1. DAX HERBERT C. ROQUE
Address: Blk 851 Hougang Central 530851
Mobile : (+65) 96265582
Email: dakkiroque@yahoo.com
OBJECTIVE
To explore and practice at its greatest extent the fields of Electrical Engineering and course
related, specifically in Electrical System Design, Power System, Information and
Technology, Project/Administrative Management, and Research and Design for the
betterment of the company and as a professional.
EDUCATION
Tertiary: MAPUA INSTITUE OF TECHNOLOGY (2007), Manila
Bachelor of Science in Electrical Engineering
Secondary: IMMACULATE CONCEPTION SCHOOL FOR BOYS (2001)
City of Malolos, Bulacan
Primary: HOLY SPIRIT ACADEMY OF MALOLOS (1997)
City of Malolos, Bulacan
WORK EXPERIENCE
February 2014 – Present
Nylect Engineering Pte. Ltd.
Project Engineer
Project: Proposed Erection of a Single-User Industrial Development (Business2)
Consisting Of 1 Block of Part 1-Storey/Part 2-Storey, 1 Block of 3-Storey and Block of
8-Storey Building on Lot 00279 MK at Tukang Innovation Drive
MTU Asia Pte. Ltd.
Ensure construction is based on M&E approved drawings and coordinate works on
site with Clients, Consultants & Sub contractors
Prepare Construction schedule, CSD & Structural penetration for approval & ensure
on site works on schedule
Involved in design and build as per Client requirements
Responsible for document control such as monitoring of sample submission,
approval status of shop drawings & reply status to information request
Manage subcontractors work progress, shop drawings, materials, samples, method
statements, submission & approval
Liaising with suppliers on material procurement
2. Attend project safety meetings, site coordination, design and planning work
procedure
Review & align M&E design drawings to ensure compliance with design
specifications & guidelines
Monitor daily work progress and feedback to project manager
Responsible for quality assurance of the installed item
Identify discrepancies between M&E, structural ID, Architectural & Client provisions
Evaluate progress claims & variation orders
Prepare site documents / accomplishment reports
In-charged for Testing and Commissioning
Compile hand over documents / requirements
Project: JEM Façade & Landscape Electrical Works
Jurong East
Ensure construction is based on M&E approved drawings and coordinate works on
site with Clients, Consultants & Sub contractors
Responsible for document control such as monitoring of sample submission,
approval status of shop drawings & reply status to information request
Manage subcontractors work progress, shop drawings, materials, samples, method
statements, submission & approval
Liaising with suppliers on material procurement
Attend project safety meetings, site coordination, design and planning work
procedure
Review & align M&E design drawings to ensure compliance with design
specifications & guidelines
Monitor daily work progress and feedback to project manager
Responsible for quality assurance of the installed item
Evaluate progress claims & variation orders
Prepare site documents / accomplishment reports
In-charged for Testing and Commissioning
Compile hand over documents / requirements / As built Drawings
September 2012 – February 2014
Builder’s Alliance Pte. Ltd.
Project Engineer / M&E Coordinator
Project: Proposed Alteration and Addition to existing 4 Storey Yacht Club And Marina
Involving an Extension of Guestroom Block and a Boat Shed on Lot 03402X MK at
52 West Coast Ferry Road (Queenstown Planning Area)
Republic of Singapore Yacht Club
Ensure construction is based on M&E drawings and coordinate M&E works on site
with Clients, Consultants & Sub contractors
3. Prepare M&E Construction schedule, CSD & Structural penetration for approval &
ensure on site M& E works on schedule
Responsible for document control such as monitoring of sample submission,
approval status of shop drawings & reply status to information request
Manage M&E subcontractors work progress, shop drawings, materials, samples,
method statements, submission & approval
Attend project safety meetings, discussion and planning work procedure
Review & align M&E design drawings to ensure compliance with design
specifications & guidelines
Monitor daily work progress and feedback to project manager
Responsible for quality assurance of the installed item
Identify discrepancies between M&E, structural ID, Architectural & Client provisions
Evaluate progress claims & variation orders
Prepare site documents / accomplishment reports
In-charged for Testing and Commissioning
Compile hand over documents / requirements
April 2012 – September 2012
Gliderol Doors (S) Pte. Ltd.
Project Engineer
Project: T&C Chocolate Factory – Tuas Bay Walk,Singapore
Project: Stats Chippac Ltd – Yishun, Singapore
Project: Paya Lebar Airbase – Paya Lebar, Singapore
Project: Singapore General Hospital – Outram Road, Singapore
Assign in planning, preparation and revision of construction plan
Liaise with sub-contractors and suppliers for quotation and documentation
Responsible for manpower supervision and work schedule
Attend project safety meetings, discussion and planning work procedure
Manage materials and equipment schedule
Monitor daily work progress and feedback to project manager
Responsible for quality assurance of the installed item
Prepare permits and particulars needed prior to work
Prepare site documents / accomplishment reports
In-charged for Testing and Commissioning
Compile hand over documents / requirements
June 2010 – February 2012
Kinetic Philippines Electrical Contractor Incorporated
Project Engineer
Project: The Persimmon West Tower, Cebu City
Project: Wyeth Dry Blending – Canlubang, Laguna
Assigned in planning, preparation and revision of construction plan
Liaise with sub-contractors and suppliers for quotation and documentation
Responsible for manpower supervision and work schedule
Attend project safety meetings, discussion and planning work procedure
Manage materials and equipment schedule
4. Monitor daily work progress and feedback to project manager
Responsible for quality assurance, quality control
Responsible for fire alarm and CCTV programming
Prepare site documents / billing / accomplishment reports
In-charged for Testing and Commissioning
Compile turn over documents / requirements
September 2008 – May 2010
Vinnell Belvoir Corporation, Makati City, Philippines
The Medical City Expansion Project
Field Electrical Engineer
Responsible for quality assurance, quality control
Prepare work plan and schedule
Prepare material list and schedule
Perform Cadd drawings
Collate and make project accomplishments report
Compile turn over documents
In-charged for project management on electrical installation
9 ML Siruna Water Reservoir
Site Engineer
Accountable for manpower management
Prepare work plan and work schedule
Prepare material list and schedule
Perform Cadd drawings
Collate and make project accomplishments report
Project: Maynilad Pipe Replacement & Rehabilitation (North & South)
Site Engineer
Prepare work plan and work schedule
Prepare material list and schedule
Perform Cadd drawings
Collate and make project accomplishments report
November 2007 – June 2008 – VB Columna Construction Corporation
Bulacan, Philippines
Office Engineering Aid
Prepare work plan / schedule
Prepare material list / schedule
Perform Cadd drawings
Collate and make project accomplishments report
5. October – December 2005 – National Bureau of Investigation
Manila, Philippines
Electrical Maintenance Lineman
Responsible power line and cable maintenance
Assigned bulb and fixture maintenance
In-charged for guarding of fuse and circuit breakers
Maintenance of Air-conditioning units
Repair electrical appliance
TECHNICAL SKILLS
Proficient in Basic Microsoft Office applications ( Word, Excel, Powerpoint)
AutoCad; Visio Cad; Electrical Design and Power System Analysis
Programmable Logic Controller, Instrumentation, Electrical Circuits, Enercon,
Industrial Electronics
AC Machines, Basic Motor Control; Electric Meter Calibration
AFFILIATIONS
Institute of Integrated Electrical Engineers of the Philippines Inc. Mapua Institute of
Technology – Student Chapter
(IIEE- MIT)
Rotary Club – Mapua Chapter
TRAININGS and SEMINARS ATTENDED
April 29, 2014
Work At Height Course for Assessors
Absolute Kinetics Consultancy Pte Ltd
April 23 – 26, 2012
Building Construction Supervisors Safety Course
Absolute Kinetics Consultancy Pte Ltd
June 29 – 30, 2012
Work At Height Course for Supervisors
QMT Industrial & Safety Pte Ltd
Autocad 2008 and Color Rendering
Microcadd Technologies Co., Inc
6. October 19 – November 2, 2007
APC UPS USER’S TRAINING
October 13, 2009
Copper and Fiber Optic Cabling Systems
Pronet Systems Integrated Network Solution, Inc.
Fire Detection And Alarm System
Multi-line Building Systems, Inc.
October 14, 2009
PERSONAL BACKGROUND
Age: 31 Birth date: January 16, 1984
Height: 5’10’’ Weight: 120 lbs.
Gender: Male Civil Status: Married
Religion: Roman Catholic Nationality: Filipino
Driving License: Class 3