1. Crisoforo Garcia
6517 Fenwick Drive Corpus Christi ,Texas 78414
361-219-4740
Objective
To Obtainan opportunitywithaqualitycompanywhere Icanutilize myleadership, initiativetodoan
excellentjobandbecome anassetto the company
Education
PremontHighSchool 1987-1990
HighSchool Diploma
Work Experience
CCC Group,Inc. July 2016 – Current
Contractor (Maintenance Mechanic/ Welder/Operator )
CertifiedPipefitterWelder
Fabrication and Installationof Pipingand Structural Iron
Assistedwith operationsduringpump swap
LOTO Equipmentfor Safetypurposes
Assistwith ReliabilityEngineersandPlanner inTroubleshootingRotating Equipment such as
ProcessPumps ,Blowers,Steam Turbines, Air Compressors , Oil Purifiers
PerformedVibrationAnalysison Rotating Equipment
PerformedPreventative Maintenance
PreformedCorrective Maintenance
Millwright
Steam Trap repair
Packing pumps
Packing valve
Control Room Operator , Maintain one steam drivenair compressor, 3 Elliott Air Compressors
and 1 Ingersoll Rand Air compressor Maintain all Condensate coming intothe plant and out of
the plant. Operate a 3 cell cooling towerwith 1 steam drivenpump and 3 480 volt pumps.
Also Start up and shut down 2 GE 1952 Steam Driven Turbinesand 2 1952 Elliott Steam Driven
Turbinesall 6 MWsDCS. Distribute steam through out the plant as neededforprocess.
Maintain bus voltage for the refinery.
Steam SystemSpecialties, Inc.
Contractor (Maintenance Mechanic/ Welder/Operator) July 2011-July 2016
CertifiedPipefitterWelder
Fabrication and Installationof Pipingand Structural Iron
Assistedwith operationsduringpump swap
2. LOTO Equipmentfor Safetypurposes
Assistwith ReliabilityEngineersandPlanner inTroubleshootingRotating Equipmentsuch as
ProcessPumps ,Blowers,Steam Turbines, Air Compressors, Oil Purifiers
PerformedVibrationAnalysison Rotating Equipment
PerformedPreventative Maintenance
PreformedCorrective Maintenance
Millwright
Steam Trap repair
Packing Pumps
Packing Valves
Control Room Operator , Maintain one steam drivenair compressor, 3 Elliott Air Compressors
and 1 Ingersoll Rand Air compressor Maintain all Condensate coming intothe plant and out of
the plant. Operate a 3 cell cooling towerwith 1 steam drivenpump and 3 480 volt pumps.
Also Start up and shut down 2 GE 1952 Steam Driven Turbinesand 2 1952 Elliott Steam Driven
Turbinesall 6 MWsDCS. Distribute steam through out the plant as neededforprocess.
Maintain bus voltage for the refinery.
Turn AroundEnergy Services, Inc.
Contractor (Welder) January 2008-July 2011
CertifiedPipefitterWelder
Fabrication and Installationof Pipingand Structural Iron
Pipelines
Installing Tank
Installingseparators
FieldSupervisor
Crew Leader
OrderingMaterials
Turner Brothers Crane & RiggingCo.
Contractor ( Rigger)
Rigger
Flag man
Crew leader
ForkliftOperator
Communicationswith supervisionandthe crane operators on two way radios
3. Additional Skillsand Training
Multitasking
JourneymanMillwright
Man-liftOperator
ForkliftOperator
Bridge Crane Operator
Carry Deck Crane Operator
Excavator Operator
Hands on
Mathematical Skills
ComputerSkills ( Typing ,Email/Outlook,Copy/Fax ,Excel/Word/ PowerPoint )
References
Daniel Estrada FieldSupervisor 361-563-4579
Carlos Castellano Maintenance Mechanic 361-994-8968
Ricardo Conarrubiaz WelderSupervisor 361-739-9931
Marvin Luther Professional Mechanical Engineer 361-652-0917
Scott Hall Operations Supervisor 361-463-1900