4. CNG Net
> CNG Net is investing in a cleaner
future.
> CNG Net carries out the
exploitation of a network of
refuelling stations in The
Netherlands.
> CNG Net designs, build, finance,
maintain and operate the
refuelling stations at own risk.
> CNG Net is a total solution
provider.
5. Refuelling stations
> 57 CNG Net public
refuelling stations
> 120+ CNG refuelling
stations
> 2 LNG 24 refuelling stations
> 10 LNG refuelling stations
in total
6. The role of standards
> International accepted
safety level
• minimal safety requirements
• safety distances at refuelling station
> Standards are necessary to
introduce a “new” fuel to
get market acceptance
• clear specifications and test methods
• no trade barriers caused by local
regulations
> To overcome international
trade barriers
• refuelling coupling car/filling
station
• pressure levels for LNG storage
> International certification of
components and systems
• clear specifications and test
methods
• no trade barriers caused by local
regulations
10. Goal EC
> Stimulate the introduction
of biomethane
> A European Standard for
biomethane to be used as
fuel for vehicle engines
> TS or EN for biomethane to
be injected into the grid
11. Scope PC 408
Upgrading
biogas from
digestion
injection into
the gas grid
Refueling station
Part 1 grid
specification
Part 2:
Automotive
Specification
biogas from
thermo chemical process
conditioning
Refueling station
Part 2 :
Automotive
specification
Natural gas Grid
Local dedicated
infrastructure
Non-grid sourced
natural gas
12. Current status
> first enquiry ended
> reviewing the comments
> four major challanges
> Wobbe range for L gas
> Sulpher content
> Methane number
> Silicon levels
13. Preliminary results
Parameter Injection group Fuel group
hydrocarbon dewpoint prEN 16726 (max -2 oC) max -2 oC
water dewpoint prEN 16726 (max -8 oC
at injection pressure)
max -10 oC at 200 bar Class A
max -20 oC Class B
max -30 oC Class C
Oxygen prEN 16726 (1% with
restrictions)
max 1 %
H2S + COS prEN 16726 (5 mg/m3) max 5 mg/m3
S total prEN 16726 (20 mg/m3
without odorant)
need for 10 mg/m3
CO max 0,1 %
Total Silicon research research
14. Preliminary results
Parameter Injection group Fuel group
Lower heating value min 39 MJ/kg - max 42.8 MJ/kg
Net Wobbe index prEN 16726 min 41,9 MJ/kg - max 49 MJ/kg
Net Wobbe index L gas min 35,0 MJ/kg - max 40,8 MJ/kg
Methane number prEN 16726 (min 65) min 65
Methane number dedicated spec. prEN 16726 min 80
Hydrogen prEN 16726 same text max 2 %
Compressor oil technically free
dust impurities technically free proposal < 5 micron dust
< 10 micron liquid
Chlorinated, Fluorinated compounds based upon health criteria
15. Values based upon Health
Criterea
Injection group
Preliminary results
Metals:
Arsenic 0.0041 mg/m3
Barium 0.11 mg/m3
Cadmium 0.0034 mg/m3
Chromium (Hexavalent) 0.00014 mg/m3
Chromium (Total) 0.00054 mg/m3
Nickel 0.014 mg/m3
Organo-chlorides [1] 1.0 mgCl/m3
Organo-fluorides [2] 3.5 mgFl/m3
Total S [3] 14 mgS/m3
Inorganic compounds:
Ammonia 5824 mg/m3
Aromatic compounds:
Xylene 13989 mg/m3
> Risk Assessment Methodology,
bases upon European research
carried out in UK (2012) and
France (2008)
> Health criterea assement will be
a separate Technical Report (TS)
> assessment /input needed from
other European countries
16. research on Silicon
> Limit values have to be set
> report on behaviour of silicon for domestic
boilers
> failure of ionization safety device
> clogging of stainless steel heat exchangers
> carried out in L gas situation
> research on behaviour of gas engines exposed
to silicon
> failure of spark plug
> sensors performance like Lambda sensors
> performance of catalist
> Silica build up in lubrication oil
17. Time frame
aug-‐14
apr-‐15
apr-‐15
aug-‐15
okt-‐15
jan-‐16
End
of
enquiry
TC/BT
decision:
2nd
enquiry
or
vote
if
vote
Final
draA
to
CMC
Start
of
vote
End
of
vote
PublicaFon
8,5
mont
hs
(treat
ment)
3,5
months
(translaFo
n)
2
months
(weighte
d
vote)
3
month
s
(treat
ment)
apr-‐15
jul-‐15
dec-‐15
aug-‐16
dec-‐16
feb-‐17
may-‐17
if
2nd
enquiry
Enquiry
draA
to
CMC
Start
of
enquiry
End
of
enquiry
TC/BT
decision:
vote
or
deleted
Final
draA
to
CMC
Start
of
vote
End
of
vote
PublicaF
on
2,5
months
(translaFo
n)
5
months
(commen
ts)
8,5
month
s
(treat
ment)
3,5
months
(translaF
on)
2
month
s
(votes)
3
months
(treatm
ent)
18. Contact
Erik Büthker
Business Development Manager
e.buthker@cngnet.nl
+31 6 2150 1403
CNG Net
Ringwade 71
3439 LM Nieuwegein
The Netherlands