1. 1 of 5
Results you can rely on
BRAD WILSON
AREAS OF EXPERTISE
Mr. Brad Wilson has GIS survey and technical experience in the following general
areas:
Computer aided drafting and design using AutoCAD and MicroStation
Preparation of alignment sheets, property plots, map and pipeline drafting,
quad maps and quad excerpts, permit drawings, document control and
supervision.
Researching and programming ways to streamline survey data processing
from the stage of collection to the stage of drawing completion; through
programming feature code libraries, in Trimble Geomatics and Inroads to
make the process much more efficient and cost effective
Written numerous procedures to help remove the human error in data
collection, data QA/QC and data post processing
Streamlined data to the point of GIS and into Pipeline Integrity Management
Created numerous feature code libraries to make data more compatible with
GIS.
Created and managed spreadsheets/databases for material documents, x-
ray reader sheets, purchase orders, hydrostatic test documents, field reports,
survey notes and photographs for data records integrity management,
through organized data deliverables, Hyperlinked data to geographic X,Y,Z
locations in spreadsheets and in GIS.
Utilized loader templates mirroring the GIS tables to load GIS data into the
client GIS systems.
Constantly evolving/streamlining data management for small data projects to
big data operations management.
Performed field and office training to show different ways of utilizing and
collecting data to make data 100% usable from a positional and content
standpoint, collecting only the data necessary in the field and linking that
data to data records to pull in the necessary data variables not collected in
the field by collecting match numbers in the field that match to numbers in
data records integrity.
REPRESENTATIVE EXPERIENCE
Mr. Wilson has spent my time since 1999 researching and programming ways to
streamline survey data processing from the stage of collection to the stage of
drawing completion; through programming feature code libraries, in Trimble
Geomatics and Inroads, he has been able to make the process much more efficient
and cost effective. Since the Gulfstream project completion in 1999 he has worked
as a Survey/GIS Data Technician Coordinator on countless projects, learning new
ways to take the information collected in the field and use the data for GIS tables,
station and offset reports, traverse reports, DOT reports, X-ray reports, as-built weld
reports, pi calculations, weld calculations, DTM's, profiling, cross sections,
2. 2 of 5
permitting and FERC, construction and as-built drawings, constantly finding
innovative ways to meet client demands. He has written numerous procedures to
help remove the human error in data collection, data QA/QC and data post
processing.
I have evolved to look at data differently, to make data accurate throughout the
project lifespan and to apply data records to that data to give the data tractability to
an X, Y and Z location and eventually an as-built horizontal and vertical station.
Specialties:
Survey/GIS Data processing
Problem solving
Communication
Expediting
Organization
Making Data Accurate, Transparent, Traceable, Verifiable and Complete
Mr. Wilson serves as a GIS Survey Data Technician Coordinator with
responsibilities of coordinating office and field GIS survey Data Technicians on
various project listed below. Process, QA/QC and manage data for delivery into
numerous GIS platforms. Write procedures, progress reports, proposals and track
man-hours to keep projects running efficiently and effectively. He is responsible for
field and office training for project kick-off meetings. He has worked with clients to
attain the project expectations and see that those expectations are met. Below are
some of the projects coordinated in this position.
ONEOK - Overland Pass Project – 760 Miles
El Paso Natural Gas – Ruby Project – 680 Miles
El Paso Natural Gas - Raton Project - 120 Miles
El Paso Natural Gas - Elba Express – 125 Miles
El Paso Natural Gas – Line 300 Project – 125 Miles
El Paso Natural Gas – MPP Project – 6 Miles
El Paso Natural Gas – NSD Project – 7 Miles
El Paso Natural Gas – South System Expansion – 200 Miles
Kinder Morgan – NSD Project – 8 Miles
Kinder Morgan – NEUP Project – 45 Miles
Enterprise – Texas Express Project – 580 Miles
Carolina Gas – 10 Miles
Occidental - Elk Hills Project – 60 Miles
Colonial Excel – 450 Miles
NiSource Program – Numerous Operations Projects
Marathon Program – Numerous Gathering Projects
BP Program – Numerous line replacement projects
Colonial – Numerous Projects
Panhandle – Numerous projects
Williams Midstream – Multiple Projects
3. 3 of 5
Williams – Gulfstream Natural Gas – 450 Miles
Millennium Pipeline – 200 Miles
Centurion – Elk Hills – 60 Miles
Enterprise – Texas Express – 580 Miles
UGI – Auburn II – 28 Miles
UGI – Uniondale – 7 Miles
UGI – Auburn Loop – 10 Miles
CPG – Mountaineer – 180 Miles
100’s of operation and maintenance projects, numerous clients
100’s of gathering line projects, multiple clients
Mr. Wilson served as a Drafting Coordinator with coordination of the field survey
data technicians. Responsibilities included design tasks on Phase I and 2 of the
Gulfstream Natural Gas System project. Coordinated drafting tasks and responsible
for processing civil and environmental survey data, training of survey data
technicians, and worked directly with surveyors to improve the overall quality of
data. Coordinated design and survey data processing in Florida field office during
construction of Phase I. Created and maintained property base of property plats for
approximately 650 plats on Phase I and approximately 350 plats on Phase 2 of the
project. Coordinated and processed data on Gulfstream phase 3.
Mr. Wilson served as a Designer or Drafter on several projects, below are a few key
projects with his responsibilities:
On the Inland Petroleum Distribution Systems Project
Responsible for drawing 3D fuel parts for rapid deployment fuel systems for the
military and performed computer design layout of fuel systems. Prepared fuel parts
and systems drawings at 1:1 scale to check compatibility of all parts. Created,
printed and assembled drawings for presentations.
TriState Project
Detailed engineering and right-of-way acquisition in support of an application to
FERC for a proposed 147-mile, 30-inch natural gas pipeline. Responsible for ISO
9000 compliance, creation of forms and procedures, environmental geobases and
level-lists and procedures for accepting environmental data from environmental lists.
Performed work on all aspects of the pipeline project, including troubleshooting,
river crossing drawings, alignment sheets, training and photo imagery.
KN Energy’s Pony Express Project
Decommissioning of a 916-mile, 8- through 24-inch crude oil pipeline and
conversion to natural gas service, and the construction of a new 114-mile, 12-inch
crude oil pipeline and a 62-mile, 16-inch natural gas lateral. Responsible for building
alignment sheets and quad maps for FERC deadline. Extracted, combined and
rotated imagery for the alignment sheets through Iras-b and MBI in MicroStation.
Also worked on Geobases for alignment sheets.
4. 4 of 5
Tenneco’s Boston Expansion Project
A 64-mile, 20- through 36-inch gas pipeline through urban areas. Responsible for
preparing alignment sheets, quad maps, site-specific drawings for river permits,
wetland construction and residential construction. Created the environmental
geobase and worked on other geobases.
Great Lakes Security Loop Expansion Project
A 24.5-mile, 36-inch natural gas loopline in the Upper Peninsula of Michigan.
Worked with binary raster images, cleaned and rebuilt scanned images and made
engineer corrections. Also drew 30 stream crossings from field notes.
Northern Border Pipeline Extension Project
A 231-mile, 30-inch natural gas pipeline extension. The project included six
compressor stations, a gas metering and pressure reduction station and 12 river
crossings. Responsible for stream and river crossing permits and construction
drawings in accordance with ISO 9000 specifications. Supervised 15 drafters and
designers performing construction and as-built drawings in accordance with FERC
regulations. Responsible for collation of drawings for the construction bid package.
PARCO MFM Pipeline Extension Project
A 176-mile, 18-inch and a 5- mile. 16-inch products pipeline, including two pump
stations and three terminal stations. Responsible for preparation of drawing logic
diagrams and redline corrections of civil drawings. Also performed plotting of
drawings.
Public Service Electric & Gas Meter Regulator Stations Project
The project scope included preliminary and detailed engineering for upgrades to
meter stations and associated gas pipeline segments. Performed detailed drawings
of anchor blocks with rebar and concrete.
Mr. Wilson served as a Field Data Technician on the Palmetto and South System
Expansion Projects. Responsible for processing survey data; creating forms,
procedures and drawings; training survey data technicians and working directly with
surveyors to improve overall quality of data.
Freebird Project
15 mile Bi-directional pipeline including preliminary design through staking survey,
well pad layout and design, project drawings through issued for bid set.
Mr. Wilson created a data management plan to streamline the survey data
processing/QA/QC. Using several different software's, created a data management
system for this 15 mile project. He worked with the survey crews to streamline the
processes to the GIS techs. GIS Survey Data Technician Coordinator and Drafting
Coordinator. Responsible for processing survey data; creating forms, procedures
and drawings; training survey data technicians and working directly with surveyors to
improve overall quality of data. Performed drafting coordination duties, creating and
managing quad maps, alignment sheets, quad excerpts NWI maps, residential
5. 5 of 5
construction drawings, Site specific road crossings and directional drill drawings.
EDUCATION
Engineering, Tulsa Junior College
Drafting and Design, Tulsa Technology Center
CAD Drafting, Tulsa Technology Center
SPECIALIZED TRAINING
Managing For Success - Behavioral Research
Effective Communication
Personnel Management
Business communication
AutoCAD Light
Fieldworks Class
AutoCAD 2000i
AutoCAD, Tulsa Vo-Tech
MicroStation
2002, Applying Inroads Cogo
2002, Inroads Survey Basics
Introduction to ArcView GIS
Blue Marble Training
Access Training
Communications Training
Pipeline Safety Training
Excel
Word
Workplace Harassment
Foreign Corrupt Practices Act
Workplace Harassment: Recog. and Prev. Harassing
Behavior for Employee
Code of Business Conduct and Ethics
FERC Standards of Conduct: Order 717
FERC Standards of Conduct
AutoCAD 2000i Level 1 – Professional
FieldWorks Basic
Access 2002 Level 1
Civil3D
Trimble Geomatics
Geographic Calculator
Microsoft Excel Level 1
Microsoft Excel Level 2
Microsoft Excel Level 3
Concur and American Express
IntegraLink
6. 6 of 5
Mapping Data Solutions
Mapping Data Solutions Cloud Based
Geospatial Information Technology Association
GIS Strategy
PHMSA
Improving Pipeline Assessment Data Management
Mobile Data management
GIS Accuracy
Pipeline Data Management
Leveraging tablets and the cloud
Risk and Integrity Management
Photogrammetric Point Clouds
GIS - Offshore
Offshore ground and pipeline survey
Defensive Driving - DDC
Blue Ocean Strategy
PREVIOUS EMPLOYERS
Heart’s Desire of Oklahoma / 1988 to 1992