SlideShare a Scribd company logo
1 of 26
ISO 14001:2004 (EMS)
OHSAS 18001:2007 (OHSAS)
Awareness Training
Content - Index
1. Understanding EMS & OHSAS Standard
2. Why Necessary to implement Standard requirement?
3. Overview of EMS & OHSAS standard requirement
4. EHS Policy & Objective
5. Process Mapping & Interaction
6. Some Definitions
7. Documentation
8. Environmental Aspect & Impacts
9. Hazard Identification & Risk Analysis(HIRA)
10. Significant Aspects & Hazards
11. Emergency Response Plan
12. Legal Requirement
13. Communication
14. Monitoring & measurement
15. Management Programs
16. Operational Controls
17. Training 18. Internal Audit
Understanding EMS & OHSAS Standard
This International Standard specifies requirements for an environmental
management system to enable an organization to develop and implement a
policy and objectives which take into account legal requirements and
information about significant environmental aspects. It is intended to apply to
all types and sizes of organization and to accommodate diverse geographical,
cultural and social conditions. The basis of the approach is shown
in Figure 1. The success of the system depends on commitment from all levels
and functions of the organization, and especially from top management. A
system of this kind enables an organization to develop an environmental policy,
establish objectives and processes to achieve the policy commitments, take
action as needed to improve its performance and demonstrate the conformity
of the system to the requirements of this International Standard. The overall
aim of this International Standard is to support environmental protection and
prevention of pollution in balance with socio-economic needs.
Understanding EMS & OHSAS Standard
ISO 14001 :2004 & OHSAS 18001:2007
1 Scope
2 Normative references
3 Terms and definitions
4 EHS system requirements
4.1 General requirements
4.2 EHS policy
4.3 Planning
4.4 Implementation and operation
4.5 Checking
4.6 Management review
Scope :
The manufacture of High Pressure Aluminium Die
Cast machined & Painted parts and their Assemblies
Why Necessary to implement EMS OHSAS Standard Requirement
Addressing environmental, health & safety concerns is the need of the
hour and companies that have incorporated it in their operational
processes have started accruing benefits.
Any kind of waste, ill health & unsafe work environment is just a
symptom of inefficient operations.
The world's resources are now coming to an end. If development is to
proceed it must be through conservation and wiser use of not only of raw
materials but also the waste generated.
Industry can make a significant contribution by increasing the efficiencies
of its processes/products. Environment, Health & Safety Management
&System if adopted would not only result in substantial financial savings
environmental protection but also raise the goodwill in the eyes of public.
As the legal and other applicable requirements are being made stricter
day by day ,we need to have a proactive approach through establishing
our own code of practice in advance to the legislation. This enhanced
commitment should be transformed into consistent & positive actions
immediately.
It is our pursuit on the journey towards excellence which prompted us to
adopt ISO 14001 & OHSAS 18001standard, which in turn can help us to
have a cleaner environment, minimum pollution & waste, Safer and
cleaner working conditions & to become a world class company…
EHS Policy & Objectives
Sr.
No.
EHS Objective
1 To Conserve Electrical Energy
2 To Conserve Water
3 To Reduce Hazardous waste
4 To improve Green Belt
5 To prevent Accident
6 To identify Near miss accidents
Process Mapping & Interaction
Definitions
Environmental
Aspect
Element of an organizational activities or products or
services that can interact with an environment
Environment Impact Any change to the environment whether adverse or
beneficial, wholly or partially resulting from an
organization’s environmental aspects.
Environmental
Performance
Measurable results of an organization’s management of
its environmental aspects
Prevention of
Pollution
Use of processes, practices, techniques, materials,
products, services or energy to avoid, reduce or
control ( separately or in combination) the creation,
emission, or discharge, of any type of pollutant or
waste, in order to reduce adverse environmental
impacts
Acceptable Risk Risk that has been reduced to a level that can be
tolerated by the organization having regard to its legal
obligations & its own OH & S policy.
Hazard Source , situation or act with a potential for harm in
terms of human injury or ill health or a combination of
these.
Interested Party Person or group concerned with or affected by the
environmental , OH & Safety performance of an
organization
ill Health Identifiable, adverse physical or mental condition arising
from and/or made worse by a work activity and / or work
related situation.
Incident Work-related event(s) in which an injury or ill health
(regardless of severity) or fatality occurred or could have
occurred.
Occupational Health &
Safety
Conditions and factors that affect, or could affect, the health
& safety of employees or other workers(including temporary
workers and contract personnel), visitor, or any other
person in the work place.
OH & Safety
performance
Conditions & factors that affect, or could affect the health
and safety of employees or other workers (including
temporary workers and contract personnel), visitor or any
other person in the workplace.
Risk Combination of the likelihood of an occurrence of a
hazardous event or exposures(s) and the severity of injury
or ill health that can be caused by the event or
exposures(s).
Risk Assessment Process of evaluating risk(s) arising from a hazard(s),
taking into account the adequacy of any existing controls,
and deciding whether or not the risk(s) is acceptable.
EHS Manual – Level I, EHS Procedures - Level II
Emergency Response Plan
Formats ETP
Environmental Review & Aspect Impacts studies
Identification Of Significant Aspects
Establishing Operational Controls & Management Program identification & Implementation
Hazard Identification & Risk Analysis (HIRA)
EHS Objective Monitoring & Measurement
Legal Requirement Review & its implementation – MPCB Consent, EMS, OHSAS, Factory Act
Training Records - Related to EMS & OHSAS
Records – Legal Compliance, Training, Internal audits , MRM ,ETP /STP, Maintenance Records,
Communication
Environmental Aspect & Impact
Hazard Identification & Risk Analysis (HIRA)
1
Die Loading /
Unloading
Physical hazard
due to falling of die
while loading /
unloading by crane
Act Yes Yes 3 1 3
Not
accepta
ble
Testing by
competent
person &
scheduled
Preventive
maintenance
2 1 2
Accepta
ble
OCP
Electrical hazard
due to contact with
Operating panel of
crane
Source Yes Yes 3 1 3
Not
accepta
ble
Testing by
competent
person &
scheduled
Preventive
maintenance
2 1 2
Accepta
ble
OCP
Mechinical hazard
failure of crane due
slippage of brake
Act Yes Yes 3 1 3
Not
accepta
ble
Testing by
competent
person &
scheduled
Preventive
maintenance
2 1 2
Accepta
ble
OCP
Mechnical hazard
due to breaking of
slings /wire rope /
hooks
Act Yes Yes 3 1 3
Not
accepta
ble
Testing by
competent
person
2 1 2
Accepta
ble
OCP
2 Die coating
Chemical hazard
due to Eye irritation
(splashing of
chemical)
Act No Yes 2 1 2
Accepta
ble
PPE 2 1 2
Accepta
ble
OCP
Sr.No
Operation / Work
Activities /
Services
OH & S Hazards
Source,
Situation
or Act
Emer
situation
(Y / N)
Legal
Concern
(Y /N)
Base Risk
Assesment
Base
Risk
Level
Acceptabl
e / Not
acceptable
Control in place &
in use (
A/B/C/D/E)
Final Risk
Assessment
Final
Risk
Leve
l
Acceptabl
e / Not
acceptable
Additional control
required
Sev Prob Sev Prob
Significant Aspects & Hazards
Emergency Response Plan
PURPOSE:
The risky operations and
activities are analyzed that
leads to emergency
situation and preventive
measures are implemented
to avoid emergencies. In
case of emergency
situations are raised, those
are handled in a manner
that minimizes the
dangerous impacts
Legal Requirement
ISO 14001 ENVIRONMENT MANAGEMENT SYSTEM
- LEGAL REQUIRMENT REGISTER
Doc. No.: EHS: FO:06
Rev. No. 00
Rev.Date : 01.05.2011
Evaluation Frequency: Three
months
Date of Evaluation: 01.11.12
Due Date of Next Evaluation:
30.12.12
S.
No.
Act /
Rule /
Clause /
Section
Applicable
Requirement
Compliance to be
done
Monitoring
Frequen
cy
Record
Form No.
Respons
ibility
Compliance
Status
Action Plan
Target
Date.
B Air (Prevention & Control of Pollution) Act 1981 & Rules 1982/1983
1
Rules
1983
Rules 1983 Rule-9
Form-I
Consent for
emission/continuatio
n of emission under
section 21 of the Air
Act-1981
No. of Stakes &
Vents with height &
Diameter (m).
Quality & Quantity
of Stack emission
for SPM. SO2 &
additional
parameters
specified by PCB in
consent
Yearly Lab Report
Maintena
nce
Complied ------ ------
C Batteries (Management and Handling) Rules, 2001
1 Sec 10
Disposal of
batteries
Disposal of batteries
in Form VIII & IX
Disposal through
authorized agency
following norms in
Form VIII & IX
Half
yearly
(by 30th
June &
31st Dec.
Form VIII &
IX
Stores
Not
complied
Prepared Buyback
contract with
dealer/supplier &
mainatin records of
buyback in from VII/IX.
Aslo mentioned in PO.
20/11/2012
2 Sec 11
Communication
1. EHS policy must be communicated in local language by
displaying it on company gate.
2. Supplier, Service providers, work contractors must be
communicated for required compliance related to EMS &
OHSAS and their involvement / support must focused.
3. Hazardous item carrying transporters must be communicated
legal requirement and conditions of supply through PO or
communicating transporter, supplier guidelines. Records of
the same must be maintained.
4. Emergency Response plan must be communicated to District
collector.
5. Internal communication system must be defined and
implemented.
Monitoring & Measurement
1. Company level EHS objective should be monitored at
monthly frequency and actions should be initiated as per plan
and records should be maintained.
1. All process owners should identify and monitor EHS
objective and management programs and maintain records of
performance.
2. Each process should be monitored as per operational controls
for best environmental performance and records should be
maintained.
3. All legal requirement related to MPCB, EMS & OHSAS,
Factory Act should be monitored at defined and required
frequency and records of compliance must be maintained.
Management Program - Example
Operational Controls
Trainings
Plan for Training on EMS OHSAS, Training Records – Attendance sheet,
Training Feedback, Training Evaluation Records.
Training Subjects :
1. EMS OHSAS Awareness – All Employees
2. Internal Auditor Qualification
3. Mock Drill importance & awareness
4. Environmental Aspects & Impacts & Identification of Significant Aspects
5. EHS Procedure Training
6. Operational Control procedure training
7. Fire Fighting & Emergency Control Training
8. HIRA – Hazard Identification, Risk Analysis and identification of
significant Hazard
9. Training on Best safety practices – Environment & Occupational Health
Safety
10. Social Responsibility towards environment
Internal Audits & MRM
Internal Audits:
1. Internal Audit should be conducted by Qualified Internal Auditor for EMS
& OHSAS
2. Internal Audit should be conducted in a planned manner (Six Monthly)
3. Audit Observation and NC report should be maintained
4. NC raised must be closed by respective process owners.
MRM:
1. MRM should conducted at planned frequency (Six Monthly)
2. MRM should cover all agenda points
3. Records of MRM (Minutes of Meeting ) should be maintained and decided
actions must be reviewed for compliance periodically and status should be
updated to Management during next management review
Shop Floor Assignment
1. Maintain very clean & neat shop floor and company premises.
2. Display Operational controls and ensure visibility – Give training to respective team
members to control their processes.
3. Report Air, Water, Oil leakages and arrest them immediately.
4. Collect waste in containers / bins specified and ensure it is shifted to scrap yard at designated
area at defined frequency.
5. Do not walk under moving cranes , in dark
6. Display Emergency EXIT locations and Emergency evaluation layout at many places –
make people aware of emergency routes and assembly areas.
7. Minimize / save natural resources (water, oils, metal etc)
8. Minimize waste generation and try to recycle waste to save natural resources.
9. Use required safety equipments (PPEs) at operation areas.
10. Dispose hazardous waste generated to MPCB authorized vendors only and maintain records.
11. Do not throw hazardous waste (Oily Cotton, used hand gloves, used oil, asbestos sheets, ETP
sludge etc. on open ground – collect such waste in defined containers.
12. Maintain records of daily effluent generation, FO, Oil, Chemical, Metal Water usage.
13. Do not store gases near flammable material like thinner/ paints.
14. Maintain all First Aid Box – verify listed medicines are available and these medicines have
not crossed expiry dates.
15. List of Trained First Aiders Trained Fire Fighters is displayed at various locations and it is
known to every body.
16. Do not allow vehicle having bad condition, driver not having valid driving license, PUC
certificate etc. Maintain vehicle check register.
17. Visitors are made aware of precautions to be taken during their stay in plant premises.
Shop Floor Assignment
18. Shift / move gas cylinders on trolley and in vertical conditions.
19. Store gas cylinders in vertical condition only and ensure they are properly
secured.
20. Ensure emergency lights are available in good working condition.
21. On hearing emergency alarm :
a. If you are trained for handling emergency – try / help other evacuate from
the place and guide them towards assembly area.
b. If you are not trained to handle emergency – Don’t be panic -Get access of
nearest gangway and move towards assembly area as fast as possible.
22. Read instructions / controls/ guidelines care fully and follow them strictly –
do not neglect instructions given as they are for your and environment safety.
23. Try to educate people and give them awareness of their responsibility
towards environment, health & safety.
24.Do not waste food, water
25. Do not access / operate any equipment / machine for which you are not
trained. It is dangerous.
26. Do not enter restricted areas.
27. Do not lift heavy material/objects manually – use trolleys, pallet trucks,
cranes.
Shop Floor Assignment
28. Use helmets while driving two wheeler vehicles.
29. Use safety belts while driving 4 wheeler vehicles.
30.Put off fans. Bulbs, tubes, machines, electrical appliances off when not
required.
31. Do not waste paper
32.Maintain your work place clean and safe .
33. Report near miss accidents to HR
34. Do not pollute Land, Water , Air by any means it will in turn pollute your
health.
Thank you !

More Related Content

Similar to EMS OHSAS Awareness Traning .pptx

Environment management system
Environment management systemEnvironment management system
Environment management systemAdane Nega
 
00 EMS and OH&S Basic Awareness.pptx
00 EMS and OH&S Basic Awareness.pptx00 EMS and OH&S Basic Awareness.pptx
00 EMS and OH&S Basic Awareness.pptxDeepakMore54
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB
 
Environmental management
Environmental managementEnvironmental management
Environmental managementManoj Mota
 
Ems for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaEms for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaPrincessRabiii
 
Health and safety
Health and safetyHealth and safety
Health and safetyMahmood Ali
 
Environmental Management System Ems 14001
Environmental Management System Ems 14001Environmental Management System Ems 14001
Environmental Management System Ems 14001Hammad Mushtaq
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptxAfrim Alili
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptxJamalJauher1
 
Introduction to ISO45001 rev 0.pptx
Introduction to ISO45001 rev 0.pptxIntroduction to ISO45001 rev 0.pptx
Introduction to ISO45001 rev 0.pptxMTaufik23
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctpHeshantha Kosala Perera
 
Environmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharEnvironmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharAbu Khairul Bashar
 
Environmental audit methodology
Environmental audit methodologyEnvironmental audit methodology
Environmental audit methodologymwaurah
 
MRC ISO 14001 Implementation
MRC ISO 14001 ImplementationMRC ISO 14001 Implementation
MRC ISO 14001 ImplementationEssam Al-Kahloot
 

Similar to EMS OHSAS Awareness Traning .pptx (20)

Environment management system
Environment management systemEnvironment management system
Environment management system
 
00 EMS and OH&S Basic Awareness.pptx
00 EMS and OH&S Basic Awareness.pptx00 EMS and OH&S Basic Awareness.pptx
00 EMS and OH&S Basic Awareness.pptx
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
Welcome heath safety
Welcome heath safetyWelcome heath safety
Welcome heath safety
 
ems.ppt
ems.pptems.ppt
ems.ppt
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Ems for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwalaEms for prince mallamine industry gujranwala
Ems for prince mallamine industry gujranwala
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
Introduction to HSE
Introduction to HSEIntroduction to HSE
Introduction to HSE
 
Environmental Management System Ems 14001
Environmental Management System Ems 14001Environmental Management System Ems 14001
Environmental Management System Ems 14001
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptx
 
Environmental_Management_Systems.pptx
Environmental_Management_Systems.pptxEnvironmental_Management_Systems.pptx
Environmental_Management_Systems.pptx
 
Introduction to ISO45001 rev 0.pptx
Introduction to ISO45001 rev 0.pptxIntroduction to ISO45001 rev 0.pptx
Introduction to ISO45001 rev 0.pptx
 
Health and safety management system csctp
Health and safety management system csctpHealth and safety management system csctp
Health and safety management system csctp
 
Environmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul BasharEnvironmental management systems by Abu Khairul Bashar
Environmental management systems by Abu Khairul Bashar
 
Environmental audit methodology
Environmental audit methodologyEnvironmental audit methodology
Environmental audit methodology
 
IMS & Sustainability
IMS & SustainabilityIMS & Sustainability
IMS & Sustainability
 
MRC ISO 14001 Implementation
MRC ISO 14001 ImplementationMRC ISO 14001 Implementation
MRC ISO 14001 Implementation
 
Environmental Audit
Environmental AuditEnvironmental Audit
Environmental Audit
 

More from AshweeniTiwari

Why - why -analysis Training Presentation
Why - why -analysis Training PresentationWhy - why -analysis Training Presentation
Why - why -analysis Training PresentationAshweeniTiwari
 
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) NumberAshweeniTiwari
 
TPM-QM-Training Material as Per JIPM Methodology
TPM-QM-Training Material as Per JIPM MethodologyTPM-QM-Training Material as Per JIPM Methodology
TPM-QM-Training Material as Per JIPM MethodologyAshweeniTiwari
 
Introduction to Six Sigma.pptx
Introduction to Six Sigma.pptxIntroduction to Six Sigma.pptx
Introduction to Six Sigma.pptxAshweeniTiwari
 

More from AshweeniTiwari (6)

Why - why -analysis Training Presentation
Why - why -analysis Training PresentationWhy - why -analysis Training Presentation
Why - why -analysis Training Presentation
 
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number
𝗪𝗵𝗮𝘁 𝗶𝘀 𝗥𝗶𝘀𝗸 𝗣𝗿𝗶𝗼𝗿𝗶𝘁𝘆 𝗡𝘂𝗺𝗯𝗲𝗿 (𝗥𝗣𝗡) Number
 
TPM-QM-Training Material as Per JIPM Methodology
TPM-QM-Training Material as Per JIPM MethodologyTPM-QM-Training Material as Per JIPM Methodology
TPM-QM-Training Material as Per JIPM Methodology
 
Quality.pptx
Quality.pptxQuality.pptx
Quality.pptx
 
Introduction to Six Sigma.pptx
Introduction to Six Sigma.pptxIntroduction to Six Sigma.pptx
Introduction to Six Sigma.pptx
 
fta.ppt
fta.pptfta.ppt
fta.ppt
 

Recently uploaded

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

EMS OHSAS Awareness Traning .pptx

  • 1. ISO 14001:2004 (EMS) OHSAS 18001:2007 (OHSAS) Awareness Training
  • 2. Content - Index 1. Understanding EMS & OHSAS Standard 2. Why Necessary to implement Standard requirement? 3. Overview of EMS & OHSAS standard requirement 4. EHS Policy & Objective 5. Process Mapping & Interaction 6. Some Definitions 7. Documentation 8. Environmental Aspect & Impacts 9. Hazard Identification & Risk Analysis(HIRA) 10. Significant Aspects & Hazards 11. Emergency Response Plan 12. Legal Requirement 13. Communication 14. Monitoring & measurement 15. Management Programs 16. Operational Controls 17. Training 18. Internal Audit
  • 3. Understanding EMS & OHSAS Standard This International Standard specifies requirements for an environmental management system to enable an organization to develop and implement a policy and objectives which take into account legal requirements and information about significant environmental aspects. It is intended to apply to all types and sizes of organization and to accommodate diverse geographical, cultural and social conditions. The basis of the approach is shown in Figure 1. The success of the system depends on commitment from all levels and functions of the organization, and especially from top management. A system of this kind enables an organization to develop an environmental policy, establish objectives and processes to achieve the policy commitments, take action as needed to improve its performance and demonstrate the conformity of the system to the requirements of this International Standard. The overall aim of this International Standard is to support environmental protection and prevention of pollution in balance with socio-economic needs.
  • 4. Understanding EMS & OHSAS Standard ISO 14001 :2004 & OHSAS 18001:2007 1 Scope 2 Normative references 3 Terms and definitions 4 EHS system requirements 4.1 General requirements 4.2 EHS policy 4.3 Planning 4.4 Implementation and operation 4.5 Checking 4.6 Management review Scope : The manufacture of High Pressure Aluminium Die Cast machined & Painted parts and their Assemblies
  • 5. Why Necessary to implement EMS OHSAS Standard Requirement Addressing environmental, health & safety concerns is the need of the hour and companies that have incorporated it in their operational processes have started accruing benefits. Any kind of waste, ill health & unsafe work environment is just a symptom of inefficient operations. The world's resources are now coming to an end. If development is to proceed it must be through conservation and wiser use of not only of raw materials but also the waste generated. Industry can make a significant contribution by increasing the efficiencies of its processes/products. Environment, Health & Safety Management &System if adopted would not only result in substantial financial savings environmental protection but also raise the goodwill in the eyes of public. As the legal and other applicable requirements are being made stricter day by day ,we need to have a proactive approach through establishing our own code of practice in advance to the legislation. This enhanced commitment should be transformed into consistent & positive actions immediately. It is our pursuit on the journey towards excellence which prompted us to adopt ISO 14001 & OHSAS 18001standard, which in turn can help us to have a cleaner environment, minimum pollution & waste, Safer and cleaner working conditions & to become a world class company…
  • 6. EHS Policy & Objectives Sr. No. EHS Objective 1 To Conserve Electrical Energy 2 To Conserve Water 3 To Reduce Hazardous waste 4 To improve Green Belt 5 To prevent Accident 6 To identify Near miss accidents
  • 7. Process Mapping & Interaction
  • 8. Definitions Environmental Aspect Element of an organizational activities or products or services that can interact with an environment Environment Impact Any change to the environment whether adverse or beneficial, wholly or partially resulting from an organization’s environmental aspects. Environmental Performance Measurable results of an organization’s management of its environmental aspects Prevention of Pollution Use of processes, practices, techniques, materials, products, services or energy to avoid, reduce or control ( separately or in combination) the creation, emission, or discharge, of any type of pollutant or waste, in order to reduce adverse environmental impacts Acceptable Risk Risk that has been reduced to a level that can be tolerated by the organization having regard to its legal obligations & its own OH & S policy. Hazard Source , situation or act with a potential for harm in terms of human injury or ill health or a combination of these. Interested Party Person or group concerned with or affected by the environmental , OH & Safety performance of an organization
  • 9. ill Health Identifiable, adverse physical or mental condition arising from and/or made worse by a work activity and / or work related situation. Incident Work-related event(s) in which an injury or ill health (regardless of severity) or fatality occurred or could have occurred. Occupational Health & Safety Conditions and factors that affect, or could affect, the health & safety of employees or other workers(including temporary workers and contract personnel), visitor, or any other person in the work place. OH & Safety performance Conditions & factors that affect, or could affect the health and safety of employees or other workers (including temporary workers and contract personnel), visitor or any other person in the workplace. Risk Combination of the likelihood of an occurrence of a hazardous event or exposures(s) and the severity of injury or ill health that can be caused by the event or exposures(s). Risk Assessment Process of evaluating risk(s) arising from a hazard(s), taking into account the adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable.
  • 10. EHS Manual – Level I, EHS Procedures - Level II Emergency Response Plan Formats ETP Environmental Review & Aspect Impacts studies Identification Of Significant Aspects Establishing Operational Controls & Management Program identification & Implementation Hazard Identification & Risk Analysis (HIRA) EHS Objective Monitoring & Measurement Legal Requirement Review & its implementation – MPCB Consent, EMS, OHSAS, Factory Act Training Records - Related to EMS & OHSAS Records – Legal Compliance, Training, Internal audits , MRM ,ETP /STP, Maintenance Records, Communication
  • 11.
  • 13. Hazard Identification & Risk Analysis (HIRA) 1 Die Loading / Unloading Physical hazard due to falling of die while loading / unloading by crane Act Yes Yes 3 1 3 Not accepta ble Testing by competent person & scheduled Preventive maintenance 2 1 2 Accepta ble OCP Electrical hazard due to contact with Operating panel of crane Source Yes Yes 3 1 3 Not accepta ble Testing by competent person & scheduled Preventive maintenance 2 1 2 Accepta ble OCP Mechinical hazard failure of crane due slippage of brake Act Yes Yes 3 1 3 Not accepta ble Testing by competent person & scheduled Preventive maintenance 2 1 2 Accepta ble OCP Mechnical hazard due to breaking of slings /wire rope / hooks Act Yes Yes 3 1 3 Not accepta ble Testing by competent person 2 1 2 Accepta ble OCP 2 Die coating Chemical hazard due to Eye irritation (splashing of chemical) Act No Yes 2 1 2 Accepta ble PPE 2 1 2 Accepta ble OCP Sr.No Operation / Work Activities / Services OH & S Hazards Source, Situation or Act Emer situation (Y / N) Legal Concern (Y /N) Base Risk Assesment Base Risk Level Acceptabl e / Not acceptable Control in place & in use ( A/B/C/D/E) Final Risk Assessment Final Risk Leve l Acceptabl e / Not acceptable Additional control required Sev Prob Sev Prob
  • 15. Emergency Response Plan PURPOSE: The risky operations and activities are analyzed that leads to emergency situation and preventive measures are implemented to avoid emergencies. In case of emergency situations are raised, those are handled in a manner that minimizes the dangerous impacts
  • 16. Legal Requirement ISO 14001 ENVIRONMENT MANAGEMENT SYSTEM - LEGAL REQUIRMENT REGISTER Doc. No.: EHS: FO:06 Rev. No. 00 Rev.Date : 01.05.2011 Evaluation Frequency: Three months Date of Evaluation: 01.11.12 Due Date of Next Evaluation: 30.12.12 S. No. Act / Rule / Clause / Section Applicable Requirement Compliance to be done Monitoring Frequen cy Record Form No. Respons ibility Compliance Status Action Plan Target Date. B Air (Prevention & Control of Pollution) Act 1981 & Rules 1982/1983 1 Rules 1983 Rules 1983 Rule-9 Form-I Consent for emission/continuatio n of emission under section 21 of the Air Act-1981 No. of Stakes & Vents with height & Diameter (m). Quality & Quantity of Stack emission for SPM. SO2 & additional parameters specified by PCB in consent Yearly Lab Report Maintena nce Complied ------ ------ C Batteries (Management and Handling) Rules, 2001 1 Sec 10 Disposal of batteries Disposal of batteries in Form VIII & IX Disposal through authorized agency following norms in Form VIII & IX Half yearly (by 30th June & 31st Dec. Form VIII & IX Stores Not complied Prepared Buyback contract with dealer/supplier & mainatin records of buyback in from VII/IX. Aslo mentioned in PO. 20/11/2012 2 Sec 11
  • 17. Communication 1. EHS policy must be communicated in local language by displaying it on company gate. 2. Supplier, Service providers, work contractors must be communicated for required compliance related to EMS & OHSAS and their involvement / support must focused. 3. Hazardous item carrying transporters must be communicated legal requirement and conditions of supply through PO or communicating transporter, supplier guidelines. Records of the same must be maintained. 4. Emergency Response plan must be communicated to District collector. 5. Internal communication system must be defined and implemented.
  • 18. Monitoring & Measurement 1. Company level EHS objective should be monitored at monthly frequency and actions should be initiated as per plan and records should be maintained. 1. All process owners should identify and monitor EHS objective and management programs and maintain records of performance. 2. Each process should be monitored as per operational controls for best environmental performance and records should be maintained. 3. All legal requirement related to MPCB, EMS & OHSAS, Factory Act should be monitored at defined and required frequency and records of compliance must be maintained.
  • 21. Trainings Plan for Training on EMS OHSAS, Training Records – Attendance sheet, Training Feedback, Training Evaluation Records. Training Subjects : 1. EMS OHSAS Awareness – All Employees 2. Internal Auditor Qualification 3. Mock Drill importance & awareness 4. Environmental Aspects & Impacts & Identification of Significant Aspects 5. EHS Procedure Training 6. Operational Control procedure training 7. Fire Fighting & Emergency Control Training 8. HIRA – Hazard Identification, Risk Analysis and identification of significant Hazard 9. Training on Best safety practices – Environment & Occupational Health Safety 10. Social Responsibility towards environment
  • 22. Internal Audits & MRM Internal Audits: 1. Internal Audit should be conducted by Qualified Internal Auditor for EMS & OHSAS 2. Internal Audit should be conducted in a planned manner (Six Monthly) 3. Audit Observation and NC report should be maintained 4. NC raised must be closed by respective process owners. MRM: 1. MRM should conducted at planned frequency (Six Monthly) 2. MRM should cover all agenda points 3. Records of MRM (Minutes of Meeting ) should be maintained and decided actions must be reviewed for compliance periodically and status should be updated to Management during next management review
  • 23. Shop Floor Assignment 1. Maintain very clean & neat shop floor and company premises. 2. Display Operational controls and ensure visibility – Give training to respective team members to control their processes. 3. Report Air, Water, Oil leakages and arrest them immediately. 4. Collect waste in containers / bins specified and ensure it is shifted to scrap yard at designated area at defined frequency. 5. Do not walk under moving cranes , in dark 6. Display Emergency EXIT locations and Emergency evaluation layout at many places – make people aware of emergency routes and assembly areas. 7. Minimize / save natural resources (water, oils, metal etc) 8. Minimize waste generation and try to recycle waste to save natural resources. 9. Use required safety equipments (PPEs) at operation areas. 10. Dispose hazardous waste generated to MPCB authorized vendors only and maintain records. 11. Do not throw hazardous waste (Oily Cotton, used hand gloves, used oil, asbestos sheets, ETP sludge etc. on open ground – collect such waste in defined containers. 12. Maintain records of daily effluent generation, FO, Oil, Chemical, Metal Water usage. 13. Do not store gases near flammable material like thinner/ paints. 14. Maintain all First Aid Box – verify listed medicines are available and these medicines have not crossed expiry dates. 15. List of Trained First Aiders Trained Fire Fighters is displayed at various locations and it is known to every body. 16. Do not allow vehicle having bad condition, driver not having valid driving license, PUC certificate etc. Maintain vehicle check register. 17. Visitors are made aware of precautions to be taken during their stay in plant premises.
  • 24. Shop Floor Assignment 18. Shift / move gas cylinders on trolley and in vertical conditions. 19. Store gas cylinders in vertical condition only and ensure they are properly secured. 20. Ensure emergency lights are available in good working condition. 21. On hearing emergency alarm : a. If you are trained for handling emergency – try / help other evacuate from the place and guide them towards assembly area. b. If you are not trained to handle emergency – Don’t be panic -Get access of nearest gangway and move towards assembly area as fast as possible. 22. Read instructions / controls/ guidelines care fully and follow them strictly – do not neglect instructions given as they are for your and environment safety. 23. Try to educate people and give them awareness of their responsibility towards environment, health & safety. 24.Do not waste food, water 25. Do not access / operate any equipment / machine for which you are not trained. It is dangerous. 26. Do not enter restricted areas. 27. Do not lift heavy material/objects manually – use trolleys, pallet trucks, cranes.
  • 25. Shop Floor Assignment 28. Use helmets while driving two wheeler vehicles. 29. Use safety belts while driving 4 wheeler vehicles. 30.Put off fans. Bulbs, tubes, machines, electrical appliances off when not required. 31. Do not waste paper 32.Maintain your work place clean and safe . 33. Report near miss accidents to HR 34. Do not pollute Land, Water , Air by any means it will in turn pollute your health.