2. 10-12-2011_PCC Pilot PlantLinde AG Engineering Division
Pipe Stress Analysis of Reformer R-101
Maximum Temperatures to Run.
Allowable Stresses of Incoloy 800HT at 10,000 hrs.
2 By: E. Perez
1870°F
3. 10-12-2011_PCC Pilot PlantLinde AG Engineering Division
Pipe Stress Analysis of Reformer R-101
Maximum Pressures to Run.
Allowable Stresses of Incoloy 800HT at 10,000 hrs.
3 By: E. Perez