1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] May 9, 2012
Name-Surname Mr.Narubas Younuch
Student ID. 53219012
Group Name Conthai
Golf : 53211804 , Benz : 53211811 , Champ :
Engineering Team 53211819 , June : 53211831 , Bank : 53211833
Members Rin : 54261504 , Tum : 54261512 , Golf : 54261520 ,
Chai : 54261522
Product Design
P’Dukdik , P’Ake , P’L , P’Friend
Team Members
Weekly Progress
For this week My project have 2 problem, first problem is touch switch not working
because check inside product for find wrong point. Find that shield cables are touch copper plate.
Because we must cut shield cables for don’t touch copper plate. Second problem project don’t
control temperature. When temperature into set point. Heat is cutoff, but thermostat is heat
before. It make temperature cutoff by not to set point. Next I have assembly together a rice cooker.
And I collected all data for made the report.
Figure 1. Report
Engineering Analysis
Strong Point
- Sent report of rice cooker project
Week Point
- Problem about touch switch and temperature.
- Language may be a mistake.
Next Week Job
- Finish project
Department of Control System and Instrumentation Engineering