The revision of ISO 9001:2000 to
ISO 9001:2008 did not bring in drastic
additions.
Its changes seek to make clarification
in relevant clauses based on the vast
application experiences from the
various industrial sectors.
‘Product’ and ‘Service’ will be
used interchangeably as
always in ISO 9001.
Paragraph 0.1
A statement about whom and where the
standard is including any statutory
requirements and have the same scale
as any customer or regulatory
requirements. It also clarified that these
requirements are restricted to those
applicable to the product.
Paragraph 0.4
A comment that states that the new
standard is made due consideration to
ISO 14001:2004.
(Quite common for organizations that
embarked on ISO 14000 also to have
the ISO 9000 certification)
Paragraph 1
Statutory requirements had been referred
in connection with purchased products
and product realization. Second note
explains that a statutory requirement can
be a legal requirement.
(Since statutory requirements have the weight
of statute behind them. It implied that your
suppliers must follow the laws too)
Paragraph 2
Normative reference - the ISO 9000
now refers to ISO 9000:2005
Paragraph 3
Explanation on what is a customer
and what is an organization and
what is a supplier had been
removed.
Paragraph 4.1
The word "determine” replaced "identify".
Any outsourced process has to be
suitably controlled to ensure product
conformity and, defined in the Quality
Management System.
Paragraph 4.2.1
Slight change of words but no change in
meaning from earlier edition.
Note 2 was changed - a single document
may include requirements for more than
one procedure and requirements of one
procedure may appear in more than one
document.
Paragraph 4.2.3
clarified that external documentation
are the ones needed for the quality
management system.
Paragraph 5.1
The word "statutory" had been
added.
Paragraph 5.5.2
An addition for a demand that the
management representative would
have to be a member of the
organization's management.
Paragraph 6.2
Words, "affecting product quality" changed to
"affecting conformity to product requirements”
Paragraph 6.2.2
Sub-clause (b) -"provide training or take other
actions to satisfy these needs" changed to
"where applicable training needs to be
provided to achieve the necessary
competence".
Sub-clause (c) – obligation to ensure that the
staff attained the expected competence.
Paragraph 6.3
Sub-clause (c) states that information
systems are included as part of
Infrastructure.
(Good to cover information system, process
software, design software etc under 6.3c as
periodic verification of some design software
was audited under 7.6, which is
not so correct previously.)
Paragraph 6.4
A new note mentioning that noise,
humidity, temperatures are part of a
working environment.
Paragraph 7.1
Sub-clause (c) - measurement had been
added to the activities.
Paragraph number 7.2.1
Sub-clause (a) - change of words with no
change in the meaning.
Sub-clause (c) - the word 'applicable'
replaced 'related'.
Sub-clause (d) - change of words with no
change in the meaning.
(A note has been added to explain what is
the meaning of "post delivery activities".)
Paragraph 7.3.1
A note had been added to clarify
that design review, verification and
validation are separated processes
but they can be conducted together.
Paragraph 7.3.3
A change of wording. A note had
been added clarifying what is
included in "preservation
of product".
Paragraph 7.5.3
A requirement added specifying
that product traceability must be
included throughout the product
realization.
Paragraph 7.5.4
A change in the note had been amended
to highlight that personal data shall be
included as customer's property.
Paragraph 7.5.5
Change of words; from "conformity
of" to "in order to maintain
conformity to requirements"
Paragraph 7.6
Change of words; from "devices" to
"equipment" The reference to paragraph
7.2.1 had been removed.
Sub-clause (c) - from "be identified to
enable the” to "identification to enable
their”
Changes in the notes: Note 1 - the reference to
ISO 100012-2 had been removed while Note 3
seeks to explain about situation when
configuration of computer must be applied when
the computer is identified and used for monitor &
measurements processes.
Formula for
Delighting
Customers
Paragraph 8.2.1
A note had been added to throw
light on some of the means for
conducting customer satisfaction
evaluation.
Paragraph 8.2.2
Requirements for the audit
evidence and results had been
added. It is made clearer now that
the management is responsible to
ensure preventive and corrective
action will be taken.
The reference to the ISO 10011
had been updated to ISO 19011.
Paragraph 8.2.3
Minor change of words i.e. "to ensure
conformity of the product" had been
removed.
A note had been added to clarify that the
organization should determine the type of
the monitoring and measuring according
to the processes and, how will this affect
the quality management system.
Paragraph 8.2.4
Change of words: "maintain evidence
of conformity with acceptance
criteria" had been removed but it is
still a perceived requirement.
Paragraph number 8.3
An addition sub-clause (d) that
specifies how to deal with a
nonconforming product that was
discovered after delivery.
(Nothing new as it had always been
addressed under Warranty or After-sales
protocol.)
kaizenplus88@yahoo.co.uk

More Related Content

Similar to Quality Management System ISO 2008 Edition.ppt

QMSR Harmonization: The Future of FDA's Quality Management System Regulation
QMSR Harmonization: The Future of FDA's Quality Management System RegulationQMSR Harmonization: The Future of FDA's Quality Management System Regulation
QMSR Harmonization: The Future of FDA's Quality Management System RegulationGreenlight Guru
 
NQA ISO 22301 Transition Gap Guide
NQA ISO 22301 Transition Gap GuideNQA ISO 22301 Transition Gap Guide
NQA ISO 22301 Transition Gap GuideNQA
 
ISO 9001:2015 clause wise changes
ISO 9001:2015 clause wise changesISO 9001:2015 clause wise changes
ISO 9001:2015 clause wise changesKranthi Rainbow
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindGovind Ramu
 
Payment Card Industry Data Security Standard (PCI DSS) 3.0
Payment Card Industry Data Security Standard (PCI DSS) 3.0Payment Card Industry Data Security Standard (PCI DSS) 3.0
Payment Card Industry Data Security Standard (PCI DSS) 3.0- Mark - Fullbright
 
NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA
 
NQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNA Putra
 
Iso 2008 vs 2015
Iso 2008 vs 2015Iso 2008 vs 2015
Iso 2008 vs 2015Haya Haroon
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management systemdrdej19
 
054 JIT and Quality Management System
054 JIT and Quality Management System054 JIT and Quality Management System
054 JIT and Quality Management SystemDr Fereidoun Dejahang
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualDien Ha The
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualDien Ha The
 
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...Samantha Chen, CQA
 
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdfISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdfHaris Waseem
 
Gap analysis for IATF 16949 2016
Gap analysis for IATF 16949 2016Gap analysis for IATF 16949 2016
Gap analysis for IATF 16949 2016Amit Mishra
 

Similar to Quality Management System ISO 2008 Edition.ppt (20)

ISO/IEC 27001:2005 naar ISO 27001:2013 Checklist
ISO/IEC 27001:2005 naar ISO 27001:2013  ChecklistISO/IEC 27001:2005 naar ISO 27001:2013  Checklist
ISO/IEC 27001:2005 naar ISO 27001:2013 Checklist
 
QMSR Harmonization: The Future of FDA's Quality Management System Regulation
QMSR Harmonization: The Future of FDA's Quality Management System RegulationQMSR Harmonization: The Future of FDA's Quality Management System Regulation
QMSR Harmonization: The Future of FDA's Quality Management System Regulation
 
NQA ISO 22301 Transition Gap Guide
NQA ISO 22301 Transition Gap GuideNQA ISO 22301 Transition Gap Guide
NQA ISO 22301 Transition Gap Guide
 
ISO 9001:2015 clause wise changes
ISO 9001:2015 clause wise changesISO 9001:2015 clause wise changes
ISO 9001:2015 clause wise changes
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
 
Payment Card Industry Data Security Standard (PCI DSS) 3.0
Payment Card Industry Data Security Standard (PCI DSS) 3.0Payment Card Industry Data Security Standard (PCI DSS) 3.0
Payment Card Industry Data Security Standard (PCI DSS) 3.0
 
FSSC version 5.1 ppt
FSSC  version 5.1 pptFSSC  version 5.1 ppt
FSSC version 5.1 ppt
 
NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?
 
NQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap Guide
 
Assignment
AssignmentAssignment
Assignment
 
Iso 2008 vs 2015
Iso 2008 vs 2015Iso 2008 vs 2015
Iso 2008 vs 2015
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
054 JIT and Quality Management System
054 JIT and Quality Management System054 JIT and Quality Management System
054 JIT and Quality Management System
 
Comparis
ComparisComparis
Comparis
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manual
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manual
 
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...
Canadian Medical Devices Conformity Assessment System(CMDCAS) - Training mate...
 
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdfISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
ISO_TC_176_SC2_N1286_Guidance_on_the_req.pdf
 
Gap analysis for IATF 16949 2016
Gap analysis for IATF 16949 2016Gap analysis for IATF 16949 2016
Gap analysis for IATF 16949 2016
 

Recently uploaded

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 

Recently uploaded (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

Quality Management System ISO 2008 Edition.ppt

  • 1.
  • 2. The revision of ISO 9001:2000 to ISO 9001:2008 did not bring in drastic additions. Its changes seek to make clarification in relevant clauses based on the vast application experiences from the various industrial sectors. ‘Product’ and ‘Service’ will be used interchangeably as always in ISO 9001.
  • 3. Paragraph 0.1 A statement about whom and where the standard is including any statutory requirements and have the same scale as any customer or regulatory requirements. It also clarified that these requirements are restricted to those applicable to the product.
  • 4. Paragraph 0.4 A comment that states that the new standard is made due consideration to ISO 14001:2004. (Quite common for organizations that embarked on ISO 14000 also to have the ISO 9000 certification)
  • 5. Paragraph 1 Statutory requirements had been referred in connection with purchased products and product realization. Second note explains that a statutory requirement can be a legal requirement. (Since statutory requirements have the weight of statute behind them. It implied that your suppliers must follow the laws too)
  • 6. Paragraph 2 Normative reference - the ISO 9000 now refers to ISO 9000:2005 Paragraph 3 Explanation on what is a customer and what is an organization and what is a supplier had been removed.
  • 7. Paragraph 4.1 The word "determine” replaced "identify". Any outsourced process has to be suitably controlled to ensure product conformity and, defined in the Quality Management System.
  • 8. Paragraph 4.2.1 Slight change of words but no change in meaning from earlier edition. Note 2 was changed - a single document may include requirements for more than one procedure and requirements of one procedure may appear in more than one document.
  • 9. Paragraph 4.2.3 clarified that external documentation are the ones needed for the quality management system.
  • 10. Paragraph 5.1 The word "statutory" had been added. Paragraph 5.5.2 An addition for a demand that the management representative would have to be a member of the organization's management.
  • 11. Paragraph 6.2 Words, "affecting product quality" changed to "affecting conformity to product requirements” Paragraph 6.2.2 Sub-clause (b) -"provide training or take other actions to satisfy these needs" changed to "where applicable training needs to be provided to achieve the necessary competence". Sub-clause (c) – obligation to ensure that the staff attained the expected competence.
  • 12. Paragraph 6.3 Sub-clause (c) states that information systems are included as part of Infrastructure. (Good to cover information system, process software, design software etc under 6.3c as periodic verification of some design software was audited under 7.6, which is not so correct previously.)
  • 13. Paragraph 6.4 A new note mentioning that noise, humidity, temperatures are part of a working environment.
  • 14. Paragraph 7.1 Sub-clause (c) - measurement had been added to the activities. Paragraph number 7.2.1 Sub-clause (a) - change of words with no change in the meaning. Sub-clause (c) - the word 'applicable' replaced 'related'. Sub-clause (d) - change of words with no change in the meaning. (A note has been added to explain what is the meaning of "post delivery activities".)
  • 15. Paragraph 7.3.1 A note had been added to clarify that design review, verification and validation are separated processes but they can be conducted together. Paragraph 7.3.3 A change of wording. A note had been added clarifying what is included in "preservation of product".
  • 16. Paragraph 7.5.3 A requirement added specifying that product traceability must be included throughout the product realization.
  • 17. Paragraph 7.5.4 A change in the note had been amended to highlight that personal data shall be included as customer's property.
  • 18. Paragraph 7.5.5 Change of words; from "conformity of" to "in order to maintain conformity to requirements"
  • 19. Paragraph 7.6 Change of words; from "devices" to "equipment" The reference to paragraph 7.2.1 had been removed. Sub-clause (c) - from "be identified to enable the” to "identification to enable their” Changes in the notes: Note 1 - the reference to ISO 100012-2 had been removed while Note 3 seeks to explain about situation when configuration of computer must be applied when the computer is identified and used for monitor & measurements processes.
  • 20. Formula for Delighting Customers Paragraph 8.2.1 A note had been added to throw light on some of the means for conducting customer satisfaction evaluation.
  • 21. Paragraph 8.2.2 Requirements for the audit evidence and results had been added. It is made clearer now that the management is responsible to ensure preventive and corrective action will be taken. The reference to the ISO 10011 had been updated to ISO 19011.
  • 22. Paragraph 8.2.3 Minor change of words i.e. "to ensure conformity of the product" had been removed. A note had been added to clarify that the organization should determine the type of the monitoring and measuring according to the processes and, how will this affect the quality management system.
  • 23. Paragraph 8.2.4 Change of words: "maintain evidence of conformity with acceptance criteria" had been removed but it is still a perceived requirement.
  • 24. Paragraph number 8.3 An addition sub-clause (d) that specifies how to deal with a nonconforming product that was discovered after delivery. (Nothing new as it had always been addressed under Warranty or After-sales protocol.)