SlideShare a Scribd company logo
1 of 12
Download to read offline
Christian Ivan Monarres Alvarez
Senior Health Physics Technician
Training Courses
2011 Dose rate, contamination instrumentation and surveys qualified at Brunswick.
4/8/11 NUF RP Test satisfactory passed on with 90% in Brunswick.
2006 Dose rate, contamination instrumentation and surveys qualified at SONGS.
2/2004 Course of Re-Training for Rad Training Course (POE), in the facilities of Bartlett
de México S.A. de C.V.
10/16/98 Laguna Verde course for Rad Training for new employees (POE) in the nuclear
power station, in the training center of the Nuclear Power Plant Laguna Verde.
10/16/98 Rad Training Course at Laguna Verde (POE) in the Nuclear Power Station, in the
facilities of Bartlett de México S.A. de C.V.
8/13/97 Course at Laguna Verde for Rad Training Course (POE) in the Nuclear power
station, in the training center.
Experience
10/12/15 - Oconee Nuclear Power Plant (Bartlett)
11/8/15 Senior Health Physics Lead Technician
Duties included: Duties included: Lead on Alloy 600 project, support in
containment: performing radiological surveys of materials and equipment in order
to characterize radiation and contamination levels and quantities, Rover in RCB,
job coverage during refuel activities and smear and clear from CA tools and
equipment, HRA guards, and routines.
9/2/15 - McGuire Nuclear Power Plant (Bartlett)
10/5/15 Senior Health Physics Technician
Duties included: Duties included: support in upper containment: performing
radiological surveys of materials and equipment in order to characterize radiation
and contamination levels and quantities, Radiological job coverage on pressurizer,
valves and during refuel activities, survey areas and smear and clear from CA
tools and equipment, HRA guards, and routines.
5/5/15 - Robinson Nuclear Power Plant (Bartlett)
6/19/15 Senior Health Physics Technician
Duties included: Duties included: support in containment: performing radiological
surveys of materials and equipment in order to characterize radiation and
contamination levels and quantities, Rover in RCB, RHR pumps radiological job
coverage, job coverage in Auxiliary building, scaffold surveys and smear and
clear from CA tools and equipment, HRA guards, and routines.
3/25/15 - Shearon Harris Nuclear Power Plant (Bartlett)
5/02/15 Senior Health Physics Technician
Duties included: Duties included: support in containment: performing radiological
surveys of materials and equipment in order to characterize radiation and
contamination levels and quantities, Rover in RCB, providing job coverage in
head (reactor) repairs, scaffold surveys and smear and clear from CA tools and
equipment, HRA guards, and routines.
01/26/15 - Brunswick Steam Electric Plant (Bartlett)
03/23/15 Senior Health Physiscs
Duties included: Performing radiological surveys of materials, rooms, areas and
equipment in order to characterize radiation and contamination levels and
quantities in order to label, store, move, release and tag for transfer various
packages and containers of radioactive materials, HP job coverage support on
valves in Turbine Building, scaffold and air ample surveys, installing and
demobing HEPA and Vacuum equipment.
10/29/14 Oconee Nuclear Power Station (Bartlett)
12/13/14 Senior Health Physics Lead Tech
RP work on refuel, Smear and clear radioactive material, RP coverage on reactor
Cavity decontamination, Steam generators RP job coverage, etc
9/03/14 McGuire Nuclear Power Station (Bartlett)
10/23/14 Senior Health Physics Technician
Duties included: support in containment: performing radiological surveys of
materials and equipment in order to characterize radiation and
contamination levels and quantities, Upper containment RP work, Technology
support, Thimbles replacement, Rx core barrel & Rx vessel UT inspections,
Smear and clear radioactive arterial, RP job coverage, etc.
04/22/14 Oconee Nuclear Power Station (Bartlett)
05/09/14 Senior Health Physics Lead Tech
RP work on refuel deck, Technology support, Rx core barrel & Rx vessel
UT inspections, Smear and clear radioactive arterial, RP job coverage, etc
3/11/14 McGuire Nuclear Power Station (Bartlett)
4/21/14 Senior Health Physics Technician
Duties included: Upper containment RP work, Technology support,
Thimbles replacement, Rx core barrel & Rx vessel UT inspections,
Smear and clear radioactive arterial, RP job coverage, etc.
10/11/13 - Oconee Nuclear Power Station (Bartlett)
12/05/13 Senior Health Physics Technician
Duties included: support in containment: performing radiological surveys of
materials and equipment in order to characterize radiation and
contamination levels and quantities, RP work on refuel deck, Technology support,
Rx core barrel, Rx Head
& Rx vessel UT inspections, Smear and clear radioactive arterial,
RP job coverage, etc
9/9/13 - Catawba Nuclear Power Station (Bartlett)
10/6/13 Senior Health Physics Technician
Duties included: support in containment: performing radiological surveys of
materials and equipment in order to characterize radiation and
contamination levels and quantities. Performed surveys in order to
label, store, move, and prepare for transfer various packages and
containers of radioactive materials., reactor head inspections, etc.
4/9/13 - Susquehanna Steam Electric Station (Bartlett)
5/23/13 Junior Health Physics Technician
Duties included: TB work including: rotor blades replacement, FWH, condenser,
smear and clear tools and equipment, etc.
2/16/13 - Brunswick Steam Electric Plant (Bartlett)
4/7/13 Senior Health Physiscs
Duties included: Performing radiological surveys of materials, rooms, areas and
equipment in order to characterize radiation and contamination levels and
quantities in order to label, store, move, release and tag for transfer various
packages and containers of radioactive materials, HP job coverage support on
valves in Turbine Building, scaffold and air ample surveys, installing and
demobing HEPA and Vacuum equipment.
10/22/12 - Oconee Nuclear Power Station (Bartlett)
11/25/12 Senior Health Physics Technician
8/27/12 - McGuire Nuclear Power Station (Bartlett)
10/20/12 Senior Health Physics Technician
Duties included: S/G RP work, technology support, etc.
4/14/12 - Shearon Harris Nuclear Power Plant (Bartlett)
6/11/12 Junior Health Physics Technician
Duties included: Containment support. Rover in RCB, helping in head (reactor)
repairs, scaffold surveys and smear and clear from CA tools and equipment, HRA
guards, and routines.
2/25/12 - Brunswick Steam Electric Plant (Bartlett)
4/12/12 Junior Health Physics Technician
Duties included: Performing radiological surveys of materials, rooms, areas and
equipment in order to characterize radiation and contamination levels and
quantities in order to label, store, move, release and tag for transfer various
packages and containers of radioactive materials, HP job coverage support on
valves in Turbine Building, scaffold and air ample surveys, installing and
demobing HEPA and Vacuum equipment.
1/3/12 - San Onofre Nuclear Generating Station (Bartlett)
2/17/12 Senior Decontamination Technician
Duties included: Unit II - Duties consisted during Rx Head Replacement; support
in containment: performing radiological surveys of materials and equipment in
order to characterize radiation and contamination levels and quantities. Rad-waste
Bldg. Support: performed surveys in order to label, store, move, and prepare for
transfer various packages and containers of radioactive materials. Performed
physical decontamination of rooms, areas and equipment, including ECCS, Heat
Exchanger, and decontamination & clean up boric acid. Collected and surveyed
radioactive trash and laundry.
8/29/11 - Peach Bottom Atomic Power Station (Bartlett)
12/1/11 Senior Radwaste Technician
Duties included: Decon activities on Dry-well, Turbine Bldg., Refuel floor, Rad-
waste Bldg., Low Level Rad-waste, Cavity Decon, CRDs, RHR Room, store,
move, and prepare for transfer various packages and containers of radioactive
materials. Performed physical decontamination of rooms, areas and equipment,
collected radioactive trash and laundry, and Fire-watch duties.
4/11/11 - Catawba Nuclear Power Station (Bartlett) TN Visa
5/27/11 Junior Health Physics Technician
Duties included: Performing radiological surveys of materials and equipment in
order to characterize radiation and contamination levels and quantities in order to
label, store, move, and prepare for transfer various packages and containers of
radioactive materials, performing support on refuel floor (upper containment) and
lower containment such as: Reactor Head removal, RH HVAC removal, smear
and clear radioactive material, moving filters, moving fuel, counting air samples.
2/14/11 - Brunswick Steam Electric Plant (Bartlett) TN Visa
4/8/11 Senior Decontamination Technician
Duties included: Performing radiological surveys of materials and equipment in
order to characterize radiation and contamination levels and quantities in order to
label, store, move, and prepare for transfer various packages and containers of
radioactive materials. Performed physical decontamination of rooms, valves, areas
and equipment, FME and Firewatch duties, Collected and surveyed radioactive
trash and laundry.
9/13/10 - San Onofre Nuclear Generating Station (Bartlett) TN Visa
1/29/11 Senior Decontamination Technician
Duties included: During SGR: Unit III - Duties consisted during SGR: performing
radiological surveys of materials and equipment in order to characterize radiation
and contamination levels and quantities. Performed surveys in order to label,
store, move, and prepare for transfer various packages and containers of
radioactive materials. Performed physical decontamination of rooms, areas and
equipment, including steam generator platforms, reactor head stand, and
decontaminations spray booth operations. Collected and surveyed radioactive
trash and laundry.
4/11/10 - H.B. Robinson Nuclear Power Plant (Bartlett) L1B Visa
6/4/10 Senior Decontamination Technician
Duties included: Performed decontamination of rooms, tools and equipment,
support on steam generators activities, vacuuming, support on refuel floor such as:
removing temporary reactor head/ and decontamination, vacuum, divers support,
support the removal of Core Barrel, and many other decon activities.
Decontamination of RCPs and seal ring, and trash and laundry.
2/15/10 - Brunswick Steam Electric Plant (Bartlett) L1B Visa
4/9/10 Senior Decontamination Technician
Duties included: Performed physical decontamination of rooms, valves, areas and
equipment, FME and Firewatch duties, Collected and surveyed radioactive trash
and laundry.
8/29/2009 - San Onofre Nuclear Generating Station (Bartlett) L1B Visa
1/9/10 Senior Decontamination Technician
Duties included: Unit II - Duties consisted during SGR: performing radiological
surveys of materials and equipment in order to characterize radiation and
contamination levels and quantities. Performed surveys in order to label, store,
move, and prepare for transfer various packages and containers of radioactive
materials. Performed physical decontamination of rooms, areas and equipment,
including steam generator platforms, reactor head stand, and decontaminations
spray booth operations. Collected and surveyed radioactive trash and laundry.
3/9/2009 - D.C. Cook Nuclear Power Plant (Bartlett) L1B Visa
5/1/2009 Senior Decontamination Technician
Duties included: Work on lower and upper containment such as cavity decon,
decon tools and equipment on TEDA, ALARA crew moving and hanging led
blankets and lower containment and support decon rooms.
9/30/2006 - San Onofre Nuclear Generating Station (Bartlett) LIB Visa
1/30/2009 Senior Decontamination Technician
Duties included: Provided Radwaste support to the Unit 1 Decommissioning
project for preparation, packaging and shipment of waste to processors or burial.
Units II and Units III - Duties consisted of performing radiological surveys of
materials and equipment in order to characterize radiation and contamination
levels and quantities. Performed surveys in order to label, store, move, and
prepare for transfer various packages and containers of radioactive materials.
Performed physical decontamination of rooms, areas and equipment, including
steam generator platforms, reactor head stand, and decontaminations spray booth
operations. Collected and surveyed radioactive trash and laundry.
5/22/2006 - Enrico Fermi Nuclear Power Plant (Bartlett) LIB Visa
5/30/2006 Senior Decontamination Technician
Duties included: Cavity decon and decon areas, support with works on basement.
3/15/2006 - Enrico Fermi Nuclear Power Plant (Bartlett) LIB Visa
5/3/2006 Senior Decontamination Technician
Duties included: Support on Decon activities like lead shields, Touros, trash and
laundry, decon tools and equipment, cavity decon support, and support on CRDs.
4/29/2005 - Laguna Verde Nuclear Power Station
3/14/2006 Decontamination Technician
Duties included: Works of decontamination and Waste segregation and coverage
routine of transportation Anti C cloth, Anti C cloth storaging in the Unit-1 and
Unit-2 from the Movable Laundry.
4/20/2005 - Pilgrim Nuclear Power Station LIB Visa
4/28/2005 Decontamination Technician
Duties included: Outage support for North American company IHI SwT. in
Decontamination and installation of equipment, tools, in restricted areas like
Refuel Floor and all Reactor Building, and as a translator.
4/10/2005 - IHI Southwest Tec. LIB Visa
4/19/2005 Decontamination Technician
Duties included: Travel to San Antonio to check the equipment and prepare tools
for the next outage, and take training from IHI SwT. about the functionability to
the equipment.
4/7/2005 - Duane Arnold Energy Center LIB Visa
4/9/2005 Decontamination Technician
Duties included: Outage support for North American company IHI SwT. in
Decontamination and installation of equipment, tools, in restricted areas like
Refuel Floor and all Reactor Building, and as a translator.
4/6/2005 - IHI Southwest Tec. LIB Visa
4/6/2005 Decontamination Technician
Duties included: Travel to San Antonio to check the equipment and prepare tools
for the next outage.
3/16/2005 - Quad Cities Nuclear Power Plant LIB Visa
4/5/2005 Decontamination Technician
Duties included: Outage support for North American company IHI SwT. in
Decontamination and installation of equipment, tools, in restricted areas like
Refuel Floor and all Reactor Building, and as a translator.
3/12/2005 - IHI Southwest Tec. LIB Visa
3/15/2005 Decontamination Technician
Duties included: Travel to San Antonio to check the equipment and prepare tools
for the next outage, and take training from IHI SwT. about the functionability to
the equipment.
2/23/2005 - Limerick Nuclear Generating Station LIB Visa
3/11/2005 Decontamination Technician
Duties included: Outage support for North American company IHI SwT. in
Decontamination and installation of equipment, tools, in restricted areas like
Refuel Floor and all Reactor Building, and as a translator.
2/13/2005 - IHI Southwest Tec. LIB Visa
2/22/2005 Decontamination Technician
Duties included: Support for North American company IHI SwT. in their facilities
in preparation of equipment, tools, to work on restricted areas like Refuel Floor,
and as a translator.
10/12/2004 - Laguna Verde Nuclear Power Station
11/28/2004 Decontamination Technician
Duties included: Provided outage support for North American company IHI SwT,
Decontaminating and installing equipment, tools, in restricted areas such as like
dry well, and all Reactor Building, and as a translator. Works of decontamination
and Waste segregation and coverage routine of transportation Anti C cloth, Anti C
cloth storaging in the Unit-1 and Unit-2 from the Movable Laundry.
4/12/2004 - Laguna Verde Nuclear Power Station
5/30/2004 Decontamination Technician
Duties included: Provided outage support to North American company IHI SwT.
in Decontamination and installation of equipment, tools, in restricted areas such as
Dry Well, and Reactor Building. Performed decontamination and Waste
segregation and coverage routine of transporting Anti C cloth, Anti C cloth
storaging in Unit-1 and Unit-2 from the Movable Laundry.
8/26/2003 - MUÑIZ Construcciones
1/25/2004 Valve Mechanic
Duties included: Performed preventive maintenance and/or corrective
maintenance to valves (removing valves, disassembly, fixing internal parts,
polishing seats and seals, assemble and install the valves) in Plant Matapionche
Cotaxtla PEMEX Veracruz.
4/21/2003 - Laguna Verde Nuclear Power Station
6/6/2003 Mechanic Assistant
Duties included: Performed outage Mechanical Maintenance for Valves, provide
preventive and to assembly) with work conducted in Dry Well, Turbine, Reactor,
etc.
8/23/2002 - Laguna Verde Nuclear Power Station
12/22/2002 Decontamination Technician
Duties included: Performed outage support to North American company IHI SwT
for decontamination and installation of equipment, tools, in restricted areas like
Dry Well, and all Reactor Building. Performed decontamination and waste
segregation coverage routine of transporting Anti C cloth, Anti C cloth storaging
into the Unit-1 and Unit-2 from the Movable Laundry.
5/16/2002 - Bartlett de México
8/22/2002 Administrative Aux. Technician
Duties included: Supported different areas of HP (performance reports),
Accounting (elaborating the payroll, Purchasing, Quality assurance, technical
Management, Phone operator and Office Assistant.
3/12/2002 - Bartlett de México
5/15/2002 House Keeping Technician
Duties included: Performed Industrial housekeeping in TAMSA in areas such as
LACO, Steel Forge, Cranes, cleaning pipes, cleaning pumps, cleaning motors and
moving oil barrels.
11/2001- Dumex-Copisa
1/2002 Welder Assistant
Duties included: Performed construction of the Mechanical-electrical utilities
assisting in the electrical area (electrical installation), mechanical area (installing
mechanical equipment), and welder assistant (building structures) of Unit II of the
CLV.
4/23/2001 - Laguna Verde Nuclear Power Station
6/24/2001 Mechanical Technician
Duties included: Performed preventive maintenance repair to snubbers (uninstall,
cleaning, repair and installation) mechanics and hydraulic, in the Mechanical
Maintenance areas of the CLV like Dry Well, Turbo generators, Reactor and
Turbine.
10/2000 - Laguna Verde Nuclear Power Station
11/2000 Mechanical Technician
Duties included: Preventive maintenance repair to snubbers (uninstall, cleaning,
repair and installation) mechanics and hydraulic, in the Mechanical Maintenance
areas of the CLV like Dry Well, Turbo generators, Reactor and Turbine.
3/13/2000 - Laguna Verde Nuclear Power Station
5/21/2000 Mechanical Technician
Duties included: Performed preventive maintenance repair to snubbers (uninstall,
cleaning, repair and installation) mechanics and hydraulic, in the Mechanical
Maintenance areas of the CLV like Dry Well, Turbo generators, Reactor and
Turbine.
5/2/1999 - Laguna Verde Nuclear Power Station
12/19/1999 Decontamination Technician
Duties included: Performed Decontamination of Equipment and Tools, Waste
Segregation of compactable and non-compactable solid radioactive waste, transfer
of cans with liquid waste, works of Decontamination of areas in the CLV like Dry
Well, Turbo Generators, Turbine, Radioactive Waste Building and Reactor
Building.
5/2/1999 - Laguna Verde Nuclear Power Station
6/20/1999 House Keeping Technician
Duties included: Performed housekeeping in the CLV., in the Reactor Building,
Radioactive Waste Building, Turbine Building, Turbo Generators and Purification
Building. Giving support to other areas like Decontamination, and Movable
Laundry.
2/21/1999 - Laguna Verde Nuclear Power Station
5/2/1999 Administrative Aux. Technician
Duties included: Supported different areas like PR.( performance reports),
Accounting (pay-roll), Purchasing, Quality assurance, technical Management,
Phone operator and Admin Assistant.
11/4/1998 - Laguna Verde Nuclear Power Station
12/20/1998 Mechanical Assistant
Duties included: Performed Preventive Maintenance to ventilation systems
(HVAC) in areas like Dry Well, Turbine, Turbo generators, etc. fixing ventilation
systems, air conducts, and electrical motors / vibration test.
3/9/1998 - Laguna Verde Nuclear Power Station
4/19/1998 Mechanical Assistant
Duties included: Supported outage in Mechanical Maintenance in the area of
Valves, works of preventive maintenance and/or corrective to valves (disassembly,
fixing internal parts, polishing seats and seals, reassembly of valves) with works
conducted in Dry Well, Turbine, Reactor, etc.
8/25/1997 - Ultra Ingeniería
10/13/1997 Technical Mounted "B"
Duties included: Work of maintenance and/or assembly of heat insulation in the
Nuclear power station Green Lagoon, in restricted areas (Dry Well, Turbine, Tub
generators, etc.). Making the heat insulation cloths for the pipes and installation
to. Installation of the reflective heat insulation in the different zones of Dry Well.

More Related Content

What's hot

Scott E. Potter Current Resume
Scott E. Potter Current ResumeScott E. Potter Current Resume
Scott E. Potter Current ResumeScott Potter
 
Services Catalogue
Services CatalogueServices Catalogue
Services Cataloguejppiris
 
Resume - John Wray 1.27.16
Resume - John Wray 1.27.16Resume - John Wray 1.27.16
Resume - John Wray 1.27.16John Wray
 
Le Trench DISPONET INTRO
Le Trench  DISPONET INTRO Le Trench  DISPONET INTRO
Le Trench DISPONET INTRO Peter ORMAI
 
NASA_Acknowledgments_2014
NASA_Acknowledgments_2014NASA_Acknowledgments_2014
NASA_Acknowledgments_2014William Sprowl
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brentNASAPMC
 
Ormai Robbins Intro Management of Challenging Waste
Ormai Robbins Intro Management of Challenging WasteOrmai Robbins Intro Management of Challenging Waste
Ormai Robbins Intro Management of Challenging WastePeter ORMAI
 
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingRecommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingMarcellus Drilling News
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015BobSpeirs
 
Mohamed Ghermoul-Resume_Wellsite Geol
Mohamed Ghermoul-Resume_Wellsite Geol Mohamed Ghermoul-Resume_Wellsite Geol
Mohamed Ghermoul-Resume_Wellsite Geol Mohamed ghermoul
 

What's hot (20)

Scott E. Potter Current Resume
Scott E. Potter Current ResumeScott E. Potter Current Resume
Scott E. Potter Current Resume
 
ARCADIS work history
ARCADIS work historyARCADIS work history
ARCADIS work history
 
Anthony Covelli's CV
Anthony Covelli's CVAnthony Covelli's CV
Anthony Covelli's CV
 
Services Catalogue
Services CatalogueServices Catalogue
Services Catalogue
 
sommer resume new
sommer resume newsommer resume new
sommer resume new
 
Resume - John Wray 1.27.16
Resume - John Wray 1.27.16Resume - John Wray 1.27.16
Resume - John Wray 1.27.16
 
Reduced size m3 ft 15sn08180210 hansen
Reduced size m3 ft 15sn08180210 hansenReduced size m3 ft 15sn08180210 hansen
Reduced size m3 ft 15sn08180210 hansen
 
RESUME
RESUMERESUME
RESUME
 
SQA Resume
SQA ResumeSQA Resume
SQA Resume
 
Copy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBSCopy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBS
 
Le Trench DISPONET INTRO
Le Trench  DISPONET INTRO Le Trench  DISPONET INTRO
Le Trench DISPONET INTRO
 
NASA_Acknowledgments_2014
NASA_Acknowledgments_2014NASA_Acknowledgments_2014
NASA_Acknowledgments_2014
 
Don Richardson CSST
Don Richardson CSSTDon Richardson CSST
Don Richardson CSST
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brent
 
Ormai Robbins Intro Management of Challenging Waste
Ormai Robbins Intro Management of Challenging WasteOrmai Robbins Intro Management of Challenging Waste
Ormai Robbins Intro Management of Challenging Waste
 
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas DrillingRecommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
Recommended Practices for Pre-Drill Water Supply Surveys in Shale Gas Drilling
 
Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015Robert Ireland Speirs - 23 July 2015
Robert Ireland Speirs - 23 July 2015
 
Long_Resume3-25-15
Long_Resume3-25-15Long_Resume3-25-15
Long_Resume3-25-15
 
Mohamed Ghermoul-Resume_Wellsite Geol
Mohamed Ghermoul-Resume_Wellsite Geol Mohamed Ghermoul-Resume_Wellsite Geol
Mohamed Ghermoul-Resume_Wellsite Geol
 
JEFFREY ROBINSON RESUME
JEFFREY ROBINSON RESUMEJEFFREY ROBINSON RESUME
JEFFREY ROBINSON RESUME
 

Viewers also liked

Polyplus 2013專刊(確定版)
Polyplus 2013專刊(確定版)Polyplus 2013專刊(確定版)
Polyplus 2013專刊(確定版)Shelly Shen
 
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...открытый урок по литературе. 8 класс. творчество порождает творчество (по про...
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...natalja-ver5
 
Pantech- Dotnet projects 2016-2017
Pantech- Dotnet projects 2016-2017Pantech- Dotnet projects 2016-2017
Pantech- Dotnet projects 2016-2017Java Team
 
Divya 3 yrs exp in qa engg
Divya 3 yrs exp in qa enggDivya 3 yrs exp in qa engg
Divya 3 yrs exp in qa enggDivya Lakshmi.B
 
зош № 8, день пам’яті героїв крут ( 2016)
зош № 8,  день пам’яті героїв крут  ( 2016)зош № 8,  день пам’яті героїв крут  ( 2016)
зош № 8, день пам’яті героїв крут ( 2016)Александр Дрон
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July UKADBiogas
 

Viewers also liked (9)

Polyplus 2013專刊(確定版)
Polyplus 2013專刊(確定版)Polyplus 2013專刊(確定版)
Polyplus 2013專刊(確定版)
 
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...открытый урок по литературе. 8 класс. творчество порождает творчество (по про...
открытый урок по литературе. 8 класс. творчество порождает творчество (по про...
 
TUM Diploma Cert.
TUM Diploma Cert.TUM Diploma Cert.
TUM Diploma Cert.
 
Pantech- Dotnet projects 2016-2017
Pantech- Dotnet projects 2016-2017Pantech- Dotnet projects 2016-2017
Pantech- Dotnet projects 2016-2017
 
A historia do bondinho do pao de acucar
A historia do bondinho do pao de acucarA historia do bondinho do pao de acucar
A historia do bondinho do pao de acucar
 
Divya 3 yrs exp in qa engg
Divya 3 yrs exp in qa enggDivya 3 yrs exp in qa engg
Divya 3 yrs exp in qa engg
 
зош № 8, день пам’яті героїв крут ( 2016)
зош № 8,  день пам’яті героїв крут  ( 2016)зош № 8,  день пам’яті героїв крут  ( 2016)
зош № 8, день пам’яті героїв крут ( 2016)
 
UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July  UK AD & BIogas 2016: Purple Seminar Room - 7 July
UK AD & BIogas 2016: Purple Seminar Room - 7 July
 
CURRICULUM VITAE Thony
CURRICULUM VITAE ThonyCURRICULUM VITAE Thony
CURRICULUM VITAE Thony
 

Similar to RESUME CHRISTIAN MONARRES

Newest Combined Env & SRM
Newest Combined Env & SRMNewest Combined Env & SRM
Newest Combined Env & SRMRenee Houston
 
Eric_G_Hood_Resume
Eric_G_Hood_ResumeEric_G_Hood_Resume
Eric_G_Hood_ResumeEric Hood
 
John R Roeske Resume
John R Roeske ResumeJohn R Roeske Resume
John R Roeske ResumeJohn Roeske
 
Case Study – WIPP Radiological Release NSE 515 11212018 .docx
Case Study – WIPP Radiological Release NSE 515 11212018 .docxCase Study – WIPP Radiological Release NSE 515 11212018 .docx
Case Study – WIPP Radiological Release NSE 515 11212018 .docxdrennanmicah
 
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingPA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingMarcellus Drilling News
 
Isotopes poster DH
Isotopes poster DHIsotopes poster DH
Isotopes poster DHDanita Hohne
 
Rapid radiochemical methods_in_water_with_cover_06-24-10
Rapid radiochemical methods_in_water_with_cover_06-24-10Rapid radiochemical methods_in_water_with_cover_06-24-10
Rapid radiochemical methods_in_water_with_cover_06-24-10Omar Alonso Suarez Oquendo
 
Resume_Templeton_Joseph Social Media
Resume_Templeton_Joseph Social MediaResume_Templeton_Joseph Social Media
Resume_Templeton_Joseph Social MediaJoseph Templeton
 
Rocky Flats SEC Presentation 00192
Rocky Flats SEC Presentation 00192Rocky Flats SEC Presentation 00192
Rocky Flats SEC Presentation 00192Xander Page
 
Matthew Brenden Resume 3
Matthew Brenden Resume 3Matthew Brenden Resume 3
Matthew Brenden Resume 3Matthew Brenden
 
Patrick J Hanly Resume 15726 1
Patrick J Hanly Resume 15726 1Patrick J Hanly Resume 15726 1
Patrick J Hanly Resume 15726 1Patrick Hanly
 
TAIWAN BARBER Resume
TAIWAN BARBER ResumeTAIWAN BARBER Resume
TAIWAN BARBER ResumeTaiwan Barber
 
TAIWAN BARBER Resume
TAIWAN BARBER ResumeTAIWAN BARBER Resume
TAIWAN BARBER ResumeTaiwan Barber
 

Similar to RESUME CHRISTIAN MONARRES (20)

Beavis EPA Bio
Beavis EPA BioBeavis EPA Bio
Beavis EPA Bio
 
Newest Combined Env & SRM
Newest Combined Env & SRMNewest Combined Env & SRM
Newest Combined Env & SRM
 
wesley weaver li.pdf
wesley weaver li.pdfwesley weaver li.pdf
wesley weaver li.pdf
 
Eric_G_Hood_Resume
Eric_G_Hood_ResumeEric_G_Hood_Resume
Eric_G_Hood_Resume
 
Steven.Norman
Steven.NormanSteven.Norman
Steven.Norman
 
John R Roeske Resume
John R Roeske ResumeJohn R Roeske Resume
John R Roeske Resume
 
Case Study – WIPP Radiological Release NSE 515 11212018 .docx
Case Study – WIPP Radiological Release NSE 515 11212018 .docxCase Study – WIPP Radiological Release NSE 515 11212018 .docx
Case Study – WIPP Radiological Release NSE 515 11212018 .docx
 
Nowak_Robert
Nowak_RobertNowak_Robert
Nowak_Robert
 
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingPA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
 
resume
resumeresume
resume
 
Resume Newest
Resume NewestResume Newest
Resume Newest
 
Isotopes poster DH
Isotopes poster DHIsotopes poster DH
Isotopes poster DH
 
Rapid radiochemical methods_in_water_with_cover_06-24-10
Rapid radiochemical methods_in_water_with_cover_06-24-10Rapid radiochemical methods_in_water_with_cover_06-24-10
Rapid radiochemical methods_in_water_with_cover_06-24-10
 
Resume_Templeton_Joseph Social Media
Resume_Templeton_Joseph Social MediaResume_Templeton_Joseph Social Media
Resume_Templeton_Joseph Social Media
 
wkpcvsept
wkpcvseptwkpcvsept
wkpcvsept
 
Rocky Flats SEC Presentation 00192
Rocky Flats SEC Presentation 00192Rocky Flats SEC Presentation 00192
Rocky Flats SEC Presentation 00192
 
Matthew Brenden Resume 3
Matthew Brenden Resume 3Matthew Brenden Resume 3
Matthew Brenden Resume 3
 
Patrick J Hanly Resume 15726 1
Patrick J Hanly Resume 15726 1Patrick J Hanly Resume 15726 1
Patrick J Hanly Resume 15726 1
 
TAIWAN BARBER Resume
TAIWAN BARBER ResumeTAIWAN BARBER Resume
TAIWAN BARBER Resume
 
TAIWAN BARBER Resume
TAIWAN BARBER ResumeTAIWAN BARBER Resume
TAIWAN BARBER Resume
 

RESUME CHRISTIAN MONARRES

  • 1. Christian Ivan Monarres Alvarez Senior Health Physics Technician Training Courses 2011 Dose rate, contamination instrumentation and surveys qualified at Brunswick. 4/8/11 NUF RP Test satisfactory passed on with 90% in Brunswick. 2006 Dose rate, contamination instrumentation and surveys qualified at SONGS. 2/2004 Course of Re-Training for Rad Training Course (POE), in the facilities of Bartlett de México S.A. de C.V. 10/16/98 Laguna Verde course for Rad Training for new employees (POE) in the nuclear power station, in the training center of the Nuclear Power Plant Laguna Verde. 10/16/98 Rad Training Course at Laguna Verde (POE) in the Nuclear Power Station, in the facilities of Bartlett de México S.A. de C.V. 8/13/97 Course at Laguna Verde for Rad Training Course (POE) in the Nuclear power station, in the training center. Experience 10/12/15 - Oconee Nuclear Power Plant (Bartlett) 11/8/15 Senior Health Physics Lead Technician Duties included: Duties included: Lead on Alloy 600 project, support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, Rover in RCB, job coverage during refuel activities and smear and clear from CA tools and equipment, HRA guards, and routines.
  • 2. 9/2/15 - McGuire Nuclear Power Plant (Bartlett) 10/5/15 Senior Health Physics Technician Duties included: Duties included: support in upper containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, Radiological job coverage on pressurizer, valves and during refuel activities, survey areas and smear and clear from CA tools and equipment, HRA guards, and routines. 5/5/15 - Robinson Nuclear Power Plant (Bartlett) 6/19/15 Senior Health Physics Technician Duties included: Duties included: support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, Rover in RCB, RHR pumps radiological job coverage, job coverage in Auxiliary building, scaffold surveys and smear and clear from CA tools and equipment, HRA guards, and routines. 3/25/15 - Shearon Harris Nuclear Power Plant (Bartlett) 5/02/15 Senior Health Physics Technician Duties included: Duties included: support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, Rover in RCB, providing job coverage in head (reactor) repairs, scaffold surveys and smear and clear from CA tools and equipment, HRA guards, and routines. 01/26/15 - Brunswick Steam Electric Plant (Bartlett) 03/23/15 Senior Health Physiscs Duties included: Performing radiological surveys of materials, rooms, areas and equipment in order to characterize radiation and contamination levels and quantities in order to label, store, move, release and tag for transfer various packages and containers of radioactive materials, HP job coverage support on valves in Turbine Building, scaffold and air ample surveys, installing and demobing HEPA and Vacuum equipment. 10/29/14 Oconee Nuclear Power Station (Bartlett) 12/13/14 Senior Health Physics Lead Tech RP work on refuel, Smear and clear radioactive material, RP coverage on reactor Cavity decontamination, Steam generators RP job coverage, etc
  • 3. 9/03/14 McGuire Nuclear Power Station (Bartlett) 10/23/14 Senior Health Physics Technician Duties included: support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, Upper containment RP work, Technology support, Thimbles replacement, Rx core barrel & Rx vessel UT inspections, Smear and clear radioactive arterial, RP job coverage, etc. 04/22/14 Oconee Nuclear Power Station (Bartlett) 05/09/14 Senior Health Physics Lead Tech RP work on refuel deck, Technology support, Rx core barrel & Rx vessel UT inspections, Smear and clear radioactive arterial, RP job coverage, etc 3/11/14 McGuire Nuclear Power Station (Bartlett) 4/21/14 Senior Health Physics Technician Duties included: Upper containment RP work, Technology support, Thimbles replacement, Rx core barrel & Rx vessel UT inspections, Smear and clear radioactive arterial, RP job coverage, etc. 10/11/13 - Oconee Nuclear Power Station (Bartlett) 12/05/13 Senior Health Physics Technician Duties included: support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities, RP work on refuel deck, Technology support, Rx core barrel, Rx Head & Rx vessel UT inspections, Smear and clear radioactive arterial, RP job coverage, etc 9/9/13 - Catawba Nuclear Power Station (Bartlett) 10/6/13 Senior Health Physics Technician Duties included: support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities. Performed surveys in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials., reactor head inspections, etc.
  • 4. 4/9/13 - Susquehanna Steam Electric Station (Bartlett) 5/23/13 Junior Health Physics Technician Duties included: TB work including: rotor blades replacement, FWH, condenser, smear and clear tools and equipment, etc. 2/16/13 - Brunswick Steam Electric Plant (Bartlett) 4/7/13 Senior Health Physiscs Duties included: Performing radiological surveys of materials, rooms, areas and equipment in order to characterize radiation and contamination levels and quantities in order to label, store, move, release and tag for transfer various packages and containers of radioactive materials, HP job coverage support on valves in Turbine Building, scaffold and air ample surveys, installing and demobing HEPA and Vacuum equipment. 10/22/12 - Oconee Nuclear Power Station (Bartlett) 11/25/12 Senior Health Physics Technician 8/27/12 - McGuire Nuclear Power Station (Bartlett) 10/20/12 Senior Health Physics Technician Duties included: S/G RP work, technology support, etc. 4/14/12 - Shearon Harris Nuclear Power Plant (Bartlett) 6/11/12 Junior Health Physics Technician Duties included: Containment support. Rover in RCB, helping in head (reactor) repairs, scaffold surveys and smear and clear from CA tools and equipment, HRA guards, and routines. 2/25/12 - Brunswick Steam Electric Plant (Bartlett) 4/12/12 Junior Health Physics Technician Duties included: Performing radiological surveys of materials, rooms, areas and equipment in order to characterize radiation and contamination levels and quantities in order to label, store, move, release and tag for transfer various packages and containers of radioactive materials, HP job coverage support on valves in Turbine Building, scaffold and air ample surveys, installing and demobing HEPA and Vacuum equipment.
  • 5. 1/3/12 - San Onofre Nuclear Generating Station (Bartlett) 2/17/12 Senior Decontamination Technician Duties included: Unit II - Duties consisted during Rx Head Replacement; support in containment: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities. Rad-waste Bldg. Support: performed surveys in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, areas and equipment, including ECCS, Heat Exchanger, and decontamination & clean up boric acid. Collected and surveyed radioactive trash and laundry. 8/29/11 - Peach Bottom Atomic Power Station (Bartlett) 12/1/11 Senior Radwaste Technician Duties included: Decon activities on Dry-well, Turbine Bldg., Refuel floor, Rad- waste Bldg., Low Level Rad-waste, Cavity Decon, CRDs, RHR Room, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, areas and equipment, collected radioactive trash and laundry, and Fire-watch duties. 4/11/11 - Catawba Nuclear Power Station (Bartlett) TN Visa 5/27/11 Junior Health Physics Technician Duties included: Performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials, performing support on refuel floor (upper containment) and lower containment such as: Reactor Head removal, RH HVAC removal, smear and clear radioactive material, moving filters, moving fuel, counting air samples. 2/14/11 - Brunswick Steam Electric Plant (Bartlett) TN Visa 4/8/11 Senior Decontamination Technician Duties included: Performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, valves, areas and equipment, FME and Firewatch duties, Collected and surveyed radioactive trash and laundry.
  • 6. 9/13/10 - San Onofre Nuclear Generating Station (Bartlett) TN Visa 1/29/11 Senior Decontamination Technician Duties included: During SGR: Unit III - Duties consisted during SGR: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities. Performed surveys in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, areas and equipment, including steam generator platforms, reactor head stand, and decontaminations spray booth operations. Collected and surveyed radioactive trash and laundry. 4/11/10 - H.B. Robinson Nuclear Power Plant (Bartlett) L1B Visa 6/4/10 Senior Decontamination Technician Duties included: Performed decontamination of rooms, tools and equipment, support on steam generators activities, vacuuming, support on refuel floor such as: removing temporary reactor head/ and decontamination, vacuum, divers support, support the removal of Core Barrel, and many other decon activities. Decontamination of RCPs and seal ring, and trash and laundry. 2/15/10 - Brunswick Steam Electric Plant (Bartlett) L1B Visa 4/9/10 Senior Decontamination Technician Duties included: Performed physical decontamination of rooms, valves, areas and equipment, FME and Firewatch duties, Collected and surveyed radioactive trash and laundry. 8/29/2009 - San Onofre Nuclear Generating Station (Bartlett) L1B Visa 1/9/10 Senior Decontamination Technician Duties included: Unit II - Duties consisted during SGR: performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities. Performed surveys in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, areas and equipment, including steam generator platforms, reactor head stand, and decontaminations spray booth operations. Collected and surveyed radioactive trash and laundry.
  • 7. 3/9/2009 - D.C. Cook Nuclear Power Plant (Bartlett) L1B Visa 5/1/2009 Senior Decontamination Technician Duties included: Work on lower and upper containment such as cavity decon, decon tools and equipment on TEDA, ALARA crew moving and hanging led blankets and lower containment and support decon rooms. 9/30/2006 - San Onofre Nuclear Generating Station (Bartlett) LIB Visa 1/30/2009 Senior Decontamination Technician Duties included: Provided Radwaste support to the Unit 1 Decommissioning project for preparation, packaging and shipment of waste to processors or burial. Units II and Units III - Duties consisted of performing radiological surveys of materials and equipment in order to characterize radiation and contamination levels and quantities. Performed surveys in order to label, store, move, and prepare for transfer various packages and containers of radioactive materials. Performed physical decontamination of rooms, areas and equipment, including steam generator platforms, reactor head stand, and decontaminations spray booth operations. Collected and surveyed radioactive trash and laundry. 5/22/2006 - Enrico Fermi Nuclear Power Plant (Bartlett) LIB Visa 5/30/2006 Senior Decontamination Technician Duties included: Cavity decon and decon areas, support with works on basement. 3/15/2006 - Enrico Fermi Nuclear Power Plant (Bartlett) LIB Visa 5/3/2006 Senior Decontamination Technician Duties included: Support on Decon activities like lead shields, Touros, trash and laundry, decon tools and equipment, cavity decon support, and support on CRDs. 4/29/2005 - Laguna Verde Nuclear Power Station 3/14/2006 Decontamination Technician Duties included: Works of decontamination and Waste segregation and coverage routine of transportation Anti C cloth, Anti C cloth storaging in the Unit-1 and Unit-2 from the Movable Laundry.
  • 8. 4/20/2005 - Pilgrim Nuclear Power Station LIB Visa 4/28/2005 Decontamination Technician Duties included: Outage support for North American company IHI SwT. in Decontamination and installation of equipment, tools, in restricted areas like Refuel Floor and all Reactor Building, and as a translator. 4/10/2005 - IHI Southwest Tec. LIB Visa 4/19/2005 Decontamination Technician Duties included: Travel to San Antonio to check the equipment and prepare tools for the next outage, and take training from IHI SwT. about the functionability to the equipment. 4/7/2005 - Duane Arnold Energy Center LIB Visa 4/9/2005 Decontamination Technician Duties included: Outage support for North American company IHI SwT. in Decontamination and installation of equipment, tools, in restricted areas like Refuel Floor and all Reactor Building, and as a translator. 4/6/2005 - IHI Southwest Tec. LIB Visa 4/6/2005 Decontamination Technician Duties included: Travel to San Antonio to check the equipment and prepare tools for the next outage. 3/16/2005 - Quad Cities Nuclear Power Plant LIB Visa 4/5/2005 Decontamination Technician Duties included: Outage support for North American company IHI SwT. in Decontamination and installation of equipment, tools, in restricted areas like Refuel Floor and all Reactor Building, and as a translator.
  • 9. 3/12/2005 - IHI Southwest Tec. LIB Visa 3/15/2005 Decontamination Technician Duties included: Travel to San Antonio to check the equipment and prepare tools for the next outage, and take training from IHI SwT. about the functionability to the equipment. 2/23/2005 - Limerick Nuclear Generating Station LIB Visa 3/11/2005 Decontamination Technician Duties included: Outage support for North American company IHI SwT. in Decontamination and installation of equipment, tools, in restricted areas like Refuel Floor and all Reactor Building, and as a translator. 2/13/2005 - IHI Southwest Tec. LIB Visa 2/22/2005 Decontamination Technician Duties included: Support for North American company IHI SwT. in their facilities in preparation of equipment, tools, to work on restricted areas like Refuel Floor, and as a translator. 10/12/2004 - Laguna Verde Nuclear Power Station 11/28/2004 Decontamination Technician Duties included: Provided outage support for North American company IHI SwT, Decontaminating and installing equipment, tools, in restricted areas such as like dry well, and all Reactor Building, and as a translator. Works of decontamination and Waste segregation and coverage routine of transportation Anti C cloth, Anti C cloth storaging in the Unit-1 and Unit-2 from the Movable Laundry. 4/12/2004 - Laguna Verde Nuclear Power Station 5/30/2004 Decontamination Technician Duties included: Provided outage support to North American company IHI SwT. in Decontamination and installation of equipment, tools, in restricted areas such as Dry Well, and Reactor Building. Performed decontamination and Waste segregation and coverage routine of transporting Anti C cloth, Anti C cloth storaging in Unit-1 and Unit-2 from the Movable Laundry.
  • 10. 8/26/2003 - MUÑIZ Construcciones 1/25/2004 Valve Mechanic Duties included: Performed preventive maintenance and/or corrective maintenance to valves (removing valves, disassembly, fixing internal parts, polishing seats and seals, assemble and install the valves) in Plant Matapionche Cotaxtla PEMEX Veracruz. 4/21/2003 - Laguna Verde Nuclear Power Station 6/6/2003 Mechanic Assistant Duties included: Performed outage Mechanical Maintenance for Valves, provide preventive and to assembly) with work conducted in Dry Well, Turbine, Reactor, etc. 8/23/2002 - Laguna Verde Nuclear Power Station 12/22/2002 Decontamination Technician Duties included: Performed outage support to North American company IHI SwT for decontamination and installation of equipment, tools, in restricted areas like Dry Well, and all Reactor Building. Performed decontamination and waste segregation coverage routine of transporting Anti C cloth, Anti C cloth storaging into the Unit-1 and Unit-2 from the Movable Laundry. 5/16/2002 - Bartlett de México 8/22/2002 Administrative Aux. Technician Duties included: Supported different areas of HP (performance reports), Accounting (elaborating the payroll, Purchasing, Quality assurance, technical Management, Phone operator and Office Assistant. 3/12/2002 - Bartlett de México 5/15/2002 House Keeping Technician Duties included: Performed Industrial housekeeping in TAMSA in areas such as LACO, Steel Forge, Cranes, cleaning pipes, cleaning pumps, cleaning motors and moving oil barrels. 11/2001- Dumex-Copisa 1/2002 Welder Assistant Duties included: Performed construction of the Mechanical-electrical utilities assisting in the electrical area (electrical installation), mechanical area (installing mechanical equipment), and welder assistant (building structures) of Unit II of the CLV.
  • 11. 4/23/2001 - Laguna Verde Nuclear Power Station 6/24/2001 Mechanical Technician Duties included: Performed preventive maintenance repair to snubbers (uninstall, cleaning, repair and installation) mechanics and hydraulic, in the Mechanical Maintenance areas of the CLV like Dry Well, Turbo generators, Reactor and Turbine. 10/2000 - Laguna Verde Nuclear Power Station 11/2000 Mechanical Technician Duties included: Preventive maintenance repair to snubbers (uninstall, cleaning, repair and installation) mechanics and hydraulic, in the Mechanical Maintenance areas of the CLV like Dry Well, Turbo generators, Reactor and Turbine. 3/13/2000 - Laguna Verde Nuclear Power Station 5/21/2000 Mechanical Technician Duties included: Performed preventive maintenance repair to snubbers (uninstall, cleaning, repair and installation) mechanics and hydraulic, in the Mechanical Maintenance areas of the CLV like Dry Well, Turbo generators, Reactor and Turbine. 5/2/1999 - Laguna Verde Nuclear Power Station 12/19/1999 Decontamination Technician Duties included: Performed Decontamination of Equipment and Tools, Waste Segregation of compactable and non-compactable solid radioactive waste, transfer of cans with liquid waste, works of Decontamination of areas in the CLV like Dry Well, Turbo Generators, Turbine, Radioactive Waste Building and Reactor Building. 5/2/1999 - Laguna Verde Nuclear Power Station 6/20/1999 House Keeping Technician Duties included: Performed housekeeping in the CLV., in the Reactor Building, Radioactive Waste Building, Turbine Building, Turbo Generators and Purification Building. Giving support to other areas like Decontamination, and Movable Laundry. 2/21/1999 - Laguna Verde Nuclear Power Station 5/2/1999 Administrative Aux. Technician Duties included: Supported different areas like PR.( performance reports), Accounting (pay-roll), Purchasing, Quality assurance, technical Management, Phone operator and Admin Assistant.
  • 12. 11/4/1998 - Laguna Verde Nuclear Power Station 12/20/1998 Mechanical Assistant Duties included: Performed Preventive Maintenance to ventilation systems (HVAC) in areas like Dry Well, Turbine, Turbo generators, etc. fixing ventilation systems, air conducts, and electrical motors / vibration test. 3/9/1998 - Laguna Verde Nuclear Power Station 4/19/1998 Mechanical Assistant Duties included: Supported outage in Mechanical Maintenance in the area of Valves, works of preventive maintenance and/or corrective to valves (disassembly, fixing internal parts, polishing seats and seals, reassembly of valves) with works conducted in Dry Well, Turbine, Reactor, etc. 8/25/1997 - Ultra Ingeniería 10/13/1997 Technical Mounted "B" Duties included: Work of maintenance and/or assembly of heat insulation in the Nuclear power station Green Lagoon, in restricted areas (Dry Well, Turbine, Tub generators, etc.). Making the heat insulation cloths for the pipes and installation to. Installation of the reflective heat insulation in the different zones of Dry Well.