1. EDUCATION:
Bachelors of Science in Civil Engineering –
Michigan Technological University, 2004
PROFESSIONAL ORGANIZATIONS:
Canadian Parking Associa on
Interna onal Parking Associa on
Interna onal Concrete Repair Ins tute,
2008/09 Michigan Chapter President
Interna onal Concrete Repair Ins tute,
2010-Current Michigan Chapter Exec.
Willis Founda on, Board Member
REGISTRATIONS:
Completed the Fundamentals of
Engineering Examina on
Engineer in Training (E.I.T.)
PUBLICATIONS:
Technology is Transforming Access and
revenue Control, Parker, 4th Quarter 2012
Repairs to the Primary Tanks at a
Wastewater Treatment Plant, Concrete
Repair Bulle n, September/October 2006
Repairs at the Grand Rapids Wastewater
Treatment Plant, Michigan Chapter of the
Interna onal Concrete Repair Ins tute
Newsle er Volume 1, Issue 3 October
2007
Maintaining Wastewater Treatment Plant
Infrastructure, WaterWorld, June 2008
SPEAKING ENGAGEMENTS:
Effec ve Event Parking
Canadian Parking Associa on
September 14, 2014
Buying Parking Spaces in the 21st Century
Michigan Parking Associa on
October 9, 2014
Reac ng to Canada’s Parking Trends,
Canadian Parking Associa on Conference,
September 24, 2013
Parking 101, Western Michigan University
American Society of Civil Engineers, February
14, 2013
Parking Planning, Michigan Technological
University, January 28, 2010
Planning for Parking using the Shared
Use Parking Approach, Canadian Parking
Associa on Conference, October 1, 2012
Emerging Parking Access Revenue Control
Equipment Technologies are Here to Stay,
Canadian Parking Associa on Conference,
October 1, 2012
Energy Efficient Ligh ng, Michigan Parking
Associa on Conference, September 20, 2012
Advancements in Parking Access and
Revenue Control Systems Technology,
Mee ng of the Minds, July 14, 2011
Managing Your Parking Liability, University
of Rochester Mee ng of the Minds VII, July
14, 2010
Parking Asset Management Planning,
University of Rochester Mee ng of the Minds
VII, July 16, 2009
Andrew is a Parking Consultant in the Kalamazoo office. His areas of focus are project
management, parking consul ng, traffic engineering and restora on consul ng. In addi on
to Andrew’s consul ng and engineering responsibili es, he’s regularly asked to speak at
conferences.
His parking consul ng responsibili es include parking master planning, basis of design
documents; supply/demand analysis; projec ng future parking demand; coordina ng field
data collec on teams; analysis of data from the field including future parking projec ons;
iden fying improvements for exis ng parking systems.
Regarding technology, Andrew worked with his clients around the globe to iden fy
the technology related to parking appropriate to the objec ves of each project. A er
the technology is iden fied, Andrew develops the documents for bid solicita on and
procurement. The technologies o en recommended include parking guidance systems as
well as systems for access and revenue control. Andrew o en designs new signage and
wayfinding to be incorporated in the technology package, other mes the new signage
designs are a stand alone project.
Andrew’s role in traffic engineering studies include analysis of exis ng traffic condi ons
on the street system; analysis of future traffic condi ons on the street system both from
future traffic; as well as addi ons from traffic for known developments. Andrew also makes
recommenda ons for improvements to the roadway system and traffic signals based on the
results of his analysis. Andrew has conducted consul ng engagements and traffic impact
studies for developers, mixed use facili es, hospitals, banks, municipali es, churches, and
other clients. Andrew works closely with his clients during all phases to ensure per nent
informa on is exchanged on the status of the project.
His restora on responsibili es include evalua on and condi on appraisals on parking
facili es and infrastructure type projects, technical development of construc on
documents, and field representa on and construc on administra on during construc on.
Andrew manages design coordina on, informa on flow, project design scheduling, and
client interac on. Andrew is also responsible for development of asset management plans
and mul --year budget forecast models for maintenance and repairs on various parking and
concrete infrastructure facili es.
Andrew J. Vidor
Parking Consultant
2. Representa ve Projects
AIRPORT:
Aus n Straubel Interna onal Airport
Green Bay, WI
Parking access and revenue control design
Manha an Regional Airport
Manha an, KS
Parking access and revenue control design
DEVELOPER:
Bayfront Condos
Naples, FL
Parking needs assessment
Bell Tower Shops
Fort Myers, FL
Shared parking demand analysis for new
restaurants and retail space at exis ng
shopping mall
Marco Island Marrio
Marco Island, FL
Traffic impact analysis for hotel expansion
Roche Diagnos cs
Indianapolis, IN
Traffic impact analysis for new parking
structure
Skyline Complex
O awa, ON
Func onal redevelopment of parking lot to
improve traffic flow and increase pedestrian
safety
The Parklands of Floyds Park
Louisville, KY
Traffic management consul ng for hos ng
the 2013 PGA Championship at Valhalla Golf
Club
101 Main Street Development
Wa ord, ND
Traffic impact analysis for new office
development
Irvine Spectrum Center
Irvine, CA
Signage and Wayfinding Study, Parking
Guidance System Design, Func onal
Improvement Recommenda ons
2013
5th & Race Parking Garage
Cincinna , OH
Access and Circula on Study
2012
211 West Monroe Office Tower/
Condominium
Golub & Company
Phoenix, AZ
Traffic engineering consul ng services
for the 211 West Monroe Office Tower/
Condominium, a mixed-use development,
2008
Signature Building
Fairfax, VA
Func onal design review for new parking
garage
2012
Diagnos cs Company
Indianapolis, IN
Traffic Engineering Study for New Parking
Garage
2013
38 Commerce Property
Kelwin Proper es
Grand Rapids, MI
Func onal feasibility study for downtown
development, 2007
West Michigan and Rose Street
Development
Kalamazoo, MI
Func onal Design
2011
Four Oaks Place
Transwestern
Houston, TX
Signage and Wayfinding Study and Design
2013
Bridgewater Place Parking Structure
Robert Grooters Development Company
Grand Rapids, MI
Designed new structural system to carry
loads from cu ng ledger beam spandrel
panels for access to new condo parking, 2006
Chesapeake Energy Corpora on
Oklahoma City, OK
Traffic study, 2011
Glaxo Smith Kline Moore Drive Campus
Garage
Durham, NC
Supply/Demand study and management
strategy, PARCS consul ng for automated
parking guidance system, restriping plans and
signage design/consul ng for updated ADA
spaces, 2011
Principal Financial Group
Terrus Real Estate Group
Des Moines, IA
Traffic Impact Analysis, 2007
Secaucus Junc on Parking Facility
Intermodal Proper es, LLC
Secaucus, NJ
Financial study for a parking facility on a six-
acre property that would serve commuters
seeking access to NYC, the Meadowlands
complex and other des na ons via NJ Transit,
2011
HEALTHCARE:
Harris Methodist Hospital
Fort Worth, TX
Parking Needs Assessment
2013
Bronson Hospital Jasper Street Parking
Structure
Kalamazoo, MI
Prime Design of a 600-space 7-level precast
concrete structure with sandblasted precast
spandrel panels with recessed cast-in half
brick, 2004
Buffalo Niagara Medical Campus
Buffalo, NY
Alterna ves Analysis, On-Street Parking
Study, Site Selec on & Analysis, Supply/
Demand, Master Planning, 2008
City of Saskatoon
Saskatoon, SK
On-street parking meter replacement RFQ
2013
One Jackson Square Parking Garage
Allegiance Health
Jackson, MI
Condi on Appraisal, Repair Documents,
Construc on Administra on, 2009
Trinity Mother Francis Hospital
Tyler, TX
Parking Needs Assessment, traffic
engineering study, alterna ves analysis,
PARCS recommenda ons for new Heart
Hospital
2012
Royal University Hospital
Saskatoon, SK
Traffic Engineering Study/Basis of Design for
Parking Expansion/Access & Revenue Control
Design, 2009
WALKER PARKING CONSULTANTS
3. St. John’s Hospital
Springfield, IL
Parking Needs Assessment, 2010
Saint Mary’s Health Care Hauenstein Deck
Grand Rapids, MI
Prime Design of a 559-space 7-level cast-
in-place post-tensioned concrete parking
structure with a helipad on the roof and a
drive through to the emergency room on the
ground level, 2008
St. Vincent’s Hospital
Birmingham, AL
Traffic Engineering Analysis/ Func onal
Design Review/ Supply Demand Analysis,
2010
W.A. Foote Hospital
Jackson, MI
Parking Needs Assessment, 2008
GOVERNMENT:
Arcadia Commons West
Kalamazoo, MI
Parking demand study for new event center/
arena
City of Frederick
Frederick, MD
Downtown circulator study for trolley
opera on. Analysis included routes, trolley
stops, opera ng schedule and opera ng cost.
City of Frederick
Frederick, MD
Downtown parking study for proposed hotel
development. Variable rate pricing strategy
and financial pro forma for new parking
structure.
City of Houghton
Houghton, MI
Grant applica on for LED ligh ng upgrade in
parking structures
City of Birmingham
Birmingham, MI
Grant applica on for LED ligh ng upgrade in
parking structures
City of Kalamazoo
Kalamazoo, MI
Grant applica on for LED ligh ng upgrade in
parking structures
Government of Alberta
Edmonton, Alberta
Parking operator RFP for management of
mul -space parking meters
Rivera Beach Community Redevelopment
Authority
Rivera Beach, FL
Parking access and revenue control strategy
for conver ng free beach parking to paid
beach parking.
City of U ca
U ca, NY
Parking opera ons consul ng to determine
the effec veness of using a parking operator
to manage the parking system. Recommend
cashier less parking access and revenue
control system. Prepare on-street mul space
parking meter RFP.
Abu Dhabi DoT
Abu Dhabi, UAE
Parking Needs Assessment, parking strategies
recommenda ons and on Call parking
consul ng services
2013
Al Ain DoT
Al Ain, UAE
Parking Needs Assessment and parking
strategies recommenda ons
2013
City of Sault Ste. Marie
Sault Ste. Marie, MI
Func onal Design for Parking Lot
Redevelopment
2012
Birmingham Pierce Street Garage
Birmingham, MI
Ligh ng Consul ng - Performed a ligh ng
energy audit and prepared an Energy
Efficiency Grant Applica on, 2010
City of Birmingham North Old Woodward
Parking Garage
Birmingham, MI
Energy audit, evalua on and design for
replacing high-pressure sodium fixtures with
LED ligh ng, 2011
City of Dubuque
Dubuque, IA
Supply/demand study and alterna ves
analysis, including the possible Firehouse
demoli on, and recommend improvements to
the public parking assets, 2009
City of Grand Rapids
Heartside Neighborhood Area
Grand Rapids, MI
Parking and Transporta on Demand
Management Study, 2005
City of Houghton
Houghton, MI
Ligh ng Consul ng - Performed a ligh ng
energy audit and prepared an Energy
Efficiency Grant Applica on, 2010
City of Kalamazoo Lot 9
Kalamazoo, MI
Ligh ng Consul ng - Performed a ligh ng
energy audit and prepared an Energy
Efficiency Grant Applica on, 2010
City of Kalamazoo/Downtown Kalamazoo
Inc.
Kalamazoo, MI
Parking Supply/Demand Study for Event
Center and Associated Developments
City of Kalamazoo/Downtown Kalamazoo
Inc.
Kalamazoo, MI
Parking Supply/Demand Study for sector
within town 2012
City of Hopkins
Hopkins, MN
Parking Supply/Demand Study & Alterna ves
Analysis
2013
City of Ba le Creek
Ba le Creek, MI
Parking Needs Assessment and Alterna ves
Analysis
2013
COTPA
City of Oklahoma City
Parking Needs Assessment Update
2013
COTPA
City of Oklahoma City
Bond Financing Study for new Parking Garage
2013
City of Rochester
Rochester, NY
Supply/Demand Study, Alterna ves Analysis,
Financial Feasibility Analysis, 2008
City of Syracuse Parking System
Syracuse, NY
Financial review and parking management
recommenda ons to determine the opera ng
cost of the city-wide parking system, 2011
City Center Parking Ramp
City of Grand Rapids
Grand Rapids, MI
Field Representa on
Demoli on of parking structure, 2005
4. Grand Rapids Dash 9 Lot
City of Grand Rapids
Grand Rapids, MI
Prime Design for a 500 space parking surface
lot, 2004
Heartside Neighborhood Area
City of Grand Rapids
Grand Rapids, MI
Parking and Transporta on Demand
Management Study, 2004
High Falls Parking Garage
City of Rochester
Rochester, NY
PARCS reloca on feasibility and short-term
revenue study, 2008
Midtown Redevelopment Garage
City of Rochester
Rochester, NY
Parking master planning for the corporate
headquarters of a high tech company
with 1,200 employees and a 1,800 space
underground parking garage, 2008
Rochester Downtown Parking Study
City of Rochester
Rochester, NY
Supply/Demand Study, Alterna ves Analysis,
Financial Feasibility Analysis, 2008
Sault Saint Marie Downtown Development
Sault Saint Marie, MI
Parking Lot Peer Review, 2011
State of Michigan Parking Ramps
Lansing, MI
Parking Consul ng and wayfinding consul ng
for the Allegan and O awan Ramps, 2010
EDUCATION:
Angelo State University
San Angelo, TX
Parking Consultant
Traffic study to iden fy the best prac ces
to implement traffic calming measures that
would reduce the speed and volume of traffic
on Johnson Avenue and create a pedestrian
friendly connec on within the campus, 2008
Grand Valley State University
Grand Rapids, MI
Analysis of intersec ons for a proposed 1,000
car garage on Michigan Hill, 2007
Indiana University
Bloomington, IN
Traffic Engineering Analysis and Parking
Garage Site Selec on Study
Miller Auditorium Parking Structure
Western Michigan University
Kalamazoo, MI
CIPP, 2008
CIPP Update, 2010
Texas A&M University
Corpus Chris , TX
Traffic Engineering Analysis, 2010
University of Buffalo & BNMC
Buffalo, NY
Alterna ves Analysis, On-Street/Long-Term
Parking Study, Site Selec on & Analysis,
Supply/Demand, Master Planning, 2008
University of Houston
Houston, TX
Traffic Engineering Study
University of West Florida
Pensacola, FL
Parking Supply/Demand Study
RELIGIOUS/CHURCH:
Community of Faith Church
Hockley, TX
Traffic Engineering Analysis of projected peak
hour volume to ascertain the maximum traffic
volume exi ng the campus following services,
2010
St. Mary’s Catholic Church
College Sta on, TX
Traffic Management Plan for Church
Expansion
2013
INTERNATIONAL:
Msheireb Heart of Doha
Doha, Qatar
Shared Use Parking Analysis/ Parking
Basis of Design for City Redevelopment,
Parking consul ng to advise the owner
and the project team in the areas of car
park planning, design and management
of a cohesive parking system with nearly
14,000-spaces, 2011
Skyline Complex
O awa, Ontario
Func onal redevelopment of parking
lot to improve traffic flow and increase
pedestrian safety
King Abdulaziz Center for World Culture
Dhahran, Saudi Arabia
Parking Planning for 200,000 sm
development planning incuding supply/
demand analysis, parking opera ons
plan, technology reccomenda ons,
parking site selec on,transit opera ons
plan, basis of design documents for new
car park, shared use parking analysis,
alterna ves analysis, sensi vi es analysis
Government of Alberta
Edmonton, Alberta
Mul -space parking meter specifica ons
The Dubai Mall
Dubai, UEA
Func onal Design Improvement
Recommenda ons, 2011
King Abdulaziz Center for World Culture
Dhahran, Saudi Arabia
Visitor shu le study including ridership
projec ons, routes, opera ng schedule,
opera ng cost and environmental impact
Royal University Hospital
Saskatoon, SK
Traffic Engineering Study/Basis of Design for
Parking Expansion/Access & Revenue Control
Design, Signage and Wayfinding Design 2009
City of Saskatoon
Saskatoon, SK
On-street parking meter replacement RFQ
2013
Government of Alberta
Edmonton, Alberta
Parking operator RFP for management of
mul -space parking meters
Abu Dhabi DoT
Abu Dhabi, UAE
Parking Needs Assessment, parking strategies
recommenda ons and on Call parking
consul ng services
2013
Al Ain DoT
Al Ain, UAE
Parking Needs Assessment and parking
strategies recommenda ons
2013
RESTORATION
PARKING STRUCTURES:
200/300 O awa Avenue Garage
Deep Creek Holdings
Grand Rapids, MI
Condi on Appraisal of 2 level underground
parking garage and supported plaza for
surrounding office buildings, 2008
ADDITIONAL SPEAKING ENGAGEMENTS:
Sustainable Restora on Design, April 24,
2009, Interna onal Concrete Repair Ins tute
Spring Conference.
Common Concrete Deficiencies in New
Construc on, West Michigan American
Concrete Ins tute, January 2009
Concrete Restora on at Wastewater
Treatment Facili es, Michigan Interna onal
Concrete Repair Ins tute, October 2007