PROFESSIONAL INDEMNITY INSURANCE FOR
QUANTITY SURVEYORS
Dilan De Silva
  PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS 
2   
 
                                                                                                                                                                         
Generally 
Clause no. 1.4 of conditions of engagement of Australian Institute of Quantity Surveyors (AIQS) has states “The
Quantity Surveyor will exercise reasonable skill, care and diligence in performing its work”.
If a client get a loss because of the Quantity Surveyor (QS) fails to comply with aforesaid sub clause or similar
one, QS is at a risk of being sued by the client.
Some examples for branch the sub clause;
1) Produce an unrealistic law estimate
2) Arithmetical errors in Bills of Quantities (BOQ)/Estimates
3) Certify an over payment.
The case of Commonwealth bank of Australia v Hollier, the QS was held liable to pay the Holliers, the
difference between the variation that had been assessed and what the Court found should have been assessed
plus interest. The QS get a fee for variation assessment is $3000 but he had to pay the damage of
$70000+interest to Hollier. Actually the fee $3000 is a reduced fee while the actual fee is $30, 000; however the
court did not consider any suggestion that the fee reduction entitled the QS to perfume with less the reasonable
care. Even advices without fee may cause for punishes by court under professional negligence.
In such situations QS may have to pay more than the consultancy fee as damage to a client. How QS can
manage such big risk?
Most practicable way is use Professional Indemnity Insurance as risk sharing mechanism.
 
Professional Indemnity Insurance (PII) 
PII is an Insurance scheme for Professional as a safe guard in their professional life to cover negligence or
branch of contract. PII generally obtain by business professionals like QS who provide advice to their clients.
Some of professional Institutions like AIQS and Royal Institution of Charted Surveyors (RICS) have been
recommend the PII for their members in code of professional conducts/regulations. Sub clause 3.13 in AIQS
code of professional conducts states ”where holding themselves out to the public as practicing quantity
  PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS 
3   
 
surveyors, have and maintain appropriate professional liability insurance”. Also RICS members in private
practice must have minimum indemnity insurance cover of £ 250,000 if their gross fee income does not exceed
£100,000, and £500,000 for gross fee between £100, 000 and £200,000. Further it recommends a minimum
£1,000,000 insurance if the gross fee exceeds £200,000.
Professional liability insurance should take few years beyond the end of job or service. Because every claims
not arise just after the service, it may be few years later. Some laws have defined the liability of consultants
beyond the completion/handover of the project.
Qatar Civil code article 219 states1
liabilities for an “unlawful act” (which may or may not include one of
negligence) expire three years from the day the injured party becomes aware of the loss or fifteen years from the
commission of the unlawful act, whichever is sooner.” It means contractual liability is continues for period of
fifteen years.
In addition that according to latent damage act 1986 in UK, any court proceeding claiming damages must be
commenced within six years from the bench of contract or from when the damage was suffered where a claim is
made in tort. Because of such reasons RICS advises run-off cover for an absolute minimum 6 years.
Further, QS should take the PII not only for cover the damage awarded, also it should sufficient to cover interest
and cost of the person making the claim.
Professional indemnity insurance is a “claims made” policy. It means, it cover the claims made/notified within
the policy period but not claims arising out of a branch of duty within the policy period. Because of that the
insured should notify the insurer as soon as possible after aware about any event which is likely to result in a
claim. Also insurer does not liable for claims which the insured knew about before the policy was agreed. It is a
liability of previous insurer. Because of that insured should notified to the insurer, any event which is likely to
result in a claim before the end of each policy year, especially when changing the insurers.
Liabilities which are not cover from PII 
Generally a Professional indemnity policy for QS is limited to a QS profession only. It would not cover project
management or dispute resolution services. If QS want to include such special services to his Professional
indemnity policy, he should discuss it with the insurance company.
  PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS 
4   
 
Also some policies may cover claims for bench of contract and some are not.
Sometimes QS have to give a collateral warranties to third party, such as future buyers or tenants. Collateral
warranties are not likely to be covered by PII policies. In such cases QS need to take advice from insurance
company.
In addition that PII cover the damages only to client but not damages to third parties. Because of that it’s good
to take public liability insurance (PLI) which concerns the damages to third parties.
Also there is a another liability of both designers and contractors as Decennial liability which is run beyond 10
year from date of hand over in some countries like Qatar, French and Egypt. Decennial liability is not falls
within the scope of professional liability insurance. In some countries like French and Egypt it is a legal
requirement that designers and contractors obtain insurance against decennial liability.
When enter in to sub consultancy agreement with a lead consultant, PII and PLI may be a mandatory condition.
 
How to minimize risk of negligence claims for QS 
Quantity Surveyors can adopt good quality management system and professional guidance in their practice to
deliver their service in high standard with reasonable skill, care and diligence. Also claims can be minimized by
adopting a clearly drafted Conditions of Engagement. In addition that;
• Do not take assignments which are outside the field of competence.
• Consider collateral warranty carefully and check whether it is covered by the PII policy or not.
Q & A 
1) What happened if the claimant insolvent before settled the claim? 
Any claim made by insured against the insurer is automatically transferred to the victim. However if
insured fails to comply with policy requirements, victim may not entitled to receive damage.
  PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS 
5   
 
2) Is the PII only for consultants? 
Generally in construction industry PII is obtained by consultants, who provide advice to their customers.
But contractor also have to maintain PII if he is engaged in design process. For example In JCT
conditions of contract, sub clause 6.11.1 requires the contractor to take a PII.
3) If  insured  provide  false  details  when  enter  in  to  insurance  agreement  or  fails  to  disclose 
information about risk, can the insurer treat the insurance contract as void? 
Yes. Insurer can. The parties to an insurance contract owe each other a duty of good faith. If the insured
doesn’t enter or perform the contract in good faith, insurer not bound to indemnify the insured, even the
non-disclosure is innocent. However insured still entitled to recovers the premium he has paid.
4) Insured makes a fraudulent claim, but part of the claim makes honestly. Is the insured entitled to 
recover the damage, at least for honest part? 
No. He is not. This also comes from good faith. Sometimes it may be reinforced by the insurance policy.
5) What are the Sri Lankan Insurance companies which provide PII? 
Asian Alliance Insurance and Union Assurance
Reference 
1) Grose, M. and Warren, L., 2007. Decennial liability under the Qatar civil code. [Online]. Available at:
http://www.clydeco.com/knowledge/articles/decennial-liability-under-the-qatari-civil-
code.cfm[Accessed on March 2011]
2) Poulton, W., 2010. Historical and Emerging Risks. The Building Economic, September 2010, pp.26-31
3) ?,?., ?. Professional Liability and Indemnity. Royal Institution of Charted Surveyors
4) Royal Institution of Charted Surveyors, 2011. Professional Indemnity Insurance. [Online] Available at:
http://www.rics.org/site/download_feed.aspx?fileID=672&fileExtension=PDF [Accessed on March
2011]

More Related Content

What's hot

Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bRedevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bOMKAR CHODANKAR
 
Professional Practices
Professional PracticesProfessional Practices
Professional PracticesRajat Katarne
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on ResortImtiaz Ahmad
 
Project management
Project managementProject management
Project managementAidiel Azhar
 
Vancouver Centre Case Study
Vancouver Centre Case StudyVancouver Centre Case Study
Vancouver Centre Case StudyJon Vehlow
 
Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiKai Yun Pang
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letterTeo Kean Hui
 
Fsekeping serendah final (f)11
Fsekeping serendah final (f)11Fsekeping serendah final (f)11
Fsekeping serendah final (f)11Stanley Jia Cheng
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
 
Worli bdd chawl case study in detail
Worli bdd chawl case study in detailWorli bdd chawl case study in detail
Worli bdd chawl case study in detailshafayeeshaikh
 
Eco retreat resort - Dissertation report
Eco retreat resort - Dissertation reportEco retreat resort - Dissertation report
Eco retreat resort - Dissertation reportAtharv Mehta
 
site analysis, zoning and master plan.pdf
site analysis, zoning and master plan.pdfsite analysis, zoning and master plan.pdf
site analysis, zoning and master plan.pdfzaindeen6
 
Architectural Professional Practice - Ethics
Architectural Professional Practice - EthicsArchitectural Professional Practice - Ethics
Architectural Professional Practice - EthicsGalala University
 
Architectural consultancy practices
Architectural consultancy practicesArchitectural consultancy practices
Architectural consultancy practicesIznny Ismail
 
TS7 - Indoor Cricket Facilities Design Guidelines
TS7 - Indoor Cricket Facilities Design GuidelinesTS7 - Indoor Cricket Facilities Design Guidelines
TS7 - Indoor Cricket Facilities Design Guidelinesyorkshirega
 
intercontinental hotel
intercontinental hotel intercontinental hotel
intercontinental hotel Fatma Mohamed
 
Marriott hyderabad hotel & convention center
Marriott hyderabad hotel &  convention centerMarriott hyderabad hotel &  convention center
Marriott hyderabad hotel & convention centerVishal Salve
 

What's hot (20)

Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)bRedevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
Redevelopment under dcpr 2034 regulation section 33(7),33(7)a & 33(7)b
 
Professional Practices
Professional PracticesProfessional Practices
Professional Practices
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
Avante Mumbai, Buy 1-2 BHK Flats in Kanjurmarg, Buy New Properties
Avante Mumbai,  Buy 1-2 BHK Flats in Kanjurmarg, Buy New PropertiesAvante Mumbai,  Buy 1-2 BHK Flats in Kanjurmarg, Buy New Properties
Avante Mumbai, Buy 1-2 BHK Flats in Kanjurmarg, Buy New Properties
 
Project management
Project managementProject management
Project management
 
Vancouver Centre Case Study
Vancouver Centre Case StudyVancouver Centre Case Study
Vancouver Centre Case Study
 
Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
PP1 Project 3 Cover letter
PP1 Project 3 Cover letterPP1 Project 3 Cover letter
PP1 Project 3 Cover letter
 
Fsekeping serendah final (f)11
Fsekeping serendah final (f)11Fsekeping serendah final (f)11
Fsekeping serendah final (f)11
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
Worli bdd chawl case study in detail
Worli bdd chawl case study in detailWorli bdd chawl case study in detail
Worli bdd chawl case study in detail
 
Eco retreat resort - Dissertation report
Eco retreat resort - Dissertation reportEco retreat resort - Dissertation report
Eco retreat resort - Dissertation report
 
site analysis, zoning and master plan.pdf
site analysis, zoning and master plan.pdfsite analysis, zoning and master plan.pdf
site analysis, zoning and master plan.pdf
 
Architectural Professional Practice - Ethics
Architectural Professional Practice - EthicsArchitectural Professional Practice - Ethics
Architectural Professional Practice - Ethics
 
Architectural consultancy practices
Architectural consultancy practicesArchitectural consultancy practices
Architectural consultancy practices
 
TS7 - Indoor Cricket Facilities Design Guidelines
TS7 - Indoor Cricket Facilities Design GuidelinesTS7 - Indoor Cricket Facilities Design Guidelines
TS7 - Indoor Cricket Facilities Design Guidelines
 
Land Inspection Report
Land Inspection Report Land Inspection Report
Land Inspection Report
 
intercontinental hotel
intercontinental hotel intercontinental hotel
intercontinental hotel
 
planning resort planning
planning resort planningplanning resort planning
planning resort planning
 
Marriott hyderabad hotel & convention center
Marriott hyderabad hotel &  convention centerMarriott hyderabad hotel &  convention center
Marriott hyderabad hotel & convention center
 

Similar to Professional indemnity insurance for quantity surveyors

Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...
Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...
Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...NationalUnderwriter
 
Vero Professional Indemnity Policy Wording
Vero Professional Indemnity Policy WordingVero Professional Indemnity Policy Wording
Vero Professional Indemnity Policy WordingMatrix Insurance Brokers
 
Advantage Talk - Need to Know (Contracts)
Advantage Talk - Need to Know (Contracts)Advantage Talk - Need to Know (Contracts)
Advantage Talk - Need to Know (Contracts)Robert Munday
 
Professional indemnity insurance policies
Professional indemnity insurance policiesProfessional indemnity insurance policies
Professional indemnity insurance policiesOptimuminsurance
 
Directors and officers liability insurance policies
Directors and officers liability insurance policiesDirectors and officers liability insurance policies
Directors and officers liability insurance policiesOptimuminsurance
 
Accounting services overview of insurance contract under ifrs
Accounting services overview of insurance contract under ifrsAccounting services overview of insurance contract under ifrs
Accounting services overview of insurance contract under ifrsAhmedTalaat127
 
UK FCA's Response to COVID-19
UK FCA's Response to COVID-19UK FCA's Response to COVID-19
UK FCA's Response to COVID-19JasonSchupp1
 
Regulatory compliance update
Regulatory compliance updateRegulatory compliance update
Regulatory compliance updatemikaelastafrace
 
Insurance claim settlement in china by daxue consulting
Insurance claim settlement in china by daxue consultingInsurance claim settlement in china by daxue consulting
Insurance claim settlement in china by daxue consultingDaxue Consulting
 
Hedge Fund Insurance Brochure
Hedge Fund Insurance BrochureHedge Fund Insurance Brochure
Hedge Fund Insurance BrochureDavid Seidner
 
Rollits Construction Focus June 2016
Rollits Construction Focus June 2016 Rollits Construction Focus June 2016
Rollits Construction Focus June 2016 Pat Coyle
 
Insurance presentation Aug. 8, 2020.pptx
Insurance presentation Aug. 8, 2020.pptxInsurance presentation Aug. 8, 2020.pptx
Insurance presentation Aug. 8, 2020.pptxRogernocom
 
Surety Industry Overview: State of the Industry by Cissie Scoggin
Surety Industry Overview: State of the Industry by Cissie ScogginSurety Industry Overview: State of the Industry by Cissie Scoggin
Surety Industry Overview: State of the Industry by Cissie ScogginDon Grauel
 
Advanced Markets Insight: Common Life Insurance Mistakes
Advanced Markets Insight: Common Life Insurance MistakesAdvanced Markets Insight: Common Life Insurance Mistakes
Advanced Markets Insight: Common Life Insurance MistakesM Financial Group
 
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)InsuranceRateMonitors
 
CBI Comments on Proposed TRIA Regulatory Definitions
CBI Comments on Proposed TRIA Regulatory DefinitionsCBI Comments on Proposed TRIA Regulatory Definitions
CBI Comments on Proposed TRIA Regulatory DefinitionsJasonSchupp1
 

Similar to Professional indemnity insurance for quantity surveyors (20)

Bizcover Misc Risks Policy Wording
Bizcover Misc Risks Policy WordingBizcover Misc Risks Policy Wording
Bizcover Misc Risks Policy Wording
 
Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...
Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...
Self-Insured Retentions Part 2: An Examination of the Uses and Problems (from...
 
Vero Professional Indemnity Policy Wording
Vero Professional Indemnity Policy WordingVero Professional Indemnity Policy Wording
Vero Professional Indemnity Policy Wording
 
Advantage Talk - Need to Know (Contracts)
Advantage Talk - Need to Know (Contracts)Advantage Talk - Need to Know (Contracts)
Advantage Talk - Need to Know (Contracts)
 
Professional indemnity insurance policies
Professional indemnity insurance policiesProfessional indemnity insurance policies
Professional indemnity insurance policies
 
Asset protection strategies, part 1
Asset protection strategies, part 1Asset protection strategies, part 1
Asset protection strategies, part 1
 
Directors and officers liability insurance policies
Directors and officers liability insurance policiesDirectors and officers liability insurance policies
Directors and officers liability insurance policies
 
Accounting services overview of insurance contract under ifrs
Accounting services overview of insurance contract under ifrsAccounting services overview of insurance contract under ifrs
Accounting services overview of insurance contract under ifrs
 
UK FCA's Response to COVID-19
UK FCA's Response to COVID-19UK FCA's Response to COVID-19
UK FCA's Response to COVID-19
 
Regulatory compliance update
Regulatory compliance updateRegulatory compliance update
Regulatory compliance update
 
Insurance claim settlement in china by daxue consulting
Insurance claim settlement in china by daxue consultingInsurance claim settlement in china by daxue consulting
Insurance claim settlement in china by daxue consulting
 
LAW601_-_TOPIC_6.pptx
LAW601_-_TOPIC_6.pptxLAW601_-_TOPIC_6.pptx
LAW601_-_TOPIC_6.pptx
 
Hedge Fund Insurance Brochure
Hedge Fund Insurance BrochureHedge Fund Insurance Brochure
Hedge Fund Insurance Brochure
 
Rollits Construction Focus June 2016
Rollits Construction Focus June 2016 Rollits Construction Focus June 2016
Rollits Construction Focus June 2016
 
Insurance presentation Aug. 8, 2020.pptx
Insurance presentation Aug. 8, 2020.pptxInsurance presentation Aug. 8, 2020.pptx
Insurance presentation Aug. 8, 2020.pptx
 
Surety Industry Overview: State of the Industry by Cissie Scoggin
Surety Industry Overview: State of the Industry by Cissie ScogginSurety Industry Overview: State of the Industry by Cissie Scoggin
Surety Industry Overview: State of the Industry by Cissie Scoggin
 
Agent Training Method
Agent Training MethodAgent Training Method
Agent Training Method
 
Advanced Markets Insight: Common Life Insurance Mistakes
Advanced Markets Insight: Common Life Insurance MistakesAdvanced Markets Insight: Common Life Insurance Mistakes
Advanced Markets Insight: Common Life Insurance Mistakes
 
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)
CGU Motor Trade PDS (Product Disclosure Statement / Policy Wording)
 
CBI Comments on Proposed TRIA Regulatory Definitions
CBI Comments on Proposed TRIA Regulatory DefinitionsCBI Comments on Proposed TRIA Regulatory Definitions
CBI Comments on Proposed TRIA Regulatory Definitions
 

Recently uploaded

Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 

Recently uploaded (20)

Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

Professional indemnity insurance for quantity surveyors

  • 1. PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS Dilan De Silva
  • 2.   PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS  2                                                                                                                                                                                Generally  Clause no. 1.4 of conditions of engagement of Australian Institute of Quantity Surveyors (AIQS) has states “The Quantity Surveyor will exercise reasonable skill, care and diligence in performing its work”. If a client get a loss because of the Quantity Surveyor (QS) fails to comply with aforesaid sub clause or similar one, QS is at a risk of being sued by the client. Some examples for branch the sub clause; 1) Produce an unrealistic law estimate 2) Arithmetical errors in Bills of Quantities (BOQ)/Estimates 3) Certify an over payment. The case of Commonwealth bank of Australia v Hollier, the QS was held liable to pay the Holliers, the difference between the variation that had been assessed and what the Court found should have been assessed plus interest. The QS get a fee for variation assessment is $3000 but he had to pay the damage of $70000+interest to Hollier. Actually the fee $3000 is a reduced fee while the actual fee is $30, 000; however the court did not consider any suggestion that the fee reduction entitled the QS to perfume with less the reasonable care. Even advices without fee may cause for punishes by court under professional negligence. In such situations QS may have to pay more than the consultancy fee as damage to a client. How QS can manage such big risk? Most practicable way is use Professional Indemnity Insurance as risk sharing mechanism.   Professional Indemnity Insurance (PII)  PII is an Insurance scheme for Professional as a safe guard in their professional life to cover negligence or branch of contract. PII generally obtain by business professionals like QS who provide advice to their clients. Some of professional Institutions like AIQS and Royal Institution of Charted Surveyors (RICS) have been recommend the PII for their members in code of professional conducts/regulations. Sub clause 3.13 in AIQS code of professional conducts states ”where holding themselves out to the public as practicing quantity
  • 3.   PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS  3      surveyors, have and maintain appropriate professional liability insurance”. Also RICS members in private practice must have minimum indemnity insurance cover of £ 250,000 if their gross fee income does not exceed £100,000, and £500,000 for gross fee between £100, 000 and £200,000. Further it recommends a minimum £1,000,000 insurance if the gross fee exceeds £200,000. Professional liability insurance should take few years beyond the end of job or service. Because every claims not arise just after the service, it may be few years later. Some laws have defined the liability of consultants beyond the completion/handover of the project. Qatar Civil code article 219 states1 liabilities for an “unlawful act” (which may or may not include one of negligence) expire three years from the day the injured party becomes aware of the loss or fifteen years from the commission of the unlawful act, whichever is sooner.” It means contractual liability is continues for period of fifteen years. In addition that according to latent damage act 1986 in UK, any court proceeding claiming damages must be commenced within six years from the bench of contract or from when the damage was suffered where a claim is made in tort. Because of such reasons RICS advises run-off cover for an absolute minimum 6 years. Further, QS should take the PII not only for cover the damage awarded, also it should sufficient to cover interest and cost of the person making the claim. Professional indemnity insurance is a “claims made” policy. It means, it cover the claims made/notified within the policy period but not claims arising out of a branch of duty within the policy period. Because of that the insured should notify the insurer as soon as possible after aware about any event which is likely to result in a claim. Also insurer does not liable for claims which the insured knew about before the policy was agreed. It is a liability of previous insurer. Because of that insured should notified to the insurer, any event which is likely to result in a claim before the end of each policy year, especially when changing the insurers. Liabilities which are not cover from PII  Generally a Professional indemnity policy for QS is limited to a QS profession only. It would not cover project management or dispute resolution services. If QS want to include such special services to his Professional indemnity policy, he should discuss it with the insurance company.
  • 4.   PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS  4      Also some policies may cover claims for bench of contract and some are not. Sometimes QS have to give a collateral warranties to third party, such as future buyers or tenants. Collateral warranties are not likely to be covered by PII policies. In such cases QS need to take advice from insurance company. In addition that PII cover the damages only to client but not damages to third parties. Because of that it’s good to take public liability insurance (PLI) which concerns the damages to third parties. Also there is a another liability of both designers and contractors as Decennial liability which is run beyond 10 year from date of hand over in some countries like Qatar, French and Egypt. Decennial liability is not falls within the scope of professional liability insurance. In some countries like French and Egypt it is a legal requirement that designers and contractors obtain insurance against decennial liability. When enter in to sub consultancy agreement with a lead consultant, PII and PLI may be a mandatory condition.   How to minimize risk of negligence claims for QS  Quantity Surveyors can adopt good quality management system and professional guidance in their practice to deliver their service in high standard with reasonable skill, care and diligence. Also claims can be minimized by adopting a clearly drafted Conditions of Engagement. In addition that; • Do not take assignments which are outside the field of competence. • Consider collateral warranty carefully and check whether it is covered by the PII policy or not. Q & A  1) What happened if the claimant insolvent before settled the claim?  Any claim made by insured against the insurer is automatically transferred to the victim. However if insured fails to comply with policy requirements, victim may not entitled to receive damage.
  • 5.   PROFESSIONAL INDEMNITY INSURANCE FOR QUANTITY SURVEYORS  5      2) Is the PII only for consultants?  Generally in construction industry PII is obtained by consultants, who provide advice to their customers. But contractor also have to maintain PII if he is engaged in design process. For example In JCT conditions of contract, sub clause 6.11.1 requires the contractor to take a PII. 3) If  insured  provide  false  details  when  enter  in  to  insurance  agreement  or  fails  to  disclose  information about risk, can the insurer treat the insurance contract as void?  Yes. Insurer can. The parties to an insurance contract owe each other a duty of good faith. If the insured doesn’t enter or perform the contract in good faith, insurer not bound to indemnify the insured, even the non-disclosure is innocent. However insured still entitled to recovers the premium he has paid. 4) Insured makes a fraudulent claim, but part of the claim makes honestly. Is the insured entitled to  recover the damage, at least for honest part?  No. He is not. This also comes from good faith. Sometimes it may be reinforced by the insurance policy. 5) What are the Sri Lankan Insurance companies which provide PII?  Asian Alliance Insurance and Union Assurance Reference  1) Grose, M. and Warren, L., 2007. Decennial liability under the Qatar civil code. [Online]. Available at: http://www.clydeco.com/knowledge/articles/decennial-liability-under-the-qatari-civil- code.cfm[Accessed on March 2011] 2) Poulton, W., 2010. Historical and Emerging Risks. The Building Economic, September 2010, pp.26-31 3) ?,?., ?. Professional Liability and Indemnity. Royal Institution of Charted Surveyors 4) Royal Institution of Charted Surveyors, 2011. Professional Indemnity Insurance. [Online] Available at: http://www.rics.org/site/download_feed.aspx?fileID=672&fileExtension=PDF [Accessed on March 2011]