MULTILANE HIGHWAYS WORKSHEET(Direction 1)
General Information Site Information
Analyst
DANIELA RODRIGU- CARLOS
FIGUER
Agency or Company
Date Performed 26/05/2015
Analysis Time Period
Highway/Direction to Travel
From/To
Jurisdiction
Analysis Year
Project Description TALLER 3. DISEÑO MULTICARRIL
Oper.(LOS) Des. (N) Plan. (vp)
Flow Inputs
Volume, V (veh/h) 1000 Peak-Hour Factor, PHF 0.85
AADT(veh/h) %Trucks and Buses, PT 24
Peak-Hour Prop of AADT (veh/d) %RVs, PR 0
Peak-Hour Direction Prop, D General Terrain: Grade
DDHV (veh/h) Grade Length (km) 1.60
Driver Type Adjustment 1.00 Up/Down % 6.00
Number of Lanes
Calculate Flow Adjustments
fp 1.00 ER 6.0
ET 3.0 fHV 0.676
Speed Inputs Calc Speed Adj and FFS
Lane Width, LW (m) 3.6
Total Lateral Clearence, LC (m) 3.6
Access Points, A (A/km) 2
Median Type, M Undivided
FFS (measured)
Base Free-Flow Speed, BFFS 98.9
fLW (km/h) 0.0
fLC (km/h) 0.0
fA (km/h) 1.3
fM
(km/h) 2.6
FFS (km/h) 95.0
Operations Design
Operational (LOS)
Flow Rate, vp (pc/h/ln)
Speed, S (km/h)
D (pc/km/ln)
LOS
Design (N)
Required Number of Lanes, N 1.7
Flow Rate, vp (pc/h) 1741
Max Service Flow Rate (pc/h/ln) 1044
Design LOS B
Copyright © 2005 University of Florida, All Rights Reserved HCS+TM Version 5.1 Generated: 29/05/2015 10:12
Página 1 de 1MULTILANE HIGHWAYS WORKSHEET(Dir 1)
29/05/2015file:///C:/Users/ÑaÑeLa/AppData/Local/Temp/u2k71F9.tmpYou created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

More Related Content

What's hot

Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buetAhmed Ferdous Ankon
 
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...Hossam Shafiq I
 
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Hossam Shafiq I
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)Priyansh Singh
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysRaghupathi Kandiboina
 
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...Hossam Shafiq I
 
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Hossam Shafiq I
 
Signalized Intersections (Transportation Engineering)
Signalized Intersections (Transportation Engineering)Signalized Intersections (Transportation Engineering)
Signalized Intersections (Transportation Engineering)Hossam Shafiq I
 
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...Hossam Shafiq I
 
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAYCAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAYMANJUNATH BORAKANAVAR
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation engineringSathik Mohamed
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 

What's hot (20)

L17.1 HCS 2010
L17.1 HCS 2010 L17.1 HCS 2010
L17.1 HCS 2010
 
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation  by ahmed ferdous - 1004137-buetTraffic volume study-opresentation  by ahmed ferdous - 1004137-buet
Traffic volume study-opresentation by ahmed ferdous - 1004137-buet
 
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...
03 Traffic Stream Characteristics (Traffic Engineering هندسة المرور & Prof. S...
 
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah) Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
Lecture 05 Roundabout (Traffic Engineering هندسة المرور & Dr. Usama Shahdah)
 
Spot Speed Study (Lab)
Spot Speed Study (Lab)Spot Speed Study (Lab)
Spot Speed Study (Lab)
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghways
 
L16 Progression
L16 ProgressionL16 Progression
L16 Progression
 
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...
Lecture 02 Traffic Flow Characteristics (Traffic Engineering هندسة المرور & D...
 
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
 
Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)Route Choice (Transportation Engineering)
Route Choice (Transportation Engineering)
 
Traffic survey
Traffic surveyTraffic survey
Traffic survey
 
Signalized Intersections (Transportation Engineering)
Signalized Intersections (Transportation Engineering)Signalized Intersections (Transportation Engineering)
Signalized Intersections (Transportation Engineering)
 
Using telematics data to research traffic related air pollution
Using telematics data to research traffic related air pollutionUsing telematics data to research traffic related air pollution
Using telematics data to research traffic related air pollution
 
Traffic studies
Traffic studiesTraffic studies
Traffic studies
 
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
 
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAYCAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
CAPACITY ESTIMATION OF TWO LANE UNDIVIDED HIGHWAY
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 

Viewers also liked (9)

renata hammouqa cv
renata hammouqa cvrenata hammouqa cv
renata hammouqa cv
 
emerson
emersonemerson
emerson
 
MITO
MITOMITO
MITO
 
Reportes
ReportesReportes
Reportes
 
PEEL PACK CART TEMPLATE
PEEL PACK CART TEMPLATEPEEL PACK CART TEMPLATE
PEEL PACK CART TEMPLATE
 
Hyperamonimea
HyperamonimeaHyperamonimea
Hyperamonimea
 
Vitamin D
Vitamin DVitamin D
Vitamin D
 
CV Willie Mahlangu final
CV Willie Mahlangu finalCV Willie Mahlangu final
CV Willie Mahlangu final
 
Bildgebung der Kavernome
Bildgebung der KavernomeBildgebung der Kavernome
Bildgebung der Kavernome
 

Similar to Reporte diseño multicarril

Traffic engineering and traffic control devices 2
Traffic engineering and traffic control devices 2Traffic engineering and traffic control devices 2
Traffic engineering and traffic control devices 2Latif Hyder Wadho
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Civil Zone
 
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...Hossam Shafiq I
 
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...Carlos Andres Figueroa
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04Stone Rayhan
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxSoKhit1
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume surveyRashed Alam
 
MMauch HOC presentation-oct-04-2013
MMauch HOC presentation-oct-04-2013MMauch HOC presentation-oct-04-2013
MMauch HOC presentation-oct-04-2013sogoss
 
road widening
road wideningroad widening
road wideningSanjay Ps
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highwayBharat Upadhyay
 
129589738 preliminariesprre
129589738 preliminariesprre129589738 preliminariesprre
129589738 preliminariesprrehomeworkping8
 
GTA West Corridor - Project Proposal
GTA West Corridor - Project Proposal GTA West Corridor - Project Proposal
GTA West Corridor - Project Proposal Neha Patel
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY664601
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptmihiretuTefera
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptmihiretuTefera
 
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfTRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfPriya Sarita Mane
 
Mapping vehicle emissions through streets and intersections application of ...
Mapping vehicle emissions through streets and intersections   application of ...Mapping vehicle emissions through streets and intersections   application of ...
Mapping vehicle emissions through streets and intersections application of ...Institute for Transport Studies (ITS)
 
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...Texas A&M Transportation Institute
 

Similar to Reporte diseño multicarril (20)

Traffic engineering and traffic control devices 2
Traffic engineering and traffic control devices 2Traffic engineering and traffic control devices 2
Traffic engineering and traffic control devices 2
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
 
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...
Modelamiento de la avenida universitaria con avenida olimpica en Tunja como: ...
 
Volume study presentation grp 04
Volume study presentation grp 04Volume study presentation grp 04
Volume study presentation grp 04
 
AWMA PHA 3
AWMA PHA 3AWMA PHA 3
AWMA PHA 3
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
MMauch HOC presentation-oct-04-2013
MMauch HOC presentation-oct-04-2013MMauch HOC presentation-oct-04-2013
MMauch HOC presentation-oct-04-2013
 
road widening
road wideningroad widening
road widening
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highway
 
129589738 preliminariesprre
129589738 preliminariesprre129589738 preliminariesprre
129589738 preliminariesprre
 
GTA West Corridor - Project Proposal
GTA West Corridor - Project Proposal GTA West Corridor - Project Proposal
GTA West Corridor - Project Proposal
 
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITYPROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
PROPOSED INTELLIGENT TRANSPORT SYSTEM DEPLOYMENTS IN KAJANG CITY
 
Volume study (group 5)
Volume study (group  5)Volume study (group  5)
Volume study (group 5)
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
 
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdfTRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
TRAFFIC ENGINEERING & HIGHWAY DRAINAGE_.pdf
 
Mapping vehicle emissions through streets and intersections application of ...
Mapping vehicle emissions through streets and intersections   application of ...Mapping vehicle emissions through streets and intersections   application of ...
Mapping vehicle emissions through streets and intersections application of ...
 
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...
The Hamburg Rutting Test – Alternative Data Analysis Methods and HMA Screenin...
 

Recently uploaded

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Reporte diseño multicarril

  • 1. MULTILANE HIGHWAYS WORKSHEET(Direction 1) General Information Site Information Analyst DANIELA RODRIGU- CARLOS FIGUER Agency or Company Date Performed 26/05/2015 Analysis Time Period Highway/Direction to Travel From/To Jurisdiction Analysis Year Project Description TALLER 3. DISEÑO MULTICARRIL Oper.(LOS) Des. (N) Plan. (vp) Flow Inputs Volume, V (veh/h) 1000 Peak-Hour Factor, PHF 0.85 AADT(veh/h) %Trucks and Buses, PT 24 Peak-Hour Prop of AADT (veh/d) %RVs, PR 0 Peak-Hour Direction Prop, D General Terrain: Grade DDHV (veh/h) Grade Length (km) 1.60 Driver Type Adjustment 1.00 Up/Down % 6.00 Number of Lanes Calculate Flow Adjustments fp 1.00 ER 6.0 ET 3.0 fHV 0.676 Speed Inputs Calc Speed Adj and FFS Lane Width, LW (m) 3.6 Total Lateral Clearence, LC (m) 3.6 Access Points, A (A/km) 2 Median Type, M Undivided FFS (measured) Base Free-Flow Speed, BFFS 98.9 fLW (km/h) 0.0 fLC (km/h) 0.0 fA (km/h) 1.3 fM (km/h) 2.6 FFS (km/h) 95.0 Operations Design Operational (LOS) Flow Rate, vp (pc/h/ln) Speed, S (km/h) D (pc/km/ln) LOS Design (N) Required Number of Lanes, N 1.7 Flow Rate, vp (pc/h) 1741 Max Service Flow Rate (pc/h/ln) 1044 Design LOS B Copyright © 2005 University of Florida, All Rights Reserved HCS+TM Version 5.1 Generated: 29/05/2015 10:12 Página 1 de 1MULTILANE HIGHWAYS WORKSHEET(Dir 1) 29/05/2015file:///C:/Users/ÑaÑeLa/AppData/Local/Temp/u2k71F9.tmpYou created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)