Detailed Tasks Assigned:
- Managing support functions covering planning, tracking, reporting, quality
management and internal communication.
- Reviews the project activities for compliance with procedures and standards and
track the project progress and quality of work.
- Review the contractors detailed design submissions.
- Attend Consultants and contractors meetings and assist with determination of
project requirements
- Process daily, weekly and monthly reporting to ensure the MEP works run
smoothly, all project activities are completed as prescribed and all the invoices is
processed in a timely fashion.
- Coordination of the MEP Contractors to ensure the interface between the MEP
works and continuity in the delivered performance with regards to quality and
safety issues.
Key Qualifications:
Very familiar with the Tender Evaluation, Design Revision and implementation
supervision of Electromechanical Equipment and systems, responsible for the design,
development and finalization of several MEP Equipment Systems for Metro, rail and road
Tunnels in Egypt.
2. Employment Record:
2011 to the current day National Authority for Tunnels of Rail and Vehicles,
Electromechanical Equipment and Systems, Team Leader Senior MEP
Team Leader Senior MEP Engineer for the following Projects and works:
- Greater Cairo Metro Line 3 Phas 1
- Greater Cairo Metro Line 3 Phas 2
- Greater Cairo Metro Line 3 Phas 3
- Greater Cairo Metro Line 3 Phas 4A
- Greater Cairo Metro Line 3 Phas 4B
- Modernization SCADA System of the Electromechanical Equipment of phase 4A
Line 3 Greater Cairo Metro.
- Modernization the electromechanical Equipments control systems of toura
workshop for Line 2 metro project.
- Modernization the control and monitoring system of high voltage station
Electromechanical systems .
- Modernization the control and monitoring system of Line 3 phase 1 workshop
electromechanical systems
- Greater Cairo Metro Line 4 ( 2 Phases – Design Stage ) .
- Suez channel Tunnels ( 3 Tunnels under suez channel ) Design Stage.
- Updating the control systems of the escalators for Phase 4A Line 3.
- Updating the control systems of the Elevators for Phase 4A Line 3.
- Updating the control systems of the Dewatering System for Phase 4A.
- Trainer of Scada System , Fire Alarm System and intelligent transportation systems
for AL AZHAR Tunnels ( Vehicles Tunnel ).
- Trainer of Scada System , Fire Alarm System and intelligent transportation systems
for AHMED HAMDY Tunnels (vehicles tunnel).
- Updating the communication medium ( Interface ) betweenthe control systems
and the electromechanical Equiment.
- Tender of purchasing 20 Trains - Hundai Rotem- Korea.
3. Site Experiences : Installation , commissioning and testing of :
- SCADA System.
- Programmable Logic Controllers ( PLC : SIEMENS & MITSUBISHI & ALLEN BRADELY & LS and
SCHNEIDER )
- Direct Digital Control System of Electromechanical Equipments.
- Electrical and Control Systems of HVAC
- Electrical and Control System of Dewatering System.
- Electrical and Control Systems of Elevators & Escalators.
- Electrical and Control Systems of Platform Screen Door ( PSD ) .
- Following up The Maintenence Work in the Electrical Control Systems in the Depot.
- SCADA of Rolling Stocks of train management system ( TMS )
- Rolling Stocks Electrical and Control Systems Software and hardware (TMS
VAC&DCU&EBCU&DCU).
- Maintenance Management System ( MMS ).
- Electrical and Control Systems of Fire Fighting System .
- Fire Alarm Fire Fighting System.
Very Familiar with The Maintenance of the PLC and Scda for the Electromechanical
Equipment for the tunnels and Depot.
Technical Office Experiences: Reviewing the documents of the Detailed design and
technical Documents of :
- Electromechanical Equipment in the Tunnels and Depot.
- SCADA for Control and Monitoring ALL The Electromechanical Equipment .
- Coordination MEP Works between the contractors.
- Direct Digital Control System of Electromechanical Equipments.
- Electrical and Control Systems of HVAC
- Electrical and Control System of Dewatering System.
- Electrical and Control Systems of Elevators & Escalators.
- Electrical and Control Systems of Platform Screen Door ( PSD ) .
- Electrical and Control Systems of Rolling Stocks
- SCADA of Rolling Stocks ( Automatic train Supervision ATS) .
- Electrical and Control Systems of Fire Fighting System .
- Fire Alarm of Fire Fighting System.
- Maintenance Management System ( MMS ).
4. Maintenance Works of (MEP) :
- Protective Maintenence : Following Up all the maintenance work according to the
maintenance time table for all tunnels electromechanical Equipment , Light Current Systems
and supervisory and control systems for monitoring and control the electromechanical
Equipment.
- Corretive Maintenance :Following Up the Correction of all the Faults and Alarms of the
Tunnels Electromechanical Equipment , Light Current Systems and supervisory and control
systems for monitoring and control the electromechanical Equipment .
( 2008 to 2011, MC International Contracting Company for Tunnels
Excavation, Electrical control systems engineer, Cairo ,Egypt )
Electrical Control Systems Enginner for Operation and Maintenance of the Tunnel Boring
Machines ( TBM ) for the following Projects :
- Selim EL AWL Street Sewerage Tunnels Project : (3 Projects) Carried out by using tunnels
digging machine TBM-Herrenknecht (1800mm Diameter) provided with high
technology of controllers PLC and scada systems for monitoring and control the
machine.
- Tookh Kaliobeya Sewerage Tunnels Project (7 Micro Tunnels projects-) Carried out by using
tunnels digging machine AVN Herrenknecht (700,800 and1000 Diameter) provided with
high technology of controllers PLC and scada systems for monitoring and control the
machine.
- Bany Souif Sewerage Tunnels Projects (1 Project) Carried out by using tunnels digging
machine TBM-Herrenknecht (1800mm Diameter) provided with high technology of
controllers PLC and scada systems for monitoring and control the machine.
PROFESSIONAL QUALIFICATIONS (TRAINING):
- Electrical and Control Systems of the Electromechanical Equipment (Colas Rail –
France )
- Using control devices for monitoring and control HVAC systems (FX TOOLS- JHONSON
CONTROL ) – FRANCE
- PLC Troubleshooting (The French Company Colas Rail Company) – EGYPT .
5. - SCADA (The French Company Colas Rail ) – EGYPT .
- Supervisory and control system - Colas Rail – FRANCE
- WINCC FLEXIBLE (HMI programming) -SIEMENS-EGYP.
- Distributed Control Systems and advanced Instrument (DCS) – AFAQ MISR – EGYPT
- Fire Fighting Alarm system(HONEYWELL Electronic Panel)- Egypt
- Locomotives Tests – SCHUMA Factory – Germany
- ATS01-ATS48-ATV61 Product ( Shneider Electric Company) – FRANCE.
- ATS , Relays, Switches and Contactors – SOCOMEC – FRANCE
- Autocad program .
PROFESSIONAL MEMBERSHIPS:
Member of the Egyptian Engineers Syndicate since2008.
Language skills:
- Arabic: Mother tongue.
- English: Fluent command of Written and Spoken .
Computer skills:
- Operating systems (windows + Dos).
- C language.
- Computer Maintenance (Software – Hardware ).
Interpersonal Skills:
Positive, Helpful and Hard worker.
Self-Motivated, and Detail Oriented.
Personal Data:
Date of Birth: 26 / 8 / 1986.
Marital Status: Married .
Nationality: Egyptian.
Military Status: Exempted.