SlideShare a Scribd company logo
1 of 10
Alex Lumbard
(408) 348-8727
Lumbard1@llnl.gov
alumbard408@gmail.com
Summary
I thrive in an R&D environment where I bring my own perspective and experience to the table, adding to a
working group as a whole. I live to design, prototype, experiment and revise. Manufacturing is paramount in
these activities and manufacturing has always been where my skills clearly stand out.
Experience
Sr. Mechanical Engineering Technologist at Lawrence Livermore National Laboratory
July 2011 - Present (5years)
Design electro/mechanical systems
Machine parts
Assemble systems
Experiment and troubleshoot
Revisions
High Vac Systems
Process Improvement
Quality Assurance
CNC Milling Machine Operator at Rage Machine
August 2004 - August 2008 (4 years 1 month)
Set up and operation of Fadal 3 Axis Vertical Milling Center
First articles
Materials Removal and Recycling
Product shipping, materials receiving
Projects
Senior Project at TerrainTrax
August 2010 - July 2011 (1 year)
Design, manufacture and market product, an environmentally friendly rubber track conversion system for four-wheel
drive vehicles
Skills & Expertise
Designfor Manufacturing Mechanical Design FMEA
Manufacturing Researchand Development Designof Experiments
Solidworks MIG welding CNC Programming
Mechanical Engineering Pro Engineer Automation
Materials GD&T High Vacuum
Machining Industrial Engineering Product Design
CNC Manufacturing Engineering
Radiation Safety Lean Manufacturing
Education
California Polytechnic State University-San Luis Obispo
Bachelor of science, Industrial Technology, 2008 - 2011
De Anza College
certification, CNC Machinist, programmer and operator, 2005 – 2008
ALEXANDER LUMBARD
Project Portfolio
Senior Project
Rubber track conversion system for Four-wheel drive vehicle
Senior Project: TerrainTrax
Duration: August 2010 - March 2011
Pictured, Complete concept prototype Design
Full scale functioning Prototype complete
Murphy bed/workstation
Duration: Two months
Designed
Manufactured
Slept in
Dual end cv joint
Duration: Two weeks
Design
Manufactured
Installed
Tested
1970 International Harvester
Duration: 2003 - on going
Custom front square drive shaft
Duration: 20 hours
Design
Manufactured
Installed
Tested
In-wall 500 gallon fish tank stand
Duration: 20 hours
Design
Manufactured
Installed
Cabinet for lasing silica into structure
Duration: 3 months
Consulting on design
Assembly/Revision of prototype
Alex Lumbard_RESUME_PROJECT_PORTFOLIO

More Related Content

Similar to Alex Lumbard_RESUME_PROJECT_PORTFOLIO

Seth Shepard Resume 10-15-15
Seth Shepard Resume 10-15-15Seth Shepard Resume 10-15-15
Seth Shepard Resume 10-15-15Seth Shepard
 
Craig A Barnes Resume - JAN15
Craig A Barnes Resume - JAN15Craig A Barnes Resume - JAN15
Craig A Barnes Resume - JAN15Craig Barnes
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer
 
Jim Cloer Process Engineer Resume
Jim Cloer Process Engineer ResumeJim Cloer Process Engineer Resume
Jim Cloer Process Engineer ResumeJim Cloer
 
Naval Aviation Materials and Manufacturing Workshop: Accelerating Technolog...
Naval Aviation Materials and Manufacturing Workshop:  Accelerating Technolog...Naval Aviation Materials and Manufacturing Workshop:  Accelerating Technolog...
Naval Aviation Materials and Manufacturing Workshop: Accelerating Technolog...frazierwe
 
CV SB 2016 2 page
CV SB 2016 2 pageCV SB 2016 2 page
CV SB 2016 2 pageSteve Berry
 
Daniel T. Persaud Resume
Daniel T. Persaud ResumeDaniel T. Persaud Resume
Daniel T. Persaud ResumeDaniel Persaud
 
Sam Broyles Resume Nov 2014
Sam Broyles Resume Nov 2014Sam Broyles Resume Nov 2014
Sam Broyles Resume Nov 2014Sam Broyles
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham
 
Rkramer Resume
Rkramer ResumeRkramer Resume
Rkramer Resumekramerrh
 

Similar to Alex Lumbard_RESUME_PROJECT_PORTFOLIO (20)

Seth Shepard Resume 10-15-15
Seth Shepard Resume 10-15-15Seth Shepard Resume 10-15-15
Seth Shepard Resume 10-15-15
 
Craig A Barnes Resume - JAN15
Craig A Barnes Resume - JAN15Craig A Barnes Resume - JAN15
Craig A Barnes Resume - JAN15
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
Jim Cloer Process Engineer Resume
Jim Cloer Process Engineer ResumeJim Cloer Process Engineer Resume
Jim Cloer Process Engineer Resume
 
Naval Aviation Materials and Manufacturing Workshop: Accelerating Technolog...
Naval Aviation Materials and Manufacturing Workshop:  Accelerating Technolog...Naval Aviation Materials and Manufacturing Workshop:  Accelerating Technolog...
Naval Aviation Materials and Manufacturing Workshop: Accelerating Technolog...
 
Mark resume
Mark resumeMark resume
Mark resume
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
 
Adisorn sardsangjun 's Resume_M
Adisorn sardsangjun 's Resume_MAdisorn sardsangjun 's Resume_M
Adisorn sardsangjun 's Resume_M
 
CV SB 2016 2 page
CV SB 2016 2 pageCV SB 2016 2 page
CV SB 2016 2 page
 
Mathusuthanan Mariilayaraja_5years
Mathusuthanan Mariilayaraja_5yearsMathusuthanan Mariilayaraja_5years
Mathusuthanan Mariilayaraja_5years
 
Kishor Pinglikar
Kishor PinglikarKishor Pinglikar
Kishor Pinglikar
 
Daniel T. Persaud Resume
Daniel T. Persaud ResumeDaniel T. Persaud Resume
Daniel T. Persaud Resume
 
JLeman resume
JLeman resumeJLeman resume
JLeman resume
 
Sam Broyles Resume Nov 2014
Sam Broyles Resume Nov 2014Sam Broyles Resume Nov 2014
Sam Broyles Resume Nov 2014
 
Pramesak Poonthong
Pramesak PoonthongPramesak Poonthong
Pramesak Poonthong
 
Shannon Griffiths Resume
Shannon Griffiths ResumeShannon Griffiths Resume
Shannon Griffiths Resume
 
LoriWashington
LoriWashingtonLoriWashington
LoriWashington
 
Gunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_ContinentalGunasekhar Karnatham_Profile_Continental
Gunasekhar Karnatham_Profile_Continental
 
Rkramer Resume
Rkramer ResumeRkramer Resume
Rkramer Resume
 
Pradeep Angadi CV
Pradeep Angadi CVPradeep Angadi CV
Pradeep Angadi CV
 

Alex Lumbard_RESUME_PROJECT_PORTFOLIO

  • 1. Alex Lumbard (408) 348-8727 Lumbard1@llnl.gov alumbard408@gmail.com Summary I thrive in an R&D environment where I bring my own perspective and experience to the table, adding to a working group as a whole. I live to design, prototype, experiment and revise. Manufacturing is paramount in these activities and manufacturing has always been where my skills clearly stand out. Experience Sr. Mechanical Engineering Technologist at Lawrence Livermore National Laboratory July 2011 - Present (5years) Design electro/mechanical systems Machine parts Assemble systems Experiment and troubleshoot Revisions High Vac Systems Process Improvement Quality Assurance CNC Milling Machine Operator at Rage Machine August 2004 - August 2008 (4 years 1 month) Set up and operation of Fadal 3 Axis Vertical Milling Center First articles Materials Removal and Recycling Product shipping, materials receiving Projects Senior Project at TerrainTrax August 2010 - July 2011 (1 year) Design, manufacture and market product, an environmentally friendly rubber track conversion system for four-wheel drive vehicles Skills & Expertise Designfor Manufacturing Mechanical Design FMEA Manufacturing Researchand Development Designof Experiments Solidworks MIG welding CNC Programming Mechanical Engineering Pro Engineer Automation Materials GD&T High Vacuum Machining Industrial Engineering Product Design CNC Manufacturing Engineering Radiation Safety Lean Manufacturing Education California Polytechnic State University-San Luis Obispo Bachelor of science, Industrial Technology, 2008 - 2011 De Anza College certification, CNC Machinist, programmer and operator, 2005 – 2008
  • 2. ALEXANDER LUMBARD Project Portfolio Senior Project Rubber track conversion system for Four-wheel drive vehicle
  • 3. Senior Project: TerrainTrax Duration: August 2010 - March 2011 Pictured, Complete concept prototype Design Full scale functioning Prototype complete
  • 4. Murphy bed/workstation Duration: Two months Designed Manufactured Slept in
  • 5. Dual end cv joint Duration: Two weeks Design Manufactured Installed Tested
  • 7. Custom front square drive shaft Duration: 20 hours Design Manufactured Installed Tested
  • 8. In-wall 500 gallon fish tank stand Duration: 20 hours Design Manufactured Installed
  • 9. Cabinet for lasing silica into structure Duration: 3 months Consulting on design Assembly/Revision of prototype