2. Strongform specializes in industrial structural concrete
construction; rebar placement, steel buildings, & structural steel
erection and civil work. Services to industries include alternative
energy, agriculture, mining, cement, fertilizer, food and beverage,
power, and other industrial projects. Strongform achieves
excellent workmanship on aggressive schedules and maintains an
excellent safety standard. From expansions to greenfield projects
we can be of service to you and, as we are a nationwide
contractor, our services are available to you wherever your
business may take you.
3. ABOUT US
CORPORATE PROFILE
•Strongform is a general contractor that specializes in industrial structural concrete construction; rebar placement, steel
buildings and structural steel erection.
•Strongform is a licensed nationwide contractor.
•Strongform has extensive Bio-refining foundation, structural steel, equipment installation experience.
•Strongform has vast experience in import/export terminal construction.
MAJOR INDUSTRIES SERVED
•Alternative Energy
Ethanol
Biodiesel
Methane Digesters
•Agriculture – Feed and Process
•Agriculture – Bulk Storage
•Mining – Metal and Non-metal
•Cement – Storage and Process
•Fertilizer – Storage and Process
•Food and Beverage
•Power Industry
TYPES OF CONSTRUCTION
•Civil
•Footings
•Walls
Gang Form
Jump Form
Hand Set
•Flatwork and Floors
•Concrete Paving
•Concrete Tanks and Silos
•Structural Concrete Beams and Columns
•Structural Steel and Equipment Installation
8. Assembly of Steel Gang Forms – Assembly of Walk-way is
done on the ground and lifted into place attached to a
section of forms
Workers will work from a safe location and platform mobile
man-lifts are used as needed.
9. Section of Gang Form and Walk-way being hoisted into place with Crane.
Note: All workers are tied-off 100% and the use of Load Tag lines is Company
Policy
11. Installing Wall Reinforcing bar – Note: Rebar is tied in mats on the
ground with the correct splicing and then hoisted into place with
crane.
12. Extra Reinforcing being set in the splice sections. Note:
Workers are 100% tied-off at all times. Spotters and Safety
personal watching at all times.
13. Closing Up outside wall form of wall section. Note
Workers using man-lifts and spotters guiding form
section into place.
14. Pouring Concrete in Wall section. Note: Workers work from walk-
ways on the inside of the wall section.
16. Gang Form wall section on inside of tank after finishing
pouring. Note: Squares on the concrete are from the pour
doors in the form panels with allows concrete to be poured
into the forms per the ACI specifications.