SlideShare a Scribd company logo
1 of 84
Download to read offline
MINISTERIAL PRESS 
BRIEFING 
FMW – SUMMARY OF FERMA 
ACTIVITIES 
Ministerial Briefing, 
September 2014 
1
Outline 
•Introduction(Background) 
•Current Administration (Transformation) 
–Strategies and Actions 
–Results and achievements 
–Work Photographs 
–Video 
•Conclusion 
Ministerial Briefing, September 2014 2
FERMA is committed to a consistent preventive road maintenance culture through intensive surveillance, monitoring and repairs. 
Ministerial Briefing, September 2014 3
Introduction 
FERMAEstablishmentandMandate 
TheFederalRoadsMaintenanceAgency(FERMA)wasestablishedonNovember30th2002byanActoftheNationalAssemblycitedastheFederalRoadsMaintenanceAgency(Establishment,etc.)Act2002andanAmendmentAct2007. 
TheAgency’smandateistoensuretheefficientandeffectivemaintenanceofallexistingFederaltrunkroadsorsuchotherroadsasmaybedeclared,fromtimetotime,asFederaltrunkroadsbytheNationalAssembly. 
Sinceestablishmentin2003,theFederalRoadsMaintenanceAgency(FERMA)havemadesignificanteffortstowardseffectiveandefficientmaintenanceofthenationsover35,000kmofFederalHighways. 
Today,theAgencyoperatesfrom12zonaland38statefieldoperationoffice. 
Ministerial Briefing, September 2014 4
Background 
•Thechallengesfrominceptionincludes; 
inheritedhugemaintenancebacklogs. 
fundingchallenges. 
Resultantcallsforthedeclarationofastateofemergencyintheroadsector. 
CURRENTADMINISTRATION`SEFFORTS 
Consequently,Mr.PresidentdirectedthatanaggressiveandstrategicmeasurebeputinplacetomakeourFederalroadsoncemoremotorable. 
ThankGodforthedrive,commitmentandsupportoftheHon. MinisterofWorks. 
Basedonthisinstruction,consideringthatcloseto80%ofthesehighwayswereinastateoftotaldisrepair. 5 Ministerial Briefing, September 2014
Background 
Theyhaveexceededdesignlifespanandgenerallyweakandolddistressedpavements. 
Stillexposedtoexcessaxleloading. 
Ministerial Briefing, September 2014 6
Current Administration 
ThusthecurrentFERMAmanagementinSeptember2011,developedablueprint(RapidRoadRecoveryBlueprint-RRRB)thatsetsouttheAgency’sRoadMaintenancePlanfor2011to2015: 
Appropriateinstitutionalframeworkwasputinplacetocopewiththischallenge. 
Ministerial Briefing, September 2014 7
Current Administration 
AggressiveResponsebytheCurrentAdministration 
Thefollowingaggressiveresponsewasadopted. 
FlaggedoffthePreventiveRoadMaintenanceProgrammeatvariouszonesnationwide,. 
EstablishedaSurveillanceandEffectiveMonitoringUnit. 
AcquiredadditionalstateoftheartroadMaintenanceequipment(patchers,backhoesetc). 
ReorganizedtheResearchandDevelopmentUnittodevelopallyearroundworkmaterialsfordistributionanduse–coldAsphalt. 
Ministerial Briefing, September 2014 8
Current Administration 
DevelopedandestablishedthePublicWorksUnittomobilizeunemployedNigerianyouthsalongFederalroadsalignmentsforroutineMaintenanceworks. 
FlaggedofftheZeropotholeinitiative. 
CommencedandsustainedthereorientationofourEngineersatvariousZonestoimproveonproductivityandembracegoodworkethics. 
CommencedthequarterlyRoadsandprojectsmonitoringprogramme. 
CommencedtheStakeholdersinteractivemeeting(NARTO,PTD)etc. 
Ministerial Briefing, September 2014 9
Current Administration 
EstablishedFederalRoadsCommitteeonSurveillanceandActionAgainstRoadAbuse(FERCSARA). 
Installedandcommissioned3Nos.80TPHAsphaltPlantsforquickaccesstoAsphalticConcreteinLagos,AbujaandOshogbo. 
Prioritizingofmaintenanceprogrammes–Takingeconomicroadsfirst. 
(Photographicrepresentationoftheabovestrategieswillbeshowninsubsequentslides) 
Ministerial Briefing, September 2014 10
Current Administration 
Otherstrategiesexploredforsustainableroadmaintenanceprogrammeinclude: 
i.Comprehensivepavementmanagementsystem(PMS) 
DeployingFallingWeightDeflectometer(FWD),RoadRoughness, andDynamicConePenetrometerequipmentfordatagatheringtoinformdecisionmakingandcosteffectiveroadmanagement. 
ii.AreaManagementContracts 
Contractingoutmaintenanceworksonaspecifiedkmofroadtocompetentandequippedcontractorsforafixedtermperiod. 
iii.Alternativefunding. 
IVTC,RoWbillboards(aswillbeapprovedbyrelevantauthorities), andMOToptionsetc. 
Ministerial Briefing, September 2014 11
SUMMARY OF CURRENT ROAD MAINTENANCE TRANSFORMATION PROGRAMME: 
•Proactive Recovery of Federal roads in bad conditions. 
•Acquisition of all in one state of the art BergkampMobile pothole patchers –38 Nos. 
•Operational use of 2No 80TPH Asphalt plant –Kuje& Lagos. 
•Regular use of over 40No. Mini Asphalt plants. 
•Production of Cold Asphalt for all year round maintenance work. 
•Blending of Emulsion for regular use at sites. 
•Inauguration of the Public Works Programme/SURE P. 
•Road Surveillance Unit for proactive maintenance. 
•General reorientation and workforce motivation. 
•Selective Emergency Intervention Works nationwide. 
•Selective Pavement Strengthening (overlay) programme. 
•Progressive repairs and replacement of damaged/vandalized hydraulic structures, bridge handrails and road signs. 12
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
NORTH CENTRAL ZONE 
1 
SPECIALREPAIRS & PAVEMENT STRENGTHENINGOF SECTIONSOF MOKWA - TEGINA ROAD 
2 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG AKWANGA -KEFFI ROAD IN NASARAWA STATE 
3 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG KATSINA –ALA – TAKUM –KONA BAISSA ROADPHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS 
13
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
NORTH EAST ZONE 
1 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG MAYOBELWA –JADA – GANYE ROAD 
2 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG GOMBE -BILLIRI –FILLIYA ROAD IN GOMBE STATE 
3 
GENERAL MAINTENANCE REPAIRS & PAVEMENT STRENGTHENING OF SECTIONS ALONG GOMBE - POTISKUM ROAD, SECTION II(KM.80+000 -KM.124+000) IN YOBE STATE 14 
PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
NORTH WEST ZONE 
1 
KANO -ZARIA ROAD (KM.0+000 -KM.86+000) SECTION I KANO STATE 
2 
EMERGENCY REPAIRS OF WASHOUT AT KM.22+000 ALONG BAGUDO -TUGA - KAOJE ROAD IN KEBBI STATE 
3 
SECTIONS OF KADUNA - BIRNIN GWARI ROAD IN KADUNA STATE 
15 
PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
SOUTH EAST ZONE 
1 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG 9TH MILE – AWKA (OLD ROAD) IN ANAMBRA STATE 
2 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG UMUAHIA – BENDE ROAD 
3 
GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG YAHE –ABAKALIKI – NKALAGU –ENUGU ROAD 16 
PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
SOUTH SOUTHZONE 
1 
GENERAL REPAIRS AND PAVEMENT STRENGTHENING (OVERLAY) OF SECTIONS ALONG OGOJA –OBUDU ROAD 
2 
GENERAL REPAIRS AND PAVEMENT STRENGTHENING (OVERLAY) OF SECTIONS ALONG AHOADA –ABUA -DEGEMA ROAD 
3 
GENERAL REPAIRS AND PAVEMENT STRENGHTENING (OVERLAY) OF SECTIONS ALONG AMUKPE-ABRAKA-UMUTU- AGBOR-UROMI ROAD 
17 
PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
S/N 
DESCRIPTION 
BEFORE 
DURING 
AFTER 
SOUTH WEST ZONE 
1 
GENERAL REPAIRS OF SECTIONS ALONG ITAWURE -ESA OKE JUNCTION OSUN STATE BORDER ROAD IN EKITI STATE 
2 
OLD ABEOKUTA ROAD IN LAGOS STATE 
3 
REPAIRS OF IJORA COURSE WAY, LAGOS STATE (FAILED SECTIONS) 
18 
PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
NORTH CENTRAL ZONE1. POTHOLE PATCHING ALONG MAKURDI –GBOKO –YANDEV ROAD (CH.0+000 –CH.82+000) IN BENUE STATE 
19
NORTH CENTRAL ZONE2. GENERAL REPAIRS OF SECTIONS ALONG KABBA –ISANLU –EGBE ROAD (INCLUDING ABU BRIDGE) IN KOGI STATE 
20
NORTH EAST ZONE1. SPECIAL MAINTENANCE REPAIRS ALONG NGURORE -MAYOBELWA ROAD CH. 18+000 –CH. 44+000 IN ADAMAWA STATE. 21
NORTH EAST ZONE 2. EMERGENCY REPAIRS OF GOMBE –NUMAN ROAD (KM. 136 + 400 –KM. 145 + 200) IN GOMBE STATE. 
22
NORTH WEST ZONE1. SPECIAL GENERAL MAINTENANCE OF SECTIONS OF KAFFIN MAIYAKI –TUDUN WADA – SAMINAKA ROAD IN KANO STATE 
23
NORTH WEST ZONE 2. EMERGENCY REPAIRS OF EMBANKMENT WASHOUT AT KM.16+200-KM.19+500 AND KM.35+100 ALONG RIJAU-RIBAH-WASAGU ROAD IN KEBBI STATE 
24
SOUTH EAST ZONE1. GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG OWERRI –OKIGWE ROAD IN IMO STATE 
25
SOUTH EAST ZONE 2. REPAIRS OF FAILED SECTIONS ALONG OWUTU –AMASIRI –OKPOSI –UBURU ROAD IN EBONYI STATE 
26
SOUTH SOUTH ZONE 
1. EXPANSION OF MBIAMA – YENAGOA ROAD, BAYELSA STATE. 
27
SOUTH SOUTH ZONE 2. GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG EWU –UROMI –AGBOR ROAD IN EDO STATE 
28
SOUTH WEST ZONE 1. MAINTENANCE REPAIRS OF FAILED SECTIONS ALONG ILESHA –IJEBU JESA ROAD IN OSUN STATE 
29
SOUTH WEST ZONE SPECIAL REPAIRS OF CRITICAL SECTIONS ALONG ADO-IKERE-ONDO STATE BORDER ROAD (CH 14+000 -CH 25 + 000) IN EKITI STATE 
30
(1) Reinstatement of Collapsed 7-Cell Box Culvert at 
CH.11+850 & CH.12+850 along Katsina – Kano highway & 
provision of 2 bridges & approach roads. 
(2) Reinstatement of Embankment washout & collapsed 3- 
cell culvert at KM.34+200 along Gombe – Bauchi road, 
Gombe state – In progress. 
(3) Washout at culvert locations at CH.0+450 along Kaduna 
Western Bypass Road – In progress. 
(4) Reinstatement of submerged box culvert and 
approaches at Ch. 29+500 along Asaba – Ebu – Ilushi 
Road, Delta state – In progress. 
Photographs in subsequent slides. 
31 
FERMA EMERGENCY INTERVENTION WORKS ON 
ROAD WASHOUTS & BRIDGES
(5)WashoutBridgeApproachandEmbankmentatCH.0+100(ShendamBridge)alongShendam–Yelwa–IbiroadinPlateaustate. 
(6)WashoutBridgeEmbankmentatCH15+025(LalinBridge)alongLangtang–Lalin–Tunkus–ShendamRoadinPlateaustate. 
(7)ReinstatementofEmbankmentwashoutatCH.39+050alongZaria– PambeguaroadinKadunastate. 
(8)ProvisionofRCPilebridge(75mlong)&1kmroadaccessacrossKolocreekatKolotown,Bayelsastate–Inprogress. 
(9)ReinstatementoffailedembankmentandvandalisedhandrailsatNjabaBridge,alongOwerri–Orluroad,Imostate. 
(10)Reinstatementofwashout&collapsedtriplecellculvertatKM10+500(4thInterchange)Enugu–PortHarcourtDualCarriageway. Completed. 
FERMA EMERGENCY INTERVENTION WORKS ON ROAD WASHOUTS & BRIDGES 
32
REINSTATEMENT OF COLLAPSED 7-CELL BOX CULVERT AT CH.11+850 & CH.12+850 ALONG KANO –KATSINA HIGHWAY 33
REINSTATEMENT OF EMBANKMENT WASHOUT AND COLLAPSED 3-CELL 
CULVERT AT KM.34+200 ALONG GOMBE – BAUCHI HIGHWAY – IN PROGRESS 
34
REINSTATEMENT OF SUBMERGED BOX CULVERT AND APPROACHES AT CH.29+500 
ALONG ASABA – ILLAH – ILLUSHI ROAD, DELTA STATE – IN PROGRESS 
35
WASHOUT BRIDGE APPROACH REPAIRS AND EMBANKMENT REINSTATEMENT AT CH0+100 (SHENDAM BRIDGE) ALONG SHENDAM –YELWA –IBI ROAD IN PLATEAU STATE 
36
EMERGENCY REINSTATEMENT OF WASHOUT BRIDGE APPROACH AND EMBANKMENT ALONG LANGTANG –LALIN –TUNKUS –SHENDAM ROAD CH 15 + 025 IN PLATEAU STATE 
37
REINSTATEMENT OF EMBANKMENT WASHOUT AT CH 39+050 ALONG ZARIA - PAMBEGUA ROAD IN KADUNA STATE 
38
PROVISION OF REINFORCED CONCRETE PILE BRIDGE (75m LONG) AND 1KM 
LINK ROAD ACROSS KOLO CREEK AT KOLO TOWN IN BAYELSA STATE – IN 
PROGRESS 
39
NJABA BRIDGE, ALONG OWERRI –ORLU ROAD, IMO STATE 
40
REINSTATEMENT OF WASHOUT AND COLLAPSED OF TRIPLE CELL CULVERT AT KM 10+500 (4THINTERCHANGE) ENUGU –PORT HARCOURT DUAL CARRIAGEWAY 
41
Table Showing Conditions of Federal Roads in 2011 & 2013 
Condition 
2011(%KM) 
2013(%KM) 
Good 
52%(17,742KM) 
Over 75%(25,600KM) 
Bad 
48%(16,378KM) 
25%(8,520KM) 
42
MOVEMENT OF GAS TURBINE FROM ONNE PORT 
TO KADUNA POWER PLANT 
43 
TAKE OFF POINT FOR THE TURBINE MOVEMENT FROM ONNE PORT, PH TO KADUNA
MOVEMENT OF GAS TURBINE FROM ONNE PORT 
TO KADUNA POWER PLANT 
ARRIVAL OF THE FINAL TRIP AT KADUNA 44
FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION 
AGAINST ROAD ABUSE (FERCSARA) 
45 
In response to an urgent need to address the abuses 
and bad behavior exhibited on the road network the 
Agency has recently inaugurated a Federal Roads 
Committee on Surveillance and Action Against Road 
Abuse(FERCSARA). The membership comprises of ; 
 FERMA Headquaters and Zonal officers, 
 Federal Ministry of Works(Highways) officers, 
 Nigerian Army Engineers, 
 Nigerian Police Force (NPF), 
 Federal Roads Safety Corps (FRSC), 
 National Union of Road Transport Workers (NUTRW), 
 National Security and Civil Defense Corps, and 
 Local Government works officials
FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION 
AGAINST ROAD ABUSE (FERCSARA) 
46 
The Committee is responsible for; 
identifying major abuses and proffering solutions 
 monitoring occurrences of road abuse and carry out 
corrective measures 
 liaising with law enforcement agencies to ensure the 
reinstatement and replacement of damaged carriageway 
and road furniture 
collaborating with appropriate law enforcement agencies 
for the enforcement of relevant extant rules and regulations 
on willful damage to government properties in the road 
infrastructure sub sector. 
 liaising with relevant stakeholders to stop further abuses 
and ensure sustenance of good road usage by motorists. 
 cause arrest to be made where necessary. 
 discourage major haulage companies from deliberate 
overloading and indiscriminate parking.
FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION 
AGAINST ROAD ABUSE (FERCSARA) 
47 REMOVAL OF SHOULDER ENCHROACHMENT IN PROGRESS
OTHER INTERVENTION WORKS 
48
REINSTATEMENT OF EMBANKMENT WASHOUT/COLLAPSED WING WALLS AND APRON AT CH.44+350 ALONG ZARIA-PAMBEGUA ROAD IN KADUNA STATE 
49
KM.29+788 –KM.29+020 ALONG MBIAMA –YENAGOA ROAD (DUAL CARRIAGEWAY) 
50
REINSTATEMENT OF WASHOUTED ROAD EMBANKMENT AT CH.124+500 (AUCHI TOWNSHIP) ALONG BENIN –AUCHI –OKENE ROAD IN EDO STATE 
51
CONSTRUCTED RC LINED DRAIN AT KM13+800 AT CH.4+300 –CH.4+800(LHS) ALONG DIKKO –MAJEROAD IN NIGER STATE 
52
ROAD SUPPORT SERVICES 
53 
 Equipment 
 Observation & Service camps 
 State Field Offices construction 
 Highway & Bridges Illumination
MOBILE POTHOLE PATCHER 
54 
BERGKAMP FP5 MOBILE POTHOLE PATCHERS
MOBILE POTHOLE PATCHER IN OPERATION AT THIRD MAINLAND BRIDGE, LAGOSMOBILE POTHOLE PATCHERS AT WORK 
MOBILE POTHOLE PATCHER IN OPERATION ALONG ABUJA –KADUNA DUAL CARRIAGEWAY 
55
MOBILE POTHOLE PATCHERS AT WORK 
MOBILE POTHOLE PATCHER IN OPERATION ALONG ABUJA –KEFFI DUAL CARRIAGEWAY 
56
80TPH ASPHALT PLANT INSTALLED AT ABUJA, LAGOS, OSOGBO WHILE 4 OTHERS ARE AT VARIOUS STAGES OF INSTALLATIONS 40 MINI ASPHALT PLANT DEPLOYED TO VARIOUS FIELD OFFICES NATIONWIDE 
57
COLD ASPHALT PRODUCTION Product of FERMA R&D for proactive intervention works6 MONTH OLD COLDASPHALTBAGGED COLD ASPHALTPRIMING & OVERLAY WITH COLD ASPHALTPRIMING & OVERLAY WITH COLD ASPHALTAGGREGATE BLENDING FOR COLD ASPHALT PRODUCTIONCOLD ASPHALT PRODUCTION IN PROGRESS 
58
OBSERVATION & SERVICE CAMP Built by FERMA to provide emergency services to road users, utilised by the FERMA, Police,& FRSCRECENTLY COMPLETED OBERVATION & SERVICE CAMP ALONG AKURE –ADO EKITI ROAD (KM.7+400) ITAOGBOLU, ONDO STATERECENTLY COMPLETED OBERVATION CAMP AT ODUKPANI, CROSS RIVER STATE 
59
www.ferma.gov.ng 
SOME PICTURES OF OBSERVATION & SERVICE CAMPS CONSTRUCTION 
OBSERVATION CAMP AT ELELE, RIVERS STATE OBSERVATION & SERVICE CAMP AT AGO ARE, OYO STATE 
OBSERVATION CAMP AT AKWANGA ,NASARAWA STATE OBSERVATION CAMP AT IGBO UKWU, ANAMBRA STATE 
60
www.ferma.gov.ng 
SOME PICTURES OF TRAILER PARKS & FIELD OFFICES CONSTRUCTION 
FENCING OF STATE FIELD OFFICE, AWKA, ANAMBRA STATE FENCING OF TRAILER PARK AT AKINYELE, OYO STATE 
STATE FIELD OFFICE CONSTRUCTION AT LAFIA COMPLETED STATE FIELD OFFICE AT ZAMFARA 
61
HIGHWAY /BRIDGE LIGHTING 
LIGHTING OF THIRD MAINLAND BRIDGE 
62
www.ferma.gov.ng 
SOLAR POWERED LIGHTING AT KEFFI 
INTERCHANGE, NASARAWA 
SOME HIGHWAY/BRIDGE LIGHTING PROJECTS 
PROCURED ALTEC L37 M STREETLIGHTS 
PLAT FORM IN USE AT JOS 
63
www.ferma.gov.ng 
LIGHTING ON NIGER BRIDGE, 
ONITSHA/ASABA 
HIGHWAY LIGHTING ALONG KADUNA 
WESTERN BYPASS 
SOME HIGHWAY/BRIDGE LIGHTING PROJECTS 
64
SOME FERMA –SURE P ACTIVITIES 
65
PREAMBLE: 
Overtheyears,hugeinvestmentshavebeenmadeonroads& bridgeswithoutadequatemaintenanceprogrammesputinplace. Rather,expensivecorrectivemeasuresafterfailurewasthepractice. 
FERMAPreventiveRoadsMaintenanceOperationsundertheSURE- PPublicWorksProgrammeinvolvesthemobilizationanddeploymentofableandwillingworkforceforroutinedirectlabourmaintenanceworksoncriticalfederalroadsclosetotheirabode. PROGRAMME CONCEPT 
66
OBJECTIVES: PROGRAMME CONCEPT•Prolong the life span of selected roads of high economic impact •Ensure that roads are made safe and motorable all year round•Job creation/Poverty alleviation•Enhance sustainable maintenance culture•Engender community/public ownership and involvement in road works•Improve trust and goodwill between government and the people•Reduce overall huge cost of corrective maintenance contracts 
67
ROAD REPAIRS ALONG ABUJA-KEFFI BY SURE P -FERMA PUBLIC WORKS TEAM 
68
PROVISION AND INSTALLATION OF HIGH-RESISTANT POLYMER NEW JERSEY CRASH-BARRIERS TO REPLACE VANDALIZED/DAMAGED HANDRAILS AT TAFA BRIDGE ALONG KADUNA-ABUJA DUAL CARRIAGEWAY 
69
DESILTING OF BLOCKED DRAINS BY THE SURE P -FERMA PUBLIC WORKS TEAM 
70
MEDIAN VEGETATION CONTROL ALONG ABUJA-KADUNA ROAD BY THE SURE P -FERMA PUBLIC WORKS TEAM 
71
POTHOLE PATCHING USING FP5 BERGKAMP FLAMELESS PATCHER & PAINTING OF PARAPET WALLSAND BRIDGE RAILINGS ON 3RD MAINLAND BRIDGE BY THE SURE P -FERMA PUBLIC WORKS TEAM 
72
ROAD MARKING ALONG ABUJA – KADUNA DUAL CARRIAGEWAY UNDER 
FERMA SURE-P 
73
SOME OF THE KITS AND BASIC HANDTOOLS FOR PUBLIC WORKS 
74
75 
SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM)STATES COVERED1Abuja-Kaduna-Dual307.0FCT -Kaduna2Kaduna-Kano -Dual336.0Kaduna-Kano3Benin-Asaba-Dual266.0Edo-Delta4Enugu-9th Mile-Otukpa93.0Enugu-Benue5Shagamu-Ore -Dual98.0Lagos-Ogun-Ondo6Owerri-Onitsha -Dual88.0Imo-Anambra7Jos-Bauchi112.0Plateau-Bauchi8Benin-Bypass-Warri-Dual138.0Edo-Delta9Partsof Benin-Auchi-Okene176.0Edo-Kogi10Parts of Lokoja-Okene100.0FCT-Kogi11Abuja-Keffi-Akwanga -(Abuja-Keffi -Dual)107.0FCT-Nasarawa12Ikot Ekpene-Odukpani-Calabar90.0AkwaIbom-Cross River
76 
SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM) STATES COVERED13Ibadan-Ilorin Dual130.0Oyo-Kwara14Primary Roads In Yenegoa35.0Bayelsa15Sokoto-Gusau210.0Zamfara-Sokoto16KatsinaAla-ZakiBiam-Wukari95.0Benue-Taraba17Ajaokuta -Itobe -Ayangba56.0Kogi18Ayangba -Ankpa -Ofu (Benue State Border)94.0Kogi19ApapaOworonshoki-Old Toll Gate32.0Lagos203rd Mailand Bridge11.0Lagos21Lagos-Badagry Seme Border Rroad180.0Lagos22Panyam -Shendam85.0Plateau23Abua-Ahoada-Omoke-Egbema129.0Rivers
77 
SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM)STATES COVERED24Okigwe-Afikpo78.0Ebonyi25Owerri-Aba road43.0Imo-Abia26Ibadan-Ife-Ilesha -Dual Carriageway119.0Oyo-Osun27Kotangora-Tegina100.0Niger28Sokoto-Shagari-Tambuwa-KebbiS/B96.0Sokoto29Jalingo Jct. -Mutum Biu -Tella -Wukari Benue S/B226.0Taraba30Ewu-Uromi-Agbor-Sapele197.0Edo-Delta31Igede-Itawure-EfonAlaayeeRoad30.0Ekiti32Ifaki-Ikole-Omuo-KogiS/B Road90.0Ekiti33Bauchi-Gombe Road156.0Bauchi-Gombe34Kano S/B-Birnin Kudu-Bauchi S/B Road88.0Jigawa35Katsina -Kano S/B128.0Katsina36Birnin Kebbi-Argungui Road50.0Kebbi37Yola-Song-Gombi road42.0Adamawa 
Total 
4411
78 
SELECTEDCOST SAVING PROJECTSS/NPROJECT DESCRIPTIONPROPOSED COST (N) EXECUTED COST (N) SAVINGS (N) 1Emergency Works Kano -Katsina Bridge800M556M244M2Emergency Works Mbiama-Yenegoaroad& BridgeOver 3Billion (S/C) 2.7Billion (D/C) 3.3Billion3Emergency Repairs and pavement strenghteningof sections along OnnePort - Kaduna route project for movement of Gas Turbines to Kaduna Power Plant (Enugu Bound) 4Billion1.7Billion2.3BillionCURRENTEFFORTS & KEY PERFORMANCE EVALUATION 1Length of Road with good ridingquality17,742km (2011)27,320km (2013)77%
79 
FERMA FUNDING SUMMARY FOR THE LAST 5 YEARS(2009 –2014) YEARAPPROPRIATION (N)RELEASES (N)SHORT FALL (N) 200943,969,689,656.4243,852,651,223.72-117,038,432.70201062,616,065,053.0051,611,527,557.80-11,004,537,495.20201129,655,265,155.0032,818,510,794.003,163,245,639.00201243,838,424,547.0043,838,404,544.04-20,002.96201339,139,930,827.0027,699,336,797.68-11,440,594,029.32
80
Conclusion 
Then,projectscommencedbutcompletiondatesweremostunrealistic. 
Nowmanyprojectsarecompletedbeforeduedates. 
Then,massiveclearing/earthworksweredoneandpaidfor,thatbecomesonlygulliesaftereachrainyseason. 
Nowpaymentsaremainlyforprotectedworks. 
Then,thecrywastodeclareastateofemergencyonroads. 
Nowtheremarkisthattheroadsarebetter. 
Then,youstartyourtripbutneverpredictarrivaltime. 
Nowyoucanpredictarrivaltimefromorigintodestination. 
Ministerial Briefing, September 2014 81
Conclusion 
Then,passengersdonotfallasleepwhilethedriversmove,duetopotholesanddiscomfort.. 
Now,alongseveralroutes,passengerssleepwhileontour. 
Alothasbeendone 
Moreisrequiredtobedone 
Butputtogether,transformationonroadsubsectorisoutstanding 
anditshowsallover. 
Wearehoweverdeterminedtomovefurtherandforwardtogether 
Ministerial Briefing, September 2014 82
FERMA Emergency Contact lines 
Ministerial Briefing, September 2014 83 
Emergency Call Lines: 
Etisalat –08092656666 
Glo–08155555889 
Airtel–08129999936 
MTN–07067779775
Conclusion 
Ministerial Briefing, September 2014 84 
THANK YOU!!!

More Related Content

Viewers also liked

Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof....
Ministerial Press Briefing 2014 Presentation by the MInister of Power,  Prof....Ministerial Press Briefing 2014 Presentation by the MInister of Power,  Prof....
Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof....
FMINigeria
 

Viewers also liked (7)

Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof....
Ministerial Press Briefing 2014 Presentation by the MInister of Power,  Prof....Ministerial Press Briefing 2014 Presentation by the MInister of Power,  Prof....
Ministerial Press Briefing 2014 Presentation by the MInister of Power, Prof....
 
#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of Environment#MP2014 Presentation by the Federal Minister of Environment
#MP2014 Presentation by the Federal Minister of Environment
 
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
#Mp2014 Presentation by the Federal Ministry of Lands, Housing and Urban Deve...
 
Road asphalt repair material TL-2000
Road asphalt repair material TL-2000Road asphalt repair material TL-2000
Road asphalt repair material TL-2000
 
POTHOLE FIXING UNIT-1
POTHOLE FIXING UNIT-1POTHOLE FIXING UNIT-1
POTHOLE FIXING UNIT-1
 
Asphalt Repair & Maintenance: Do It Yourself vs Hiring A Contractor
Asphalt Repair & Maintenance: Do It Yourself vs Hiring A Contractor Asphalt Repair & Maintenance: Do It Yourself vs Hiring A Contractor
Asphalt Repair & Maintenance: Do It Yourself vs Hiring A Contractor
 
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta AffairsMinisterial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
Ministerial Platform 2014 Presentation by the Ministry of Niger Delta Affairs
 

Similar to 2014 Ministerial Press Briefing Presentation by FERMA

Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
FMINigeria
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
Sven Maedler
 
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
Gibson Ali Holemba
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
Functional Eco
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
Sven Maedler
 
Informe mejoramieto de la via
Informe mejoramieto de la viaInforme mejoramieto de la via
Informe mejoramieto de la via
EDWINMOISES1
 
Leaside - Laird Construction Liaison Committee Meeting - May 2018
Leaside - Laird Construction Liaison Committee Meeting - May 2018Leaside - Laird Construction Liaison Committee Meeting - May 2018
Leaside - Laird Construction Liaison Committee Meeting - May 2018
Crosstown TO
 

Similar to 2014 Ministerial Press Briefing Presentation by FERMA (20)

Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
Presentation of the Hon. Minister of Works, Mike Onolememen at the #MP2013
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
2014 FINAL QUARTER BUDGET REVIEW, Morobe Province, Laguna Hotel, NCD
 
Kenya Railways SGR presentation
Kenya Railways SGR presentationKenya Railways SGR presentation
Kenya Railways SGR presentation
 
GenCvsV&a1502
GenCvsV&a1502GenCvsV&a1502
GenCvsV&a1502
 
#MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works #MP2014: MInisterial Press Briefing by the Minister of Works
#MP2014: MInisterial Press Briefing by the Minister of Works
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
 
St. Johns Street Efficiency Improvements
St. Johns Street Efficiency ImprovementsSt. Johns Street Efficiency Improvements
St. Johns Street Efficiency Improvements
 
Road
RoadRoad
Road
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
 
Small dam projects in pakistan
Small dam projects in pakistanSmall dam projects in pakistan
Small dam projects in pakistan
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
 
Turkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream RestorationTurkey Run at Truro Subdivision Stream Restoration
Turkey Run at Truro Subdivision Stream Restoration
 
constr.pptx
constr.pptxconstr.pptx
constr.pptx
 
IFCDflood
IFCDfloodIFCDflood
IFCDflood
 
Informe mejoramieto de la via
Informe mejoramieto de la viaInforme mejoramieto de la via
Informe mejoramieto de la via
 
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsMinister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
 
Mason Neck Trail - Segment 2B
Mason Neck Trail - Segment 2BMason Neck Trail - Segment 2B
Mason Neck Trail - Segment 2B
 
Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019Pharmacy kennedy clc meeting- april 30, 2019
Pharmacy kennedy clc meeting- april 30, 2019
 
Leaside - Laird Construction Liaison Committee Meeting - May 2018
Leaside - Laird Construction Liaison Committee Meeting - May 2018Leaside - Laird Construction Liaison Committee Meeting - May 2018
Leaside - Laird Construction Liaison Committee Meeting - May 2018
 

More from FMINigeria

#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
FMINigeria
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P
FMINigeria
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC
FMINigeria
 
#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund
FMINigeria
 
#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence
FMINigeria
 
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
FMINigeria
 
#MP2013 Presentation of the Minister of National Planning Commission
#MP2013 Presentation of the Minister of National Planning Commission#MP2013 Presentation of the Minister of National Planning Commission
#MP2013 Presentation of the Minister of National Planning Commission
FMINigeria
 
#MP2013 Presentation of the Acting Executive Secretary of TETFund
#MP2013 Presentation of the Acting Executive Secretary of TETFund#MP2013 Presentation of the Acting Executive Secretary of TETFund
#MP2013 Presentation of the Acting Executive Secretary of TETFund
FMINigeria
 
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
FMINigeria
 

More from FMINigeria (20)

2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...2014 Ministerial  Press Briefing by the Office The Surveyor-General Of The Fe...
2014 Ministerial Press Briefing by the Office The Surveyor-General Of The Fe...
 
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
#MP2014: Presentation by the Minister of Water Resources, Mrs. Sarah Ochekpa
 
Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...Communique issued at the 42nd Meeting of the National Council On Information ...
Communique issued at the 42nd Meeting of the National Council On Information ...
 
#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P#MP2013 Presentation of SURE-P
#MP2013 Presentation of SURE-P
 
#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC#MP2013 Presentation of NDDC
#MP2013 Presentation of NDDC
 
#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund#MP2013 Presentation of Petroleum Development Trust Fund
#MP2013 Presentation of Petroleum Development Trust Fund
 
#MP2013 Presentation of the MInister of Power
#MP2013  Presentation of the MInister of Power#MP2013  Presentation of the MInister of Power
#MP2013 Presentation of the MInister of Power
 
#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum Resources#MP2013 Presentation of the Minister of Petroleum Resources
#MP2013 Presentation of the Minister of Petroleum Resources
 
#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of Information#MP2013 Presentation of the Minister of Information
#MP2013 Presentation of the Minister of Information
 
#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence#MP2013 Presentation of the Minister of State for Defence
#MP2013 Presentation of the Minister of State for Defence
 
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
#MP2013 Presentation by the Minister of Tourism, Culture & National Orientation
 
#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of Justice#MP2013 Presentation of the Ministry of Justice
#MP2013 Presentation of the Ministry of Justice
 
#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation#MP2013 Presentation of the Minister of Aviation
#MP2013 Presentation of the Minister of Aviation
 
#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women Affairs#MP2013 Presentation of the Minister of Women Affairs
#MP2013 Presentation of the Minister of Women Affairs
 
#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.#MP2013 Presentation of the Minister of Youth Development.
#MP2013 Presentation of the Minister of Youth Development.
 
#MP2013 Presentation of the Minister of Foreign Affairs
#MP2013 Presentation of the Minister of Foreign Affairs#MP2013 Presentation of the Minister of Foreign Affairs
#MP2013 Presentation of the Minister of Foreign Affairs
 
#MP2013 Presentation of the Minister of National Planning Commission
#MP2013 Presentation of the Minister of National Planning Commission#MP2013 Presentation of the Minister of National Planning Commission
#MP2013 Presentation of the Minister of National Planning Commission
 
#MP2013 Presentation of the Acting Executive Secretary of TETFund
#MP2013 Presentation of the Acting Executive Secretary of TETFund#MP2013 Presentation of the Acting Executive Secretary of TETFund
#MP2013 Presentation of the Acting Executive Secretary of TETFund
 
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
#MP2013 Presentation of the Universal Basic Education Commission (UBEC)
 
#MP2013 Presentation of the Senior Special Assistant to the President on the ...
#MP2013 Presentation of the Senior Special Assistant to the President on the ...#MP2013 Presentation of the Senior Special Assistant to the President on the ...
#MP2013 Presentation of the Senior Special Assistant to the President on the ...
 

Recently uploaded

VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
adilkhan87451
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
nehasharma67844
 
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
Hinjewadi * VIP Call Girls Pune | Whatsapp No 8005736733 VIP Escorts Service ...
 
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...Call Girls in  Sarita Vihar Delhi Just Call 👉👉9873777170  Independent Female ...
Call Girls in Sarita Vihar Delhi Just Call 👉👉9873777170 Independent Female ...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
call girls in Raghubir Nagar (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service ...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 

2014 Ministerial Press Briefing Presentation by FERMA

  • 1. MINISTERIAL PRESS BRIEFING FMW – SUMMARY OF FERMA ACTIVITIES Ministerial Briefing, September 2014 1
  • 2. Outline •Introduction(Background) •Current Administration (Transformation) –Strategies and Actions –Results and achievements –Work Photographs –Video •Conclusion Ministerial Briefing, September 2014 2
  • 3. FERMA is committed to a consistent preventive road maintenance culture through intensive surveillance, monitoring and repairs. Ministerial Briefing, September 2014 3
  • 4. Introduction FERMAEstablishmentandMandate TheFederalRoadsMaintenanceAgency(FERMA)wasestablishedonNovember30th2002byanActoftheNationalAssemblycitedastheFederalRoadsMaintenanceAgency(Establishment,etc.)Act2002andanAmendmentAct2007. TheAgency’smandateistoensuretheefficientandeffectivemaintenanceofallexistingFederaltrunkroadsorsuchotherroadsasmaybedeclared,fromtimetotime,asFederaltrunkroadsbytheNationalAssembly. Sinceestablishmentin2003,theFederalRoadsMaintenanceAgency(FERMA)havemadesignificanteffortstowardseffectiveandefficientmaintenanceofthenationsover35,000kmofFederalHighways. Today,theAgencyoperatesfrom12zonaland38statefieldoperationoffice. Ministerial Briefing, September 2014 4
  • 5. Background •Thechallengesfrominceptionincludes; inheritedhugemaintenancebacklogs. fundingchallenges. Resultantcallsforthedeclarationofastateofemergencyintheroadsector. CURRENTADMINISTRATION`SEFFORTS Consequently,Mr.PresidentdirectedthatanaggressiveandstrategicmeasurebeputinplacetomakeourFederalroadsoncemoremotorable. ThankGodforthedrive,commitmentandsupportoftheHon. MinisterofWorks. Basedonthisinstruction,consideringthatcloseto80%ofthesehighwayswereinastateoftotaldisrepair. 5 Ministerial Briefing, September 2014
  • 8. Current Administration AggressiveResponsebytheCurrentAdministration Thefollowingaggressiveresponsewasadopted. FlaggedoffthePreventiveRoadMaintenanceProgrammeatvariouszonesnationwide,. EstablishedaSurveillanceandEffectiveMonitoringUnit. AcquiredadditionalstateoftheartroadMaintenanceequipment(patchers,backhoesetc). ReorganizedtheResearchandDevelopmentUnittodevelopallyearroundworkmaterialsfordistributionanduse–coldAsphalt. Ministerial Briefing, September 2014 8
  • 9. Current Administration DevelopedandestablishedthePublicWorksUnittomobilizeunemployedNigerianyouthsalongFederalroadsalignmentsforroutineMaintenanceworks. FlaggedofftheZeropotholeinitiative. CommencedandsustainedthereorientationofourEngineersatvariousZonestoimproveonproductivityandembracegoodworkethics. CommencedthequarterlyRoadsandprojectsmonitoringprogramme. CommencedtheStakeholdersinteractivemeeting(NARTO,PTD)etc. Ministerial Briefing, September 2014 9
  • 10. Current Administration EstablishedFederalRoadsCommitteeonSurveillanceandActionAgainstRoadAbuse(FERCSARA). Installedandcommissioned3Nos.80TPHAsphaltPlantsforquickaccesstoAsphalticConcreteinLagos,AbujaandOshogbo. Prioritizingofmaintenanceprogrammes–Takingeconomicroadsfirst. (Photographicrepresentationoftheabovestrategieswillbeshowninsubsequentslides) Ministerial Briefing, September 2014 10
  • 11. Current Administration Otherstrategiesexploredforsustainableroadmaintenanceprogrammeinclude: i.Comprehensivepavementmanagementsystem(PMS) DeployingFallingWeightDeflectometer(FWD),RoadRoughness, andDynamicConePenetrometerequipmentfordatagatheringtoinformdecisionmakingandcosteffectiveroadmanagement. ii.AreaManagementContracts Contractingoutmaintenanceworksonaspecifiedkmofroadtocompetentandequippedcontractorsforafixedtermperiod. iii.Alternativefunding. IVTC,RoWbillboards(aswillbeapprovedbyrelevantauthorities), andMOToptionsetc. Ministerial Briefing, September 2014 11
  • 12. SUMMARY OF CURRENT ROAD MAINTENANCE TRANSFORMATION PROGRAMME: •Proactive Recovery of Federal roads in bad conditions. •Acquisition of all in one state of the art BergkampMobile pothole patchers –38 Nos. •Operational use of 2No 80TPH Asphalt plant –Kuje& Lagos. •Regular use of over 40No. Mini Asphalt plants. •Production of Cold Asphalt for all year round maintenance work. •Blending of Emulsion for regular use at sites. •Inauguration of the Public Works Programme/SURE P. •Road Surveillance Unit for proactive maintenance. •General reorientation and workforce motivation. •Selective Emergency Intervention Works nationwide. •Selective Pavement Strengthening (overlay) programme. •Progressive repairs and replacement of damaged/vandalized hydraulic structures, bridge handrails and road signs. 12
  • 13. S/N DESCRIPTION BEFORE DURING AFTER NORTH CENTRAL ZONE 1 SPECIALREPAIRS & PAVEMENT STRENGTHENINGOF SECTIONSOF MOKWA - TEGINA ROAD 2 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG AKWANGA -KEFFI ROAD IN NASARAWA STATE 3 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG KATSINA –ALA – TAKUM –KONA BAISSA ROADPHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS 13
  • 14. S/N DESCRIPTION BEFORE DURING AFTER NORTH EAST ZONE 1 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG MAYOBELWA –JADA – GANYE ROAD 2 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG GOMBE -BILLIRI –FILLIYA ROAD IN GOMBE STATE 3 GENERAL MAINTENANCE REPAIRS & PAVEMENT STRENGTHENING OF SECTIONS ALONG GOMBE - POTISKUM ROAD, SECTION II(KM.80+000 -KM.124+000) IN YOBE STATE 14 PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
  • 15. S/N DESCRIPTION BEFORE DURING AFTER NORTH WEST ZONE 1 KANO -ZARIA ROAD (KM.0+000 -KM.86+000) SECTION I KANO STATE 2 EMERGENCY REPAIRS OF WASHOUT AT KM.22+000 ALONG BAGUDO -TUGA - KAOJE ROAD IN KEBBI STATE 3 SECTIONS OF KADUNA - BIRNIN GWARI ROAD IN KADUNA STATE 15 PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
  • 16. S/N DESCRIPTION BEFORE DURING AFTER SOUTH EAST ZONE 1 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG 9TH MILE – AWKA (OLD ROAD) IN ANAMBRA STATE 2 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG UMUAHIA – BENDE ROAD 3 GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG YAHE –ABAKALIKI – NKALAGU –ENUGU ROAD 16 PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
  • 17. S/N DESCRIPTION BEFORE DURING AFTER SOUTH SOUTHZONE 1 GENERAL REPAIRS AND PAVEMENT STRENGTHENING (OVERLAY) OF SECTIONS ALONG OGOJA –OBUDU ROAD 2 GENERAL REPAIRS AND PAVEMENT STRENGTHENING (OVERLAY) OF SECTIONS ALONG AHOADA –ABUA -DEGEMA ROAD 3 GENERAL REPAIRS AND PAVEMENT STRENGHTENING (OVERLAY) OF SECTIONS ALONG AMUKPE-ABRAKA-UMUTU- AGBOR-UROMI ROAD 17 PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
  • 18. S/N DESCRIPTION BEFORE DURING AFTER SOUTH WEST ZONE 1 GENERAL REPAIRS OF SECTIONS ALONG ITAWURE -ESA OKE JUNCTION OSUN STATE BORDER ROAD IN EKITI STATE 2 OLD ABEOKUTA ROAD IN LAGOS STATE 3 REPAIRS OF IJORA COURSE WAY, LAGOS STATE (FAILED SECTIONS) 18 PHOTOGRAPHS OF SOME EXECUTED ROAD MAINTENANCE PROJECTS
  • 19. NORTH CENTRAL ZONE1. POTHOLE PATCHING ALONG MAKURDI –GBOKO –YANDEV ROAD (CH.0+000 –CH.82+000) IN BENUE STATE 19
  • 20. NORTH CENTRAL ZONE2. GENERAL REPAIRS OF SECTIONS ALONG KABBA –ISANLU –EGBE ROAD (INCLUDING ABU BRIDGE) IN KOGI STATE 20
  • 21. NORTH EAST ZONE1. SPECIAL MAINTENANCE REPAIRS ALONG NGURORE -MAYOBELWA ROAD CH. 18+000 –CH. 44+000 IN ADAMAWA STATE. 21
  • 22. NORTH EAST ZONE 2. EMERGENCY REPAIRS OF GOMBE –NUMAN ROAD (KM. 136 + 400 –KM. 145 + 200) IN GOMBE STATE. 22
  • 23. NORTH WEST ZONE1. SPECIAL GENERAL MAINTENANCE OF SECTIONS OF KAFFIN MAIYAKI –TUDUN WADA – SAMINAKA ROAD IN KANO STATE 23
  • 24. NORTH WEST ZONE 2. EMERGENCY REPAIRS OF EMBANKMENT WASHOUT AT KM.16+200-KM.19+500 AND KM.35+100 ALONG RIJAU-RIBAH-WASAGU ROAD IN KEBBI STATE 24
  • 25. SOUTH EAST ZONE1. GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG OWERRI –OKIGWE ROAD IN IMO STATE 25
  • 26. SOUTH EAST ZONE 2. REPAIRS OF FAILED SECTIONS ALONG OWUTU –AMASIRI –OKPOSI –UBURU ROAD IN EBONYI STATE 26
  • 27. SOUTH SOUTH ZONE 1. EXPANSION OF MBIAMA – YENAGOA ROAD, BAYELSA STATE. 27
  • 28. SOUTH SOUTH ZONE 2. GENERAL MAINTENANCE REPAIRS OF SECTIONS ALONG EWU –UROMI –AGBOR ROAD IN EDO STATE 28
  • 29. SOUTH WEST ZONE 1. MAINTENANCE REPAIRS OF FAILED SECTIONS ALONG ILESHA –IJEBU JESA ROAD IN OSUN STATE 29
  • 30. SOUTH WEST ZONE SPECIAL REPAIRS OF CRITICAL SECTIONS ALONG ADO-IKERE-ONDO STATE BORDER ROAD (CH 14+000 -CH 25 + 000) IN EKITI STATE 30
  • 31. (1) Reinstatement of Collapsed 7-Cell Box Culvert at CH.11+850 & CH.12+850 along Katsina – Kano highway & provision of 2 bridges & approach roads. (2) Reinstatement of Embankment washout & collapsed 3- cell culvert at KM.34+200 along Gombe – Bauchi road, Gombe state – In progress. (3) Washout at culvert locations at CH.0+450 along Kaduna Western Bypass Road – In progress. (4) Reinstatement of submerged box culvert and approaches at Ch. 29+500 along Asaba – Ebu – Ilushi Road, Delta state – In progress. Photographs in subsequent slides. 31 FERMA EMERGENCY INTERVENTION WORKS ON ROAD WASHOUTS & BRIDGES
  • 32. (5)WashoutBridgeApproachandEmbankmentatCH.0+100(ShendamBridge)alongShendam–Yelwa–IbiroadinPlateaustate. (6)WashoutBridgeEmbankmentatCH15+025(LalinBridge)alongLangtang–Lalin–Tunkus–ShendamRoadinPlateaustate. (7)ReinstatementofEmbankmentwashoutatCH.39+050alongZaria– PambeguaroadinKadunastate. (8)ProvisionofRCPilebridge(75mlong)&1kmroadaccessacrossKolocreekatKolotown,Bayelsastate–Inprogress. (9)ReinstatementoffailedembankmentandvandalisedhandrailsatNjabaBridge,alongOwerri–Orluroad,Imostate. (10)Reinstatementofwashout&collapsedtriplecellculvertatKM10+500(4thInterchange)Enugu–PortHarcourtDualCarriageway. Completed. FERMA EMERGENCY INTERVENTION WORKS ON ROAD WASHOUTS & BRIDGES 32
  • 33. REINSTATEMENT OF COLLAPSED 7-CELL BOX CULVERT AT CH.11+850 & CH.12+850 ALONG KANO –KATSINA HIGHWAY 33
  • 34. REINSTATEMENT OF EMBANKMENT WASHOUT AND COLLAPSED 3-CELL CULVERT AT KM.34+200 ALONG GOMBE – BAUCHI HIGHWAY – IN PROGRESS 34
  • 35. REINSTATEMENT OF SUBMERGED BOX CULVERT AND APPROACHES AT CH.29+500 ALONG ASABA – ILLAH – ILLUSHI ROAD, DELTA STATE – IN PROGRESS 35
  • 36. WASHOUT BRIDGE APPROACH REPAIRS AND EMBANKMENT REINSTATEMENT AT CH0+100 (SHENDAM BRIDGE) ALONG SHENDAM –YELWA –IBI ROAD IN PLATEAU STATE 36
  • 37. EMERGENCY REINSTATEMENT OF WASHOUT BRIDGE APPROACH AND EMBANKMENT ALONG LANGTANG –LALIN –TUNKUS –SHENDAM ROAD CH 15 + 025 IN PLATEAU STATE 37
  • 38. REINSTATEMENT OF EMBANKMENT WASHOUT AT CH 39+050 ALONG ZARIA - PAMBEGUA ROAD IN KADUNA STATE 38
  • 39. PROVISION OF REINFORCED CONCRETE PILE BRIDGE (75m LONG) AND 1KM LINK ROAD ACROSS KOLO CREEK AT KOLO TOWN IN BAYELSA STATE – IN PROGRESS 39
  • 40. NJABA BRIDGE, ALONG OWERRI –ORLU ROAD, IMO STATE 40
  • 41. REINSTATEMENT OF WASHOUT AND COLLAPSED OF TRIPLE CELL CULVERT AT KM 10+500 (4THINTERCHANGE) ENUGU –PORT HARCOURT DUAL CARRIAGEWAY 41
  • 42. Table Showing Conditions of Federal Roads in 2011 & 2013 Condition 2011(%KM) 2013(%KM) Good 52%(17,742KM) Over 75%(25,600KM) Bad 48%(16,378KM) 25%(8,520KM) 42
  • 43. MOVEMENT OF GAS TURBINE FROM ONNE PORT TO KADUNA POWER PLANT 43 TAKE OFF POINT FOR THE TURBINE MOVEMENT FROM ONNE PORT, PH TO KADUNA
  • 44. MOVEMENT OF GAS TURBINE FROM ONNE PORT TO KADUNA POWER PLANT ARRIVAL OF THE FINAL TRIP AT KADUNA 44
  • 45. FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION AGAINST ROAD ABUSE (FERCSARA) 45 In response to an urgent need to address the abuses and bad behavior exhibited on the road network the Agency has recently inaugurated a Federal Roads Committee on Surveillance and Action Against Road Abuse(FERCSARA). The membership comprises of ;  FERMA Headquaters and Zonal officers,  Federal Ministry of Works(Highways) officers,  Nigerian Army Engineers,  Nigerian Police Force (NPF),  Federal Roads Safety Corps (FRSC),  National Union of Road Transport Workers (NUTRW),  National Security and Civil Defense Corps, and  Local Government works officials
  • 46. FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION AGAINST ROAD ABUSE (FERCSARA) 46 The Committee is responsible for; identifying major abuses and proffering solutions  monitoring occurrences of road abuse and carry out corrective measures  liaising with law enforcement agencies to ensure the reinstatement and replacement of damaged carriageway and road furniture collaborating with appropriate law enforcement agencies for the enforcement of relevant extant rules and regulations on willful damage to government properties in the road infrastructure sub sector.  liaising with relevant stakeholders to stop further abuses and ensure sustenance of good road usage by motorists.  cause arrest to be made where necessary.  discourage major haulage companies from deliberate overloading and indiscriminate parking.
  • 47. FEDERAL ROAD COMMITTEE ON SURVEILLANCE AND ACTION AGAINST ROAD ABUSE (FERCSARA) 47 REMOVAL OF SHOULDER ENCHROACHMENT IN PROGRESS
  • 49. REINSTATEMENT OF EMBANKMENT WASHOUT/COLLAPSED WING WALLS AND APRON AT CH.44+350 ALONG ZARIA-PAMBEGUA ROAD IN KADUNA STATE 49
  • 50. KM.29+788 –KM.29+020 ALONG MBIAMA –YENAGOA ROAD (DUAL CARRIAGEWAY) 50
  • 51. REINSTATEMENT OF WASHOUTED ROAD EMBANKMENT AT CH.124+500 (AUCHI TOWNSHIP) ALONG BENIN –AUCHI –OKENE ROAD IN EDO STATE 51
  • 52. CONSTRUCTED RC LINED DRAIN AT KM13+800 AT CH.4+300 –CH.4+800(LHS) ALONG DIKKO –MAJEROAD IN NIGER STATE 52
  • 53. ROAD SUPPORT SERVICES 53  Equipment  Observation & Service camps  State Field Offices construction  Highway & Bridges Illumination
  • 54. MOBILE POTHOLE PATCHER 54 BERGKAMP FP5 MOBILE POTHOLE PATCHERS
  • 55. MOBILE POTHOLE PATCHER IN OPERATION AT THIRD MAINLAND BRIDGE, LAGOSMOBILE POTHOLE PATCHERS AT WORK MOBILE POTHOLE PATCHER IN OPERATION ALONG ABUJA –KADUNA DUAL CARRIAGEWAY 55
  • 56. MOBILE POTHOLE PATCHERS AT WORK MOBILE POTHOLE PATCHER IN OPERATION ALONG ABUJA –KEFFI DUAL CARRIAGEWAY 56
  • 57. 80TPH ASPHALT PLANT INSTALLED AT ABUJA, LAGOS, OSOGBO WHILE 4 OTHERS ARE AT VARIOUS STAGES OF INSTALLATIONS 40 MINI ASPHALT PLANT DEPLOYED TO VARIOUS FIELD OFFICES NATIONWIDE 57
  • 58. COLD ASPHALT PRODUCTION Product of FERMA R&D for proactive intervention works6 MONTH OLD COLDASPHALTBAGGED COLD ASPHALTPRIMING & OVERLAY WITH COLD ASPHALTPRIMING & OVERLAY WITH COLD ASPHALTAGGREGATE BLENDING FOR COLD ASPHALT PRODUCTIONCOLD ASPHALT PRODUCTION IN PROGRESS 58
  • 59. OBSERVATION & SERVICE CAMP Built by FERMA to provide emergency services to road users, utilised by the FERMA, Police,& FRSCRECENTLY COMPLETED OBERVATION & SERVICE CAMP ALONG AKURE –ADO EKITI ROAD (KM.7+400) ITAOGBOLU, ONDO STATERECENTLY COMPLETED OBERVATION CAMP AT ODUKPANI, CROSS RIVER STATE 59
  • 60. www.ferma.gov.ng SOME PICTURES OF OBSERVATION & SERVICE CAMPS CONSTRUCTION OBSERVATION CAMP AT ELELE, RIVERS STATE OBSERVATION & SERVICE CAMP AT AGO ARE, OYO STATE OBSERVATION CAMP AT AKWANGA ,NASARAWA STATE OBSERVATION CAMP AT IGBO UKWU, ANAMBRA STATE 60
  • 61. www.ferma.gov.ng SOME PICTURES OF TRAILER PARKS & FIELD OFFICES CONSTRUCTION FENCING OF STATE FIELD OFFICE, AWKA, ANAMBRA STATE FENCING OF TRAILER PARK AT AKINYELE, OYO STATE STATE FIELD OFFICE CONSTRUCTION AT LAFIA COMPLETED STATE FIELD OFFICE AT ZAMFARA 61
  • 62. HIGHWAY /BRIDGE LIGHTING LIGHTING OF THIRD MAINLAND BRIDGE 62
  • 63. www.ferma.gov.ng SOLAR POWERED LIGHTING AT KEFFI INTERCHANGE, NASARAWA SOME HIGHWAY/BRIDGE LIGHTING PROJECTS PROCURED ALTEC L37 M STREETLIGHTS PLAT FORM IN USE AT JOS 63
  • 64. www.ferma.gov.ng LIGHTING ON NIGER BRIDGE, ONITSHA/ASABA HIGHWAY LIGHTING ALONG KADUNA WESTERN BYPASS SOME HIGHWAY/BRIDGE LIGHTING PROJECTS 64
  • 65. SOME FERMA –SURE P ACTIVITIES 65
  • 66. PREAMBLE: Overtheyears,hugeinvestmentshavebeenmadeonroads& bridgeswithoutadequatemaintenanceprogrammesputinplace. Rather,expensivecorrectivemeasuresafterfailurewasthepractice. FERMAPreventiveRoadsMaintenanceOperationsundertheSURE- PPublicWorksProgrammeinvolvesthemobilizationanddeploymentofableandwillingworkforceforroutinedirectlabourmaintenanceworksoncriticalfederalroadsclosetotheirabode. PROGRAMME CONCEPT 66
  • 67. OBJECTIVES: PROGRAMME CONCEPT•Prolong the life span of selected roads of high economic impact •Ensure that roads are made safe and motorable all year round•Job creation/Poverty alleviation•Enhance sustainable maintenance culture•Engender community/public ownership and involvement in road works•Improve trust and goodwill between government and the people•Reduce overall huge cost of corrective maintenance contracts 67
  • 68. ROAD REPAIRS ALONG ABUJA-KEFFI BY SURE P -FERMA PUBLIC WORKS TEAM 68
  • 69. PROVISION AND INSTALLATION OF HIGH-RESISTANT POLYMER NEW JERSEY CRASH-BARRIERS TO REPLACE VANDALIZED/DAMAGED HANDRAILS AT TAFA BRIDGE ALONG KADUNA-ABUJA DUAL CARRIAGEWAY 69
  • 70. DESILTING OF BLOCKED DRAINS BY THE SURE P -FERMA PUBLIC WORKS TEAM 70
  • 71. MEDIAN VEGETATION CONTROL ALONG ABUJA-KADUNA ROAD BY THE SURE P -FERMA PUBLIC WORKS TEAM 71
  • 72. POTHOLE PATCHING USING FP5 BERGKAMP FLAMELESS PATCHER & PAINTING OF PARAPET WALLSAND BRIDGE RAILINGS ON 3RD MAINLAND BRIDGE BY THE SURE P -FERMA PUBLIC WORKS TEAM 72
  • 73. ROAD MARKING ALONG ABUJA – KADUNA DUAL CARRIAGEWAY UNDER FERMA SURE-P 73
  • 74. SOME OF THE KITS AND BASIC HANDTOOLS FOR PUBLIC WORKS 74
  • 75. 75 SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM)STATES COVERED1Abuja-Kaduna-Dual307.0FCT -Kaduna2Kaduna-Kano -Dual336.0Kaduna-Kano3Benin-Asaba-Dual266.0Edo-Delta4Enugu-9th Mile-Otukpa93.0Enugu-Benue5Shagamu-Ore -Dual98.0Lagos-Ogun-Ondo6Owerri-Onitsha -Dual88.0Imo-Anambra7Jos-Bauchi112.0Plateau-Bauchi8Benin-Bypass-Warri-Dual138.0Edo-Delta9Partsof Benin-Auchi-Okene176.0Edo-Kogi10Parts of Lokoja-Okene100.0FCT-Kogi11Abuja-Keffi-Akwanga -(Abuja-Keffi -Dual)107.0FCT-Nasarawa12Ikot Ekpene-Odukpani-Calabar90.0AkwaIbom-Cross River
  • 76. 76 SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM) STATES COVERED13Ibadan-Ilorin Dual130.0Oyo-Kwara14Primary Roads In Yenegoa35.0Bayelsa15Sokoto-Gusau210.0Zamfara-Sokoto16KatsinaAla-ZakiBiam-Wukari95.0Benue-Taraba17Ajaokuta -Itobe -Ayangba56.0Kogi18Ayangba -Ankpa -Ofu (Benue State Border)94.0Kogi19ApapaOworonshoki-Old Toll Gate32.0Lagos203rd Mailand Bridge11.0Lagos21Lagos-Badagry Seme Border Rroad180.0Lagos22Panyam -Shendam85.0Plateau23Abua-Ahoada-Omoke-Egbema129.0Rivers
  • 77. 77 SOME ECONOMIC ROUTES MONITORED/MAINTAINED BY FERMAS/NCONSIDERED ROUTESLENGTH (KM)STATES COVERED24Okigwe-Afikpo78.0Ebonyi25Owerri-Aba road43.0Imo-Abia26Ibadan-Ife-Ilesha -Dual Carriageway119.0Oyo-Osun27Kotangora-Tegina100.0Niger28Sokoto-Shagari-Tambuwa-KebbiS/B96.0Sokoto29Jalingo Jct. -Mutum Biu -Tella -Wukari Benue S/B226.0Taraba30Ewu-Uromi-Agbor-Sapele197.0Edo-Delta31Igede-Itawure-EfonAlaayeeRoad30.0Ekiti32Ifaki-Ikole-Omuo-KogiS/B Road90.0Ekiti33Bauchi-Gombe Road156.0Bauchi-Gombe34Kano S/B-Birnin Kudu-Bauchi S/B Road88.0Jigawa35Katsina -Kano S/B128.0Katsina36Birnin Kebbi-Argungui Road50.0Kebbi37Yola-Song-Gombi road42.0Adamawa Total 4411
  • 78. 78 SELECTEDCOST SAVING PROJECTSS/NPROJECT DESCRIPTIONPROPOSED COST (N) EXECUTED COST (N) SAVINGS (N) 1Emergency Works Kano -Katsina Bridge800M556M244M2Emergency Works Mbiama-Yenegoaroad& BridgeOver 3Billion (S/C) 2.7Billion (D/C) 3.3Billion3Emergency Repairs and pavement strenghteningof sections along OnnePort - Kaduna route project for movement of Gas Turbines to Kaduna Power Plant (Enugu Bound) 4Billion1.7Billion2.3BillionCURRENTEFFORTS & KEY PERFORMANCE EVALUATION 1Length of Road with good ridingquality17,742km (2011)27,320km (2013)77%
  • 79. 79 FERMA FUNDING SUMMARY FOR THE LAST 5 YEARS(2009 –2014) YEARAPPROPRIATION (N)RELEASES (N)SHORT FALL (N) 200943,969,689,656.4243,852,651,223.72-117,038,432.70201062,616,065,053.0051,611,527,557.80-11,004,537,495.20201129,655,265,155.0032,818,510,794.003,163,245,639.00201243,838,424,547.0043,838,404,544.04-20,002.96201339,139,930,827.0027,699,336,797.68-11,440,594,029.32
  • 80. 80
  • 81. Conclusion Then,projectscommencedbutcompletiondatesweremostunrealistic. Nowmanyprojectsarecompletedbeforeduedates. Then,massiveclearing/earthworksweredoneandpaidfor,thatbecomesonlygulliesaftereachrainyseason. Nowpaymentsaremainlyforprotectedworks. Then,thecrywastodeclareastateofemergencyonroads. Nowtheremarkisthattheroadsarebetter. Then,youstartyourtripbutneverpredictarrivaltime. Nowyoucanpredictarrivaltimefromorigintodestination. Ministerial Briefing, September 2014 81
  • 82. Conclusion Then,passengersdonotfallasleepwhilethedriversmove,duetopotholesanddiscomfort.. Now,alongseveralroutes,passengerssleepwhileontour. Alothasbeendone Moreisrequiredtobedone Butputtogether,transformationonroadsubsectorisoutstanding anditshowsallover. Wearehoweverdeterminedtomovefurtherandforwardtogether Ministerial Briefing, September 2014 82
  • 83. FERMA Emergency Contact lines Ministerial Briefing, September 2014 83 Emergency Call Lines: Etisalat –08092656666 Glo–08155555889 Airtel–08129999936 MTN–07067779775
  • 84. Conclusion Ministerial Briefing, September 2014 84 THANK YOU!!!