SlideShare a Scribd company logo
1 of 8
Achmad Solah Hudin
Last Update: 17 February 2016
Contact Info
Address : Jl.Camar Raya Block A3/12 Komp.WaliKota Sukapura,Jakarta Utara
Telephone No. : 021-4405741 (Home)
Mobile No. : ++082340547911
Email : Solahhudin.Achmad@gmail.com
Personal Particulars
Age : 35 years Date of Birth : 04 Juli 1979
Nationality : Indonesia Gender : Male
Marital Status : Married IC No. : 09.5105.040779.02.09
Permanent Residence : Indonesia, Jakarta
Educational Background
Highest Education
Level : Bachelor Degree Grade : 2.82
Field of Study : Telecommunication
Major : Electrical Engineering
Institute / University : Universitas Darma Persada
Located In : Indonesia Graduation Date : Agust 2005
Trainning Year Obtained
The development of telecommunication technology and information in the
globalization era
1999
Job training at PT. Telkom Bekasi JL. Rawa Tembaga, Jaringan Lokal Acsess
tembaga Dept.
2003
“Illumination design and Application” seminar. 2004
Survey and Design Network 2006
Radio Network Planning (RF ) 2006
Transmission Network Planning 2006
Design Installation BTS Transmission 2006
1. Company Name : PT. DSK TELECOM
Position Title : Survey and Design Engineer (RNP & TNP)
Position Level : LOS Coordinator TNP
Specialization : RF & Transmission Line Of Sight Survey (LOS)
Industry : Telecommunication
Monthly Salary :
Date Joined : April 2006 Date Left : Maret 2007
Work Description : - Support Ericsson-Indosat at Berau East Borneo : LOS (Line Of
sight Survey)
With volume of Site : 20 Site
- Support Ericsson-Telkomsel at East Borneo : SIS (Site
Investigation Survey
With volume of Site : 25 Site
- Support Ericsson-Telkomsel at Sumatra : SIS (Site Investigation
Survey
With volume of Site : 21 Site
- Support Ericsson-Telkomsel at Jabodetabek : LOS (Line Of
sight Survey)
With volume of Site : 120 Site
2. Company Name : PT.Siemens Indonesia
Position Title : Transmission Network Planning
Position Level : TNP
Specialization : Transmission Line Of Sight Survey, Transmission Planning
Industry : Telecommunication
Monthly Salary :
Date Joined : October 2007 Date Left : April 2008
Work Description : - Support Siemens-HCPT at Jabodetabek : LOS (Line Of sight
Survey)
With volume of Site : 500 Site
- Support Siemens-HCPT at Jabodetabek 2G:Transmission
Network Planning (TNP)
3. Company Name : PT.Cahaya MitaraTec ( CMTec )
Position Title : Survey and Design Engineer (RNP & TNP) Survey
Position Level : LOS Coordinator TNP
Specialization : RF & Transmission Line Of Sight Survey (LOS)
Industry : Telecommunication
Monthly Salary :
Date Joined : Febuary 2009 Date Left : Sept 2011
Work Description : - Support NSN-HCPT at Jabodetabek : LOS (Line Of sight Survey)
With volume of Site : 300 Site
- Support NSN-HCPT at Jabodetabek: (RNP )Radio Network
Planning) Survey
With volume of Site : 300 Site
- Support NSN-Telkomsel at west Borneo : SIS (Site
Investigation Survey
With volume of Site : 150 Site
4. Company Name : PT.Elabram Systems
Position Title : Dept. Project Engineer
Position Level : ITC Coordinator
Specialization : ITC and Planning
Industry : Telecommunication
Monthly Salary :
Date Joined : 26 – Des - 2011 Date Left : 26 Juni 2012
Work Description : - Support Project C Huawei-Telkomsel Jabodetabek: Swap BTS
2G
With volume of Site : 147 Site
- Support Project D Huawei-Telkomsel Jabodetabek : Swap BTS
2G
With volume of Site : 16 Site
- Support Project IP migration Huawei-HCPT Jabodetabek
With volume of Site : 232 Site
- Support Project Mega Turn Key Huawei-HCPT Jabodetabek :
Swap BTS 2G
With volume of Site : 232 Site
- Support Project NSN (Pegasus) –Indosat Rollout 2G and 3G at
Central Java: TNP (Transmission Network Planning).
5. Company Name : PT. Intex Telecom Systems Indonesia
Position Title : Transmission Planner for Nokia Siemens Network
Position Level : TNP
Specialization : Planning Transmission
Industry : Telecommunication
Monthly Salary :
Date Joined : 28 – May - 2012 Date Left : 10 – Feb-1012
Work Description : Transmission Network Planning for NSN (pegasus)–Telkomsel Area
Balinusra :
- Support NSN to achieve Evolution project for Telkomsel
BALINUSRA area
- Support NSN to achieve Rollout project for Telkomsel
BALINUSRA area
5. Company Name : PT. INTISEL
Position Title : Access & IP Transport Engineer
Position Level : TNP
Specialization : Planning Transmission
Industry : Telecommunication
Monthly Salary :
Date Joined : 15 – Feb - 2012 Date Left : 29-Feb-2016
Work Description : Access & IP Transport Engineer Telkomsel Area Balinusra :
- Support NSN to achieve Evolution project for Telkomsel
BALINUSRA area
- Support NSN to achieve Rollout project for Telkomsel
BALINUSRA area
Responsibility
• Line of Sight (LOS) Engineer
Responsibilities :
 Study Map (Make terrain profile) for calculation Line of Sight in Pathloss software,
 Site Survey for BTS location, cable routing, antenna location use stand pole, pole wall
mount, mini tower or tower
 Check LOS from new site to far end for Ascertaining MW antenna no blocking to far end.
 Expert for using tools of survey ( GPS, Altimeter, Camera, Binocular, Compass)
 Make report LOS survey near end, far end site and submit to Vendor or Costumer.
• Transmission Planning Engineer 2G and 3G
Responsibilities:
Incumbent to Plan costamer Network Database, with the
• following detail for 2G (TDM)
 As Transmission Planner working with monthly target for new site in defining far end base
costomer network Topology design according to BSC border and make sure have 3 hope
maximum up to BSC and ensure to plan best network topology and dimensioning as
Customer requirement with related transmission link capacity on Collector.
 Service to project team about network system like ET Number each site on BSC, ABIS Plan
configuration, upgrade link and shift traffic if full capacity as planner solution.
 Assign ET allocation for new site or upgrade site every BSC and arrange ABIS Plan with
various TRX Configuration like 2/2/2, 3/3/3 … , 6/6/6, 8/8/8 High Capacity, EDGE BTS or
Drop Insert BTS using Ultrasite BTS, Metrosite, Intratalk. Make MWLP to design Radio
Microwave Transmission parameter with Pathloss software between two BTS link use Flexi
hopper 4 E1, 8E1, 16 E1 capacities or Power hopper 21 E1 with NOKIA ULTRASITE BTS &
NOKIA FLEXIHOPPER RADIO.
 Update database to 2 MB, Pathloss or MAP Info periodically.
 Update data ZEE,ZWGO,ZUFI, & ZUSI
 Provide Abis Mapping For NEW SITE, Site Collocated,Expand TRX
• following detail for 3G (ATM)
 Prepare 2 MB for 3G, existing site and new site
 Making Cross Connection for New site and upgrade E1 as Roll Out Project
 Update data diagram 2MB with Exel software
 Preparing Datafill for 3G,ATM,Hybrid
 Create ATM cross connection data ( AXC datafill ) for SAXC,Tellabs, HID,and HIT equipment.
 Create database for IuB utilization
 Provide RNC Database
 Provide all data Transmission For NEW RNC,Rehoming,Shifting Traffic
 Update data Tellabs,HIT,SAXC,HID,HIT
• following detail for 3G and 2G (NATIVE IP)
 Provide Design IP Transport, Layer 2 and Layer 3
 Provide Linkroute For New Site and Upgrade Migrasi (TDM to NATIVE IP) and Prepare BOQ
 Provide Diagram Topology Native IP and Make Sure Transport,GPON(Direct) Or
GPON+MW/IP.
 Provide Data Port FE (Available) and GE(Available) From Link Radio Transmission to RNC.
 Provide Data Port GPON (Available)
 Provide Vlan dan IP and Request Recomfiqure to Costomer
 Provide Datafill Native IP.
 Make Sure NPGE Available and utilization NPGE Load.
 Update Datafill From data Comond ZQRB(Looking NPGE Created and Iub Created)
ZQRL(Looking CAC (CAC Committed Bit Rate) and SIR(Shaper Information Rate) and Make
sure OMU Created From RNC(Looking Comond ZQRB).
 Provide Plan Datafill for REBALANCING NPGE From ROUTER
 Update Topology Native IP
• Jobs Achievement :
 Updating network databases, Prepare Transmission link plan with optimize parameter such
as Tx Power, Rx level, define frequency in the sub band and make sure no interference and
no drop.
 Perform duty as responsibility to achieve the customer target
 Make certainty all target for new site BTS will be on air according to planning and no carry
over.
 Make sure the coordinate are exactly to new site before doing implementation by project /
regional to avoid shifting location inter BSC border.
 Prepare accurate data for next site target and discuss to customer about Defining Far end,
Link Capacity, need upgrading link.
Skill Proficiency
Planning Coverage Area Intermediate
Study Map Intermediate
Map Source Intermediate
Map Info Intermediate
MS Office Intermediate
Progress Database Intermediate
Pathloss 4.0 / LinkBudget Intermediate
Design Installation BTS
Microsoft Windows + Office
AutoCAD and Visio Drawing
Intermediate
Intermediate
Intermediate
Intermediate
Tools for LOS survey
Laptop with Path Loss 4.0
Binocular
Flashing mirror
Balloon (if required)
GPS with antenna
Digital altimeter
Indonesia contour map
Inclinometer
Camera
safety harness
Proficiency
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Intermediate
Language Spoken Written
English 7 7
Indonesian 10 10
Additional Info
Willing to Travel : Heavy (>90%)
Willing to Relocate : Will Consider
Possess Own Transport : Yes
Availability : Immediately after notice period of 1 month(s)
Re f e r e n c e s
Name : Arista.Utama
Telephone No. : +0812-8300-8838
Position : Manager Project
Company : INTISEL,PT
Name : Braind
Telephone No. : +0811800402
Company : INTEX,PT
Name : Andree Gavin
Telephone No. : + 0858-9067-7408
Position : Manager Project
Company : Elabram System,PT
Name : Anthony Hutagalung
Telephone No. : +0812-8620-7990
Company : Nokia Siemens Networks, PT
Name : Fauzan Mappagiling
Telephone No. : +0811-8731-94
Company : Nokia Siemens Networks, PT
Name : Ananto.Praktikno
Telephone No. : +08118440938
Company : Nokia Siemens Networks, PT
Name : Arif.Widiatmoko
Telephone No. : +085222074024
Company : Nokia Siemens Networks, PT
Name : Andi Martua
Telephone No. : +0816-8095-40
Position : Manager Project
Company : Cahaya Mitra Tecnolgy,PT (CMTec)
CV_Achmad Solah Hudin_15 FEB 2016

More Related Content

What's hot (17)

Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Resume_Bivas Paul_1
Resume_Bivas Paul_1Resume_Bivas Paul_1
Resume_Bivas Paul_1
 
Harshit Bhawsar Resume
Harshit Bhawsar ResumeHarshit Bhawsar Resume
Harshit Bhawsar Resume
 
Sandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_ExpSandeep_CV_3 Years_Exp
Sandeep_CV_3 Years_Exp
 
kaushal resume
kaushal resumekaushal resume
kaushal resume
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
B Mahendar- CV
B Mahendar- CVB Mahendar- CV
B Mahendar- CV
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Delivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JDDelivery Engineer (Junior)-JD
Delivery Engineer (Junior)-JD
 
ajay awasthi resume.....
ajay awasthi resume.....ajay awasthi resume.....
ajay awasthi resume.....
 
SACHIN 4.6 years Exp
SACHIN 4.6 years ExpSACHIN 4.6 years Exp
SACHIN 4.6 years Exp
 
Resume Said's
Resume Said'sResume Said's
Resume Said's
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
Sandeep resume
Sandeep resumeSandeep resume
Sandeep resume
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 

Viewers also liked

Travel Inspiration Shared by Scott Lemons Myrtle Beach
Travel Inspiration Shared by Scott Lemons Myrtle BeachTravel Inspiration Shared by Scott Lemons Myrtle Beach
Travel Inspiration Shared by Scott Lemons Myrtle BeachScott Lemons Myrtle Beach
 
Development pro forma(3)
Development pro forma(3)Development pro forma(3)
Development pro forma(3)thenamesbarnett
 
Institucion educativa liceo moderno magangue
Institucion educativa liceo moderno magangueInstitucion educativa liceo moderno magangue
Institucion educativa liceo moderno maganguedanypatri16
 
El autoempleo como alternativa
El autoempleo como alternativaEl autoempleo como alternativa
El autoempleo como alternativaYolanda Busto
 
Presentacion seguridad social
Presentacion seguridad socialPresentacion seguridad social
Presentacion seguridad socialSteph Large
 
Desinstalacion de windows_xp
Desinstalacion de windows_xpDesinstalacion de windows_xp
Desinstalacion de windows_xpRobert Rodriguez
 
Partes de la computadora
Partes de la computadoraPartes de la computadora
Partes de la computadoraalandaniel76
 
Approach to primary glomerulonnephritis
Approach to primary glomerulonnephritisApproach to primary glomerulonnephritis
Approach to primary glomerulonnephritisGaurav Kumar
 

Viewers also liked (12)

Travel Inspiration Shared by Scott Lemons Myrtle Beach
Travel Inspiration Shared by Scott Lemons Myrtle BeachTravel Inspiration Shared by Scott Lemons Myrtle Beach
Travel Inspiration Shared by Scott Lemons Myrtle Beach
 
Certificat_ISEG
Certificat_ISEGCertificat_ISEG
Certificat_ISEG
 
Development pro forma(3)
Development pro forma(3)Development pro forma(3)
Development pro forma(3)
 
Institucion educativa liceo moderno magangue
Institucion educativa liceo moderno magangueInstitucion educativa liceo moderno magangue
Institucion educativa liceo moderno magangue
 
Gost 9664 74
 Gost 9664 74 Gost 9664 74
Gost 9664 74
 
PIMP
PIMPPIMP
PIMP
 
El autoempleo como alternativa
El autoempleo como alternativaEl autoempleo como alternativa
El autoempleo como alternativa
 
Presentacion seguridad social
Presentacion seguridad socialPresentacion seguridad social
Presentacion seguridad social
 
Desinstalacion de windows_xp
Desinstalacion de windows_xpDesinstalacion de windows_xp
Desinstalacion de windows_xp
 
Partes de la computadora
Partes de la computadoraPartes de la computadora
Partes de la computadora
 
Kosmetik.pdf
Kosmetik.pdfKosmetik.pdf
Kosmetik.pdf
 
Approach to primary glomerulonnephritis
Approach to primary glomerulonnephritisApproach to primary glomerulonnephritis
Approach to primary glomerulonnephritis
 

Similar to CV_Achmad Solah Hudin_15 FEB 2016

Similar to CV_Achmad Solah Hudin_15 FEB 2016 (20)

Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
Sandeep Kumar
Sandeep KumarSandeep Kumar
Sandeep Kumar
 
CV_Jared Manzano
CV_Jared ManzanoCV_Jared Manzano
CV_Jared Manzano
 
Narendhar.B
Narendhar.BNarendhar.B
Narendhar.B
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
Manikandan
ManikandanManikandan
Manikandan
 
Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 
arun kumar
arun kumararun kumar
arun kumar
 
RESUME_Sushil
RESUME_SushilRESUME_Sushil
RESUME_Sushil
 
Sanjoy_Resume (1)
Sanjoy_Resume (1)Sanjoy_Resume (1)
Sanjoy_Resume (1)
 
Contact address
Contact addressContact address
Contact address
 
CV_Febrinaldi
CV_FebrinaldiCV_Febrinaldi
CV_Febrinaldi
 
CV_ASIM_11_2014
CV_ASIM_11_2014CV_ASIM_11_2014
CV_ASIM_11_2014
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
suresh resume
suresh resumesuresh resume
suresh resume
 
Wyden Sagun's CV
Wyden Sagun's CVWyden Sagun's CV
Wyden Sagun's CV
 
kunal vedpathak
kunal vedpathakkunal vedpathak
kunal vedpathak
 

CV_Achmad Solah Hudin_15 FEB 2016

  • 1. Achmad Solah Hudin Last Update: 17 February 2016 Contact Info Address : Jl.Camar Raya Block A3/12 Komp.WaliKota Sukapura,Jakarta Utara Telephone No. : 021-4405741 (Home) Mobile No. : ++082340547911 Email : Solahhudin.Achmad@gmail.com Personal Particulars Age : 35 years Date of Birth : 04 Juli 1979 Nationality : Indonesia Gender : Male Marital Status : Married IC No. : 09.5105.040779.02.09 Permanent Residence : Indonesia, Jakarta Educational Background Highest Education Level : Bachelor Degree Grade : 2.82 Field of Study : Telecommunication Major : Electrical Engineering Institute / University : Universitas Darma Persada Located In : Indonesia Graduation Date : Agust 2005 Trainning Year Obtained The development of telecommunication technology and information in the globalization era 1999 Job training at PT. Telkom Bekasi JL. Rawa Tembaga, Jaringan Lokal Acsess tembaga Dept. 2003 “Illumination design and Application” seminar. 2004 Survey and Design Network 2006 Radio Network Planning (RF ) 2006 Transmission Network Planning 2006 Design Installation BTS Transmission 2006
  • 2. 1. Company Name : PT. DSK TELECOM Position Title : Survey and Design Engineer (RNP & TNP) Position Level : LOS Coordinator TNP Specialization : RF & Transmission Line Of Sight Survey (LOS) Industry : Telecommunication Monthly Salary : Date Joined : April 2006 Date Left : Maret 2007 Work Description : - Support Ericsson-Indosat at Berau East Borneo : LOS (Line Of sight Survey) With volume of Site : 20 Site - Support Ericsson-Telkomsel at East Borneo : SIS (Site Investigation Survey With volume of Site : 25 Site - Support Ericsson-Telkomsel at Sumatra : SIS (Site Investigation Survey With volume of Site : 21 Site - Support Ericsson-Telkomsel at Jabodetabek : LOS (Line Of sight Survey) With volume of Site : 120 Site 2. Company Name : PT.Siemens Indonesia Position Title : Transmission Network Planning Position Level : TNP Specialization : Transmission Line Of Sight Survey, Transmission Planning Industry : Telecommunication Monthly Salary : Date Joined : October 2007 Date Left : April 2008 Work Description : - Support Siemens-HCPT at Jabodetabek : LOS (Line Of sight Survey) With volume of Site : 500 Site - Support Siemens-HCPT at Jabodetabek 2G:Transmission Network Planning (TNP) 3. Company Name : PT.Cahaya MitaraTec ( CMTec )
  • 3. Position Title : Survey and Design Engineer (RNP & TNP) Survey Position Level : LOS Coordinator TNP Specialization : RF & Transmission Line Of Sight Survey (LOS) Industry : Telecommunication Monthly Salary : Date Joined : Febuary 2009 Date Left : Sept 2011 Work Description : - Support NSN-HCPT at Jabodetabek : LOS (Line Of sight Survey) With volume of Site : 300 Site - Support NSN-HCPT at Jabodetabek: (RNP )Radio Network Planning) Survey With volume of Site : 300 Site - Support NSN-Telkomsel at west Borneo : SIS (Site Investigation Survey With volume of Site : 150 Site 4. Company Name : PT.Elabram Systems Position Title : Dept. Project Engineer Position Level : ITC Coordinator Specialization : ITC and Planning Industry : Telecommunication Monthly Salary : Date Joined : 26 – Des - 2011 Date Left : 26 Juni 2012 Work Description : - Support Project C Huawei-Telkomsel Jabodetabek: Swap BTS 2G With volume of Site : 147 Site - Support Project D Huawei-Telkomsel Jabodetabek : Swap BTS 2G With volume of Site : 16 Site - Support Project IP migration Huawei-HCPT Jabodetabek With volume of Site : 232 Site - Support Project Mega Turn Key Huawei-HCPT Jabodetabek : Swap BTS 2G With volume of Site : 232 Site - Support Project NSN (Pegasus) –Indosat Rollout 2G and 3G at Central Java: TNP (Transmission Network Planning). 5. Company Name : PT. Intex Telecom Systems Indonesia Position Title : Transmission Planner for Nokia Siemens Network Position Level : TNP Specialization : Planning Transmission Industry : Telecommunication
  • 4. Monthly Salary : Date Joined : 28 – May - 2012 Date Left : 10 – Feb-1012 Work Description : Transmission Network Planning for NSN (pegasus)–Telkomsel Area Balinusra : - Support NSN to achieve Evolution project for Telkomsel BALINUSRA area - Support NSN to achieve Rollout project for Telkomsel BALINUSRA area 5. Company Name : PT. INTISEL Position Title : Access & IP Transport Engineer Position Level : TNP Specialization : Planning Transmission Industry : Telecommunication Monthly Salary : Date Joined : 15 – Feb - 2012 Date Left : 29-Feb-2016 Work Description : Access & IP Transport Engineer Telkomsel Area Balinusra : - Support NSN to achieve Evolution project for Telkomsel BALINUSRA area - Support NSN to achieve Rollout project for Telkomsel BALINUSRA area Responsibility • Line of Sight (LOS) Engineer Responsibilities :  Study Map (Make terrain profile) for calculation Line of Sight in Pathloss software,  Site Survey for BTS location, cable routing, antenna location use stand pole, pole wall mount, mini tower or tower  Check LOS from new site to far end for Ascertaining MW antenna no blocking to far end.
  • 5.  Expert for using tools of survey ( GPS, Altimeter, Camera, Binocular, Compass)  Make report LOS survey near end, far end site and submit to Vendor or Costumer. • Transmission Planning Engineer 2G and 3G Responsibilities: Incumbent to Plan costamer Network Database, with the • following detail for 2G (TDM)  As Transmission Planner working with monthly target for new site in defining far end base costomer network Topology design according to BSC border and make sure have 3 hope maximum up to BSC and ensure to plan best network topology and dimensioning as Customer requirement with related transmission link capacity on Collector.  Service to project team about network system like ET Number each site on BSC, ABIS Plan configuration, upgrade link and shift traffic if full capacity as planner solution.  Assign ET allocation for new site or upgrade site every BSC and arrange ABIS Plan with various TRX Configuration like 2/2/2, 3/3/3 … , 6/6/6, 8/8/8 High Capacity, EDGE BTS or Drop Insert BTS using Ultrasite BTS, Metrosite, Intratalk. Make MWLP to design Radio Microwave Transmission parameter with Pathloss software between two BTS link use Flexi hopper 4 E1, 8E1, 16 E1 capacities or Power hopper 21 E1 with NOKIA ULTRASITE BTS & NOKIA FLEXIHOPPER RADIO.  Update database to 2 MB, Pathloss or MAP Info periodically.  Update data ZEE,ZWGO,ZUFI, & ZUSI  Provide Abis Mapping For NEW SITE, Site Collocated,Expand TRX • following detail for 3G (ATM)  Prepare 2 MB for 3G, existing site and new site  Making Cross Connection for New site and upgrade E1 as Roll Out Project  Update data diagram 2MB with Exel software  Preparing Datafill for 3G,ATM,Hybrid  Create ATM cross connection data ( AXC datafill ) for SAXC,Tellabs, HID,and HIT equipment.  Create database for IuB utilization  Provide RNC Database  Provide all data Transmission For NEW RNC,Rehoming,Shifting Traffic  Update data Tellabs,HIT,SAXC,HID,HIT • following detail for 3G and 2G (NATIVE IP)  Provide Design IP Transport, Layer 2 and Layer 3  Provide Linkroute For New Site and Upgrade Migrasi (TDM to NATIVE IP) and Prepare BOQ  Provide Diagram Topology Native IP and Make Sure Transport,GPON(Direct) Or GPON+MW/IP.  Provide Data Port FE (Available) and GE(Available) From Link Radio Transmission to RNC.  Provide Data Port GPON (Available)  Provide Vlan dan IP and Request Recomfiqure to Costomer  Provide Datafill Native IP.  Make Sure NPGE Available and utilization NPGE Load.  Update Datafill From data Comond ZQRB(Looking NPGE Created and Iub Created) ZQRL(Looking CAC (CAC Committed Bit Rate) and SIR(Shaper Information Rate) and Make sure OMU Created From RNC(Looking Comond ZQRB).  Provide Plan Datafill for REBALANCING NPGE From ROUTER
  • 6.  Update Topology Native IP • Jobs Achievement :  Updating network databases, Prepare Transmission link plan with optimize parameter such as Tx Power, Rx level, define frequency in the sub band and make sure no interference and no drop.  Perform duty as responsibility to achieve the customer target  Make certainty all target for new site BTS will be on air according to planning and no carry over.  Make sure the coordinate are exactly to new site before doing implementation by project / regional to avoid shifting location inter BSC border.  Prepare accurate data for next site target and discuss to customer about Defining Far end, Link Capacity, need upgrading link. Skill Proficiency Planning Coverage Area Intermediate Study Map Intermediate Map Source Intermediate Map Info Intermediate MS Office Intermediate Progress Database Intermediate Pathloss 4.0 / LinkBudget Intermediate Design Installation BTS Microsoft Windows + Office AutoCAD and Visio Drawing Intermediate Intermediate Intermediate Intermediate Tools for LOS survey Laptop with Path Loss 4.0 Binocular Flashing mirror Balloon (if required) GPS with antenna Digital altimeter Indonesia contour map Inclinometer Camera safety harness Proficiency Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate
  • 7. Language Spoken Written English 7 7 Indonesian 10 10 Additional Info Willing to Travel : Heavy (>90%) Willing to Relocate : Will Consider Possess Own Transport : Yes Availability : Immediately after notice period of 1 month(s) Re f e r e n c e s Name : Arista.Utama Telephone No. : +0812-8300-8838 Position : Manager Project Company : INTISEL,PT Name : Braind Telephone No. : +0811800402 Company : INTEX,PT Name : Andree Gavin Telephone No. : + 0858-9067-7408 Position : Manager Project Company : Elabram System,PT Name : Anthony Hutagalung Telephone No. : +0812-8620-7990 Company : Nokia Siemens Networks, PT Name : Fauzan Mappagiling Telephone No. : +0811-8731-94 Company : Nokia Siemens Networks, PT Name : Ananto.Praktikno Telephone No. : +08118440938 Company : Nokia Siemens Networks, PT Name : Arif.Widiatmoko Telephone No. : +085222074024 Company : Nokia Siemens Networks, PT Name : Andi Martua Telephone No. : +0816-8095-40 Position : Manager Project Company : Cahaya Mitra Tecnolgy,PT (CMTec)