5. Vacuum Dehydrator
• VDOPS
Vacuum Dehydration Oil Purification
System
Processes up to 190 litres per minute
Effective removal of dissolved gases
and particulates down to 2.5 µm
Outperforms Centrifugal systems at
removing free, emulsified and
dissolved water
Achieve 25-30ppm moisture removal
in controlled conditions.
6. All Equipment containerised or trailer mounted
Range of VDOPS with heaters on-board
Laser particle counter on-board
Vaisala Live moisture Monitor
High velocity pumps available for pre-commissioning
Operating Temperature of 66-70°C is optimum for vacuum
dehydration and operator safety
Standard Camlock or Flange Fittings
NEMA 7 Equipment available
Method
10. Objectives and Outcomes
Focus on a professional outcome
Compliant to your site requirements and Inductions
BioKem deploys trade qualified and CE engineers
Work Instructions for a Best Practice outcome
Conform to AS/NZS ISO 9001:2008: QMS - Requirements
Achieve up to ISO 4406: 13/12/10 and moisture <30ppm.
11. Features and Benefits
Improved efficiency and independence:
Safer = Virtually self contained system
Safer = All equipment conforms with site requirements
Safer = Zero spills mandate
Professional approach
Operate autonomously allowing you to free up site
engineering staff
Complete contamination event management
12. Results: ISO Cleanliness
5x 2x 1x 0.8x 0.25x
What clean oil means for life expectancy…
Cleaner oil = life extension
14. Results
BioKem strive to
outperform the
competition with
results and outcomes.
We surpass expectation
and required
specifications on all our
projects: Note 8ppm
moisture content at the
bottom of analysis
report. The spec was
<200ppm!
15. Our Partners
BioKem has chosen to partner with
Victorian based oil company CTG
Lubrication services.
CTG have a wealth of knowledge in
tribology, varnish mitigation, as well as
servicing of oils for specialist
applications.
16. Our Team
BioKem has a
Queensland team that
are available at short
notice to deploy within
the State or further
afield.
This team has the
knowledge, resources,
skills and base support
to complete your role.
17. Your Expectations
We anticipate you will require of us:
Safe Work Practices as our first priority
Integrity to do the right thing
Commitment to deliver on our promises
Conform to site requirements
Professionalism in our approach
An outcome extending the life of your machinery.
18. Performance
KPI’s associated with our delivery:
No unsafe Work Practices
BioKem team supportive of your Engineers
Outcomes Delivered.
BioKem rewards staff by the KPI outcomes of your results
19. Timings and Tasks
On receiving your instructions we will immediately commence
our preparations:
Full BioKem team brief
Engineering visit to your site
Assembly of team and equipment
Your induction processes completed
Commencement
Field testing of Results with immediate feedback to you
Lab testing to corroborate field test results.