Qualifications
Over 15 years of experience in project management for the realization
of marine terminals and industrial installations; covering storage-,
handling- and processing facilities for liquid bulk and dry bulk as well as
waste-to-energy installations. Project activities include pre-investment
studies, conceptual design, detailed design, establishing (functional)
specifications, tender guidance and construction management for
specific equipment up to complete plants.
Education
TU Delft Delft Technical University, Mechanical engineering.
Graduated 1997
TH Rijswijk Technical School Rijswijk, Mechanical Engineering.
Propaedeutic certificate 1988
MTS Dordrecht Technical secondary School, Mechanical engineering. Dordrecht.
Graduated 1987
Languages Speaking Reading Writing
Dutch Native Native Native
English Good Good Good
German Good Good Fair
Employment Record
2014 – to date Project Manager at Riverlake Solutions S.A.
2006 – 2013 Self employed Project Manager, Kruger Projectmanagement
2001 – 2006 Project Manager, Haskoning Nederland B.V., Rotterdam
1997 – 2001 Project Engineer, GEM Consultants B.V., Rotterdam
Certificates Professional Project Management, VCA
CURRICULUM VITAE Kruger, C.
Page 2
Februari 2016
Experience Record
2016
Cadoil
Switzerland
Bunker Terminal
Technical review of the design and construction and value determination
of a new to build bunker terminal (100,000 m3) for Gasoil and Fuel oil in
the Port of Arinaga, Spain.
2016
Cadoil
Switzerland Bunker Terminal
Review and Hazop of a new to build LPG and Gasoil Import terminal
and concept design of a new bunker terminal (300,000 m3) for bunker
fuels and Gasoline as an extension of the new import terminal in the
Port of Ain Sokhna, Egypt.
2015/2016
Cadoil
Switzerland
Bunker Terminal
Technical value determination of an existing terminal and technical
review of the design and construction of a new bunker terminal (40,000
m3) for Gasoil and Fuel oil in the Port of Malaga, Spain.
2015/2016
Cadoil
Switzerland
Bunker Terminal
Technical value determination of an existing terminal and technical
review of the design and construction of a new bunker terminal (40,000
m3) for Gasoil and Fuel oil in the Port of Malaga, Spain.
2015
Chase Petroleum
Ghana
Products Storage Terminal
Survey for the extension of the import facilities for a fuel storage
terminal in the port of TEMA, Ghana.
2015
ORYX S.A.
Tanzania
Oil products Storage terminal
Establishing EPC tender document for the realization of a river crossing.
Approx. 1.5 km of pipelines (4 pcs.) installed in a sinker or by horizontal
directional drilling technique under the Dar Es Salaam river, Tanzania.
2014
OOMCO
Oman
Bunker Terminal
Client Representative for the design review of the FEED of a new
bunker terminal (300,000 m3) for Fuel oil, Marine- and Automotive
Diesel oil and in the Port of Duqm, Oman.
2014
ORYX S.A.
Sierra Leone
Petroleum jetty
Client representative for design review during detailed design and
quality control during prefabrication of a new petroleum jetty in the Port
of Freetown, Sierra Leone.
2011 – 2014
Shtandart-TT
The Netherlands
Export terminal Crude and Petroleum products
Engineering manager on behalf of Shtandart-TT for the conceptual
design, FEED study and preparation of bid package for a large oil
transhipment facility (4,000,000 m3), Tankterminal Europoort West
(TEW), in the Port of Rotterdam. Responsible for the coordination of
design information between all parties involved, including permit
engineering.
CURRICULUM VITAE Kruger, C.
Page 3
Februari 2016
2011
Royal Haskoning
The Netherlands
Port Handling and Storage facilities
Project Manager for conceptual design and cost estimation for multiple
projects in the field of port handling and storage facilities for dry bulk,
liquid bulk and break bulk products.
2009-2011
Attero
The Netherlands
Residual ash processing plant
Project manager on behalf of the client Attero for the renewal/revamp of
a residual ash processing plant connected to a waste incineration plant.
Responsible for the conceptual design, preparation of tender documents
and tender procedure, and construction- and contract management.
2006-2009
BVG Moerdijk
The Netherlands
Waste incineration plant
Project manager, member of the project team for the construction of a
new waste incineration line and connection/integration to generic
process installations of the existing three incineration lines. Responsible
for engineering review and construction management for in particular
the water-steam cycle including a new steam turbine and an
interconnecting steam piping with tie-in to the existing LP steam turbine
of the adjacent CHP plant (RWE/Essent).
2006 – 2007
Vopak
Germany
Relocation tank terminal
Project Manager for the Feasibility- and FEED study of the relocation of
the Dupeg Tank terminal and implementation the Dupeg business at the
existing Vopak oil terminal in Hamburg, Germany. Project includes
construction of new tank pits for new and relocated Dupeg tanks as well
as a new truck- and train loading station. Responsible for the
engineering design study, cost estimate and presentation of results to
the Hamburg Port Authority.
2005 – 2006
PB Amsterdam
The Netherlands
Upgrade oil & gas terminal
Project Manager for the basic engineering and cost estimate as part of a
commercial feasibility study for the renewal and extension of the BP
Amsterdam Terminal for petroleum products and gas in Amsterdam.
1997 - 2005 Project Engineer at Royal Haskoning. Participant in project teams for
multidisciplinary projects in the field of Industrial Installations:
Evides, Rotterdam Upgrade of water purification plant.
Valvoline, Dordrecht Upgrading tank farm of an oil blend facility.
Marlan Fertilizer Concept design of a transhipment facility for fertilizer in Cotonou, Benin.
Heros, Sluiskil FEED for a residual ash processing plant.
AVR, Rotterdam Realization of Piping system for low- and middle pressure steam.
AVR Chemie Upgrade of fire fighting system in storage of K-1 Products
AVR Chemie Realization of pre-treatment facility for incineration of hazardous waste.
BTC, Dordrecht Realization of a palletizing plant for Refused Derived Fuels.
Borax, Rotterdam Concept design for port transhipment facility for minerals.
UNA, Amsterdam Sludge injection facility at Coal power plant.
Confidential Transhipment facility for fertilizer in Pakistan.
Roteb, Rotterdam Upgrade fire fighting system of waste incineration plant.
Borax, Rotterdam Facility for storage of boric acid at a container terminal.
BTC, Dordrecht Feasibility study for Refuse Derived Fuel plant.
CURRICULUM VITAE Kruger, C.
Page 4
Februari 2016
Cyprus GC Extension of a grain import terminal.
Roteb, Rotterdam Upgrade of a processing plant for residual ash.
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these data correctly
describe me, my qualifications and my experience.
December 2016
C. Kruger

More Related Content

Viewers also liked (20)

Trabajo practico n1
Trabajo practico n1Trabajo practico n1
Trabajo practico n1
 
Practico n 3 georgii
Practico n 3 georgiiPractico n 3 georgii
Practico n 3 georgii
 
Presentacion medios guiados
Presentacion medios guiadosPresentacion medios guiados
Presentacion medios guiados
 
Ejecucion
EjecucionEjecucion
Ejecucion
 
La b blia_y_el_celular
La b blia_y_el_celularLa b blia_y_el_celular
La b blia_y_el_celular
 
idj 3
idj 3idj 3
idj 3
 
UMaine-records
UMaine-recordsUMaine-records
UMaine-records
 
Seguir andando
Seguir andandoSeguir andando
Seguir andando
 
ganesh paper
ganesh paperganesh paper
ganesh paper
 
Centro educativo nelly biaggi evidencias tic 2016
Centro educativo nelly biaggi  evidencias tic 2016Centro educativo nelly biaggi  evidencias tic 2016
Centro educativo nelly biaggi evidencias tic 2016
 
Glosario de q basic
Glosario de q basicGlosario de q basic
Glosario de q basic
 
The Pitch 2 - Edited version
The Pitch 2 - Edited versionThe Pitch 2 - Edited version
The Pitch 2 - Edited version
 
Trabajo practico n 4
Trabajo practico n 4Trabajo practico n 4
Trabajo practico n 4
 
Princesas en peligro
Princesas en peligroPrincesas en peligro
Princesas en peligro
 
My Events Photographer
My Events PhotographerMy Events Photographer
My Events Photographer
 
What Are the Tax Benefits of Charitable Giving? - Worth Magazine
What Are the Tax Benefits of Charitable Giving? - Worth MagazineWhat Are the Tax Benefits of Charitable Giving? - Worth Magazine
What Are the Tax Benefits of Charitable Giving? - Worth Magazine
 
Paper google earth fix
Paper google earth fixPaper google earth fix
Paper google earth fix
 
Digital Marketing Presentation
Digital Marketing PresentationDigital Marketing Presentation
Digital Marketing Presentation
 
Anemia
AnemiaAnemia
Anemia
 
The family
The familyThe family
The family
 

Similar to CKrugerCV2016 Riverlake Solutions

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014Manuel Bartilotti
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedDennis Talley
 
TRL_A4brochure_CP
TRL_A4brochure_CPTRL_A4brochure_CP
TRL_A4brochure_CPPeter Hale
 
Webinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentWebinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentGlobal CCS Institute
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1RToet
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Waqas Farooq, PMP®
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015Des Jameson
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14Trevor Lucas
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Jailton Rodrigues
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund
 

Similar to CKrugerCV2016 Riverlake Solutions (20)

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014CV-English_Bartilotti-16-12-2014
CV-English_Bartilotti-16-12-2014
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
CV-DF-15
CV-DF-15CV-DF-15
CV-DF-15
 
Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formatted
 
TRL_A4brochure_CP
TRL_A4brochure_CPTRL_A4brochure_CP
TRL_A4brochure_CP
 
TK.CV15
TK.CV15TK.CV15
TK.CV15
 
Webinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology developmentWebinar: How to manage technical risk in CO2 capture technology development
Webinar: How to manage technical risk in CO2 capture technology development
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)Resume Waqas Farooq (Project Engineer)
Resume Waqas Farooq (Project Engineer)
 
CV-2
CV-2CV-2
CV-2
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
lucas_trevor 10.11.14
lucas_trevor 10.11.14lucas_trevor 10.11.14
lucas_trevor 10.11.14
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
 
T.lokesh 230
T.lokesh   230T.lokesh   230
T.lokesh 230
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
 

CKrugerCV2016 Riverlake Solutions

  • 1. CURRICULUM VITAE C. KRUGER December 2016 Name Kruger, Chris Title MSc. Mech. Eng. Year of birth 1969 Nationality Dutch Profession Project manager Industrial Installations Contact  +31 6 14606274  Kruger@RiverlakeSolutions.com Address Riverlake Solutions Parklaan 46 3016 BC ROTTERDAM The Netherlands Key Qualifications Over 15 years of experience in project management for the realization of marine terminals and industrial installations; covering storage-, handling- and processing facilities for liquid bulk and dry bulk as well as waste-to-energy installations. Project activities include pre-investment studies, conceptual design, detailed design, establishing (functional) specifications, tender guidance and construction management for specific equipment up to complete plants. Education TU Delft Delft Technical University, Mechanical engineering. Graduated 1997 TH Rijswijk Technical School Rijswijk, Mechanical Engineering. Propaedeutic certificate 1988 MTS Dordrecht Technical secondary School, Mechanical engineering. Dordrecht. Graduated 1987 Languages Speaking Reading Writing Dutch Native Native Native English Good Good Good German Good Good Fair Employment Record 2014 – to date Project Manager at Riverlake Solutions S.A. 2006 – 2013 Self employed Project Manager, Kruger Projectmanagement 2001 – 2006 Project Manager, Haskoning Nederland B.V., Rotterdam 1997 – 2001 Project Engineer, GEM Consultants B.V., Rotterdam Certificates Professional Project Management, VCA
  • 2. CURRICULUM VITAE Kruger, C. Page 2 Februari 2016 Experience Record 2016 Cadoil Switzerland Bunker Terminal Technical review of the design and construction and value determination of a new to build bunker terminal (100,000 m3) for Gasoil and Fuel oil in the Port of Arinaga, Spain. 2016 Cadoil Switzerland Bunker Terminal Review and Hazop of a new to build LPG and Gasoil Import terminal and concept design of a new bunker terminal (300,000 m3) for bunker fuels and Gasoline as an extension of the new import terminal in the Port of Ain Sokhna, Egypt. 2015/2016 Cadoil Switzerland Bunker Terminal Technical value determination of an existing terminal and technical review of the design and construction of a new bunker terminal (40,000 m3) for Gasoil and Fuel oil in the Port of Malaga, Spain. 2015/2016 Cadoil Switzerland Bunker Terminal Technical value determination of an existing terminal and technical review of the design and construction of a new bunker terminal (40,000 m3) for Gasoil and Fuel oil in the Port of Malaga, Spain. 2015 Chase Petroleum Ghana Products Storage Terminal Survey for the extension of the import facilities for a fuel storage terminal in the port of TEMA, Ghana. 2015 ORYX S.A. Tanzania Oil products Storage terminal Establishing EPC tender document for the realization of a river crossing. Approx. 1.5 km of pipelines (4 pcs.) installed in a sinker or by horizontal directional drilling technique under the Dar Es Salaam river, Tanzania. 2014 OOMCO Oman Bunker Terminal Client Representative for the design review of the FEED of a new bunker terminal (300,000 m3) for Fuel oil, Marine- and Automotive Diesel oil and in the Port of Duqm, Oman. 2014 ORYX S.A. Sierra Leone Petroleum jetty Client representative for design review during detailed design and quality control during prefabrication of a new petroleum jetty in the Port of Freetown, Sierra Leone. 2011 – 2014 Shtandart-TT The Netherlands Export terminal Crude and Petroleum products Engineering manager on behalf of Shtandart-TT for the conceptual design, FEED study and preparation of bid package for a large oil transhipment facility (4,000,000 m3), Tankterminal Europoort West (TEW), in the Port of Rotterdam. Responsible for the coordination of design information between all parties involved, including permit engineering.
  • 3. CURRICULUM VITAE Kruger, C. Page 3 Februari 2016 2011 Royal Haskoning The Netherlands Port Handling and Storage facilities Project Manager for conceptual design and cost estimation for multiple projects in the field of port handling and storage facilities for dry bulk, liquid bulk and break bulk products. 2009-2011 Attero The Netherlands Residual ash processing plant Project manager on behalf of the client Attero for the renewal/revamp of a residual ash processing plant connected to a waste incineration plant. Responsible for the conceptual design, preparation of tender documents and tender procedure, and construction- and contract management. 2006-2009 BVG Moerdijk The Netherlands Waste incineration plant Project manager, member of the project team for the construction of a new waste incineration line and connection/integration to generic process installations of the existing three incineration lines. Responsible for engineering review and construction management for in particular the water-steam cycle including a new steam turbine and an interconnecting steam piping with tie-in to the existing LP steam turbine of the adjacent CHP plant (RWE/Essent). 2006 – 2007 Vopak Germany Relocation tank terminal Project Manager for the Feasibility- and FEED study of the relocation of the Dupeg Tank terminal and implementation the Dupeg business at the existing Vopak oil terminal in Hamburg, Germany. Project includes construction of new tank pits for new and relocated Dupeg tanks as well as a new truck- and train loading station. Responsible for the engineering design study, cost estimate and presentation of results to the Hamburg Port Authority. 2005 – 2006 PB Amsterdam The Netherlands Upgrade oil & gas terminal Project Manager for the basic engineering and cost estimate as part of a commercial feasibility study for the renewal and extension of the BP Amsterdam Terminal for petroleum products and gas in Amsterdam. 1997 - 2005 Project Engineer at Royal Haskoning. Participant in project teams for multidisciplinary projects in the field of Industrial Installations: Evides, Rotterdam Upgrade of water purification plant. Valvoline, Dordrecht Upgrading tank farm of an oil blend facility. Marlan Fertilizer Concept design of a transhipment facility for fertilizer in Cotonou, Benin. Heros, Sluiskil FEED for a residual ash processing plant. AVR, Rotterdam Realization of Piping system for low- and middle pressure steam. AVR Chemie Upgrade of fire fighting system in storage of K-1 Products AVR Chemie Realization of pre-treatment facility for incineration of hazardous waste. BTC, Dordrecht Realization of a palletizing plant for Refused Derived Fuels. Borax, Rotterdam Concept design for port transhipment facility for minerals. UNA, Amsterdam Sludge injection facility at Coal power plant. Confidential Transhipment facility for fertilizer in Pakistan. Roteb, Rotterdam Upgrade fire fighting system of waste incineration plant. Borax, Rotterdam Facility for storage of boric acid at a container terminal. BTC, Dordrecht Feasibility study for Refuse Derived Fuel plant.
  • 4. CURRICULUM VITAE Kruger, C. Page 4 Februari 2016 Cyprus GC Extension of a grain import terminal. Roteb, Rotterdam Upgrade of a processing plant for residual ash. Certification: I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. December 2016 C. Kruger