Dassian WAM - Workforce Authorization Management - module is an invaluable tool for managing personnel and effectively authorizing and controlling labor charges and
travel trip assignments. WAM provides your personnel their authorized work list and validates time charges and travel expense assignments in real time to effectively eliminate time and travel mischarges. Personnel authorizations for time and trip
expense assignments are as easy as drag and drop.
1. Dassian Workforce Management
(WAM)
• 6900 East Camelback Rd.
Suite 805
Kevin McGuire
Scottsdale, Arizona
Director, 85251
Solution • Phone: 480-922-1700
Management
• Email:
kmcguire@dassian.com
2. Workforce Authorization Management
– What is it?
• Role based dashboard for resource assignment, time entry
enablement and time entry validation, change control,
certification language, and enhanced change log
– What does it do?
• Facilitates time entry by presenting the user with the
worklist of end cost objectives that they are allowed to
charge
• Prevents time mischarging and the costly expense of finding
and correcting time mischarges
• Provides for stringent change control, certification language,
and change log for auditability
4. WAM Features
Dassian WAM eliminates time mischarging and gives project and resource managers
the ability to authorize the right employees for the appropriate time horizon
Flexible role based workbench
CATS integration to automatically validate time entry against the project resource
assignments
CATS integration to automatically populate the worklist for the items an employee may
charge
Optional capability to assign and validate the activity type
Standard SAP only supports a limited number of ways to assign resources to jobs
Built in exception capability for time administrators to correct time entries
Service providers need to be able to stop employee charging without having to wait for
month end or for the need to change the charge objects
Automatic time horizon update as soon as the project dates change
5. WAM Overview
Project Systems
Orders
Resource Cost Centers
Selection
WAM Profile External
Activity Type Timekeeping
XLS
Reporting • Export
• What are my resources • Import
Assigned to? CATS
• What am I assigned to? • Worklist
• Actual Hours Report • Time Validations
6. WAM Workbench
A standard SAP Evaluate & view
look & feel within a assigned resources
dynamic & their
workbench that assignments
offers the ability to:
Assign Resources to
Annotate information
charge objects
about the assignment
Assign Activity types Rough Planning
to Charge objects
7. WAM Workbench – Resource View
Daily
Sort
View Employee Weekly
Sum
Resource Assignments: Changeable Time
Export to Excel
Horizon
8. WAM Workbench – Activity Type Assignment
The user may
select the entire
group or single
Activity Types for
assignment
The assignment may
be at the Project top
level and any sub-
objects will be
allowed to charge
those Activity Types
9. CATS Timesheet Integration
If the object charged is
WAM controlled then
the user must be pre-
authorized to charge it
or they will not be
permitted
The work list at the top
of the timesheet will The worklist and data
display all assigned entry section name
charge objects which field is populated with
are current for the the object description
week to improve object
selection