2. What are we talking about?
โข The โsmart gridโ or grid modernization = use of increased
remote data collection and automation to increase
efficiency of grid, allow for two-way power flows (not just
generator-> user), and increase reliability
3.
4. Massachusetts Context
โข DPU Grid Modernization Docket โ began in 2012
โข Extensive facilitated working group process
โข Grid Modernization Order โ June 2014
โข Time Varying Rates Order โ November 2014
โข Grid Modernization Plan due โ August 2015
โข Grid Mod Pilots โ ongoing
โข CLC has been involved in all of the above
5. DPU โ Grid Mod Objectives
1. Reduce the effect of outages
2. Optimize demand, which includes reducing system and
customer costs
3. Integrate distributed energy resources
4. Improve mobile workforce and asset management
New
England
Load
profiles
6. Time Varying Rates (TVR) Order
โข Basic Service โ
โ Default โ Time of Use (TOU)
with critical peak pricing (CPP)
โ Customer may opt out โ flat
pricing with peak time rebate
(PTR)
โข Contingent upon advanced
metering functionality
โข Eversource expressed
concern about having TOU as
the default
7. Utility Approaches
โข National Grid
โ Calls their plan โutility of
the futureโ
โ Want to be โplatform
providerโ โ like iphone
analogy
โ More of an all of the above
approach
โ AMI for ~ 15,000 in
Worcester
โ Exploring batteries as well
โข Eversource
โ Focus on grid-facing
technologies
โ Strong emphasis on
reliability
โ Not convinced
residential/small business
customers will benefit from
TOU/advanced metering
โ Point out that โ 2% of their
customers = 80% of usage,
and 80% of their customers
= 6% of usage
11. Challenge of integrating renewables
Because we canโt
control when
variable resources
(wind, solar, etc.)
produce electricity,
incorporating more
of them requires
the flexibility
offered by grid
modernization.
12. What could this mean for the Cape?
โข Power supply โ TOU?
โข Greater focus on kW vs. kWh
โข Geo-targeting
โข Integration of renewables
โข Energy storage (batteries)
โข EVs?
โข Crucial question โ metering/data
availability?
Acadia Center Utility Vision
http://acadiacenter.org/wp-
content/uploads/2015/02/AcadiaCenter_UtilityVision_WebVi
ew_S.pdf
13. Next Steps for Compact
โข Communicate Compactโs position on Grid Mod to
Eversource
โข Participate in Eversourceโs Grid Mod Plan at the DPU
โข Collaborate with other Cape and Vineyard
Stakeholders on Grid Modernization