SAFETY REPORT 
PT. SP Manufacturing - Batam 
1 
What’s the purpose of safety report…??? 
 to ensure all employees aware about safety. 
 make improvements in accordance to the findings. 
 meet government requirements of effort in maintaining 
occupational health and safety in the workplace (Act. No.1 / 1970) 
 form of seriousness of the management in protecting all 
employees from a work accident. 
Audited By : Fahrizal Nasution
1. Stacker (Lifting  transport Equipment). 
2 
Post / Area : 
Logistic/Store. 
 Hazard Identification : 
- Stacker turn 
signal/lamp broken. 
 Potential Risk : 
- collisions. 
 Risk Control : 
- Change/repair. 
 Status : Open. 
 PIC : Wang. 
 Date Closed : ………?
3 
2. Stacker (Lifting  transport Equipment). 
Post / Area : 
Logistic/Store. 
 Hazard Identification : 
- Stacker rearview 
mirror broken. 
 Potential Risk : 
- bumping into others at 
store area. 
 Risk Control : 
- Change. 
 Status : Open. 
 PIC : Wang. 
 Date Closed : ………?
4 
3. No Fire Extinguisher on Stacker. 
Post / Area : Logistic/Store. 
 Hazard Identification : 
- No Fire extinguisher on stacker . 
 Potential Risk : 
- In case of fire in the stacker or area 
near stacker . 
 Risk Control : 
- Must be provide / install. 
 Status : Open. 
 PIC : Wang. 
 Date Closed : ………?
5 
4. Height of Boxes Exceeded. 
Post / Area : 
Logistic/Store. 
 Hazard Identification : 
- On top of rack, boxes over 
height . 
 Potential Risk : 
- collapse / fall and hit someone 
else 
 Risk Control : 
- 1.8M (Safety purpose). 
 Status : Open. 
 PIC : Wang. 
 Date Closed : ………?
6 
5. Emergency Exit Door Blocking. 
Post / Area : 
Logistic/Store. 
 Hazard Identification : 
- Emergency Exit Door 
still Blocking. 
 Potential Risk : 
- slow evacuation in the event 
of an emergency. 
 Risk Control : 
- free from objects that 
obstructs. 
 Status : Open. 
 PIC : Wang. 
 Date Closed : ………?
7 
6. Eyewash liquid no make sense. 
Post / Area : Eyewash 
Station. 
 Hazard Identification : 
- Eyewash liquid production date no 
make sense, received 27 October'14, 
while the production date is 
November 14th ‘ 
 Potential Risk : 
- potentially resulting in pain in 
the eyes and skin. 
 Risk Control : 
- Replace and recommend to find 
other supplier for the next order 
since this fatal error. 
 Status : Open. 
 PIC : Lusi / User. 
 Date Closed : ………?
8 
7. Auto splice Machine #2 and #4. 
Post / Area : WH 
Production. 
 Hazard Identification : 
- Auto splice M/C No. 2 and No. 4 
protective cover is not installed. 
 Potential Risk : 
- Hand pinched, electrical shock, 
etc.. 
 Risk Control : 
- Install cover 
 Status : Open. 
 PIC : Jaliber/Burhan. 
 Date Closed : ………?
9 
8. No Use License (S.I.O) on Badge. 
Post / Area : Logistic / Store. 
 Hazard Identification : 
- Storeman no use license (SIO) on badge 
when operate lifting / transport 
equipment (Stacker).. 
 Potential Risk : 
- used by others store who do not 
have license (SIO) may cause 
damage and accidents 
 Risk Control : 
- To all storeman that use stacker 
must have license and paired on a 
badge (license copy). 
 Status : Open. 
 PIC : Wang /Verini. 
 Date Closed : ………? 
S.I.O = SURAT IZIN OPERATOR.
10 
9. Air receiver Tank (Fastening air outlet loose). 
Post / Area : Compressor 
Room. 
 Hazard Identification : 
- Fastening Air Outlet at air 
receiver tank loose. 
 Potential Risk : 
- leaks that may cause an explosion. 
 Risk Control : 
- tensioned. 
 Status : Open. 
 PIC : Ayong / Contractor. 
 Date Closed : ………?
11 
10. Genset (Flue pipe damage). 
Post / Area : Genset. 
 Hazard Identification : 
- Flue pipe damage. 
 Potential Risk : 
- Leakage emissions, Excess 
vibration, room temperature is 
higher potential for a fire or 
explosion.. 
 Risk Control : 
- Change. 
 Status : Open. 
 PIC : Ayong / Burhan. 
 Date Closed : ………?
12 
11.Chemical Waste Container (Spill). 
Post / Area : Washing 
Room. 
 Hazard Identification : 
- Chemical Spillage outside washing 
room. 
 Potential Risk : 
- environmental damage. 
 Risk Control : 
- Change Container or build water 
treatment. 
 Status : Open. 
 PIC : Alboin / Verini. 
…….To Drain  Date Closed : ………?
13 
12. Residual dust. 
Post / Area : WH 
Maintenance Room. 
 Hazard Identification : 
- Many residual dust plywood, from 
cutting  drilling. 
 Potential Risk : 
- it can lead occupational diseases. 
(Cough, TBC, etc.) 
 Risk Control : 
- the cutting and drilling are carried out 
in the area of facility (outside). 
 Status : Open. 
 PIC : Jaliber / Burhan / Ayong. 
 Date Closed : ………?
14 
13. Masker is not used properly. 
Post / Area : WH 
Maintenance Room. 
 Hazard Identification : 
- Some of the operator do not use 
masker properly. 
 Potential Risk : 
- it can lead occupational diseases. 
(Cough, TBC, etc.) 
 Risk Control : 
- Masker must be use properly (Control 
by Leader, S’visor, Manager). 
 Status : Open. 
 PIC : H.O.D related. 
 Date Closed : TBA.
15 
14. Exit Door. 
Post / Area : All Emergency 
Exit door. 
 Hazard Identification : 
- Emergency Exit door, the direction do 
not open outwards / swing out. 
 Potential Risk : 
- slow evacuation in the event of an 
emergency. 
 Risk Control : 
- Suggest change the direction (swing 
out). 
 Status : Open. 
 PIC : Facility. 
 Date Closed : TBA.
16 
Others Suggestion for improved to prevent 
an accidents. 
 Genset Emergency Button. 
Emergency 
Button
17 
Others Suggestion for improved to prevent 
an accidents. 
Background the potential occurrence ; 
When there is a fire or explosion in 
the genset, it will not be easy to 
turn off immediately or may not be 
due to the high risks that can result 
in an accident on a technician or 
engineer.
18 
Others Suggestion for improved to prevent 
an accidents. 
Improvement to be planned ; 
Install emergency button as a safety switch at 
different location especially outdoor genset 
room. 
Suggest to install 
in this location.
19

More Related Content

Similar to Routine Safety Report

MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
RajuBiswas41
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Andrew Louis
 
ig2_forms_electronic_submission_v2__2_.docx.pdf
ig2_forms_electronic_submission_v2__2_.docx.pdfig2_forms_electronic_submission_v2__2_.docx.pdf
ig2_forms_electronic_submission_v2__2_.docx.pdf
ShadyHella1
 

Similar to Routine Safety Report (20)

SHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docxSHO_WORKBOOK_Hazard_Identification.docx
SHO_WORKBOOK_Hazard_Identification.docx
 
Section 10 - SBM Certification Procedure
Section 10 - SBM Certification ProcedureSection 10 - SBM Certification Procedure
Section 10 - SBM Certification Procedure
 
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.docMS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
MS False Ceiling Rolling shutter & Door,Window Fixing_RA.doc
 
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
Airside Observation Statement -24.12.2015.xlsx(A).xlsx01
 
HSE Emergency preparedness plan 500 villas rev 1
HSE Emergency  preparedness plan 500 villas rev 1HSE Emergency  preparedness plan 500 villas rev 1
HSE Emergency preparedness plan 500 villas rev 1
 
Atf marketing segment sorc meeting 14.05.2020 atf rev01
Atf marketing segment sorc meeting  14.05.2020   atf rev01Atf marketing segment sorc meeting  14.05.2020   atf rev01
Atf marketing segment sorc meeting 14.05.2020 atf rev01
 
Collision management risk evaluation for mobile equipment - Dr Chris Doran
Collision management risk evaluation for mobile equipment - Dr Chris Doran Collision management risk evaluation for mobile equipment - Dr Chris Doran
Collision management risk evaluation for mobile equipment - Dr Chris Doran
 
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
 
TRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docx
 
On board safety
   On board safety    On board safety
On board safety
 
Emergency Response Plan 9 Oct 2021
Emergency Response Plan 9 Oct 2021Emergency Response Plan 9 Oct 2021
Emergency Response Plan 9 Oct 2021
 
warehouse.pdf
warehouse.pdfwarehouse.pdf
warehouse.pdf
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Manufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMICManufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMIC
 
Lockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualLockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry Mutual
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
 
SITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAININGSITE SAFETY INDUCTION ENGINEERING TRAINING
SITE SAFETY INDUCTION ENGINEERING TRAINING
 
ig2_forms_electronic_submission_v2__2_.docx.pdf
ig2_forms_electronic_submission_v2__2_.docx.pdfig2_forms_electronic_submission_v2__2_.docx.pdf
ig2_forms_electronic_submission_v2__2_.docx.pdf
 
Near miss awareness for Petroleum Oil Refinery
Near miss awareness  for Petroleum Oil RefineryNear miss awareness  for Petroleum Oil Refinery
Near miss awareness for Petroleum Oil Refinery
 
Atf near miss analysis-2019-20
Atf  near miss analysis-2019-20Atf  near miss analysis-2019-20
Atf near miss analysis-2019-20
 

Routine Safety Report

  • 1. SAFETY REPORT PT. SP Manufacturing - Batam 1 What’s the purpose of safety report…??? to ensure all employees aware about safety. make improvements in accordance to the findings. meet government requirements of effort in maintaining occupational health and safety in the workplace (Act. No.1 / 1970) form of seriousness of the management in protecting all employees from a work accident. Audited By : Fahrizal Nasution
  • 2. 1. Stacker (Lifting transport Equipment). 2 Post / Area : Logistic/Store. Hazard Identification : - Stacker turn signal/lamp broken. Potential Risk : - collisions. Risk Control : - Change/repair. Status : Open. PIC : Wang. Date Closed : ………?
  • 3. 3 2. Stacker (Lifting transport Equipment). Post / Area : Logistic/Store. Hazard Identification : - Stacker rearview mirror broken. Potential Risk : - bumping into others at store area. Risk Control : - Change. Status : Open. PIC : Wang. Date Closed : ………?
  • 4. 4 3. No Fire Extinguisher on Stacker. Post / Area : Logistic/Store. Hazard Identification : - No Fire extinguisher on stacker . Potential Risk : - In case of fire in the stacker or area near stacker . Risk Control : - Must be provide / install. Status : Open. PIC : Wang. Date Closed : ………?
  • 5. 5 4. Height of Boxes Exceeded. Post / Area : Logistic/Store. Hazard Identification : - On top of rack, boxes over height . Potential Risk : - collapse / fall and hit someone else Risk Control : - 1.8M (Safety purpose). Status : Open. PIC : Wang. Date Closed : ………?
  • 6. 6 5. Emergency Exit Door Blocking. Post / Area : Logistic/Store. Hazard Identification : - Emergency Exit Door still Blocking. Potential Risk : - slow evacuation in the event of an emergency. Risk Control : - free from objects that obstructs. Status : Open. PIC : Wang. Date Closed : ………?
  • 7. 7 6. Eyewash liquid no make sense. Post / Area : Eyewash Station. Hazard Identification : - Eyewash liquid production date no make sense, received 27 October'14, while the production date is November 14th ‘ Potential Risk : - potentially resulting in pain in the eyes and skin. Risk Control : - Replace and recommend to find other supplier for the next order since this fatal error. Status : Open. PIC : Lusi / User. Date Closed : ………?
  • 8. 8 7. Auto splice Machine #2 and #4. Post / Area : WH Production. Hazard Identification : - Auto splice M/C No. 2 and No. 4 protective cover is not installed. Potential Risk : - Hand pinched, electrical shock, etc.. Risk Control : - Install cover Status : Open. PIC : Jaliber/Burhan. Date Closed : ………?
  • 9. 9 8. No Use License (S.I.O) on Badge. Post / Area : Logistic / Store. Hazard Identification : - Storeman no use license (SIO) on badge when operate lifting / transport equipment (Stacker).. Potential Risk : - used by others store who do not have license (SIO) may cause damage and accidents Risk Control : - To all storeman that use stacker must have license and paired on a badge (license copy). Status : Open. PIC : Wang /Verini. Date Closed : ………? S.I.O = SURAT IZIN OPERATOR.
  • 10. 10 9. Air receiver Tank (Fastening air outlet loose). Post / Area : Compressor Room. Hazard Identification : - Fastening Air Outlet at air receiver tank loose. Potential Risk : - leaks that may cause an explosion. Risk Control : - tensioned. Status : Open. PIC : Ayong / Contractor. Date Closed : ………?
  • 11. 11 10. Genset (Flue pipe damage). Post / Area : Genset. Hazard Identification : - Flue pipe damage. Potential Risk : - Leakage emissions, Excess vibration, room temperature is higher potential for a fire or explosion.. Risk Control : - Change. Status : Open. PIC : Ayong / Burhan. Date Closed : ………?
  • 12. 12 11.Chemical Waste Container (Spill). Post / Area : Washing Room. Hazard Identification : - Chemical Spillage outside washing room. Potential Risk : - environmental damage. Risk Control : - Change Container or build water treatment. Status : Open. PIC : Alboin / Verini. …….To Drain Date Closed : ………?
  • 13. 13 12. Residual dust. Post / Area : WH Maintenance Room. Hazard Identification : - Many residual dust plywood, from cutting drilling. Potential Risk : - it can lead occupational diseases. (Cough, TBC, etc.) Risk Control : - the cutting and drilling are carried out in the area of facility (outside). Status : Open. PIC : Jaliber / Burhan / Ayong. Date Closed : ………?
  • 14. 14 13. Masker is not used properly. Post / Area : WH Maintenance Room. Hazard Identification : - Some of the operator do not use masker properly. Potential Risk : - it can lead occupational diseases. (Cough, TBC, etc.) Risk Control : - Masker must be use properly (Control by Leader, S’visor, Manager). Status : Open. PIC : H.O.D related. Date Closed : TBA.
  • 15. 15 14. Exit Door. Post / Area : All Emergency Exit door. Hazard Identification : - Emergency Exit door, the direction do not open outwards / swing out. Potential Risk : - slow evacuation in the event of an emergency. Risk Control : - Suggest change the direction (swing out). Status : Open. PIC : Facility. Date Closed : TBA.
  • 16. 16 Others Suggestion for improved to prevent an accidents. Genset Emergency Button. Emergency Button
  • 17. 17 Others Suggestion for improved to prevent an accidents. Background the potential occurrence ; When there is a fire or explosion in the genset, it will not be easy to turn off immediately or may not be due to the high risks that can result in an accident on a technician or engineer.
  • 18. 18 Others Suggestion for improved to prevent an accidents. Improvement to be planned ; Install emergency button as a safety switch at different location especially outdoor genset room. Suggest to install in this location.
  • 19. 19