SlideShare a Scribd company logo
1 of 16
2023
REGAINING CONTROL IN THE NEW SUPPLY CHAIN
THE VIEWS AND OPINIONS EXPRESSED IN THIS
DOCUMENT ARE THOSE OF THE SPEAKERS AND DO NOT
NECESSARILY REFLECT THE VIEWS OR POSITIONS OF ARROW
ELECTRONICS AND ITS ENTITIES.
DMS Resolution
Runway
Sr. Engineering Manager DMS
General Atomics Aeronautical Systems
DAVID
PENIC
BOSTON, MA
20
23
This document does not contain U.S. export controlled technical data.
DMS Resolution Runway
David Penic
DMSMS / Component Engineering Senior Manager
Engineering Services Group
David.Penic@ga-asi.com | (858) 312-4022
This document does not contain U.S. export controlled technical data.
General Atomics Aeronautical Systems Family of Aircraft
Avenger
Armed Reconnaissance , Quick Response
Gray Eagle
U.S. Army Troop Support
Ground Control Station
Block 30
Predator B/MQ-9 Reaper/SkyGuardian
Certifiable / Maritime Surveillance
700+
Aircraft Delivered
Every Second
of Every Day
There are over 70
Predator-series
aircraft airborne
worldwide.
450+
Ground Control
Stations Delivered
6.5M+ Flight Hours
90% Combat Hours
Predator/Predator XP
Persistent Regional Surveillance
This document does not contain U.S. export controlled technical data.
Vertically Integrated Design and
Manufacturing Operations
9,000+ Employees | 5.3M Square Feet
Composite Manufacturing
Engineering Mission Payloads & Exploitations
Manufacturing
Headquarters
GA-ASI– San Diego, CA
This document does not contain U.S. export controlled technical data.
Facilities Overview
El Mirage
Spanish Fork
Castle Dome
Gray Butte
Adelanto
This document does not contain U.S. export controlled technical data.
Diminishing Manufacturing Sources & Integrated Product Team Overview
Obsolescence
Management
DMS Program
Management
DMS
Engineering
Component
Engineering
Obsolescence Management
Obsolescence
Management
• POC for all Obsolescence and DMS Parts Issues
• Identifies, analyzes, tracks, and reports DMS issues via proposals and contractor data
requirements list (CDRLs)
• Manages and executes all Last Time Buys (LTB) to provide short-term mitigation for impending
DMS
This document does not contain U.S. export controlled technical data.
Obsolescence
Management
DMS Program
Management
DMS
Engineering
Component
Engineering
DMS Program Management
DMS Program
Management
• Program Management
• Provides point of contact and supports briefings for GA-ASI Programs and Government Reps on
DMS issues
• Manage critical last time buy (LTB) inventory/material
Diminishing Manufacturing Sources & Integrated Product Team Overview
This document does not contain U.S. export controlled technical data.
Obsolescence
Management
DMS Program
Management
DMS
Engineering
Component
Engineering
DMS Engineering
DMS
Engineering
• Develops mitigation strategies to resolve identified DMS issues
• Executes “Quick Start” NRE activities to address emergent DMS issues
Diminishing Manufacturing Sources & Integrated Product Team Overview
This document does not contain U.S. export controlled technical data.
Obsolescence
Management
DMS Program
Management
DMS
Engineering
Component
Engineering
Component Engineering
Component
Engineering
• Executes GA-ASI’s Counterfeit Parts Prevention program
• Provides support to Engineering on new part selection to optimize part lifecycle and availability
• Supports Procurement with part shortages
Diminishing Manufacturing Sources & Integrated Product Team Overview
This document does not contain U.S. export controlled technical data.
DMS IPT
Support
United Kingdom
Italy
France
Spain
Belgium
Japan CG
Netherlands
Poland
India
Taiwan
UAE
USAF
US Army
USMC / Navy
DHS / CBP
Avenger
Armed Reconnaissance,Quick Response
Predator B/MQ-9 Reaper/SkyGuardian
Hunter Killer/MaritimeSurveillance
Gray Eagle
U.S. Army Troop Support
GroundControl Station
Block 30
Diminishing Manufacturing Sources & Integrated Product Team Support
This document does not contain U.S. export controlled technical data.
DMS Resolution Runway
This document does not contain U.S. export controlled technical data.
DMS Issue Strategy Development
Program(s) Impact / Material Run Out
Lead time to acquire evaluation units
Impact to software and / or hardware
Development time
NRE (Non-Recurring Engineering)
Impact to existing contracts?
If not, plan for future contracts to cover?
Funding
Reporting and Customer approval
Bench & System level
Environmental
Flight / ground
Testing
Last
Time
Buy
(LTB)
>>
>>
>>
>>
DMS Resolution Runway
This document does not contain U.S. export controlled technical data.
Other Considerations
MQ-9B SeaGuardian
Do we need to procure materials at
risk in advance to reduce production
introduction lead time?
During NRE timeline, how do we
ensure that no new demand comes in
that consumes our last time buy
material and shortens our runway?
THANK YOU
This document does not contain U.S. export controlled technical data.
Contact Information
David Penic
DMSMS / Component Engineering Senior Manager
Engineering Services Group
David.Penic@ga-asi.com | (858) 312-4022
Connect with me on
LinkedIn

More Related Content

Similar to DMS Resolution Runway

William_Jones_Modified_012016
William_Jones_Modified_012016William_Jones_Modified_012016
William_Jones_Modified_012016
Bill Jones
 
Resume Nasir Likedin 11-9-16
Resume Nasir Likedin 11-9-16Resume Nasir Likedin 11-9-16
Resume Nasir Likedin 11-9-16
Nasir Pirani
 
MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3
Allison Marie Rhen
 
MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3
Allison Marie Rhen
 
Blast technologies wiaman
Blast technologies wiamanBlast technologies wiaman
Blast technologies wiaman
ldpayne
 
baes_ds_201408_Bradley+A3
baes_ds_201408_Bradley+A3baes_ds_201408_Bradley+A3
baes_ds_201408_Bradley+A3
Eric Canoy
 

Similar to DMS Resolution Runway (20)

Avionics system Standard
Avionics system StandardAvionics system Standard
Avionics system Standard
 
Avionics System Standards.pdf
Avionics System Standards.pdfAvionics System Standards.pdf
Avionics System Standards.pdf
 
Model-Based Design & Analysis.ppt
Model-Based Design & Analysis.pptModel-Based Design & Analysis.ppt
Model-Based Design & Analysis.ppt
 
William_Jones_Modified_012016
William_Jones_Modified_012016William_Jones_Modified_012016
William_Jones_Modified_012016
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdooh
 
digital avionics systems
digital avionics systemsdigital avionics systems
digital avionics systems
 
Resume Nasir Likedin 11-9-16
Resume Nasir Likedin 11-9-16Resume Nasir Likedin 11-9-16
Resume Nasir Likedin 11-9-16
 
MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3
 
MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3MJLM Capabilities Overview 2016 (FULL) v3
MJLM Capabilities Overview 2016 (FULL) v3
 
5_16_15_Chron_Resume
5_16_15_Chron_Resume5_16_15_Chron_Resume
5_16_15_Chron_Resume
 
IoT and M2M Safety and Security
IoT and M2M Safety and Security 	IoT and M2M Safety and Security
IoT and M2M Safety and Security
 
Mark A Schmier-II
Mark A Schmier-IIMark A Schmier-II
Mark A Schmier-II
 
Blast technologies wiaman
Blast technologies wiamanBlast technologies wiaman
Blast technologies wiaman
 
Cayley Aerospace Inc USA
Cayley Aerospace Inc USACayley Aerospace Inc USA
Cayley Aerospace Inc USA
 
#Interactive Session by Ashwini Lalit, RRR of Test Automation Maintenance" at...
#Interactive Session by Ashwini Lalit, RRR of Test Automation Maintenance" at...#Interactive Session by Ashwini Lalit, RRR of Test Automation Maintenance" at...
#Interactive Session by Ashwini Lalit, RRR of Test Automation Maintenance" at...
 
5 Things to Know about Safety-Critical Applications in Aerospace
5 Things to Know about Safety-Critical Applications in Aerospace5 Things to Know about Safety-Critical Applications in Aerospace
5 Things to Know about Safety-Critical Applications in Aerospace
 
5 Things to Know about Safety-Critical Applications in Aerospace
5 Things to Know about Safety-Critical Applications in Aerospace5 Things to Know about Safety-Critical Applications in Aerospace
5 Things to Know about Safety-Critical Applications in Aerospace
 
MJLM Capabilities Presentation - 2013
MJLM Capabilities Presentation - 2013MJLM Capabilities Presentation - 2013
MJLM Capabilities Presentation - 2013
 
Dj Mack Resume.Doc
Dj Mack Resume.DocDj Mack Resume.Doc
Dj Mack Resume.Doc
 
baes_ds_201408_Bradley+A3
baes_ds_201408_Bradley+A3baes_ds_201408_Bradley+A3
baes_ds_201408_Bradley+A3
 

More from Converge (6)

Regain Supply Chain Control
Regain Supply Chain ControlRegain Supply Chain Control
Regain Supply Chain Control
 
Supporting a Dynamic Marketplace
Supporting a Dynamic MarketplaceSupporting a Dynamic Marketplace
Supporting a Dynamic Marketplace
 
Connected for the Long Haul
Connected for the Long HaulConnected for the Long Haul
Connected for the Long Haul
 
Staying on the Cutting Edge While Dealing With Today's Complexities
Staying on the Cutting Edge While Dealing With Today's ComplexitiesStaying on the Cutting Edge While Dealing With Today's Complexities
Staying on the Cutting Edge While Dealing With Today's Complexities
 
Adapting to the Changing Landscapes in Supply Chain Management
Adapting to the Changing Landscapes in Supply Chain ManagementAdapting to the Changing Landscapes in Supply Chain Management
Adapting to the Changing Landscapes in Supply Chain Management
 
Obsoleting Global Supply Chain Management
Obsoleting Global Supply Chain ManagementObsoleting Global Supply Chain Management
Obsoleting Global Supply Chain Management
 

Recently uploaded

Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
FIDO Alliance
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc
 

Recently uploaded (20)

State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptxCyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
Cyber Insurance - RalphGilot - Embry-Riddle Aeronautical University.pptx
 
WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024WebRTC and SIP not just audio and video @ OpenSIPS 2024
WebRTC and SIP not just audio and video @ OpenSIPS 2024
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
How to Check GPS Location with a Live Tracker in Pakistan
How to Check GPS Location with a Live Tracker in PakistanHow to Check GPS Location with a Live Tracker in Pakistan
How to Check GPS Location with a Live Tracker in Pakistan
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Navigating the Large Language Model choices_Ravi Daparthi
Navigating the Large Language Model choices_Ravi DaparthiNavigating the Large Language Model choices_Ravi Daparthi
Navigating the Large Language Model choices_Ravi Daparthi
 
AI mind or machine power point presentation
AI mind or machine power point presentationAI mind or machine power point presentation
AI mind or machine power point presentation
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 

DMS Resolution Runway

  • 1. 2023 REGAINING CONTROL IN THE NEW SUPPLY CHAIN THE VIEWS AND OPINIONS EXPRESSED IN THIS DOCUMENT ARE THOSE OF THE SPEAKERS AND DO NOT NECESSARILY REFLECT THE VIEWS OR POSITIONS OF ARROW ELECTRONICS AND ITS ENTITIES.
  • 2. DMS Resolution Runway Sr. Engineering Manager DMS General Atomics Aeronautical Systems DAVID PENIC BOSTON, MA 20 23
  • 3. This document does not contain U.S. export controlled technical data. DMS Resolution Runway David Penic DMSMS / Component Engineering Senior Manager Engineering Services Group David.Penic@ga-asi.com | (858) 312-4022
  • 4. This document does not contain U.S. export controlled technical data. General Atomics Aeronautical Systems Family of Aircraft Avenger Armed Reconnaissance , Quick Response Gray Eagle U.S. Army Troop Support Ground Control Station Block 30 Predator B/MQ-9 Reaper/SkyGuardian Certifiable / Maritime Surveillance 700+ Aircraft Delivered Every Second of Every Day There are over 70 Predator-series aircraft airborne worldwide. 450+ Ground Control Stations Delivered 6.5M+ Flight Hours 90% Combat Hours Predator/Predator XP Persistent Regional Surveillance
  • 5. This document does not contain U.S. export controlled technical data. Vertically Integrated Design and Manufacturing Operations 9,000+ Employees | 5.3M Square Feet Composite Manufacturing Engineering Mission Payloads & Exploitations Manufacturing Headquarters GA-ASI– San Diego, CA
  • 6. This document does not contain U.S. export controlled technical data. Facilities Overview El Mirage Spanish Fork Castle Dome Gray Butte Adelanto
  • 7. This document does not contain U.S. export controlled technical data. Diminishing Manufacturing Sources & Integrated Product Team Overview Obsolescence Management DMS Program Management DMS Engineering Component Engineering Obsolescence Management Obsolescence Management • POC for all Obsolescence and DMS Parts Issues • Identifies, analyzes, tracks, and reports DMS issues via proposals and contractor data requirements list (CDRLs) • Manages and executes all Last Time Buys (LTB) to provide short-term mitigation for impending DMS
  • 8. This document does not contain U.S. export controlled technical data. Obsolescence Management DMS Program Management DMS Engineering Component Engineering DMS Program Management DMS Program Management • Program Management • Provides point of contact and supports briefings for GA-ASI Programs and Government Reps on DMS issues • Manage critical last time buy (LTB) inventory/material Diminishing Manufacturing Sources & Integrated Product Team Overview
  • 9. This document does not contain U.S. export controlled technical data. Obsolescence Management DMS Program Management DMS Engineering Component Engineering DMS Engineering DMS Engineering • Develops mitigation strategies to resolve identified DMS issues • Executes “Quick Start” NRE activities to address emergent DMS issues Diminishing Manufacturing Sources & Integrated Product Team Overview
  • 10. This document does not contain U.S. export controlled technical data. Obsolescence Management DMS Program Management DMS Engineering Component Engineering Component Engineering Component Engineering • Executes GA-ASI’s Counterfeit Parts Prevention program • Provides support to Engineering on new part selection to optimize part lifecycle and availability • Supports Procurement with part shortages Diminishing Manufacturing Sources & Integrated Product Team Overview
  • 11. This document does not contain U.S. export controlled technical data. DMS IPT Support United Kingdom Italy France Spain Belgium Japan CG Netherlands Poland India Taiwan UAE USAF US Army USMC / Navy DHS / CBP Avenger Armed Reconnaissance,Quick Response Predator B/MQ-9 Reaper/SkyGuardian Hunter Killer/MaritimeSurveillance Gray Eagle U.S. Army Troop Support GroundControl Station Block 30 Diminishing Manufacturing Sources & Integrated Product Team Support
  • 12. This document does not contain U.S. export controlled technical data. DMS Resolution Runway
  • 13. This document does not contain U.S. export controlled technical data. DMS Issue Strategy Development Program(s) Impact / Material Run Out Lead time to acquire evaluation units Impact to software and / or hardware Development time NRE (Non-Recurring Engineering) Impact to existing contracts? If not, plan for future contracts to cover? Funding Reporting and Customer approval Bench & System level Environmental Flight / ground Testing Last Time Buy (LTB) >> >> >> >> DMS Resolution Runway
  • 14. This document does not contain U.S. export controlled technical data. Other Considerations MQ-9B SeaGuardian Do we need to procure materials at risk in advance to reduce production introduction lead time? During NRE timeline, how do we ensure that no new demand comes in that consumes our last time buy material and shortens our runway?
  • 16. This document does not contain U.S. export controlled technical data. Contact Information David Penic DMSMS / Component Engineering Senior Manager Engineering Services Group David.Penic@ga-asi.com | (858) 312-4022 Connect with me on LinkedIn