8. WBS diagram project
Preparation work
Submission
of authorities
Preparation of
Tender
Procedure
and time
schedule
BCA
LTA
SCDF
PUB
Construction work
civil works
(sub-
structure)
civil works
(super-
structure)
Architect
ural work
M & E
works
Inspection
Interior
works
Insulation
Drywall
Paint and
Wallpaper
Cabinets
Finish
Plumbing
Lighting
Maintenance
Window
Installation
Landscape
Works
Irrigation
Inspection
of all works
Completion
and handing
over
Ground
Investigation
Foundation
construction
Cost Analysis
Construction of
building
Prepare structure and
specifications
Direct workers who
prepare drawings and
documents
Prepare scale
drawings
Design firefighting
system
Electrical power
system
ACMV system
Lift Installation
Water and
sanitation system
13. Time table for workers
All workers work from Monday to Friday for 8hours
daily (9am – 5pm)
But for the draftsmen, they are required to work on
normal days including Saturday at 9am-1pm and
2pm-6pm.
Public holidays were marked on 09th of August 2018,
26th of October 2018, 7th of November 2018 and 25th
of December 2018 as no working days.
15. Critical path
Critical path method is one of the essential technique in
the planning of a project. It can calculate the longest
path of an activity to the end of the project and also
calculate the earliest and latest of each activity that can
start and finish without making the project longer.