Roatan Island, Power Plant, RECO, Honduras (outside coast line)
- Existing diesel power plant new prime mover implementation and partial plant upgrading
project with electrical and control systems manufacturing and delivery (panels etc)
- NAOY limited delivery with equipment, procurement, installation and commissioning
- NAOY limited delivery of design, engineering, drawings and manuals
- NAOY scope including mechanical equipment, process, instrumentation, electrification and
automation systems; including integration to existing/previous systems
- Project was executed in co-operation with WGT, as functional local
representative and partner
Dr.Bird 2, JEP, 50MW Power Barge, Singapore (construction) and Jamaica
(commissioning and operation)
- Floating power plant electrification (DC, LV, MV, HV), instrumentation and
automation + Scada systems on site works; including man power locally and over seas
- NAOY coordination and execution of its corresponding man power for related works; NAOY
was sub-contracted by project owner WFI & WSG.
- Generally; very fast track project executed in Singapore shipyard, with peaking up to >80 men
with supervisors from/by NAOY on site during busiest installation time
- NAOY commissioning and testing personnel works and duties in Jamaica for
instrumentation, control and automation systems (after barge arrival to end location)
OL3, Olkiluoto, Finland, Nuclear Power Plant construction site
- NAOY arrangements, task management and delivery of special welders for OL3 & Areva sub-
contractor BabCock & Noell GMBH (Germany)
- Limited time and entity specific welding works, including “correcting and finalizing” of previously
not accepted welding quality performed by other parties/sub- contractors
- Man power with project coordination tasks by NAOY
Fortum Heat, Järvenpää, Finland, Gas-diesel power plant modification (dismantling and
removal) to district heat plant (hot water boiler plant only)
- NAOY as main contractor in order to remove and dismantle the complete plant including;
diesel engine, generator and all related auxiliaries
- NAOY man power, work force and supervision, design and engineering with project
management in complete for the whole project
- NAOY safety planning and “station remaining on line status” planning with implementation in
complete; project handled and delivered as full “turn-key” deal
Teknobulevardi 3-5
FIN-01530 Vantaa
P.O.Box 35
FIN-01531 Vantaa
Tel: +358 400 952108
Fax: +358 46 7122371
Yrittäjänkatu 15
FIN-65380 Vaasa
P.O. Box 810
FIN-65101 Vaasa
Tel: +358 6 2828816-8
Fax: +358 6 2828819
Reg: 1954384-9
VAT: FI19543849
3. Page 2 of 5
Delta Marin Oy, Raisio Headquarters, Finland (with various project locations)
- NAOY support specifically in engineering and design in the Delta Marin Raisio main office and
thereon for the related projects in Norway, Holland and Singapore; and as yet on going in
Malaysia (FPSO design specialists from NAOY)
- NAOY provisions for onsite man power/supervision for installations,
commissioning and testing world wide
- Typically and lately related to FPSO type ship and/or drilling platform re-building projects; our
services and particularly the engineering support is still continuing at the moment
- NAOY off-shore supervision and expert availability; visiting oil rig(s) for the engineering
data and information gathering; system studies
Plzen, Czech Republic, Diesel Power Plant, industrial area and common grid specific
Hot Stand-by power plant (emergency functions and rates/especial loading curves)
- NAOY limited participation in WFI power plant project; non typical power plant
installation and construction (building, facilities and usage) overall and throughout
- NAOY construction & installation assistance, trouble shooting and customer- supplier
specific consultation
- NAOY technical and operational support and assistance throughout the project duration
(already approx. 2.5 year, will be finished during this year; fine tuning ongoing)
- NAOY limited man power on site; mechanical and electrical supervision especially, training
and assistance, customer operation support (guidance and training).
Ivanhoe, Gold Mine Diesel-Gas Power Plant, Australia
- NAOY project management support for WFI in order to re-build and modify older and existing
diesel power plant into gas-diesel power plant; all systems inclusively upgraded
- NAOY site management with site manager and mechanical supervisor on site; project
management and engineering with design (including electrical and automation) NAOY office
support
- Finished in last quarter of 2013, 4+1 x W12V32DF engines compound / gold mine site.
ITPL, Industrial Area Power Plant, W18V32 Gas conversion project, India
- NAOY master engineering, design (incl. drawings and documentation) for mechanical systems,
electrical systems and control/automation for WFI (as main contractor and project owner)
- Existing power plant engine/auxiliaries and related system conversion from HFO to gas (dual fuel
engine type); all conversion works done on situ bases; designed and planned like wise
- Still continuing project, ETA finishing in second quarter of 2014
Manaus Diesel (WFI) Power Plant 156 MW
- Supervising and commissioning PLC (DCS) systems (logic Modicon Quantum).
- Development of the speed controller software with the WFI, so that an automatic power support
to the electricity grid would be possible in case failures of the main grid.
Cameroon Diesel (WFI) Power Plant 95 MW
- NAOY deliveries 80% manpower of the electricians. Work included electrical and PLC
supervisions, and section management.
- Units test and commissioning also included.(logic Modicon Quantum).
Black Start Unit (WFI) 18MW
- PLC Advisor; The purpose of the work to carry out the commissioning procedure.
- Advise on the technical issues to the customer
- Handing over documentation and sing it behalf of WFI
Teknobulevardi 3-5
FIN-01530 Vantaa
P.O.Box 35
FIN-01531 Vantaa
Tel: +358 400 952108
Fax: +358 46 7122371
Yrittäjänkatu 15
FIN-65380 Vaasa
P.O. Box 810
FIN-65101 Vaasa
Tel: +358 6 2828816-8
Fax: +358 6 2828819
Reg: 1954384-9
VAT: FI19543849
4. Page 3 of 5
Black Start Units 2 x 2MVA (IT-company, Finland)
- Addition of a new fully automatic generator unit to parallel with other three existing unit.
- Delivery with equipment, procurement, installation, commissioning, design and engineering.
Scope of supply 400/20kV step-up transformer terminals.
- Replaced the old unit to new fully automatic generator set. Scope as above.
- Replaced logic (Siemens S7-300) of distribution network system. All work has been done
without compromising the performance of production.
Offshore Vessel, Canada
- Purpose of the project, remove the old mechanical propellers and install new propulsion system.
- NA's share of the project was to replace the old control system of the engines and combine new
one to the ship's management system. (Siemens S7-300 and Woodward 723+)
Najran, Saudi-Arabia Diesel (WFI) Power Plant 50 MW (Island mode)
- Supervising and commissioning PLC (DCS) systems.(logic Modicon Quantum)
Burkina Faso, Diesel (WFI) Power Plant 15 MW
- Work included electrical and PLC supervisions/works
- Units test and commissioning also included. (logic Modicon Quantum).
Kenya, Diesel (WFI) Power Plant 95 MW
- Work included PLC supervisions/works
- Units test and commissioning also included. (logic Modicon Quantum).
Guyana, Diesel (WFI) Power Plant 35 MW
- Replaced logic and operation and interface system (Modicon Concept and Factory Link) of Power
Plant. New system Modicon Quantum and Intouch.
- All work has been done without compromising the performance power.
Philippines, Diesel (WFI) Power Plant 90 MW
- Purpose of the project was change the power plant load mode from base load to island mode.
(add island mode)
- Units test and commissioning. (logic Modicon Quantum).
Seychelles, Diesel (WFI) Power Plant 7 MW
- Work included PLC supervisions.
- Units test and commissioning.
Black Start Units (WFI) 40MW for 4,2 GW steam turbine Power Plant, ( Alsthom, Germany)
- PLC Advisor/Supervision; The purpose of the work to carry out the commissioning procedures
- Advise on the technical issues to the customer
- Linked Black Start Power Plant to main DCS. Main logic ABB, BSU logic Modicon Quantum.
Control system upgrade/modification 7 x 8L52/52 MAN Diesel power plant, Saudi Arabia
- Complete control & monitoring system modification for older MAN marine engines
for power plant utilization with software development & installation
Several MAN Diesel & Turbo diesel SE power plant installations, Americas, Africa, Russia etc.
- Various construction & commissioning works worldwide for MAN Diesel & Turbo SE
- Engineering and Project Coordination support by NAOY engineers, location for these longer term
works was MAN Augsburg head office, thus partially worked through remotely from Finland also.
Teknobulevardi 3-5
FIN-01530 Vantaa
P.O.Box 35
FIN-01531 Vantaa
Tel: +358 400 952108
Fax: +358 46 7122371
Yrittäjänkatu 15
FIN-65380 Vaasa
P.O. Box 810
FIN-65101 Vaasa
Tel: +358 6 2828816-8
Fax: +358 6 2828819
Reg: 1954384-9
VAT: FI19543849
5. Page 4 of 5
Ghana, Africa, 120 MW Gas turbine plant
- Large LCO fuel tanks 2 x 15 000 m³ with floating roof & piping/transfer systems and related
instrumentation/automation for GE (GECAD) 120 MW gas turbine plant
Ghana/Benin, Africa
- Complete relocation of 32 MW power plant ( 19 x 12V200 ) from Ghana to Benin ( 3 separate
locations; 7 + 6 + 6 ) with electrical, automation, mechanical and electrical/automation works,
dismantling & construction including land transportation over Togo to Benin
Ilmenite, Smelting Plant, Saudi Arabia: special project for Outotec Oy, Finland
- Secured Emergency Power Units in Special Constructed Container
- 2 x containers, including 2x 2000kVA MTU generator sets, purchased and therein packed into
containers by NAOY; including all related auxiliary systems. Turn-key type of modules
- NAOY special own development and design of construction
- Fully “turn-key” units and technology; on site commissioning/testing with end user training
inclusively; will be finalized during this spring 2014.
Aalborg Industries, Alfa-Laval, boiler section, Finland
- Several customer Aalborg owned boiler installations, man power support from/by NAOY boiler
specialists; installation supervision, commissioning and start-up of boilers.
- New units and refurbishments of older boilers, typically diesel engine plants heat recovery
systems related (exhaust gas boilers and oil fired) within several MAN/WFI etc. engine plants
Emergency/stand-by power projects, latest references: Mainly Finland and EU
- Regional Hospital, S-Finland: MTU unit 830kVA, 400VAC, 30-ft power container.
- Gold Mine, N-Finland: MTU unit 2200kVA, 690VAC, 40-ft arctic special power cont.
- Constr. Company, S-Finland: 800kVA, 400VAC Canopy, EI60 fire classified, special compartment.
- Media Company, S-Finland: MTU unit 830kVA, 400VAC lowered 30-ft special cont.
- IT-company, S-Finland: MTU unit 1023kVA, 400VAC restored second-hand dg-set constructed to
a new 30-ft container.
- Farm business, SW-Finland: 80kVA, 400VAC 20-ft power container.
- Deliveries for WFI of some stand-by/emergency open/container solutions within 250 – 2200 kVA
annually; to be installed in the main power plants as black start units globally.
Voltage levels 400VAC, 480VAC, 6kV, 10.5 kV, 11kV.
- 2x1406kVA 400VAC Stand-by power units for a real estate company Southern-Finland.
- Ämari NATO-airfield Estonia: 1x 250kVA & 1x 350kVA 400VAC Emergency power systems.
( NATO Classification)
- IT-company S-Finland: MTU units 1 + 1x 2000kVA 400VAC emergency power project with remote
cooling system (60m), with 34 meter long exhaust gas piping system to ground level from the
underground facilities.
- Business Center S-Finland: 1x 250kVA 400VAC Power project.
- Regional Hospital, SE-Finland: 2x 500kVA 400VAC Power project with distribution system
& top level automation.
- Commercial Center, Eastern-Finland, 1x 250kVA 400VAC Power Project
- IT-company, E-Finland: 1x 1225kVA 400VAC Power project
- Regional hospital, Denmark: 5x 2500kVA, 10kV Power project, MTU units.
- Radio Denmark: 10 x 1596kVA 400VAC Power project, MTU units.
- Denmark-Sweden, bridge authority: 2 x 1750kVA 11.5 kV Power project, MTU units.
- Power facility in Denmark: 1x 1400kVA, 10kV/400VAC stand-by plant, MTU unit.
- It-Company, Southern-Finland: 2000kVA Power container with full remote automation.
- Commercial Bank, S-Finland: 1000kVA power project with heat exchanger system.
- Health Center, SE-Finland: 300kVA fully automated Power container.
- HTV, IT Company, 650kVA 1x 12V1600F MTU unit, EG set
Teknobulevardi 3-5
FIN-01530 Vantaa
P.O.Box 35
FIN-01531 Vantaa
Tel: +358 400 952108
Fax: +358 46 7122371
Yrittäjänkatu 15
FIN-65380 Vaasa
P.O. Box 810
FIN-65101 Vaasa
Tel: +358 6 2828816-8
Fax: +358 6 2828819
Reg: 1954384-9
VAT: FI19543849