PROJECT DESCRIPTION
Final completion of the building’s works and infrastructures:
water (supply, waste water, drainage), electrical,
telecommunications, gas supply and landscape works
Manpower planning and execution, Schedule management,
Team Work and Subcontracts management, Operations
management, Procurement Management, Quality assurance
management, Analytical skills and Building Surveyor…
I did the Construction Management at the final phase of
construction.
Daily problem-solving as “expected” and coordination.
330 APTS
CONDOMINHAS
Oporto /
Portugal
PROJECT DESCRIPTION
Built from inception to deliver. Earthworks, exterior and
interior infrastructures: water (supply, waste water,
drainage), electrical, telecommunications, gas supply,
concrete structure, walling, coatings, kitchen furnish, … and
landscape works.
The construction of 64 apartments for Social Housing.
Although “Social Housing” the infrastructures and valences
had a wide and complete range.
Construction planning and management, Manpower planning
and execution, Budget and schedule management, Team
Work and played crucial role in preparation of consultation
processes for Subcontracts, Operations management,
Procurement Management, Quality assurance management,
Analytical skills and Building Surveyor…
I did the Construction/Project Management with
Architecture and Engineering Companies.
64 APTS
DÁLIA’S STREET
Vila do
Conde /
Portugal
64 APTS
DÁLIA’S STREET
Vila do
Conde /
Portugal
PROJECT DESCRIPTION
Built from inception to deliver. Earthworks, exterior and
interior infrastructures: water (supply, waste water,
drainage), electrical, telecommunications, gas supply,
concrete structure, walling, coatings, kitchen furnish, … and
landscape works.
Construction planning and management, Manpower planning
and execution, Budget and schedule management, Team
Work and played crucial role in preparation of consultation
processes for Subcontracts, Operations management,
Procurement Management, Quality assurance management,
Analytical skills and Building Surveyor…
The construction of 25 apartments for Social Housing.
Although “Social Housing” the infrastructures and valences
had a wide and complete range.
I did the Project Management with Architecture and
Engineering Companies as well with the Contractor.
25 APTS
FONTE DA CRUZ
Penafiel /
Portugal
25 APTS
FONTE DA CRUZ
Penafiel /
Portugal
LinkedIn Profile: http://pt.linkedin.com/in/coelhodasilva/
Website: www.coelhosilva.weebly.com
http://coelhosilva.weebly.com/residential.html
http://coelhosilva.weebly.com/highways--eathworks.html
http://coelhosilva.weebly.com/hospitality.html
http://coelhosilva.weebly.com/health--education.html
http://coelhosilva.weebly.com/industry.html
jaccsilva@gmail.com
+351 967070061
PORTUGAL
 COELHO DA
SILVA
 International
Project
Director
CIVIL ENGINEER
Oporto University / Portugal / 1994

More Related Content

Similar to CoelhoSilva_ResidentialProjects

Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Claus Otto Nielsen
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15Pieter Manders
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnellingAntti Nykänen
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017Richard Batts
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdfFaruq42
 
Henk Beekhof - English CV jan 2016
Henk Beekhof - English CV jan 2016Henk Beekhof - English CV jan 2016
Henk Beekhof - English CV jan 2016Henk Beekhof
 
Cv_NEkinci_02_sep2018 eng
Cv_NEkinci_02_sep2018 engCv_NEkinci_02_sep2018 eng
Cv_NEkinci_02_sep2018 engNihatEkinci1
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Harsh Gupta
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex projectAbhishek singh
 

Similar to CoelhoSilva_ResidentialProjects (20)

Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2Capacity_Statement_January_2014_2
Capacity_Statement_January_2014_2
 
LORENZO CABRAS CV
LORENZO CABRAS CVLORENZO CABRAS CV
LORENZO CABRAS CV
 
cvJP301015(English)
cvJP301015(English)cvJP301015(English)
cvJP301015(English)
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 
Porfolio
PorfolioPorfolio
Porfolio
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
CV NDJOCK yannick adonis english
CV NDJOCK yannick adonis englishCV NDJOCK yannick adonis english
CV NDJOCK yannick adonis english
 
DaveGriffithsCV
DaveGriffithsCVDaveGriffithsCV
DaveGriffithsCV
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
 
Henk Beekhof - English CV jan 2016
Henk Beekhof - English CV jan 2016Henk Beekhof - English CV jan 2016
Henk Beekhof - English CV jan 2016
 
Cv_NEkinci_02_sep2018 eng
Cv_NEkinci_02_sep2018 engCv_NEkinci_02_sep2018 eng
Cv_NEkinci_02_sep2018 eng
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
Stelian Dragomir CV
Stelian Dragomir CVStelian Dragomir CV
Stelian Dragomir CV
 
Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)Introduction to Civil Engineering (Harsh Gupta)
Introduction to Civil Engineering (Harsh Gupta)
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex project
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
resume_odesio mariano
resume_odesio marianoresume_odesio mariano
resume_odesio mariano
 

CoelhoSilva_ResidentialProjects

  • 2. 330 APTS CONDOMINHAS Oporto / Portugal PROJECT DESCRIPTION Final completion of the building’s works and infrastructures: water (supply, waste water, drainage), electrical, telecommunications, gas supply and landscape works Manpower planning and execution, Schedule management, Team Work and Subcontracts management, Operations management, Procurement Management, Quality assurance management, Analytical skills and Building Surveyor… I did the Construction Management at the final phase of construction. Daily problem-solving as “expected” and coordination.
  • 4. PROJECT DESCRIPTION Built from inception to deliver. Earthworks, exterior and interior infrastructures: water (supply, waste water, drainage), electrical, telecommunications, gas supply, concrete structure, walling, coatings, kitchen furnish, … and landscape works. The construction of 64 apartments for Social Housing. Although “Social Housing” the infrastructures and valences had a wide and complete range. Construction planning and management, Manpower planning and execution, Budget and schedule management, Team Work and played crucial role in preparation of consultation processes for Subcontracts, Operations management, Procurement Management, Quality assurance management, Analytical skills and Building Surveyor… I did the Construction/Project Management with Architecture and Engineering Companies. 64 APTS DÁLIA’S STREET Vila do Conde / Portugal
  • 5. 64 APTS DÁLIA’S STREET Vila do Conde / Portugal
  • 6. PROJECT DESCRIPTION Built from inception to deliver. Earthworks, exterior and interior infrastructures: water (supply, waste water, drainage), electrical, telecommunications, gas supply, concrete structure, walling, coatings, kitchen furnish, … and landscape works. Construction planning and management, Manpower planning and execution, Budget and schedule management, Team Work and played crucial role in preparation of consultation processes for Subcontracts, Operations management, Procurement Management, Quality assurance management, Analytical skills and Building Surveyor… The construction of 25 apartments for Social Housing. Although “Social Housing” the infrastructures and valences had a wide and complete range. I did the Project Management with Architecture and Engineering Companies as well with the Contractor. 25 APTS FONTE DA CRUZ Penafiel / Portugal
  • 7. 25 APTS FONTE DA CRUZ Penafiel / Portugal
  • 8. LinkedIn Profile: http://pt.linkedin.com/in/coelhodasilva/ Website: www.coelhosilva.weebly.com http://coelhosilva.weebly.com/residential.html http://coelhosilva.weebly.com/highways--eathworks.html http://coelhosilva.weebly.com/hospitality.html http://coelhosilva.weebly.com/health--education.html http://coelhosilva.weebly.com/industry.html jaccsilva@gmail.com +351 967070061 PORTUGAL  COELHO DA SILVA  International Project Director CIVIL ENGINEER Oporto University / Portugal / 1994