Project Fact Sheet
Project Name: Refurbishment of the Fluoroscopy Room and Patient Recovery Room
OT0039 - Barium Room
Location: X-Ray Imaging Department
Stage: Delivered
Client representative: Keith Marfleet / Imaging Services Lead
Andrew Delaney / Deputy Imaging Service Lead
Senior Project Manager (Capital): Alessandro Annunziata
Head of Capital Projects: John Brierley
Director of Estates: Phil Eagles
Project Update:
• Project completed in January 2016
• In Defects until January 2017
Project Brief:
In 2015 Milton Keynes University Hospital NHS Foundation Trust stated its intentions that the
provision of a clinical room ready for a future conversion to Fluoroscopy Room and Patient
Recovery Room was needed.
The benefits to Patients arising from the scheme proposals are:
• Provide an alternative area to undertake non fluoroscopic interventions e.g. Ultrasound
scans and ultrasound guided biopsies.
• Allow better use of the interventional room through receiving/recovering/monitoring
patients outside of the room. Datix’s are on the system indicating room blockage due to
waiting for hand over or bad availability.
• Provide a dedicated area for the recovery of patients within Imaging.
Construction works to create adequate clinical areas for effective delivery of services include
as follows:
• Alteration of partition walls to
reconfigure the layout of the area.
• Mechanical ventilation with hygienic
air grilles
• Hot and cold water services for
clinical sink and stainless steel scrub
up trough
• New fire smoke detectors
• New antiglare dimmable lights
panels in LED
• New heating and cooling at X-Ray
department with Daikin VRV IV Heat
Pump with Variable Refrigerant
Temperature (VRT)
• Presence Detectors (PIR sensors)
designed to switch off lights if an
area is unoccupied
• New wireless nurse call system
• New hygienic Glass Reinforced
Polyester (GRP) doors
Construction Project Team:
Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata
Main Contractor Parias Commercial Interiors Ltd
Project Facts & Figures:
Budget: £130,000.00 Funding Source: Capital
Tendering: single stage with priced schedule of works
Contract: JCT Minor works

More Related Content

Similar to MKUH Project Fact Sheet Barium Project 2015

BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building SuccessJason Holbrook, PMP
 
Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Island Health
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxShashidharaTV2
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDYPaul Harrison
 
Dag Bøhler's presentation from Hospital + Innovation 2015
Dag Bøhler's presentation from Hospital + Innovation 2015Dag Bøhler's presentation from Hospital + Innovation 2015
Dag Bøhler's presentation from Hospital + Innovation 2015Healthcare DENMARK
 
Corporate presentation of CASA Sólo Arquitectos
Corporate presentation of CASA Sólo ArquitectosCorporate presentation of CASA Sólo Arquitectos
Corporate presentation of CASA Sólo ArquitectosCASA Solo Arquitectos
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless Care
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless CareNearly the Holy Grail – Clinical Portals for Faster, Better and Borderless Care
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless CareNHSScotlandEvent
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...JISC's Green ICT Programme
 
Nottingham University Hospital have implemented advanced wireless solutions i...
Nottingham University Hospital have implemented advanced wireless solutions i...Nottingham University Hospital have implemented advanced wireless solutions i...
Nottingham University Hospital have implemented advanced wireless solutions i...Plan de Calidad para el SNS
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout pptSandeep Singh
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...Environmental Protection Agency, Ireland
 
End of Internship presentation by John
End of Internship presentation by JohnEnd of Internship presentation by John
End of Internship presentation by JohnAdedigba John
 
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBC
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBCIDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBC
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBCDanfoss India
 
Innovation day 2013 3.1 ann-rose gustin (flux medical) - when nature fails,...
Innovation day 2013   3.1 ann-rose gustin (flux medical) - when nature fails,...Innovation day 2013   3.1 ann-rose gustin (flux medical) - when nature fails,...
Innovation day 2013 3.1 ann-rose gustin (flux medical) - when nature fails,...Verhaert Masters in Innovation
 

Similar to MKUH Project Fact Sheet Barium Project 2015 (20)

BIM at Stanford - Building Success
BIM at Stanford - Building SuccessBIM at Stanford - Building Success
BIM at Stanford - Building Success
 
Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013Campbell River Community Presentation Feb 21, 2013
Campbell River Community Presentation Feb 21, 2013
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptx
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
Dag Bøhler's presentation from Hospital + Innovation 2015
Dag Bøhler's presentation from Hospital + Innovation 2015Dag Bøhler's presentation from Hospital + Innovation 2015
Dag Bøhler's presentation from Hospital + Innovation 2015
 
Corporate presentation of CASA Sólo Arquitectos
Corporate presentation of CASA Sólo ArquitectosCorporate presentation of CASA Sólo Arquitectos
Corporate presentation of CASA Sólo Arquitectos
 
Guys Hospital[1]
Guys Hospital[1]Guys Hospital[1]
Guys Hospital[1]
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless Care
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless CareNearly the Holy Grail – Clinical Portals for Faster, Better and Borderless Care
Nearly the Holy Grail – Clinical Portals for Faster, Better and Borderless Care
 
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...Ppt5   exp lonodn - kevin cope & alex yakimov ( imperial college )  data cent...
Ppt5 exp lonodn - kevin cope & alex yakimov ( imperial college ) data cent...
 
Nottingham University Hospital have implemented advanced wireless solutions i...
Nottingham University Hospital have implemented advanced wireless solutions i...Nottingham University Hospital have implemented advanced wireless solutions i...
Nottingham University Hospital have implemented advanced wireless solutions i...
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout ppt
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
 
End of Internship presentation by John
End of Internship presentation by JohnEnd of Internship presentation by John
End of Internship presentation by John
 
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBC
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBCIDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBC
IDC – 2, Reliance Corporate Park, Navi Mumbai - Green Campus certified by IGBC
 
Innovation day 2013 3.1 ann-rose gustin (flux medical) - when nature fails,...
Innovation day 2013   3.1 ann-rose gustin (flux medical) - when nature fails,...Innovation day 2013   3.1 ann-rose gustin (flux medical) - when nature fails,...
Innovation day 2013 3.1 ann-rose gustin (flux medical) - when nature fails,...
 
Recycling of Community Occupational Therapy Equipment
Recycling of Community Occupational Therapy EquipmentRecycling of Community Occupational Therapy Equipment
Recycling of Community Occupational Therapy Equipment
 
Chemo Daycare unit
Chemo Daycare unitChemo Daycare unit
Chemo Daycare unit
 
FXB_Mission Critical
FXB_Mission CriticalFXB_Mission Critical
FXB_Mission Critical
 

More from Alessandro Annunziata

More from Alessandro Annunziata (11)

MKUH X-Ray room 3 & 4 - After works
MKUH X-Ray room 3 & 4 - After worksMKUH X-Ray room 3 & 4 - After works
MKUH X-Ray room 3 & 4 - After works
 
MKUH Cook Chill project - Before & after works
MKUH Cook Chill project - Before & after worksMKUH Cook Chill project - Before & after works
MKUH Cook Chill project - Before & after works
 
MKUH Barium project -After works
MKUH Barium project -After worksMKUH Barium project -After works
MKUH Barium project -After works
 
MKUH Barium project - Before works
MKUH Barium project - Before worksMKUH Barium project - Before works
MKUH Barium project - Before works
 
MKUH Physiotherapy Hydropool refurbishment - After works
MKUH Physiotherapy Hydropool refurbishment - After worksMKUH Physiotherapy Hydropool refurbishment - After works
MKUH Physiotherapy Hydropool refurbishment - After works
 
MKUH Physiotherapy Hydropool refurbishment - Before works
MKUH Physiotherapy Hydropool refurbishment - Before worksMKUH Physiotherapy Hydropool refurbishment - Before works
MKUH Physiotherapy Hydropool refurbishment - Before works
 
Maternity Murray ward - After works
Maternity Murray ward - After worksMaternity Murray ward - After works
Maternity Murray ward - After works
 
Maternity Murray ward - Before refurbishment
Maternity Murray ward - Before refurbishmentMaternity Murray ward - Before refurbishment
Maternity Murray ward - Before refurbishment
 
TB Clinic After
TB Clinic AfterTB Clinic After
TB Clinic After
 
TB Clinic Before
TB Clinic BeforeTB Clinic Before
TB Clinic Before
 
TB Clinic Proposed Layout
TB Clinic Proposed LayoutTB Clinic Proposed Layout
TB Clinic Proposed Layout
 

MKUH Project Fact Sheet Barium Project 2015

  • 1. Project Fact Sheet Project Name: Refurbishment of the Fluoroscopy Room and Patient Recovery Room OT0039 - Barium Room Location: X-Ray Imaging Department Stage: Delivered Client representative: Keith Marfleet / Imaging Services Lead Andrew Delaney / Deputy Imaging Service Lead Senior Project Manager (Capital): Alessandro Annunziata Head of Capital Projects: John Brierley Director of Estates: Phil Eagles Project Update: • Project completed in January 2016 • In Defects until January 2017 Project Brief: In 2015 Milton Keynes University Hospital NHS Foundation Trust stated its intentions that the provision of a clinical room ready for a future conversion to Fluoroscopy Room and Patient Recovery Room was needed. The benefits to Patients arising from the scheme proposals are: • Provide an alternative area to undertake non fluoroscopic interventions e.g. Ultrasound scans and ultrasound guided biopsies. • Allow better use of the interventional room through receiving/recovering/monitoring patients outside of the room. Datix’s are on the system indicating room blockage due to waiting for hand over or bad availability. • Provide a dedicated area for the recovery of patients within Imaging. Construction works to create adequate clinical areas for effective delivery of services include as follows: • Alteration of partition walls to reconfigure the layout of the area. • Mechanical ventilation with hygienic air grilles • Hot and cold water services for clinical sink and stainless steel scrub up trough • New fire smoke detectors • New antiglare dimmable lights panels in LED • New heating and cooling at X-Ray department with Daikin VRV IV Heat Pump with Variable Refrigerant Temperature (VRT) • Presence Detectors (PIR sensors) designed to switch off lights if an area is unoccupied • New wireless nurse call system • New hygienic Glass Reinforced Polyester (GRP) doors Construction Project Team: Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata Main Contractor Parias Commercial Interiors Ltd Project Facts & Figures: Budget: £130,000.00 Funding Source: Capital Tendering: single stage with priced schedule of works Contract: JCT Minor works