STORMWATER
EFFECTS ON WATER
QUALITY AND THE
ENVIRONMENT
Why Are We Here?
What Happens
Four Categories of Effects
• Hydrology
• Geomorphology
• Habitat
• Water Quality
Hydrology
• Increase in flow and
velocities
• Increase in flooding
• Increase in frequency
• Increase in bankfull flows
Geomorphology
• Stream Widening
• Channel Instability
• Erosion
Habitat
• Fish Barriers
• Loss of Substrate
• Loss of Riparian Zone
• Loss of
Micro-topography
Water Quality
• Sediments
Channel erosion can be the
primary sediment source!
• Nutrients
Maintained vegetated areas
• Temperature
Warm pavements and
pond pools
• Other
Oils, Greases, heavy metals,
toxics
Water Quality
Instability
Instability
Regulations and
Permitting Overview
What is a Stream?
• Waters of the U. S.
• Definition includes tidal navigable water, nontidal
navigable water and adjacent headwaters and
wetlands adjacent to such waters – but how far
up does it go?
• Determines extent of Sec 401 (Water Quality
Certification), 402 (NPDES) and 404 (Dredge
and Fill) components of the Clean Water Act.
What is an impact?
• Impacts are discharges or grading
• Discharges can be out of a pipe or placement
of material (CWA Sec 402 & 404)
• Discharges can be permitted
• Individual Permits or General Permits
Types of Stormwater Permitting
• NPDES Phase I and II – U. S. EPA delegated to States by GP – regulates
new construction AND existing older stormwater sources – passes
through localities – only permit means to retrofit
• New DoD and federal facility SWM mandates
• State/local Stormwater Management Regulations – new construction
• State/local Erosion and Sediment Control Regulations – new construction
• Other (Wetlands, Flood Plain, etc.)
• Both Individual & General NPDES permitting - Most new construction
under GP
NPDES Phase I &II Permitting
• 1972 amendments to the Federal Water Pollution
Control Act (Clean Water Act) prohibit the discharge
of any pollutant to waters of the United States from a
point source unless the discharge is authorized by a
National Pollutant Discharge Elimination System
(NPDES) permit.
• Past efforts to address stormwater discharges under
the NPDES program have generally been limited to
certain industrial categories
Background
• Stormwater out of a pipe was not necessarily a
point source discharge
• National Urban Runoff Program (NURP) – first
meaningful stormwater study showed stormwater
impacts
• In response to water quality concerns, in 1987,
the EPA was required to issue regulations
addressing stormwater discharges under the
NPDES program
Phase I
• NPDES established first regulations in 1990 permit
requirements for:
1) existing “medium” and “large” municipal separate storm
sewer systems (MS4) – individual permits by State to locality
with conditions
2) new construction activity disturbing 5 acres of land or greater
– general permits
3) certain industrial activities
• Many continue to operate under Phase I
MDE Phase I Permit
Conditions
• ID legal authority and data sources
• Assess existing programs
• Watershed Management and
Restoration (often needs its own
construction controls and 404 and
state wetland permit!)
• Utilize current collected best
management practice (BMP) data
to modify and improve programs
• Fiscal Analysis
Phase II
• In 1999, new rule automatically covers on a nationwide
basis all existing small MS4s located in urbanized areas
and new construction activities of 1 acre or more
• Most localities already complying
• Can authorize industries or facilities
• Have more flexible permitting options
GP including the NOI process
Utilizing existing programs in place
Combine with other Phase II
Combine with a Phase I
Six Requirements of
Phase II
• Personnel education/outreach
• Public involvement/participation
• Illicit discharge detection elimination
• Construction site stormwater runoff control
(E/S)
• Post construction stormwater management
• Pollution prevention/good housekeeping
Phase II Can be Subjective
• Monitoring, public outreach and BMPs can be flexible as long as:
– Reduces pollutants to the maximum extent practical
– Protects water quality
– Satisfies CWA
– Many existing SWM programs are satisfactory
– Montgomery County & Washington DC will be templates
How Does NPDES Affect
Construction Activities?
• Compliance with NPDES Stormwater permits is
primarily through BMP implementation
• E/S and SWM plans are not the same as NPDES
compliance – but can usually serve as compliance
with NPDES requirements
• However, a good E/S and SWM plan alone does not
necessarily assure compliance with all NPDES criteria
How Does NPDES Affect
Construction Activities?
To comply with NPDES Maryland General Permit (GP) requirements,
Submit Notice of Intent to MDE if 1 acre or more of disturbance
New GP criteria
• Permittees no longer can start work at moment of
NOI submission
• MDE needs notice that SWM and E/S plan approved
• New submission forms
How Does NPDES Affect
Construction Activities?
New GP criteria - continued
• Individual discharge permits for construction disturbing 150 acres or more – GP lost
• Individual permits required for construction disturbing between 30 and 150 acres that
discharge to waters impaired by pollutants if MDE receives a timely objection to NOI
that credibly supports technical standards included under the GP are not sufficient to
ensure the protection of water quality standards
• Identify whether the receiving waters are listed on the 303(d) list as impaired for
sediment
• MDE posts project for 45-day public notice for sites 3 acres or more disturbed area or a
30-day period for sites with 1 to less than 3 acres disturbed area
How Does NPDES Affect
Construction Activities?
New GP criteria - continued
• MDE will not approve coverage under GP until PN ends and applicant notifies
that E/S plan approved – work can’t begin until SWM plan approved
• PN process may result in IP
• Include written explanation how ESD and sensitive construction techniques used
for waters with an established Total Maximum Daily Load (TMDL)
• If significant sediment discharge occurs, required to inspect, evaluate and repair
or install all site controls - if second event occurs, required to have engineer
evaluate if E/S plan needs additional on-site practices or modifications
How Does NPDES Affect
Construction Activities?
New GP criteria - continued
• Permittee must select, install, implement and maintain control measures at site
that minimize pollutants in the discharge as necessary to meet applicable water
quality standard
• If MDE determines discharges may cause “an excursion” above any applicable
water quality standard, required to modify controls to indicate receiving water is
attaining water quality standards
• Conduct weekly inspections and the next day (changed from next business day
last year) after a rainfall event resulting in runoff
• Must implement measures to ensure discharges from the site meets
requirements of TMDL
• Potential for flocculent or turbidity controls?
How Does NPDES Affect
Construction Activities?
• 1 to 3 acres of disturbance = submit for coverage with minimum 30-day public
comment and local E/S coordination
• 3 to 5 acres of disturbance = submit for coverage with minimum 45-day public
comment and local E/S coordination
• 5 to 10 acres of disturbance = as above but potential requirement for passive
chemical treatment
• 10 to 20 acres of disturbance = as above but potential for active chemical
treatment
• 20 to 150 acres of disturbance = was to comply with 280 NTU turbidity
• Over 150 acres of disturbance = does not qualify for NPDES GP and individual
permit is required (similar to industrial discharge permit in terms of processing)
How Does NPDES Affect
Construction Activities?
• Compliance is reflected in a Stormwater Pollution Prevention
Plan (SWPPP) – what is it and when is one required?
- Includes E/S and SWM plans (structural) but also
includes ESD and nonstructural: other pollutant
management considerations (spillage, storage, litter),
monitoring records
- In MD, not typically required under general permit
• Potential vs. Actual Discharges – treated the same?!
State & Local SWM
Concurrently along with new NPDES compliance, need to comply with
following regulations
• State Erosion and Sediment Control Law
• State Stormwater Management Law
Incorporates SWM Manual by reference - Revised by 2007
Maryland Stormwater Management Act – Effective May 2009
Formalizes “LID-like” or Environmental Site Design to “Maximum
Extent Practicable” - MEP is met if channel stability and
predevelopment groundwater recharge rates are maintained and
nonpoint source pollution is minimized…. structural stormwater
practices may be used only if determined to be absolutely
necessary
State & Local SWM
State Stormwater Management Law - continued
• Applies via approved local ordinance to all new and
redevelopment projects that have not received final
approval for erosion and sediment control and
stormwater management plans by May 4, 2010
• Primary MEP standard is to use ESD to reduce post
development runoff to levels found in natural,
forested conditions – need to treat 1 to 2.6 in rainfall
depending on site and design conditions
> 5,000 s.f. disturbance
Waters Disturbance Triggers - Indirect
• Both MDE permit processes incorporate CWA Section 401 Water
Quality Certification Requirements required when 404 Corps permit
required
Numeric and Narrative Water Quality Standards are basis for
sensitive waters requirements
• Numeric - DO, Temp, pH, Turbidity, fecal coliform, toxics
• Narrative – basis of more stringent controls
Protection of aquatic life...fishable…swimmable…includes EPA
Anti-degradation policy:
“…To accomplish the objective of maintaining existing
water quality…Nonpoint sources shall achieve all cost
effective and reasonable best management practices for
nonpoint source control…”
Waters Disturbance Triggers –
less common
• CWA Section 404 dredge and fill permit
- U. S. Army Corps of Engineers – Waters of the U. S.
including wetlands (MDE joint process if < 1 acre) up to
ephemeral
• Nontidal Wetland and Waterways Permit
- MDE – State waters up to intermittent including
wetlands and 100-year flood plain
- Has special NTW E/S BMP Conditions
• Tidal Wetlands License/Permit
- MDE – State waters including wetlands
Other Criteria
• Coastal Zone Management Act
• Chesapeake Bay Critical Area Law
Administered through local zoning and subdivision
ordinances for overlay 1,000 feet from shoreline
100-foot Buffer is the most restricted
10% SWM rule in Intensely Developed Areas
• State Forest Conservation Law
Delegated to localities
Requires NRI or FSD which could be first SWM concept
under new regulations
Silt fences frequently double as tree save fence
Even More Water Quality
Initiatives in Progress!
• Chesapeake Bay
TMDL for N & P
• Largest most
complex TMDL in the
country, covering the
64,000 s. m.
watershed in six
states & DC =
Watershed
Implementation Plans
(WIP) in progress
now
Issues under Deliberation
• What should be most
sound priorities of
focus? From CBF,
percent nutrient
contribution – some
variations in data but
current is:
• ESD (and LID) versus
Smart Growth versus
impervious surface
criteria?
• TMDL models
challenged by PA
Farming & NAHB
Construction Compliance
• Usually oriented to E/S compliance
• Locality inspects for E/S, FC and Critical Area
• MDE (and occasionally EPA) inspect for NPDES, E/S
and Wetland and Waterways Permit (and mining
compliance)
• Corps inspects for Wetland and Waterways Permit
Newer Compliance
Requirements
• Usually oriented to post-construction assessment
• Third party quality control construction monitoring
• Specific SWM device maintenance conditions
• Post-construction BMP performance can be required
• Used also for MS4
Compliance
• Can be MDE requirement
• Preconstruction,
construction and post-
construction
• Macroinvertebrate Studies
(from WWTP & mining)
• Chemistry
• Geomorphology
• Groundwater
Post-Construction BMP and Water
Quality Monitoring
For Construction Activities -
Remember!
• Have most current approved plans on site during construction
• Diligence over perfection – develop a good relationship with regulatory
agencies
• Any E/S modifications made after permitting may potentially have other
regulated impacts.
• Any temporary material storage, staging or heavy equipment in or near
flood plain, streams, wetlands, buffers, forest, specimen tree may
potentially be a regulated impact
• Document all E/S plan changes, rectification measures and spill control
measures in log book
Types of Designs for
Storm Water Control
What is a Best Management
Practice (BMP)?
Best Management Practices (BMPs) are policies, practices, procedures, or
structures implemented to mitigate the adverse environmental effects on
surface water quality resulting from development. BMPs are categorized
as structural or non-structural.
• Early Planning
• Low Impact Development
– “LID-like” or Better Site Design or Environmental Site Design
• Local stream buffers and setbacks
• Minimize or disconnect impervious surfaces sheet flow, open section
pavement
• Devices
Most significant factor affecting performance is construction
and maintenance
Erosion and Sediment Control
vs. Stormwater Management
E/S
• Construction Phase
• Sediments are primary criteria
• Can be temporary or “permanent”
SWM
• Post-construction
• Manages various pollutants
• Permanent
Common E/S Practices
• Silt Fence
• Vegetative Stabilization
• Stone lined conveyance
• Temporary Sediment Basin/Trap
• Temporary Use of Permanent Pond or other facility
Common E/S Practices
Common E/S Practices
Surface Stabilization
Sensitive Resources
Newer Technologies
Common Compliance Issues
Common Compliance Issues
Similar for E/S & SWM
Construction
Maintenance
Common SWM Practices
• Better/Environmental Site Design
• Sheet flow management – prior to and after
conveyance
• Open section surfaces
• Engineered practices
Common ESD Practices per
Regulations
• Preserving and protecting natural
resources
• Conserving natural drainage
patterns
• Minimizing impervious area
• Reducing runoff volume
• Using ESD practices to maintain
100 percent of the
• Annual predevelopment
groundwater recharge volume
• Using green roofs, permeable
pavement, reinforced turf,
• And other alternative surfaces
• Limiting soil disturbance, mass
grading, and compaction
• Clustering development
• Any practices approved by the
Administration.
ESD Planning Techniques and
Practices
• Disconnection of rooftop runoff
• Disconnection of non-rooftop runoff
• Sheetflow to conservation areas
• Rainwater harvesting
• Submerged gravel wetlands
• Landscape infiltration
• Infiltration berms
• Dry wells
• Micro-bioretention
• Rain gardens
• Swales
• Enhanced filters
The Best BMP - Work with Forest
and Wetland Conservation
Work with Site Character Before
Devices
When Using Engineered Practices
Smaller Volumes
Most compatible with ESD
goals of 2007 SWM Act –
At Source & Pretreatment
Quality Control Only
• Infiltration
– trench/basin
• Filtering
– sand filter/bioretention
• Hydrodynamic Devices
• “New” Technology
– pervious surfaces/green roofs
Larger Volumes
When preferred is
Insufficient
Central Locations
For Quantity and Quality
Control
• Stormwater Ponds
– wet pond
– wet ED pond
– dry ED pond (for cold water w/
pre-treatment)
– multiple pond system
• Stormwater Wetlands
– shallow marsh
– ED shallow wetland
– pond/wetland systems
Bioretention & Infiltration
Bioretention & Infiltration
Landscaped Bioretention Facility
Hydrodynamic Devices
Get Creative
Pond and Wetlands
Pond and Wetlands
Transition Habitat
Transition Habitat
SWM & Amenity Not Incompatible
Detention or Dry Pond
Enhance & Plant Dry Ponds Also
Stream Stabilization as a BMP
• Can be effective watershed sediment control practice
• Can be local approval requirement
• Can be a traded credit
• Can be out-of-kind wetland mitigation
“Newer” Technologies
Resources
• For:
• NPDES MS4 and Notice of Intent (NOI) Compliance
• Stormwater Management Act & Regulations
• Maryland Stormwater Design Manual
• Erosion and Sediment Control Regulations
• Waterways and Wetlands
• Go to MDE: www.mde.state.md.us/Programs/WaterPrograms/SedimentandStormwater/index.asp
• For US EPA related information:
• Regulations http://cfpub.epa.gov/npdes/npdesreg.cfm?program_id=45
• National Menu of Stormwater Best Management Practices
http://cfpub.epa.gov/npdes/stormwater/menuofbmps
• Urban BMP Performance Tool Urban BMP Performance Tool
http://cfpub.epa.gov/npdes/stormwater/urbanbmp/bmpeffectiveness.cfm
• Stormwater Discharges From Construction Activities http://cfpub.epa.gov/npdes/stormwater/const.cfm
• Or, “Google it” – web pages changing rapidly
• Or Contact me : Andrew T. Der 443 224 1824
ader@wrallp.com

More Related Content

What's hot

California State Stormwater Permit Requirements
California State Stormwater Permit RequirementsCalifornia State Stormwater Permit Requirements
California State Stormwater Permit RequirementsMichael Josselyn
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaDan Schleck
 
Overview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related RulesOverview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related RulesLoren Larson, CHMM, CPEA
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projectsbuckje123
 
Balancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyBalancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyAndrew T. Der & Associates, LLC
 
Capstone Midterm
Capstone MidtermCapstone Midterm
Capstone Midtermdchewni
 
The Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekThe Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekCraig Collins, Ph.D.
 
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...New Jersey Future
 

What's hot (20)

Environmental Compliance Overview for Architects
Environmental Compliance Overview for ArchitectsEnvironmental Compliance Overview for Architects
Environmental Compliance Overview for Architects
 
California State Stormwater Permit Requirements
California State Stormwater Permit RequirementsCalifornia State Stormwater Permit Requirements
California State Stormwater Permit Requirements
 
New Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in MinnesotaNew Construction Stormwater Regulation in Minnesota
New Construction Stormwater Regulation in Minnesota
 
An Overview of Stormwater Management
An Overview of Stormwater ManagementAn Overview of Stormwater Management
An Overview of Stormwater Management
 
Maryland Wetland Law and Compliance
Maryland Wetland Law and ComplianceMaryland Wetland Law and Compliance
Maryland Wetland Law and Compliance
 
Overview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related RulesOverview of Clean Water Act and Related Rules
Overview of Clean Water Act and Related Rules
 
Nonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland PreservationNonpoint Source Management and Wetland Preservation
Nonpoint Source Management and Wetland Preservation
 
The Clean Water Act
The Clean Water ActThe Clean Water Act
The Clean Water Act
 
Barfield
BarfieldBarfield
Barfield
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Areas2123 pic2boards
Areas2123 pic2boardsAreas2123 pic2boards
Areas2123 pic2boards
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Base line study in eia
Base line study in eiaBase line study in eia
Base line study in eia
 
Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
 
Balancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case StudyBalancing Wetland Protection with Stormwater Management - a Case Study
Balancing Wetland Protection with Stormwater Management - a Case Study
 
Capstone Midterm
Capstone MidtermCapstone Midterm
Capstone Midterm
 
The Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t CreekThe Clean Water Act: Up Sh*!t Creek
The Clean Water Act: Up Sh*!t Creek
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...
Announcing the "Developers' Green Infrastructure Guide": Atlantic Builders Co...
 

Similar to Stormwater Regulation

Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Finalaearles
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...Andrew T. Der & Associates, LLC
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNew Jersey Future
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesAndrew T. Der & Associates, LLC
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelAndrew T. Der & Associates, LLC
 
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopPinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopNew Jersey Future
 
TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICECharles Ice
 
3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slidesguest7dbf4
 
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningPhosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningMSA Professional Services, Inc.
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14MCDEP
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
2013 Florida Legislative Summary - Environmental and Water Bills
2013 Florida Legislative Summary - Environmental and Water Bills2013 Florida Legislative Summary - Environmental and Water Bills
2013 Florida Legislative Summary - Environmental and Water BillsThomas F. Mullin
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkKevin Perry
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater ManagementSean Carroll
 

Similar to Stormwater Regulation (20)

Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
Maryland Water Laws and Regulations
Maryland Water Laws and RegulationsMaryland Water Laws and Regulations
Maryland Water Laws and Regulations
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration Activities
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
 
Oil & Gas Stormwater Regulation
Oil & Gas Stormwater RegulationOil & Gas Stormwater Regulation
Oil & Gas Stormwater Regulation
 
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopPinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
 
TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICE
 
3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides3 epa elg for const sites ksa 2010 w hidden slides
3 epa elg for const sites ksa 2010 w hidden slides
 
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance PlanningPhosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
Phosphorus Limits: Avoidance Tactics to Consider During Compliance Planning
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
2013 Florida Legislative Summary - Environmental and Water Bills
2013 Florida Legislative Summary - Environmental and Water Bills2013 Florida Legislative Summary - Environmental and Water Bills
2013 Florida Legislative Summary - Environmental and Water Bills
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
 
Natural gas
Natural gasNatural gas
Natural gas
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater Management
 
green streets_richards
green streets_richardsgreen streets_richards
green streets_richards
 

More from Andrew T. Der & Associates, LLC (16)

Waters, waters everywhere
Waters, waters everywhereWaters, waters everywhere
Waters, waters everywhere
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Bat Blog
Bat BlogBat Blog
Bat Blog
 
Wetland Law and Compliance
Wetland Law and ComplianceWetland Law and Compliance
Wetland Law and Compliance
 
NTU is Not a University
NTU is Not a UniversityNTU is Not a University
NTU is Not a University
 
Stream Buffers
Stream BuffersStream Buffers
Stream Buffers
 
Turbidity
TurbidityTurbidity
Turbidity
 
Stream Buffers
Stream BuffersStream Buffers
Stream Buffers
 
SER News
SER NewsSER News
SER News
 
Waters, Waters Everywhere
Waters, Waters EverywhereWaters, Waters Everywhere
Waters, Waters Everywhere
 
WRA DelDOT WL Presentation
WRA DelDOT WL PresentationWRA DelDOT WL Presentation
WRA DelDOT WL Presentation
 
What are Waters of the United States?
What are Waters of the United States?What are Waters of the United States?
What are Waters of the United States?
 
Invited Panel University of Delaware Symposium
Invited Panel University of Delaware SymposiumInvited Panel University of Delaware Symposium
Invited Panel University of Delaware Symposium
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 

Recently uploaded

(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp202215407
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresvasubhanot1234
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 

Recently uploaded (20)

(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974FULL ENJOY Call Girls In  kashmiri gate (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In kashmiri gate (Delhi) Call Us 9953056974
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Abu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community ppAbu Dhabi Sea Beach Visitor Community pp
Abu Dhabi Sea Beach Visitor Community pp
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Soil pollution causes effects remedial measures
Soil pollution causes effects remedial measuresSoil pollution causes effects remedial measures
Soil pollution causes effects remedial measures
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 

Stormwater Regulation

  • 1. 801 South Caroline Street | Baltimore, MD 21231 443.224.1824 | ader@wrallp.com Presentation for Lorman Educational Services in Annapolis, MD June 12, 2012
  • 3. Why Are We Here?
  • 5. Four Categories of Effects • Hydrology • Geomorphology • Habitat • Water Quality
  • 6. Hydrology • Increase in flow and velocities • Increase in flooding • Increase in frequency • Increase in bankfull flows
  • 7. Geomorphology • Stream Widening • Channel Instability • Erosion
  • 8. Habitat • Fish Barriers • Loss of Substrate • Loss of Riparian Zone • Loss of Micro-topography
  • 9. Water Quality • Sediments Channel erosion can be the primary sediment source! • Nutrients Maintained vegetated areas • Temperature Warm pavements and pond pools • Other Oils, Greases, heavy metals, toxics
  • 14. What is a Stream? • Waters of the U. S. • Definition includes tidal navigable water, nontidal navigable water and adjacent headwaters and wetlands adjacent to such waters – but how far up does it go? • Determines extent of Sec 401 (Water Quality Certification), 402 (NPDES) and 404 (Dredge and Fill) components of the Clean Water Act.
  • 15. What is an impact? • Impacts are discharges or grading • Discharges can be out of a pipe or placement of material (CWA Sec 402 & 404) • Discharges can be permitted • Individual Permits or General Permits
  • 16. Types of Stormwater Permitting • NPDES Phase I and II – U. S. EPA delegated to States by GP – regulates new construction AND existing older stormwater sources – passes through localities – only permit means to retrofit • New DoD and federal facility SWM mandates • State/local Stormwater Management Regulations – new construction • State/local Erosion and Sediment Control Regulations – new construction • Other (Wetlands, Flood Plain, etc.) • Both Individual & General NPDES permitting - Most new construction under GP
  • 17. NPDES Phase I &II Permitting • 1972 amendments to the Federal Water Pollution Control Act (Clean Water Act) prohibit the discharge of any pollutant to waters of the United States from a point source unless the discharge is authorized by a National Pollutant Discharge Elimination System (NPDES) permit. • Past efforts to address stormwater discharges under the NPDES program have generally been limited to certain industrial categories
  • 18. Background • Stormwater out of a pipe was not necessarily a point source discharge • National Urban Runoff Program (NURP) – first meaningful stormwater study showed stormwater impacts • In response to water quality concerns, in 1987, the EPA was required to issue regulations addressing stormwater discharges under the NPDES program
  • 19. Phase I • NPDES established first regulations in 1990 permit requirements for: 1) existing “medium” and “large” municipal separate storm sewer systems (MS4) – individual permits by State to locality with conditions 2) new construction activity disturbing 5 acres of land or greater – general permits 3) certain industrial activities • Many continue to operate under Phase I
  • 20. MDE Phase I Permit Conditions • ID legal authority and data sources • Assess existing programs • Watershed Management and Restoration (often needs its own construction controls and 404 and state wetland permit!) • Utilize current collected best management practice (BMP) data to modify and improve programs • Fiscal Analysis
  • 21. Phase II • In 1999, new rule automatically covers on a nationwide basis all existing small MS4s located in urbanized areas and new construction activities of 1 acre or more • Most localities already complying • Can authorize industries or facilities • Have more flexible permitting options GP including the NOI process Utilizing existing programs in place Combine with other Phase II Combine with a Phase I
  • 22. Six Requirements of Phase II • Personnel education/outreach • Public involvement/participation • Illicit discharge detection elimination • Construction site stormwater runoff control (E/S) • Post construction stormwater management • Pollution prevention/good housekeeping
  • 23. Phase II Can be Subjective • Monitoring, public outreach and BMPs can be flexible as long as: – Reduces pollutants to the maximum extent practical – Protects water quality – Satisfies CWA – Many existing SWM programs are satisfactory – Montgomery County & Washington DC will be templates
  • 24. How Does NPDES Affect Construction Activities? • Compliance with NPDES Stormwater permits is primarily through BMP implementation • E/S and SWM plans are not the same as NPDES compliance – but can usually serve as compliance with NPDES requirements • However, a good E/S and SWM plan alone does not necessarily assure compliance with all NPDES criteria
  • 25. How Does NPDES Affect Construction Activities? To comply with NPDES Maryland General Permit (GP) requirements, Submit Notice of Intent to MDE if 1 acre or more of disturbance New GP criteria • Permittees no longer can start work at moment of NOI submission • MDE needs notice that SWM and E/S plan approved • New submission forms
  • 26. How Does NPDES Affect Construction Activities? New GP criteria - continued • Individual discharge permits for construction disturbing 150 acres or more – GP lost • Individual permits required for construction disturbing between 30 and 150 acres that discharge to waters impaired by pollutants if MDE receives a timely objection to NOI that credibly supports technical standards included under the GP are not sufficient to ensure the protection of water quality standards • Identify whether the receiving waters are listed on the 303(d) list as impaired for sediment • MDE posts project for 45-day public notice for sites 3 acres or more disturbed area or a 30-day period for sites with 1 to less than 3 acres disturbed area
  • 27. How Does NPDES Affect Construction Activities? New GP criteria - continued • MDE will not approve coverage under GP until PN ends and applicant notifies that E/S plan approved – work can’t begin until SWM plan approved • PN process may result in IP • Include written explanation how ESD and sensitive construction techniques used for waters with an established Total Maximum Daily Load (TMDL) • If significant sediment discharge occurs, required to inspect, evaluate and repair or install all site controls - if second event occurs, required to have engineer evaluate if E/S plan needs additional on-site practices or modifications
  • 28. How Does NPDES Affect Construction Activities? New GP criteria - continued • Permittee must select, install, implement and maintain control measures at site that minimize pollutants in the discharge as necessary to meet applicable water quality standard • If MDE determines discharges may cause “an excursion” above any applicable water quality standard, required to modify controls to indicate receiving water is attaining water quality standards • Conduct weekly inspections and the next day (changed from next business day last year) after a rainfall event resulting in runoff • Must implement measures to ensure discharges from the site meets requirements of TMDL • Potential for flocculent or turbidity controls?
  • 29. How Does NPDES Affect Construction Activities? • 1 to 3 acres of disturbance = submit for coverage with minimum 30-day public comment and local E/S coordination • 3 to 5 acres of disturbance = submit for coverage with minimum 45-day public comment and local E/S coordination • 5 to 10 acres of disturbance = as above but potential requirement for passive chemical treatment • 10 to 20 acres of disturbance = as above but potential for active chemical treatment • 20 to 150 acres of disturbance = was to comply with 280 NTU turbidity • Over 150 acres of disturbance = does not qualify for NPDES GP and individual permit is required (similar to industrial discharge permit in terms of processing)
  • 30. How Does NPDES Affect Construction Activities? • Compliance is reflected in a Stormwater Pollution Prevention Plan (SWPPP) – what is it and when is one required? - Includes E/S and SWM plans (structural) but also includes ESD and nonstructural: other pollutant management considerations (spillage, storage, litter), monitoring records - In MD, not typically required under general permit • Potential vs. Actual Discharges – treated the same?!
  • 31. State & Local SWM Concurrently along with new NPDES compliance, need to comply with following regulations • State Erosion and Sediment Control Law • State Stormwater Management Law Incorporates SWM Manual by reference - Revised by 2007 Maryland Stormwater Management Act – Effective May 2009 Formalizes “LID-like” or Environmental Site Design to “Maximum Extent Practicable” - MEP is met if channel stability and predevelopment groundwater recharge rates are maintained and nonpoint source pollution is minimized…. structural stormwater practices may be used only if determined to be absolutely necessary
  • 32. State & Local SWM State Stormwater Management Law - continued • Applies via approved local ordinance to all new and redevelopment projects that have not received final approval for erosion and sediment control and stormwater management plans by May 4, 2010 • Primary MEP standard is to use ESD to reduce post development runoff to levels found in natural, forested conditions – need to treat 1 to 2.6 in rainfall depending on site and design conditions > 5,000 s.f. disturbance
  • 33. Waters Disturbance Triggers - Indirect • Both MDE permit processes incorporate CWA Section 401 Water Quality Certification Requirements required when 404 Corps permit required Numeric and Narrative Water Quality Standards are basis for sensitive waters requirements • Numeric - DO, Temp, pH, Turbidity, fecal coliform, toxics • Narrative – basis of more stringent controls Protection of aquatic life...fishable…swimmable…includes EPA Anti-degradation policy: “…To accomplish the objective of maintaining existing water quality…Nonpoint sources shall achieve all cost effective and reasonable best management practices for nonpoint source control…”
  • 34. Waters Disturbance Triggers – less common • CWA Section 404 dredge and fill permit - U. S. Army Corps of Engineers – Waters of the U. S. including wetlands (MDE joint process if < 1 acre) up to ephemeral • Nontidal Wetland and Waterways Permit - MDE – State waters up to intermittent including wetlands and 100-year flood plain - Has special NTW E/S BMP Conditions • Tidal Wetlands License/Permit - MDE – State waters including wetlands
  • 35. Other Criteria • Coastal Zone Management Act • Chesapeake Bay Critical Area Law Administered through local zoning and subdivision ordinances for overlay 1,000 feet from shoreline 100-foot Buffer is the most restricted 10% SWM rule in Intensely Developed Areas • State Forest Conservation Law Delegated to localities Requires NRI or FSD which could be first SWM concept under new regulations Silt fences frequently double as tree save fence
  • 36. Even More Water Quality Initiatives in Progress! • Chesapeake Bay TMDL for N & P • Largest most complex TMDL in the country, covering the 64,000 s. m. watershed in six states & DC = Watershed Implementation Plans (WIP) in progress now
  • 37. Issues under Deliberation • What should be most sound priorities of focus? From CBF, percent nutrient contribution – some variations in data but current is: • ESD (and LID) versus Smart Growth versus impervious surface criteria? • TMDL models challenged by PA Farming & NAHB
  • 38. Construction Compliance • Usually oriented to E/S compliance • Locality inspects for E/S, FC and Critical Area • MDE (and occasionally EPA) inspect for NPDES, E/S and Wetland and Waterways Permit (and mining compliance) • Corps inspects for Wetland and Waterways Permit
  • 39. Newer Compliance Requirements • Usually oriented to post-construction assessment • Third party quality control construction monitoring • Specific SWM device maintenance conditions • Post-construction BMP performance can be required
  • 40. • Used also for MS4 Compliance • Can be MDE requirement • Preconstruction, construction and post- construction • Macroinvertebrate Studies (from WWTP & mining) • Chemistry • Geomorphology • Groundwater Post-Construction BMP and Water Quality Monitoring
  • 41. For Construction Activities - Remember! • Have most current approved plans on site during construction • Diligence over perfection – develop a good relationship with regulatory agencies • Any E/S modifications made after permitting may potentially have other regulated impacts. • Any temporary material storage, staging or heavy equipment in or near flood plain, streams, wetlands, buffers, forest, specimen tree may potentially be a regulated impact • Document all E/S plan changes, rectification measures and spill control measures in log book
  • 42. Types of Designs for Storm Water Control
  • 43. What is a Best Management Practice (BMP)? Best Management Practices (BMPs) are policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development. BMPs are categorized as structural or non-structural. • Early Planning • Low Impact Development – “LID-like” or Better Site Design or Environmental Site Design • Local stream buffers and setbacks • Minimize or disconnect impervious surfaces sheet flow, open section pavement • Devices Most significant factor affecting performance is construction and maintenance
  • 44. Erosion and Sediment Control vs. Stormwater Management E/S • Construction Phase • Sediments are primary criteria • Can be temporary or “permanent” SWM • Post-construction • Manages various pollutants • Permanent
  • 45. Common E/S Practices • Silt Fence • Vegetative Stabilization • Stone lined conveyance • Temporary Sediment Basin/Trap • Temporary Use of Permanent Pond or other facility
  • 52. Common Compliance Issues Similar for E/S & SWM Construction Maintenance
  • 53. Common SWM Practices • Better/Environmental Site Design • Sheet flow management – prior to and after conveyance • Open section surfaces • Engineered practices
  • 54. Common ESD Practices per Regulations • Preserving and protecting natural resources • Conserving natural drainage patterns • Minimizing impervious area • Reducing runoff volume • Using ESD practices to maintain 100 percent of the • Annual predevelopment groundwater recharge volume • Using green roofs, permeable pavement, reinforced turf, • And other alternative surfaces • Limiting soil disturbance, mass grading, and compaction • Clustering development • Any practices approved by the Administration.
  • 55. ESD Planning Techniques and Practices • Disconnection of rooftop runoff • Disconnection of non-rooftop runoff • Sheetflow to conservation areas • Rainwater harvesting • Submerged gravel wetlands • Landscape infiltration • Infiltration berms • Dry wells • Micro-bioretention • Rain gardens • Swales • Enhanced filters
  • 56. The Best BMP - Work with Forest and Wetland Conservation
  • 57. Work with Site Character Before Devices
  • 58. When Using Engineered Practices Smaller Volumes Most compatible with ESD goals of 2007 SWM Act – At Source & Pretreatment Quality Control Only • Infiltration – trench/basin • Filtering – sand filter/bioretention • Hydrodynamic Devices • “New” Technology – pervious surfaces/green roofs Larger Volumes When preferred is Insufficient Central Locations For Quantity and Quality Control • Stormwater Ponds – wet pond – wet ED pond – dry ED pond (for cold water w/ pre-treatment) – multiple pond system • Stormwater Wetlands – shallow marsh – ED shallow wetland – pond/wetland systems
  • 68. SWM & Amenity Not Incompatible
  • 70. Enhance & Plant Dry Ponds Also
  • 71. Stream Stabilization as a BMP • Can be effective watershed sediment control practice • Can be local approval requirement • Can be a traded credit • Can be out-of-kind wetland mitigation
  • 73. Resources • For: • NPDES MS4 and Notice of Intent (NOI) Compliance • Stormwater Management Act & Regulations • Maryland Stormwater Design Manual • Erosion and Sediment Control Regulations • Waterways and Wetlands • Go to MDE: www.mde.state.md.us/Programs/WaterPrograms/SedimentandStormwater/index.asp • For US EPA related information: • Regulations http://cfpub.epa.gov/npdes/npdesreg.cfm?program_id=45 • National Menu of Stormwater Best Management Practices http://cfpub.epa.gov/npdes/stormwater/menuofbmps • Urban BMP Performance Tool Urban BMP Performance Tool http://cfpub.epa.gov/npdes/stormwater/urbanbmp/bmpeffectiveness.cfm • Stormwater Discharges From Construction Activities http://cfpub.epa.gov/npdes/stormwater/const.cfm • Or, “Google it” – web pages changing rapidly • Or Contact me : Andrew T. Der 443 224 1824 ader@wrallp.com