
 
criticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfcriticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfSalahudin Babar
 
Critical path lecture by EDP.pptxbdhshsjjdj
Critical path lecture by EDP.pptxbdhshsjjdjCritical path lecture by EDP.pptxbdhshsjjdj
Critical path lecture by EDP.pptxbdhshsjjdjlicpn03
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review TechniqueDrAsifMohammad
 
Critical path method (CPM).pptx
Critical path method (CPM).pptxCritical path method (CPM).pptx
Critical path method (CPM).pptxHimanshuKaklotar1
 

Similar to CPM.pptx (20)

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
CPM AND PERT
CPM AND PERTCPM AND PERT
CPM AND PERT
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
Cpm module iii reference
Cpm module iii referenceCpm module iii reference
Cpm module iii reference
 
Project management
Project managementProject management
Project management
 
CPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource managementCPM, Network Analysis A-O-A, A-O-N, Resource management
CPM, Network Analysis A-O-A, A-O-N, Resource management
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Cpmpert
CpmpertCpmpert
Cpmpert
 
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxSession 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
 
Network Techniques for Project Management
Network Techniques for Project ManagementNetwork Techniques for Project Management
Network Techniques for Project Management
 
Ch 5.pptx
Ch 5.pptxCh 5.pptx
Ch 5.pptx
 
Pb602 operation management chapter 7
Pb602  operation management chapter 7Pb602  operation management chapter 7
Pb602 operation management chapter 7
 
Networktechniques
NetworktechniquesNetworktechniques
Networktechniques
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1
 
criticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdfcriticalpathmethod-151022164503-lva1-app6892.pdf
criticalpathmethod-151022164503-lva1-app6892.pdf
 
Critical path lecture by EDP.pptxbdhshsjjdj
Critical path lecture by EDP.pptxbdhshsjjdjCritical path lecture by EDP.pptxbdhshsjjdj
Critical path lecture by EDP.pptxbdhshsjjdj
 
Cpm and pert
Cpm and pertCpm and pert
Cpm and pert
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review Technique
 
Critical path method (CPM).pptx
Critical path method (CPM).pptxCritical path method (CPM).pptx
Critical path method (CPM).pptx
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 

More from FashionHub12

BP Presentation.pptx
BP Presentation.pptxBP Presentation.pptx
BP Presentation.pptxFashionHub12
 
Nature & scope of finance function.pptx
Nature & scope of finance function.pptxNature & scope of finance function.pptx
Nature & scope of finance function.pptxFashionHub12
 
international_business module I.ppt
international_business module I.pptinternational_business module I.ppt
international_business module I.pptFashionHub12
 
Class 2 Types of Entrepreneurs.pptx
Class 2 Types of Entrepreneurs.pptxClass 2 Types of Entrepreneurs.pptx
Class 2 Types of Entrepreneurs.pptxFashionHub12
 
Class 11 Entreprneurial Competency.pptx
Class 11 Entreprneurial Competency.pptxClass 11 Entreprneurial Competency.pptx
Class 11 Entreprneurial Competency.pptxFashionHub12
 
Class 9 EDI-Entrepreneurship Development Institutes.pptx
Class 9 EDI-Entrepreneurship Development Institutes.pptxClass 9 EDI-Entrepreneurship Development Institutes.pptx
Class 9 EDI-Entrepreneurship Development Institutes.pptxFashionHub12
 

More from FashionHub12 (9)

BP Presentation.pptx
BP Presentation.pptxBP Presentation.pptx
BP Presentation.pptx
 
MODULE 1.ppt
MODULE 1.pptMODULE 1.ppt
MODULE 1.ppt
 
Nature & scope of finance function.pptx
Nature & scope of finance function.pptxNature & scope of finance function.pptx
Nature & scope of finance function.pptx
 
MODULE- I.pptx
MODULE- I.pptxMODULE- I.pptx
MODULE- I.pptx
 
international_business module I.ppt
international_business module I.pptinternational_business module I.ppt
international_business module I.ppt
 
Class 2 Types of Entrepreneurs.pptx
Class 2 Types of Entrepreneurs.pptxClass 2 Types of Entrepreneurs.pptx
Class 2 Types of Entrepreneurs.pptx
 
Class 11 Entreprneurial Competency.pptx
Class 11 Entreprneurial Competency.pptxClass 11 Entreprneurial Competency.pptx
Class 11 Entreprneurial Competency.pptx
 
ED WCM.pptx
ED WCM.pptxED WCM.pptx
ED WCM.pptx
 
Class 9 EDI-Entrepreneurship Development Institutes.pptx
Class 9 EDI-Entrepreneurship Development Institutes.pptxClass 9 EDI-Entrepreneurship Development Institutes.pptx
Class 9 EDI-Entrepreneurship Development Institutes.pptx
 

Recently uploaded

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Recently uploaded (20)

Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

CPM.pptx

  • 1. Critical Path Methods (CPM) Presented by Manoj Kumar Rout Assistant Professor BIITM, Bhubaneswar
  • 2. CPM • The critical path method (CPM) is a technique which is used for planning and coordinating large project. • A critical path in project management is the longest sequence of activities that must be finished on time in order for the entire project to be complete. • Application area are construction project such as bridges, building, dams , canals etc.
  • 3. Objectives of CPM 1) Complete the job at the earliest to avoid rising cost. 2) Ensure logical discipline in planning, scheduling and controlling projects. 3) Encourage more long range and detailed planning of projects. 4) Provide management with periodic reports as the project progress. 5) Identify the most critical element of the plan.
  • 4. Procedure to Drawing a CPM Network Structure Analysis:  Draw up list of Activities  Draft of Structure /Network  Numbering of Events Time Analysis:  Assessment of the duration of the Activities.  Progressive time Calculation (Forward Pass & Backward Pass)  Assessment of the Critical Path  Assessment of the Float/ Slack
  • 5. Forward Pass (Progressive Computation)  Forward Pass used to compute Earliest Event Time.  Sequence of activity start from left to right of the network.  It usually start with zero (first activity) i.e. ES (Earliest start) to EF (earliest finish)  Zero be the staring time for the Project.
  • 6. Backward Pass (Retrogressive Computation)  Backward Pass used to calculate latest Event Time.  Sequence of activity start from Right to left right of the network.  For finding event consider E = L
  • 7. Assessment of Critical Path  In every network EE = LE Or Earliest time of event (EE) = Latest time of event (LE)  An activity is said to b critical, if the total float (TFij) for any activity is zero.  Critical path Condition • ESi = LFi • ESj = LFj • ESj-ESi= LFj-LFi= tij
  • 8. Assessment of Float/Slack Slack/ Float:  It is the time by which occurrence of an event can be delayed. It is denoted as “S” [S= L-E ]of the event  It is other wisely known as allowable slippage for a path.  The Slack analysis is done for each activity path to identify the sub critical path.  It is of two types; 1. Event Slack 2. Activity Slack
  • 9. Event Slack • Event slack is the difference between latest event time and earliest event time. • Event Slack= LE- EE = Latest event time- Earliest event time
  • 10. Activity Slack Activity Slack= (LEA- ESA)-D where; LEA = latest ending time ESA = earliest starting time D = Duration of the activities In network (CPM), three types of activity slacks or foat are identified; Total Float/Slack: it is the difference between maximum available to perform the activity and activity duration. (TF)ij = LEj - EEi -D Free Float/Slack: it is the time by which completion of an activity can be delay without delaying its immediate succession. (FF)ij = EEj - EEi -D Independent Float/Slack: it is the portion of total float within which an activity can be delay for start with effecting the float of preceding activity. (IF)ij = EEj - LEi -D
  • 11. Example-1 • A project schedule has the following characteristics; • Construct Network Diagram. • Compute the earliest event time and latest event time. • Determine the critical path and total project duration. • Compute the total and free float for each activity. Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10 Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
  • 12. Example-1 • Construct Network Diagram. Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10 Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
  • 13. Example-1 • Construct Network Diagram. Activity 1-2 1-3 2-4 3-4 3-5 4-9 5-6 5-7 6-8 7-8 8-10 9-10 Time (Days) 4 1 1 1 6 5 4 8 1 2 5 7
  • 16. Computation of Earliest Event & Latest Event time
  • 17. Table Activit y Time (Days) (tij) Earliest Latest Total Float TF= LS-ES Free Float FF= Ej –Ei - tij Ej Start (ES) (Ei) Finish (EF) EF = (Ei+ tij) Start (LS) LS = (Lj - tij) Finish (LF) (Lj) 1-2 4 0 0+4=4 9-4=5 9 5-0= 5 1-3 1 0 0+1=1 1-1=0 1 0-0= 0 2-4 1 4 5 9 10 5 3-4 1 1 2 9 10 8 3-5 6 1 7 1 7 0 4-9 5 5 10 10 15 5 5-6 4 7 11 12 16 5 5-7 8 7 15 7 15 0 6-8 1 11 12 16 17 5 7-8 2 15 17 15 17 0 8-10 5 17 22 17 22 0 9-10 7 10 17 15 22 5
  • 18. Critical path = 1-3-5-7-8-10 S0 Total project duration =1+6+8+2+5 =22 Days
  • 19. Table Activit y Time (Days) (tij) Earliest Latest Total Float TF= LS-ES Free Float FF= Ej –Ei - tij Ej Start (ES) (Ei) Finish (EF) EF = (Ei+ tij) Start (LS) LS = (Lj - tij) Finish (LF) (Lj) 1-2 4 0 0+4=4 9-4=5 9 5-0= 5 4-0-4= 0 4 1-3 1 0 0+1=1 1-1=0 1 0-0= 0 0 1 2-4 1 4 5 9 10 5 0 5 3-4 1 1 2 9 10 8 3 5 3-5 6 1 7 1 7 0 0 7 4-9 5 5 10 10 15 5 0 10 5-6 4 7 11 12 16 5 0 11 5-7 8 7 15 7 15 0 0 15 6-8 1 11 12 16 17 5 5 17 7-8 2 15 17 15 17 0 0 17 8-10 5 17 22 17 22 0 0 22 9-10 7 10 17 15 22 5 5 22
  • 20. PERT • Program (Project) Evaluation and Review Technique (PERT) is an activity to understand the planning, arranging, scheduling, coordinating and governing of a project. • This program helps to understand the technique of a study taken to complete a project, identify the least and minimum time taken to complete the whole project. • PERT was developed in the 1950s, with the aim of the cost and time of a project.
  • 21.
  • 22. How to make PERT Chart? Recognize particular projects and milestones. Decide the precise sequence of the project. Create a network diagram. Determine the time needed for each project activity. Manage the critical path. Update the PERT chart as the project progresses.
  • 23. PERT PERT is a probabilistic method, where the activity times are represented by probability distribution. This distribution of activity is based on three different time estimate made for each activity, which are as follows; • Optimistic time estimate • Most likely time estimate • Pessimistic time estimate
  • 24. PERT Optimistic time estimate: • This is the fastest time an activity can be completed. For this, the assumption is made that all the necessary resources are available and all predecessor activities are completed as planned. Most likely time estimate: • Most of the times, project managers are asked only to submit one estimate. In that case, this is the estimate that goes to the upper management. Pessimistic time estimate: • This is the maximum time required to complete an activity. In this case, it is assumed that many things go wrong related to the activity. A lot of rework and resource unavailability are assumed when this estimation is derived.
  • 25. Calculation of PERT Expected Completion Time (te) = 𝑡𝑜+4𝑡𝑚+𝑡𝑝 6 Possible Variance of the Activity 𝜎 2 = { 𝑡𝑝−𝑡𝑜 6 }2 Where; Optimistic time estimate (to) Most likely time estimate (tm) Pessimistic time estimate (tp)
  • 26. Example • The following table shows the job of a network along with their time estimates Activity Estimated Duration (Weeks) Optimistic time (to) Most Likely time (tm) Pessimistic time (tp) 1-2 1 7 13 1-6 2 5 14 2-3 2 14 26 2-4 2 5 8 3-5 7 10 19 4-5 5 5 17 6-7 5 8 29 5-8 3 3 9 7-8 8 17 32 1) Draw the Project Network 2) Find the expected duration and variance of each activity. 3) Calculate the earliest and latest occurrence of each event. 4) Calculate the variance and standard deviation of project length. 5) Find the probability of the project completing in 40 days.
  • 27. Draw the Network Diagram
  • 28. Example Activity Estimated Duration (Weeks) te σ2 Optimist ic time (to) Most Likely time (tm) Pessimistic time (tp) 1-2 1 7 13 7 4 1-6 2 5 14 6 4 2-3 2 14 26 14 16 2-4 2 5 8 5 1 3-5 7 10 19 11 4 4-5 5 5 17 7 4 6-7 5 8 29 11 16 5-8 3 3 9 4 1 7-8 8 17 32 18 16
  • 29. Calculation of Earliest Time (Forward Pass)
  • 30. Calculation of Latest Time (Backward Pass)
  • 31. Example Critical path = 1-2-3-5-8 So, Total project duration =7+14+11+4=36 Weeks Project length variance (σ2)= 4+16+4+1= 25 Project length standard deviation (σ) = 5 weeks
  • 32. Calculation of Standard Normal Variable 𝑍 = 𝑇𝑠 − 𝑇𝑒 σ Where, Ts= Schedule time to complete the project Te= Normal expected project length σ =expected standard deviation of the project length The probability that the project will be complete in 40 days is given by P (Z ≤ D ) So D = 𝑇𝑠−𝑇𝑒 σ = 0.8 P (Z ≤ 0.8) = 0.7881 or 87.81% (Ans)