Jaroslav Kologrivov:
General Director at Scientific park "Kyiv Polytechnic"
Theme of speach:
How to build a successful startup and attract investment, even if you have no idea
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
How to build a successful startup and attract investment, even if you have no idea — Jaroslav Kologrivov (Tech Stage)
1. SCIENCE PARK “KYIVSKA POLYTECHNIKA”
MODERN INNOVATIVE ENVIRONMENT
Yaroslav Kologryvov
2. Mission of the Science Park:
Integration of education, science and advanced
technological production for the rapid development of
advanced technological products, as well as their
implementation in national and external markets.
3. LEGISLATION, WHICH REGULATES THE ACTIVITY OF
THE SCIENCE PARK “KYIVSKA POLYTECHNIKA”
v Law of Ukraine
December 22, 2006, № 523
On Science Park “Kyivska Polytechnika”
v Order of the Cabinet of Ministers of Ukraine
July 18, 2007, № 546.
On approval of the action plan for the implementation of the
Law of Ukraine “On Science Park “Kyivska Polytechnika”
v Order of the Cabinet of Ministers of Ukraine
September, 19, 2007 № 760.
On approval of the innovation programs for the Science Park
“Kyivska Polytechnika” for 2007-2011
4. On the base of the University
The biggest technical university of Ukraine
10 Educational-Research Institutes
19 Faculties
13 Research Institutes
30 000 Students
5 000 Scientists
25% of all engineers of Ukraine
5. KPI’s Campus
On the territory of the university there are:
23 academic buildings,
22 hostels,
Sports complex,
Library,
Center of Culture and Arts,
Kindergarten,
2 canteens and recreation place
(the territory near the Black Sea),
Students policlinic,
Health Center
43 cafeterias
21. Low Waste Sewage Water Purification
Technology
DESCRIPTION
Membrane-based water purification
technology. This technology purifies water
into a high quality drinking water from
natural salt water and industrial sewage water.
The technology treats liquid wastes, that are
created during water purification.
KEY NUMBERS
Productivity – 1000 - 20000 m3/day.
12000 m3/day treatment facility approximate initial cost – $6.5 million;
Cost of 1m3 of purified water – $0.7 - $1.2;
Facility set up period – 1.5 - 2 years;
Payback period – 5 years.