This report presents the findings of EIA of Construction of Lahore
Orange Line Metro train project
(Ali Town Dera gujran)". To comply with Pakistan Environmental
Regulations as conceived in the
Pakistan [Environmental Protect]on Act (PEPA) 1997.
Project
The overall objective of the project is to
provide a safe, congestion free and smooth
traffic facility to the people.
• To transport large amount of people
quickly over short distance with little
land use.
• To provide the public with friendly and
quality public transport
• Provide transport safety, transport
productivity, reliability and social
equity
• Reduce fuel consumption by reducing
private vehicles
The scope of EIA study includes environmental assessment of the project including
collection and securitizing the data related to physical, biological and socio
economic environment, assessment of impacts which may be caused by the project
activities and mitigation measures for the abatement of the potential environmental
impact along with the mitigation cost.
The submission of EIA and its approval from environment protection Agency (EPA)
is mandatory according to the amendment act 2012 by (PEPA )1997 section 12(1).
Impacts and Mitigation Measures
The proposed project will have both positive and negative impacts during the
construction and Operational phases for proper mitigation measures are
necessary. During the field survey, significant efforts were made to identify the
main social, cultural and environmental issues related to the project.
Following is the list of main issues and concerns which have been considered in the
study report:
• Disturbance to the public movement
• Disturbance in the daily routine activities of locals
• Air and noise pollution due to the operating of construction machinery
• Structure Stability in the patch where cut and cover will be done.
• Solid waste generation during construction and operation;
• Accidental leaks/spills of hazardous chemicals from construction
• Construction f tunnel will affect Archeological/cultural sites
Alternatives
Alternative-11; Orange Line with cut and
cover (1.72 km) and viaduct (5.64) km
Alternative-Ill: Orange Line with no out and
cover and fully elevated (27.1)
resolving traffic congestion resulting in
No time delays.
Less fuel consumption.
reduction in conflicts/accidents.
Decrease in Air and noise pollution.
Smooth flow of traffic.
Mitigation measures to contain potential
adverse impacts are described in the
Environmental Management Plan (EMP).
The total environmental cost has been
worked out to be rupees 18,512,50/-
This includes rupees 576,000 for
environmental monitoring
Tree Plantation for Rs.16,936,150
environmental training cost rupees
100,000
 The project will be a stepping stone that will transform
the overall transportation system of Pakistan in the
coming years. The project will not only help overcome
major traffic problems but will also save the time of
individuals in commuting from one place to another
without any hassle. The project will be a benchmark in
the transportation sector and will be great factor in
booming the country’s economy in the years to come.
It will be eco friendly promoting a safe and secure
environment.

More Related Content

What's hot

Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Ashwani Kumar
 
Effects of disposal of solids waste
Effects of disposal of solids wasteEffects of disposal of solids waste
Effects of disposal of solids wasteAravind Aravind
 
Municipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., indiaMunicipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., indiaNiladri Roy
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .onkar solshe
 
Municipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIAMunicipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIARavi Varma reddy
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsKushal Patel
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
 
82 hazardous waste management
82 hazardous waste management82 hazardous waste management
82 hazardous waste managementGaurav Pahuja
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14Municipal solid waste by Muhammad Fahad Ansari 12IEEM14
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14fahadansari131
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahoreAyesha Akhtar
 
EIA report on jaitapur nuclear power plant
EIA report on jaitapur nuclear power plantEIA report on jaitapur nuclear power plant
EIA report on jaitapur nuclear power plantsumankumar507
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
Plastic waste management rules 2016
Plastic waste management rules 2016Plastic waste management rules 2016
Plastic waste management rules 2016aashi jain
 

What's hot (20)

Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making
 
Effects of disposal of solids waste
Effects of disposal of solids wasteEffects of disposal of solids waste
Effects of disposal of solids waste
 
Municipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., indiaMunicipal solid waste management of gwalior, m.p., india
Municipal solid waste management of gwalior, m.p., india
 
Types of Collection system & its Analysis - Municipal Solid Wastes
Types of Collection system & its Analysis - Municipal Solid WastesTypes of Collection system & its Analysis - Municipal Solid Wastes
Types of Collection system & its Analysis - Municipal Solid Wastes
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
 
msw 2016
msw 2016msw 2016
msw 2016
 
Municipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIAMunicipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIA
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
82 hazardous waste management
82 hazardous waste management82 hazardous waste management
82 hazardous waste management
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14Municipal solid waste by Muhammad Fahad Ansari 12IEEM14
Municipal solid waste by Muhammad Fahad Ansari 12IEEM14
 
Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020Eia 2006 vs. eia 2020
Eia 2006 vs. eia 2020
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Environmental policy
Environmental policyEnvironmental policy
Environmental policy
 
EIA report on jaitapur nuclear power plant
EIA report on jaitapur nuclear power plantEIA report on jaitapur nuclear power plant
EIA report on jaitapur nuclear power plant
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Plastic waste management rules 2016
Plastic waste management rules 2016Plastic waste management rules 2016
Plastic waste management rules 2016
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 

Similar to ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE

KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAMNIT,JAIPUR
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd Kumar
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projectsAnchal Garg
 
A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)IRJET Journal
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxssuser65cc68
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeZuhair Ahmed Kowshik
 
Internship Presentation
Internship PresentationInternship Presentation
Internship PresentationSurabhi Pal
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...Mayur Rahangdale
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment studyArvind Kumar
 
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2Sadique Khan
 
Design & development of mechanism of eco-friendly toilet in train bogie
Design & development of mechanism of eco-friendly toilet in train bogieDesign & development of mechanism of eco-friendly toilet in train bogie
Design & development of mechanism of eco-friendly toilet in train bogieIRJET Journal
 
Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)Melissa Dudas
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureKANTHARAJAN GANESAN
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Projectzubeditufail
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 

Similar to ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE (20)

KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Question
QuestionQuestion
Question
 
Unit 7 eia and sd
Unit 7 eia and sd Unit 7 eia and sd
Unit 7 eia and sd
 
kochi Metro
kochi Metrokochi Metro
kochi Metro
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
 
Internship Presentation
Internship PresentationInternship Presentation
Internship Presentation
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
 
Environment impact assessment study
Environment impact assessment studyEnvironment impact assessment study
Environment impact assessment study
 
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
REVIEW ON ENVIRONMENTAL IMPACT ASSESSMENT FOR CHENNAI METRO RAIL PHASE 2
 
Design & development of mechanism of eco-friendly toilet in train bogie
Design & development of mechanism of eco-friendly toilet in train bogieDesign & development of mechanism of eco-friendly toilet in train bogie
Design & development of mechanism of eco-friendly toilet in train bogie
 
Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)Environmental Impact Assessment (Eia)
Environmental Impact Assessment (Eia)
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
Eia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway ProjectEia Karachi Thatta Dual Carriageway Project
Eia Karachi Thatta Dual Carriageway Project
 
EIA report
EIA reportEIA report
EIA report
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 

Recently uploaded

9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionrgxv72jrgc
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 

Recently uploaded (20)

9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
(ANAYA) Call Girls Hadapsar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Air pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollutionAir pollution soli pollution water pollution noise pollution land pollution
Air pollution soli pollution water pollution noise pollution land pollution
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi NcrCall Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
Call Girls In R.K. Puram 9953056974 Escorts ServiCe In Delhi Ncr
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 

ENVIRONMENTAL IMPACT ASSESMENT (EIA) OF ORANGE LINE LAHORE

  • 1. ENVIRONMENTAL IMPACT ASSESMENT (EIA) LAHORE ORANGE LINE METRO TRAIN PROJECT (ALI TOWN - DERA GUJRAN)
  • 2. This report presents the findings of EIA of Construction of Lahore Orange Line Metro train project (Ali Town Dera gujran)". To comply with Pakistan Environmental Regulations as conceived in the Pakistan [Environmental Protect]on Act (PEPA) 1997.
  • 3. Project The overall objective of the project is to provide a safe, congestion free and smooth traffic facility to the people. • To transport large amount of people quickly over short distance with little land use. • To provide the public with friendly and quality public transport • Provide transport safety, transport productivity, reliability and social equity • Reduce fuel consumption by reducing private vehicles
  • 4. The scope of EIA study includes environmental assessment of the project including collection and securitizing the data related to physical, biological and socio economic environment, assessment of impacts which may be caused by the project activities and mitigation measures for the abatement of the potential environmental impact along with the mitigation cost. The submission of EIA and its approval from environment protection Agency (EPA) is mandatory according to the amendment act 2012 by (PEPA )1997 section 12(1).
  • 5. Impacts and Mitigation Measures The proposed project will have both positive and negative impacts during the construction and Operational phases for proper mitigation measures are necessary. During the field survey, significant efforts were made to identify the main social, cultural and environmental issues related to the project.
  • 6. Following is the list of main issues and concerns which have been considered in the study report: • Disturbance to the public movement • Disturbance in the daily routine activities of locals • Air and noise pollution due to the operating of construction machinery • Structure Stability in the patch where cut and cover will be done. • Solid waste generation during construction and operation; • Accidental leaks/spills of hazardous chemicals from construction • Construction f tunnel will affect Archeological/cultural sites
  • 7. Alternatives Alternative-11; Orange Line with cut and cover (1.72 km) and viaduct (5.64) km Alternative-Ill: Orange Line with no out and cover and fully elevated (27.1) resolving traffic congestion resulting in No time delays. Less fuel consumption. reduction in conflicts/accidents. Decrease in Air and noise pollution. Smooth flow of traffic.
  • 8. Mitigation measures to contain potential adverse impacts are described in the Environmental Management Plan (EMP). The total environmental cost has been worked out to be rupees 18,512,50/- This includes rupees 576,000 for environmental monitoring Tree Plantation for Rs.16,936,150 environmental training cost rupees 100,000
  • 9.  The project will be a stepping stone that will transform the overall transportation system of Pakistan in the coming years. The project will not only help overcome major traffic problems but will also save the time of individuals in commuting from one place to another without any hassle. The project will be a benchmark in the transportation sector and will be great factor in booming the country’s economy in the years to come. It will be eco friendly promoting a safe and secure environment.