Note: Application Life Cycle Management (ALM) previously known as Quality Center(QC) is a set of
software products designed for accelerating the delivery of secure, reliable modern applications. It is
a combination of a common platform, several key applications and a dashboard targeted at
managing the core lifecycle of applications. Application lifecycle management focuses on the core
lifecycle from design through readiness for delivery to operations. It includes application
development solutions and application testing solutions. HP Application Lifecycle Management is
developed and marketed by the HP Software Division.
Application lifecycle management is designed to support the key stakeholders responsible for
delivering applications as they progress through their lifecycle. It focuses on the core lifecycle from
design through readiness for delivery to operations.
Stable release/Latest Version available in the market: 12.0
Q1. What is Quality Center?
HP Quality Center is Web based Test Management tool. We can access Quality Center over the
internet or intranet, via a Web browser. It involves interrelated steps such as defining release,
developing requirement, designing and execution of tests, monitoring and reporting defects. Quality
Center or Application Life Cycle Management(ALM) simplifies and organizes application
management by giving us systematic control over the process. It helps in creating framework and
foundation for application management workflow. Quality center features a system for organizing
and tracking application release, enabling us to align business priorities and quality expectation with
our project’s requirement, test and defects.
Q2. What is Requirement Traceability Matrix (RTM)? Expain.
Requirement Trace-ability matrix is matrix to map between requirements and test cases or test
scenarios. The traceability matrix links a business requirement to its corresponding functional
requirement Traceability Matrix (RTM) is updated by Development and Testing teams and used by
stake holders of the project to check if all the requirements are addressed, implemented and Tested.
Traceability Matrix allows forward or backward tracking of Business requirement, Functional
Requirement, Design Code and Testing.
 Consider a scenario where, you already have thousands of test cases developed from
the requirements. Now a requirement is changed or modified.
 Obviously you will need to change your test cases to meet this new requirement
 But , by now your test case suite is very large and it is very difficult to trace the test cases
affected by the test cases
 Instead, if the requirements were numbered and were referenced in the test case suite it
would have been very easy to track the test cases that are affected. This is nothing but
Traceability
 If a Test Case fails, traceability helps determine the corresponding functionality easily .
 It also helps ensure that all requirements are tested.
Traceability Matrix is a living document that would be updated whenever there are approved
additions or changes to Business / Functional Requirements, Design, Unit / Integration / Functional
Test Cases and Defects.
For More Software QA Tutorials and Interview preparations please visit: www.tonmoyelearn.com
Q3. What are the modules of Quality Center?
The Quality Center modules are:
 Management Module: This module includes following sub modules:
1. Release module: Enable us to define release and cycles for the application
management process.
2. Libraries module: Enables us to define libraries to track changes in project, reuse
entities in project, or share entities across multiple projects.
 Requirement Module: Helps us to manage requirements. This includes defining what
we are testing, defining requirement topics and items, also analyzing requirements.
 Test Plan: Enable us to develop and manage test in a hierarchical tree-structure. Tests
can be linked to requirement and defects.
 Test Resources: Enables us to manage test resources in a hierarchical tree structure.
Tests resources can be associated with tests.
 Test lab: Enables us to run tests and analyze the results.
 Defect Module: Helps us to report defects, determine, repair priorities and reopen
defects.
 Dashboard: Helps to create graphs, reports and excel reports.
Q4. How many built in tables does Quality Center have?
There are six tables accessible to user via QC’s customized project interface:
 Test Table
 Test Step Table
 Test Set Table
 Run Table
 Defect Table
 Requirement Table
Q5. What are the benefits of Requirement Traceability?
Requirement Traceability defines a relationship between two or more requirements. When analyzing the
impact of a change proposed in specific requirements, the traceability links indicate the other requirements
in the requirements tree; we can establish traceability between the requirements. Using this tab in the
Requirement Details view, you can add traceability link to and from selected requirement. Trace from links
indicates requirements that affect a selected requirement. Trace to links indicates requirements that are
affected by a selected requirement. When a requirement change QC alerts the affected requirements this
can be seen by all users. QC sends email notification to the authors of the affected requirements.
Q6. Can We Convert or Generate Test from the requirements?
Yes we can convert and also generate test case from the requirements.
There are two methods we can use to generate tests from the requirements:
 Convert Requirement to test: convert requirement to test in a specified subject in the test
plan tree. We can convert selected requirement or all requirements in the requirements
tree.
 Generate a test from requirements: convert requirement to a test in a specified subject in
the test plan tree and a specified test set in the Test Lab modules. This method enables
us to quickly run a test when analyzing our requirements.
Q7. Explain Version Control.
Version Control helps us to keep track of changes made to entities in our project including
requirements. In this we can create and manage QC entities while maintaining previous version of
those entities in requirements. To make changes in an entity in a version control enabled project,
first we have to check out the entity. When we check out an entity, QC locks the entity, preventing
other users from overwriting any changes we make. The checked out version of the entity is not
visible to the other user.
We can check out an entity in the following ways:
 Checking Out Entities Automatically
 Checking Out Entities Manually
Q8.Can we create a QTP test from QC?
Yes we can create QTP test from QC but we must first make sure QTP has the ability to execute
tests from Quality Center. Please ensure the following option in QTP Run Settings is enabled:
When QTP is enabled, follow the below steps to schedule and execute tests from Quality Center:
1. Login to QualityCenter and Navigate to Test Lab Module
2. After selecting the correct Test Set, Click the Execution Flow Tab.
3. Right-clickon the test that requires configuration of Time Dependencyand click Test Run
Schedule.
4. In the Run Schedule window, select the Time Dependency tab. The time and date of
execution can be configured.
5. Time dependency will be added to the relevant test.
6. After time dependency has been added, navigate back to the Execution Grid pane. From
the Execution Grid, select the teststo be run at the designated date and time.
7. From the AutomaticRunner dialog, click Run All.
8. Once Run All is clicked from the AutomaticRunner dialog, the test status will change to
Waiting and QC will fire the tests to be run at the scheduled date and time:
9. QC will fire the tests in the sequence configured in the Execution Flow pane. The Test Run
Scheduler will show all the tests that were selected and are executing and are to be
executed.
Q9. What is Purge Run?
Purge Run is used to delete old test run result in project. By default Purge Run delete all the run
result in the selected test sets. Purge run can be used to:
 Delete only Test Runs: In this we can select a period of time before which we want to
delete test run result
 Delete only Run Steps: In this we can select a period of time before which we want to
delete run steps.
Q10. What is test set notification, and when we need it?
Test set notification is used to inform specified user. We can instruct QC to send email to a specified
user if any of the following events occurs for a test set:
 Any test is the test set fails.
 Test in the test set fails due to reason other than the test logic itself, Environmental
failure could include. Ex. Functional call not returning access violations, version
incompatibility between application components, a missing DLL.
 All tests in the test set that were run have been finished running. But this does not
include tests that are not executed.
Q11. What is the need of Host Manager?
Using host Manager we can run test on a host connected to our network. Using the Host Manager
Dialog box we can create a list of available host for test execution and also organize hosts into
groups to be used for a specific project.
Following condition must be kept in mind before executing test on remote host:
1. QTP must be installed on each machine where you wish to execute the tests.
2. QTP must be configured to allow other HP products to run
3. QTP Connectivity add-in installed on both the Host (QTP) machines aswell as the QC
machine.
4. Define your host machines in the Host Manager of QC.
5. Ensure that Object Repositories and/or Function Libraries which are used byall scripts
are ‘shared’and accessible from all machines.
Q12. Explain Linking Defect to test in Quality Control.
We can link a test in our test plan to a specific defect in the Defect Grid. This is useful, for example,
when a new test is created specifically for a known defect. By creating a linking, we can determine if
the test should be run based on the status of the defect. We can also link the defect to other entities,
such as requirements. A defect can be linked directly or indirectly to an entity. When we add a defect
link to an entity, QC adds a direct link to this entity and indirect link to other related entities. When we
link a defect to run step, it adds an indirect link to its run, test instance, test set and test. If the same
test is covered by a requirement, an indirect link is also added to the requirement, but indirect
linkage is one directional flow.
Q13. What is Matching Defects?
Matching Defects enables us to eliminate duplicate or similar defects in project. When we add a new
defect, QC stores list of keywords from the Summary and Description Fields. When we search for
similar defects, keywords in these fields are matched against other defects. Keywords are more than
two characters and they are not case sensitive. We have two methods to conduct search of similar
defects.
 Finding similar Defects: compare a selected defect with all other existing defects in
project.
 Finding similar Text: compare a specific test string against all other existing defects in
project.
Q14. What is Defect Tracking?
Defect Tracking means locating and repairing application defect efficiently. Defects can be added or
detected to project by the users during all stages of application management process. The defect
tracking workflow consists of following:
 Adding Defects: After finding new defect we submit to QC project. The project stores
defect information that can be accessed by authorized users.
 Reviewing New Defects: Reviewing all new defects and decide which one to fix.
 Repairing Open Defects: Fix the Open defects.
 Testing a New Application Build: Run test on the new build of the application.
 Analyzing Defect Data: View Defect Report to see how many defects were resolved, and
how many still remain open.
Q15. How many types of report are there in QC?
We can generate reports any time during the testing process from each QC module, using default or
customized setting. We can apply filters and sort conditions, and display information according to our
specification. Following types are reports are available to us in QC:
 Requirement Module Reports: Standard Requirements, Tabular, Requirement with
coverage test, requirement with Coverage test and Steps, requirement with linked
Defects, requirements with Traceability, report selected.
 Test Plan Module Reports: standard test planning, subject tree, tests with design steps,
tests with covered Requirements, tests with linked Defect, report Selected,
 Test Lab Module Reports: current test set, cross test set, test set Hierarchy with tests,
cross test set with tests, execution notification.
 Defects Module Reports: standard Defects, Tabular defects, fixed or rejected Defects,
report selected.
Q16. How many types of Graphs are there in QC?
Following types are reports are available to us in QC:
 Requirement Module Graphs: requirements summary graph, requirements progress
graph, requirements coverage graph, requirements- trend graph, graph wizard.
 Test Plan Module Graphs: test planning summary graph, test planning progress graph,
test plan trend graph, graph wizard,
 Test Lab Module Graph: test execution summary graph( current test set), test execution
progress graph(current test set), test execution summary graph(cross test set), test
execution progress graph(cross test set) , graph wizard.
 Defect Module Graph: defect summary graph, defect progress graph, defect age graph,
defect trend graph, graph wizard.
Q17. What are the features of Quality Center?
Features of QC are listed below:
 QC helps to maintain project database of test that covers all functionality of application.
 QC offers integration with HP testing tools (WinRunner, QTP and Load Runner) as well
as third party tools.
 QC provides an intuitive and efficient method for scheduling and executing test sets,
collecting test results, and analyzing the data.
 Qc helps in defect tracking, enabling to monitor defects closely from initial detection to
resolution.
 By linking QC to email system, defect tracking information can be shared by all
application development, quality assurance and customer support.
Q18. How to use Quality Centre in real time project?
After completing the test cases, we do:
1. Export the test cases into Quality Centre.
2. The test cases will be loaded in the test plan module.
3. When execution is started. We move the test cases from test plan tab to the test lab
module
4. In test lab, we execute the test cases and put as pass or fail or incomplete. We generate the
graph in the test lab for dailyreport and sent to the specific user.
5. If we got anydefects and raise the defects in the defect module. When raising the defects,
attach the defectswith the screen shot.
Q19. How to map the requirements with test cases in Quality Centre?
For mapping the requirement with test cases we do:
1. In requirements tab select coverage view
2. Select requirement byclicking on parent/child or grandchild
3. On right hand side (In coverage view window) another window will appear. It has two
tabs:
-Tests coverage
-Details
Test coverage tab will be selected by default or you click on it.
4. Click on select testsbutton a new window will appear on right hand side and you will see
a list of all tests. You cans elect anytest case you want to map with your requirements.
Q20. How can we use Filter in QC?
We can use Filter on Quality Center data to display only those record that meets the criteria that we
define. We can assign a single item (such as failed) or logical expression (such as Passed or Failed)
to a filter. Only record meeting all the criteria of the filter appear in the grid or tree. In addition, we
can define multiple filters.
For example, we can define the Status filter as Failed and the tester as “Rohit or Mayank”. Only test
runs performed by Rohit and Mayank are displayed.
Q21. What is Unattached Folder in Test Plan?
We delete a folder or test from the test plan tree. When we delete a folder, we can choose to delete
the folder only, or the folder, its subfolders, and test. If we choose to delete the folder only, all the
tests are moved to unattached folder in the test plan tree. If we choose to delete a folder and test, all
subfolder and test under the selected folder are deleted permanently. If we delete a test, the test and
test script are deleted permanently.
Q22. What is difference between Generate Test from the requirements and Convert
requirements to test?
When we convert the requirements to test in a specified subject in the test plan tree where as in
generating test case, the test case generates from requirements are stored in a specified subject in
a test plan tree and a specific test set in Test Lab module. And by default we cannot generate a test
for the following, which do not enable to coverage:
 Business
 Folder
 Groups
Q23. Is ‘Not covered’ and ‘Not run’ status are same?
No, Not Covered status means all those requirements for which the test cases are not written where
as Not Run status means all those requirements for which test cases are written but are not run.
Q24. What is the advantage of libraries in Quality center?
A library represents a collection of entities in a QC, including their relationship to each other. When
dealing with many similar projects, it offers the advantage of not having repeatedly created entities.
Libraries can be imported form Project A into Project B, compare against each other, or even
synchronized. A library also allows one to collect the same entities as in versioning. With Quality
Center Premier Edition, defects are not included, but they can be shared with the new HP Quality
Center Synchronizer manually among several QC project.
Q25. What types of database are used in QC?
When we create a QC project, We need to store and manage the data generated and collected by
Quality Center. Each project is supported by a database that stores project information.
The following database application could be used to store and manage Quality Center information:
 Oracle 9.2.0.6 Standard/Enterprise Edition
 Oracle 10.2.0.3
 Microsoft SQL Server 2005 (SP2).
Q26. What is meant by test lab in Quality Centre?
Test lab is a part of Quality Centre where we can execute our test on different cycles creating test
tree for each one of them. We need to add test to these test trees from the tests, which are placed
under test plan in the project. Internally Quality Centre will refer to this test while running then in the
test lab.
Q27. How do you run reports from Quality Centre.
This is how you do it
1. Open the QualityCentre project
2. Displays the requirements modules
3. Choose report
Analysis -> reports -> standard requirements report
Q27. Can we upload test cases from an excel sheet into Quality Centre?
Yes go to Add-In menu Quality Centre, find the excel add-In, and install it in your machine.
Now open excel, you can find the new menu option export to Quality Centre. Rest of the procedure
is self explanatory.
Q28. What is the need of Host Manager?
Using host Manager we can run test on a host connected to our network. Using the Host Manager
Dialog box we can create a list of available host for test execution and also organize hosts into
groups to be used for a specific project.
Following condition must be kept in mind before executing test on remote host:
1. QTP must be installed on each machine where you wish to execute the tests.
2. QTP must be configured to allow other HPproducts to run
3. QTP Connectivity add-in installed on both the Host (QTP) machines as well as the QC
machine.
4. Define your host machines in the Host Manager of QC.
5. Ensure that Object Repositories and/or Function Libraries which are used by all scripts are
‘shared’and accessible from all machines.
Q29. What is test set notification, and when we need it?
Test set notification is used to inform specified user. We can instruct QC to send email to a specified
user if any of the following events occurs for a test set:
Any test is the test set fails.
Test in the test set fails due to reason other than the test logic itself, Environmental failure could
include. Ex. Functional call not returning access violations, version incompatibility between
application components, a missing DLL.
All tests in the test set that were run have been finished running. But this does not include tests that
are not executed.
Q30. How to map the requirements with test cases in Quality Centre?
For mapping the requirement with test cases we do:
1. In requirements tab select coverage view
2. Select requirement byclicking on parent/child or grandchild
3. On right hand side (In coverage view window) another window will appear. It has two tabs:
-Tests coverage
-Details
Test coverage tab will be selected by default or you click on it.
4. Click on select testsbutton a new window will appear on right hand side and you will see a
list of all tests. You cans elect any test case you want to map with your requirements.
Q31. What are the benefits of using Quality Center?
 Quality center is one of the best test management tools in the market. It has a lot of
features and can be accessed through an IE browser.
 It has a different set of modules and we can create releases, requirement and its
traceability, test plan, test lab, logging defects in defect modules.
 Different groups can be created like the BA’s, Developers and testers and it acts as a
centralized point of control.
 Defect assignment can be easily done in QC and in turn QC itself can generate emails to
intimate the responsible person assigned to a particular activity.
 QC provides various customization filters which can be used for creating reports and
graphs.
 QC can be integrated with QTP and HP Load Runner and HP Performance Center
 QC supports virtual environments like Citrix XenApp 6.0, VMware ESX 5.0 and ESXi 5.0
(SP3).
For More Software QA Tutorials and Interview preparations please visit: www.tonmoyelearn.com
Q32. What is the default database in Quality Center?
SQL Server.

More Related Content

Similar to hp_alm.docx

Qa interview questions and answers
Qa interview questions and answersQa interview questions and answers
Qa interview questions and answersGaruda Trainings
 
An Ultimate Guide to Continuous Testing in Agile Projects.pdf
An Ultimate Guide to Continuous Testing in Agile Projects.pdfAn Ultimate Guide to Continuous Testing in Agile Projects.pdf
An Ultimate Guide to Continuous Testing in Agile Projects.pdfKMSSolutionsMarketin
 
Real Time software Training in Nagercoil
Real Time software Training in NagercoilReal Time software Training in Nagercoil
Real Time software Training in Nagercoiljclick2
 
Alm qc 11_training
Alm qc 11_trainingAlm qc 11_training
Alm qc 11_trainingjayant25
 
Qa interview questions and answers
Qa interview questions and answersQa interview questions and answers
Qa interview questions and answerssjayasankar2k8
 
Software Quality Assurance training by QuontraSolutions
Software Quality Assurance training by QuontraSolutionsSoftware Quality Assurance training by QuontraSolutions
Software Quality Assurance training by QuontraSolutionsQUONTRASOLUTIONS
 
Test case management
Test case managementTest case management
Test case managementAshari Juang
 
Agile methodology
Agile methodologyAgile methodology
Agile methodologybipulpwc
 
Tools for Software Verification and Validation
Tools for Software Verification and ValidationTools for Software Verification and Validation
Tools for Software Verification and Validationaliraza786
 
Impact of QAOps on Software Quality
Impact of QAOps on Software QualityImpact of QAOps on Software Quality
Impact of QAOps on Software QualityMindfire LLC
 
software testing strategies
software testing strategiessoftware testing strategies
software testing strategiesHemanth Gajula
 
Software Test Automation - Best Practices
Software Test Automation - Best PracticesSoftware Test Automation - Best Practices
Software Test Automation - Best PracticesArul Selvan
 
Test planning.ppt
Test planning.pptTest planning.ppt
Test planning.pptUmmERayyan2
 
Moogilu qa-case study (Software Testing)
Moogilu qa-case study (Software Testing)Moogilu qa-case study (Software Testing)
Moogilu qa-case study (Software Testing)Jagadish Channagiri
 
Testing throughout the software life cycle
Testing throughout the software life cycleTesting throughout the software life cycle
Testing throughout the software life cycleEmi Rizki Ayunanda
 
Test Director Ppt Training
Test Director Ppt TrainingTest Director Ppt Training
Test Director Ppt Trainingshrikantg
 

Similar to hp_alm.docx (20)

Qa interview questions and answers
Qa interview questions and answersQa interview questions and answers
Qa interview questions and answers
 
An Ultimate Guide to Continuous Testing in Agile Projects.pdf
An Ultimate Guide to Continuous Testing in Agile Projects.pdfAn Ultimate Guide to Continuous Testing in Agile Projects.pdf
An Ultimate Guide to Continuous Testing in Agile Projects.pdf
 
Real Time software Training in Nagercoil
Real Time software Training in NagercoilReal Time software Training in Nagercoil
Real Time software Training in Nagercoil
 
Alm qc 11_training
Alm qc 11_trainingAlm qc 11_training
Alm qc 11_training
 
Qa interview questions and answers
Qa interview questions and answersQa interview questions and answers
Qa interview questions and answers
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
Software Quality Assurance training by QuontraSolutions
Software Quality Assurance training by QuontraSolutionsSoftware Quality Assurance training by QuontraSolutions
Software Quality Assurance training by QuontraSolutions
 
Test case management
Test case managementTest case management
Test case management
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Tools for Software Verification and Validation
Tools for Software Verification and ValidationTools for Software Verification and Validation
Tools for Software Verification and Validation
 
Impact of QAOps on Software Quality
Impact of QAOps on Software QualityImpact of QAOps on Software Quality
Impact of QAOps on Software Quality
 
software testing strategies
software testing strategiessoftware testing strategies
software testing strategies
 
Software Test Automation - Best Practices
Software Test Automation - Best PracticesSoftware Test Automation - Best Practices
Software Test Automation - Best Practices
 
Txet Document
Txet DocumentTxet Document
Txet Document
 
Test planning.ppt
Test planning.pptTest planning.ppt
Test planning.ppt
 
Moogilu qa-case study (Software Testing)
Moogilu qa-case study (Software Testing)Moogilu qa-case study (Software Testing)
Moogilu qa-case study (Software Testing)
 
Testing throughout the software life cycle
Testing throughout the software life cycleTesting throughout the software life cycle
Testing throughout the software life cycle
 
Test Director Ppt Training
Test Director Ppt TrainingTest Director Ppt Training
Test Director Ppt Training
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 

Recently uploaded

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 

Recently uploaded (20)

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 

hp_alm.docx

  • 1. ALM Interview Questions Note: Application Life Cycle Management (ALM) previously known as Quality Center(QC) is a set of software products designed for accelerating the delivery of secure, reliable modern applications. It is a combination of a common platform, several key applications and a dashboard targeted at managing the core lifecycle of applications. Application lifecycle management focuses on the core lifecycle from design through readiness for delivery to operations. It includes application development solutions and application testing solutions. HP Application Lifecycle Management is developed and marketed by the HP Software Division. Application lifecycle management is designed to support the key stakeholders responsible for delivering applications as they progress through their lifecycle. It focuses on the core lifecycle from design through readiness for delivery to operations. Stable release/Latest Version available in the market: 12.0 Q1. What is Quality Center? HP Quality Center is Web based Test Management tool. We can access Quality Center over the internet or intranet, via a Web browser. It involves interrelated steps such as defining release, developing requirement, designing and execution of tests, monitoring and reporting defects. Quality Center or Application Life Cycle Management(ALM) simplifies and organizes application management by giving us systematic control over the process. It helps in creating framework and foundation for application management workflow. Quality center features a system for organizing and tracking application release, enabling us to align business priorities and quality expectation with our project’s requirement, test and defects. Q2. What is Requirement Traceability Matrix (RTM)? Expain. Requirement Trace-ability matrix is matrix to map between requirements and test cases or test scenarios. The traceability matrix links a business requirement to its corresponding functional requirement Traceability Matrix (RTM) is updated by Development and Testing teams and used by stake holders of the project to check if all the requirements are addressed, implemented and Tested. Traceability Matrix allows forward or backward tracking of Business requirement, Functional Requirement, Design Code and Testing.  Consider a scenario where, you already have thousands of test cases developed from the requirements. Now a requirement is changed or modified.  Obviously you will need to change your test cases to meet this new requirement  But , by now your test case suite is very large and it is very difficult to trace the test cases affected by the test cases
  • 2.  Instead, if the requirements were numbered and were referenced in the test case suite it would have been very easy to track the test cases that are affected. This is nothing but Traceability  If a Test Case fails, traceability helps determine the corresponding functionality easily .  It also helps ensure that all requirements are tested. Traceability Matrix is a living document that would be updated whenever there are approved additions or changes to Business / Functional Requirements, Design, Unit / Integration / Functional Test Cases and Defects. For More Software QA Tutorials and Interview preparations please visit: www.tonmoyelearn.com Q3. What are the modules of Quality Center? The Quality Center modules are:  Management Module: This module includes following sub modules: 1. Release module: Enable us to define release and cycles for the application management process. 2. Libraries module: Enables us to define libraries to track changes in project, reuse entities in project, or share entities across multiple projects.  Requirement Module: Helps us to manage requirements. This includes defining what we are testing, defining requirement topics and items, also analyzing requirements.  Test Plan: Enable us to develop and manage test in a hierarchical tree-structure. Tests can be linked to requirement and defects.  Test Resources: Enables us to manage test resources in a hierarchical tree structure. Tests resources can be associated with tests.  Test lab: Enables us to run tests and analyze the results.  Defect Module: Helps us to report defects, determine, repair priorities and reopen defects.  Dashboard: Helps to create graphs, reports and excel reports. Q4. How many built in tables does Quality Center have? There are six tables accessible to user via QC’s customized project interface:  Test Table  Test Step Table  Test Set Table  Run Table  Defect Table  Requirement Table Q5. What are the benefits of Requirement Traceability? Requirement Traceability defines a relationship between two or more requirements. When analyzing the impact of a change proposed in specific requirements, the traceability links indicate the other requirements in the requirements tree; we can establish traceability between the requirements. Using this tab in the Requirement Details view, you can add traceability link to and from selected requirement. Trace from links indicates requirements that affect a selected requirement. Trace to links indicates requirements that are affected by a selected requirement. When a requirement change QC alerts the affected requirements this can be seen by all users. QC sends email notification to the authors of the affected requirements.
  • 3. Q6. Can We Convert or Generate Test from the requirements? Yes we can convert and also generate test case from the requirements. There are two methods we can use to generate tests from the requirements:  Convert Requirement to test: convert requirement to test in a specified subject in the test plan tree. We can convert selected requirement or all requirements in the requirements tree.  Generate a test from requirements: convert requirement to a test in a specified subject in the test plan tree and a specified test set in the Test Lab modules. This method enables us to quickly run a test when analyzing our requirements. Q7. Explain Version Control. Version Control helps us to keep track of changes made to entities in our project including requirements. In this we can create and manage QC entities while maintaining previous version of those entities in requirements. To make changes in an entity in a version control enabled project, first we have to check out the entity. When we check out an entity, QC locks the entity, preventing other users from overwriting any changes we make. The checked out version of the entity is not visible to the other user. We can check out an entity in the following ways:  Checking Out Entities Automatically  Checking Out Entities Manually Q8.Can we create a QTP test from QC? Yes we can create QTP test from QC but we must first make sure QTP has the ability to execute tests from Quality Center. Please ensure the following option in QTP Run Settings is enabled: When QTP is enabled, follow the below steps to schedule and execute tests from Quality Center: 1. Login to QualityCenter and Navigate to Test Lab Module 2. After selecting the correct Test Set, Click the Execution Flow Tab. 3. Right-clickon the test that requires configuration of Time Dependencyand click Test Run Schedule. 4. In the Run Schedule window, select the Time Dependency tab. The time and date of execution can be configured. 5. Time dependency will be added to the relevant test. 6. After time dependency has been added, navigate back to the Execution Grid pane. From the Execution Grid, select the teststo be run at the designated date and time. 7. From the AutomaticRunner dialog, click Run All. 8. Once Run All is clicked from the AutomaticRunner dialog, the test status will change to
  • 4. Waiting and QC will fire the tests to be run at the scheduled date and time: 9. QC will fire the tests in the sequence configured in the Execution Flow pane. The Test Run Scheduler will show all the tests that were selected and are executing and are to be executed. Q9. What is Purge Run? Purge Run is used to delete old test run result in project. By default Purge Run delete all the run result in the selected test sets. Purge run can be used to:  Delete only Test Runs: In this we can select a period of time before which we want to delete test run result  Delete only Run Steps: In this we can select a period of time before which we want to delete run steps. Q10. What is test set notification, and when we need it? Test set notification is used to inform specified user. We can instruct QC to send email to a specified user if any of the following events occurs for a test set:  Any test is the test set fails.  Test in the test set fails due to reason other than the test logic itself, Environmental failure could include. Ex. Functional call not returning access violations, version incompatibility between application components, a missing DLL.  All tests in the test set that were run have been finished running. But this does not include tests that are not executed. Q11. What is the need of Host Manager? Using host Manager we can run test on a host connected to our network. Using the Host Manager Dialog box we can create a list of available host for test execution and also organize hosts into groups to be used for a specific project. Following condition must be kept in mind before executing test on remote host: 1. QTP must be installed on each machine where you wish to execute the tests. 2. QTP must be configured to allow other HP products to run 3. QTP Connectivity add-in installed on both the Host (QTP) machines aswell as the QC machine. 4. Define your host machines in the Host Manager of QC. 5. Ensure that Object Repositories and/or Function Libraries which are used byall scripts are ‘shared’and accessible from all machines. Q12. Explain Linking Defect to test in Quality Control. We can link a test in our test plan to a specific defect in the Defect Grid. This is useful, for example, when a new test is created specifically for a known defect. By creating a linking, we can determine if the test should be run based on the status of the defect. We can also link the defect to other entities,
  • 5. such as requirements. A defect can be linked directly or indirectly to an entity. When we add a defect link to an entity, QC adds a direct link to this entity and indirect link to other related entities. When we link a defect to run step, it adds an indirect link to its run, test instance, test set and test. If the same test is covered by a requirement, an indirect link is also added to the requirement, but indirect linkage is one directional flow. Q13. What is Matching Defects? Matching Defects enables us to eliminate duplicate or similar defects in project. When we add a new defect, QC stores list of keywords from the Summary and Description Fields. When we search for similar defects, keywords in these fields are matched against other defects. Keywords are more than two characters and they are not case sensitive. We have two methods to conduct search of similar defects.  Finding similar Defects: compare a selected defect with all other existing defects in project.  Finding similar Text: compare a specific test string against all other existing defects in project. Q14. What is Defect Tracking? Defect Tracking means locating and repairing application defect efficiently. Defects can be added or detected to project by the users during all stages of application management process. The defect tracking workflow consists of following:  Adding Defects: After finding new defect we submit to QC project. The project stores defect information that can be accessed by authorized users.  Reviewing New Defects: Reviewing all new defects and decide which one to fix.  Repairing Open Defects: Fix the Open defects.  Testing a New Application Build: Run test on the new build of the application.  Analyzing Defect Data: View Defect Report to see how many defects were resolved, and how many still remain open. Q15. How many types of report are there in QC? We can generate reports any time during the testing process from each QC module, using default or customized setting. We can apply filters and sort conditions, and display information according to our specification. Following types are reports are available to us in QC:  Requirement Module Reports: Standard Requirements, Tabular, Requirement with coverage test, requirement with Coverage test and Steps, requirement with linked Defects, requirements with Traceability, report selected.  Test Plan Module Reports: standard test planning, subject tree, tests with design steps, tests with covered Requirements, tests with linked Defect, report Selected,  Test Lab Module Reports: current test set, cross test set, test set Hierarchy with tests, cross test set with tests, execution notification.  Defects Module Reports: standard Defects, Tabular defects, fixed or rejected Defects, report selected. Q16. How many types of Graphs are there in QC?
  • 6. Following types are reports are available to us in QC:  Requirement Module Graphs: requirements summary graph, requirements progress graph, requirements coverage graph, requirements- trend graph, graph wizard.  Test Plan Module Graphs: test planning summary graph, test planning progress graph, test plan trend graph, graph wizard,  Test Lab Module Graph: test execution summary graph( current test set), test execution progress graph(current test set), test execution summary graph(cross test set), test execution progress graph(cross test set) , graph wizard.  Defect Module Graph: defect summary graph, defect progress graph, defect age graph, defect trend graph, graph wizard. Q17. What are the features of Quality Center? Features of QC are listed below:  QC helps to maintain project database of test that covers all functionality of application.  QC offers integration with HP testing tools (WinRunner, QTP and Load Runner) as well as third party tools.  QC provides an intuitive and efficient method for scheduling and executing test sets, collecting test results, and analyzing the data.  Qc helps in defect tracking, enabling to monitor defects closely from initial detection to resolution.  By linking QC to email system, defect tracking information can be shared by all application development, quality assurance and customer support. Q18. How to use Quality Centre in real time project? After completing the test cases, we do: 1. Export the test cases into Quality Centre. 2. The test cases will be loaded in the test plan module. 3. When execution is started. We move the test cases from test plan tab to the test lab module 4. In test lab, we execute the test cases and put as pass or fail or incomplete. We generate the graph in the test lab for dailyreport and sent to the specific user. 5. If we got anydefects and raise the defects in the defect module. When raising the defects, attach the defectswith the screen shot. Q19. How to map the requirements with test cases in Quality Centre? For mapping the requirement with test cases we do: 1. In requirements tab select coverage view 2. Select requirement byclicking on parent/child or grandchild 3. On right hand side (In coverage view window) another window will appear. It has two tabs:
  • 7. -Tests coverage -Details Test coverage tab will be selected by default or you click on it. 4. Click on select testsbutton a new window will appear on right hand side and you will see a list of all tests. You cans elect anytest case you want to map with your requirements. Q20. How can we use Filter in QC? We can use Filter on Quality Center data to display only those record that meets the criteria that we define. We can assign a single item (such as failed) or logical expression (such as Passed or Failed) to a filter. Only record meeting all the criteria of the filter appear in the grid or tree. In addition, we can define multiple filters. For example, we can define the Status filter as Failed and the tester as “Rohit or Mayank”. Only test runs performed by Rohit and Mayank are displayed. Q21. What is Unattached Folder in Test Plan? We delete a folder or test from the test plan tree. When we delete a folder, we can choose to delete the folder only, or the folder, its subfolders, and test. If we choose to delete the folder only, all the tests are moved to unattached folder in the test plan tree. If we choose to delete a folder and test, all subfolder and test under the selected folder are deleted permanently. If we delete a test, the test and test script are deleted permanently. Q22. What is difference between Generate Test from the requirements and Convert requirements to test? When we convert the requirements to test in a specified subject in the test plan tree where as in generating test case, the test case generates from requirements are stored in a specified subject in a test plan tree and a specific test set in Test Lab module. And by default we cannot generate a test for the following, which do not enable to coverage:  Business  Folder  Groups Q23. Is ‘Not covered’ and ‘Not run’ status are same? No, Not Covered status means all those requirements for which the test cases are not written where as Not Run status means all those requirements for which test cases are written but are not run. Q24. What is the advantage of libraries in Quality center? A library represents a collection of entities in a QC, including their relationship to each other. When dealing with many similar projects, it offers the advantage of not having repeatedly created entities. Libraries can be imported form Project A into Project B, compare against each other, or even synchronized. A library also allows one to collect the same entities as in versioning. With Quality Center Premier Edition, defects are not included, but they can be shared with the new HP Quality Center Synchronizer manually among several QC project. Q25. What types of database are used in QC?
  • 8. When we create a QC project, We need to store and manage the data generated and collected by Quality Center. Each project is supported by a database that stores project information. The following database application could be used to store and manage Quality Center information:  Oracle 9.2.0.6 Standard/Enterprise Edition  Oracle 10.2.0.3  Microsoft SQL Server 2005 (SP2). Q26. What is meant by test lab in Quality Centre? Test lab is a part of Quality Centre where we can execute our test on different cycles creating test tree for each one of them. We need to add test to these test trees from the tests, which are placed under test plan in the project. Internally Quality Centre will refer to this test while running then in the test lab. Q27. How do you run reports from Quality Centre. This is how you do it 1. Open the QualityCentre project 2. Displays the requirements modules 3. Choose report Analysis -> reports -> standard requirements report Q27. Can we upload test cases from an excel sheet into Quality Centre? Yes go to Add-In menu Quality Centre, find the excel add-In, and install it in your machine. Now open excel, you can find the new menu option export to Quality Centre. Rest of the procedure is self explanatory. Q28. What is the need of Host Manager? Using host Manager we can run test on a host connected to our network. Using the Host Manager Dialog box we can create a list of available host for test execution and also organize hosts into groups to be used for a specific project. Following condition must be kept in mind before executing test on remote host: 1. QTP must be installed on each machine where you wish to execute the tests. 2. QTP must be configured to allow other HPproducts to run 3. QTP Connectivity add-in installed on both the Host (QTP) machines as well as the QC machine. 4. Define your host machines in the Host Manager of QC.
  • 9. 5. Ensure that Object Repositories and/or Function Libraries which are used by all scripts are ‘shared’and accessible from all machines. Q29. What is test set notification, and when we need it? Test set notification is used to inform specified user. We can instruct QC to send email to a specified user if any of the following events occurs for a test set: Any test is the test set fails. Test in the test set fails due to reason other than the test logic itself, Environmental failure could include. Ex. Functional call not returning access violations, version incompatibility between application components, a missing DLL. All tests in the test set that were run have been finished running. But this does not include tests that are not executed. Q30. How to map the requirements with test cases in Quality Centre? For mapping the requirement with test cases we do: 1. In requirements tab select coverage view 2. Select requirement byclicking on parent/child or grandchild 3. On right hand side (In coverage view window) another window will appear. It has two tabs: -Tests coverage -Details Test coverage tab will be selected by default or you click on it. 4. Click on select testsbutton a new window will appear on right hand side and you will see a list of all tests. You cans elect any test case you want to map with your requirements. Q31. What are the benefits of using Quality Center?  Quality center is one of the best test management tools in the market. It has a lot of features and can be accessed through an IE browser.  It has a different set of modules and we can create releases, requirement and its traceability, test plan, test lab, logging defects in defect modules.  Different groups can be created like the BA’s, Developers and testers and it acts as a centralized point of control.  Defect assignment can be easily done in QC and in turn QC itself can generate emails to intimate the responsible person assigned to a particular activity.  QC provides various customization filters which can be used for creating reports and graphs.  QC can be integrated with QTP and HP Load Runner and HP Performance Center  QC supports virtual environments like Citrix XenApp 6.0, VMware ESX 5.0 and ESXi 5.0 (SP3).
  • 10. For More Software QA Tutorials and Interview preparations please visit: www.tonmoyelearn.com Q32. What is the default database in Quality Center? SQL Server.