SlideShare a Scribd company logo
1 of 4
PERSONAL INFORMATION
First Name: Hakmal Alizoy
Father Name: Ghulam Ali
Nationality Afghan
Status Married
Date and Place of Birth December 1984, Afghanistan
Permanent Address Karta Now, Kabul, Afghanistan
Telephone +93 (0)799160460/777033627
E-Mail akmalalizoy@yahoo.com
Alizoy@global-trust.com
EDUCATION BACKGROUND
2005-2009 B.Sc Civil Engineering Nangarhar University
1992-2004 Baccalaureate (12 Grade) From Esmatullah High School
EMPLOYMENT DETAILS
SITE ENGINERR WITH BCRC CONSTRUCTION COMPANY IN MIRRD 15/02/2009-
15/06/2009
Responsibilities:
1. Implementation of work plan in the site.
2. Monthly inspection of road condition.
3. Preparing daily and monthly report for mirrd.
4. Sharing preparatory meeting in the site with mirrd.
5. Preparing design and drawings as required.
6. Performing Road and concrete tests in the construction site and also giving
sample for compressive strength of concrete.
QUALITY CONTROL ENGINEER WITH GULF CONSTRUCTION COMPANY IN CORPS OF
ENGINEERING PROJECTS IN KABUL CITY FROM 20/06/2009 UP TO 01/12/2009
Responsibilities:
1. Implementation of work plan in the site.
2. Controlling the quality of work according to design and specification.
3. Preparing daily report .
4. Preparing design and drawings as required.
5. Performing concrete tests in the construction site and also giving sample for
compressive strength of concrete.
Hakmal – CV 1/4
CURRICULUM VITAE
CO QUALITY CONTROL ENGINEER WITH TI TECHNOLOGY INTERNATIONAL
COMPANY IN CORPS OF ENGINEERING PROJECTS IN KABUL CITY FROM 10/01/2010
UP TO 04/04/2010
Responsibilities:
1. Implementation of work plan in the site.
2. Controlling the quality of work according to design and specification.
3. Preparing daily report .
4. Preparing design and drawings as required.
5. Performing concrete tests in the construction site and also giving sample for
compressive strength of concrete.
CONSTRUCTION ENGINEER WITH AIRS CONSTRUCTION COMPANY IN CORPS OF
ENGINEERING PROJECTS 10/04/2010-01/06/2010
Responsibilities:
1 Estimating all material of project.
2 Controlling the quality of work according to design and specification.
3 Preparing schedule for project.
4 Sharing preparatory meeting in the site with corps of engineering.
5 Preparing daily work paln .
6 preparing prepatory meeting with sub contractors.
7 Inspection of all activities of project .
CONSTRUCTION MANAGER WITH Global Trust Construction (GTCC) CONSTRUCTION
COMPANY IN CORPS OF ENGINEERING PROJECT ON RMTC PROJECT IN MAZAR-E-
SHARIF 06/06/2010-Up to 05/05/2013
Responsibilities:
1 Estimating all material of project.
2 Controlling the quality of work according to design and specification.
3 Preparing schedule for project.
4 Sharing preparatory meeting in the site with corps of engineering.
5 Preparing daily work paln .
6 preparing prepatory meeting with sub contractors.
7 Inspection of all activities of project.
PROJECT MANAGER WITH Global Trust Construction (GTCC) CONSTRUCTION
COMPANY IN AFCE PROJECTS IN CAMP PHOENIX ON WEST EXPANSION RLB
BUILDINGS PROJECT IN KABUL AFGHANISTAN 06/05/2013-Up to 09/10/2013
1 Estimating all material of project.
2 Controlling the quality of work according to design and specification.
3 Preparing schedule for project.
4 Sharing preparatory meeting in the site with corps of engineering.
5 Preparing daily work paln .
6 preparing prepatory meeting with sub contractors.
7 Inspection of all activities of project.
Hakmal – CV 2/4
PROJECT MANAGER WITH ITALIAN AFGHAN CONSTRUCTION LLC (IAC) IN CORPS
OF ENGINEERING PROJECT ON NATIONAL TRAINING CENTER PROJECT IN KARATOG
TAJIKISTAN 15/10/2013-Up to 15/11/2014.
1 Estimating all material of project.
2 Controlling the quality of work according to design and specification.
3 Preparing schedule for project.
4 Sharing preparatory meeting in the site with corps of engineering.
5 Preparing daily work paln .
6 preparing prepatory meeting with sub contractors.
7 overall management of project.
PROJECT MANAGER WITH GLOBAL TRUST CONSTRUCTION COMPANY IN MINISTRY
OF URBAN DEVELOPMENT AFFAIRS AFGHANISTAN, NANGARHAR PROVINCE
16/11/2014-Up to NOW.
1 Estimating all material of project.
2 Controlling the quality of work according to design and specification.
3 Preparing schedule for project.
4 Sharing preparatory meeting in the site with corps of engineering.
5 Preparing daily work paln .
6 preparing prepatory meeting with sub contractors.
7 overall management of project.
Trainings:
Auguest 2007
• One month Building Design workshop in university organised by IRC
Nangarhar,Afghanistan.
September 2007
• 10 days Training workshop of NSP monitoring Survey organised by
MRRD/WFP;Kabul,Afghanistan.
December 2007
• Training workshop of GPS (Geographical Position System) organised by
WFP;Kabul,Afghanistan.
JULY 2010- SEPTEMBER 2010
• Training of Auto Cad, Eagle point , SAP , Etabs,Safe ,primavera, 3d Max organised
by Haris Institute ;Peshawar,Pakistan.
MAY 2011
• Training of 35 hours of Auto CAD 2011 and training as part of the construction
management training program with all honors and privileges belonging thereto.
In faculty of engineering Nangarhar University.
Aug 2012
• Completed the US Army corps of engineers Training course of construction Quality
Management for contractors.
LANGUAGES
 Dari Mother tongue
Hakmal – CV 3/4
 Pashto Excellent
 English Very Good
 Urdu Good
 Arabic Fair
sComputer Skills
 Windows, Office (Word, Excel, and power point and Ms Projrect)
 Autocad 2D,3D
 SAP(Structure Analyse Program)
 Eaglepoint (Road design Program)
 Etabs(Structure frame design Program)
 Safe (Structur Slab and foundition design)
 3D studio MAX (3d solid modelling)
 Primavera ( project management sotwere)
REFERENCES
 Providing on request
Hakmal – CV 4/4

More Related Content

What's hot

atif hashmi cv new updated by 2015
atif hashmi cv new  updated by 2015atif hashmi cv new  updated by 2015
atif hashmi cv new updated by 2015
atif hashmi
 
ACM_AP14338_Namala Gopala Krishna
ACM_AP14338_Namala Gopala KrishnaACM_AP14338_Namala Gopala Krishna
ACM_AP14338_Namala Gopala Krishna
gopala Krishna
 
ahmed-el-shouny2016
ahmed-el-shouny2016ahmed-el-shouny2016
ahmed-el-shouny2016
ahmed samir
 
Resume nz - Andrew Nash
Resume nz - Andrew NashResume nz - Andrew Nash
Resume nz - Andrew Nash
Andrew Nash
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
zeeshan Ali
 
Sunil Kumar Final
Sunil Kumar FinalSunil Kumar Final
Sunil Kumar Final
Sunil Kumar
 
Mechanical Engineer Anjum
Mechanical Engineer AnjumMechanical Engineer Anjum
Mechanical Engineer Anjum
Anjum Shehzad
 

What's hot (20)

Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
atif hashmi cv new updated by 2015
atif hashmi cv new  updated by 2015atif hashmi cv new  updated by 2015
atif hashmi cv new updated by 2015
 
Ghazanfar CV
Ghazanfar CVGhazanfar CV
Ghazanfar CV
 
ACM_AP14338_Namala Gopala Krishna
ACM_AP14338_Namala Gopala KrishnaACM_AP14338_Namala Gopala Krishna
ACM_AP14338_Namala Gopala Krishna
 
CV Civil
CV CivilCV Civil
CV Civil
 
ahmed-el-shouny2016
ahmed-el-shouny2016ahmed-el-shouny2016
ahmed-el-shouny2016
 
Von Ludwig Castro(Resume)
Von Ludwig Castro(Resume)Von Ludwig Castro(Resume)
Von Ludwig Castro(Resume)
 
CV TOUHIDUL
CV TOUHIDULCV TOUHIDUL
CV TOUHIDUL
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Resume nz - Andrew Nash
Resume nz - Andrew NashResume nz - Andrew Nash
Resume nz - Andrew Nash
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
CV (Eng. Abdul Aziz)
CV (Eng. Abdul Aziz)CV (Eng. Abdul Aziz)
CV (Eng. Abdul Aziz)
 
Abbas khan resume
Abbas khan resumeAbbas khan resume
Abbas khan resume
 
Sunil Kumar Final
Sunil Kumar FinalSunil Kumar Final
Sunil Kumar Final
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
MANIMARAN
MANIMARANMANIMARAN
MANIMARAN
 
cv.dchand copy
cv.dchand copycv.dchand copy
cv.dchand copy
 
Mechanical Engineer Anjum
Mechanical Engineer AnjumMechanical Engineer Anjum
Mechanical Engineer Anjum
 
NIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEERNIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEER
 

Viewers also liked (6)

Dinmohammad Resume
Dinmohammad ResumeDinmohammad Resume
Dinmohammad Resume
 
CV-Stobel-Tobias
CV-Stobel-TobiasCV-Stobel-Tobias
CV-Stobel-Tobias
 
Omargul CV 2
Omargul  CV 2 Omargul  CV 2
Omargul CV 2
 
Muhammadi Iblagh CV
Muhammadi Iblagh CVMuhammadi Iblagh CV
Muhammadi Iblagh CV
 
Bertolt Brecht & Epic Theatre
Bertolt Brecht & Epic TheatreBertolt Brecht & Epic Theatre
Bertolt Brecht & Epic Theatre
 
Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building Design and analasys of a g+2 residential building
Design and analasys of a g+2 residential building
 

Similar to Hakmal CV (1) (20)

updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 
CV new
CV newCV new
CV new
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
cv.
cv.cv.
cv.
 
Ibrahim alnajar CV
Ibrahim alnajar CVIbrahim alnajar CV
Ibrahim alnajar CV
 
cm cv
cm cvcm cv
cm cv
 
Ahsin Haleem Cv
Ahsin Haleem CvAhsin Haleem Cv
Ahsin Haleem Cv
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122
 
Civil Engineer 2010 Mahmoud Mahdy
Civil Engineer 2010 Mahmoud MahdyCivil Engineer 2010 Mahmoud Mahdy
Civil Engineer 2010 Mahmoud Mahdy
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
 
Engineer salman
Engineer salmanEngineer salman
Engineer salman
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Ghazanfar CV
Ghazanfar CVGhazanfar CV
Ghazanfar CV
 
final year presentation revised
final year presentation revisedfinal year presentation revised
final year presentation revised
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Update CV (Gharwal)
Update CV (Gharwal)Update CV (Gharwal)
Update CV (Gharwal)
 
Noor c.v
Noor c.vNoor c.v
Noor c.v
 
Mehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cvMehtab zaidi planning engineer cv
Mehtab zaidi planning engineer cv
 
RESUME_31-Oct-16
RESUME_31-Oct-16RESUME_31-Oct-16
RESUME_31-Oct-16
 

Hakmal CV (1)

  • 1. PERSONAL INFORMATION First Name: Hakmal Alizoy Father Name: Ghulam Ali Nationality Afghan Status Married Date and Place of Birth December 1984, Afghanistan Permanent Address Karta Now, Kabul, Afghanistan Telephone +93 (0)799160460/777033627 E-Mail akmalalizoy@yahoo.com Alizoy@global-trust.com EDUCATION BACKGROUND 2005-2009 B.Sc Civil Engineering Nangarhar University 1992-2004 Baccalaureate (12 Grade) From Esmatullah High School EMPLOYMENT DETAILS SITE ENGINERR WITH BCRC CONSTRUCTION COMPANY IN MIRRD 15/02/2009- 15/06/2009 Responsibilities: 1. Implementation of work plan in the site. 2. Monthly inspection of road condition. 3. Preparing daily and monthly report for mirrd. 4. Sharing preparatory meeting in the site with mirrd. 5. Preparing design and drawings as required. 6. Performing Road and concrete tests in the construction site and also giving sample for compressive strength of concrete. QUALITY CONTROL ENGINEER WITH GULF CONSTRUCTION COMPANY IN CORPS OF ENGINEERING PROJECTS IN KABUL CITY FROM 20/06/2009 UP TO 01/12/2009 Responsibilities: 1. Implementation of work plan in the site. 2. Controlling the quality of work according to design and specification. 3. Preparing daily report . 4. Preparing design and drawings as required. 5. Performing concrete tests in the construction site and also giving sample for compressive strength of concrete. Hakmal – CV 1/4 CURRICULUM VITAE
  • 2. CO QUALITY CONTROL ENGINEER WITH TI TECHNOLOGY INTERNATIONAL COMPANY IN CORPS OF ENGINEERING PROJECTS IN KABUL CITY FROM 10/01/2010 UP TO 04/04/2010 Responsibilities: 1. Implementation of work plan in the site. 2. Controlling the quality of work according to design and specification. 3. Preparing daily report . 4. Preparing design and drawings as required. 5. Performing concrete tests in the construction site and also giving sample for compressive strength of concrete. CONSTRUCTION ENGINEER WITH AIRS CONSTRUCTION COMPANY IN CORPS OF ENGINEERING PROJECTS 10/04/2010-01/06/2010 Responsibilities: 1 Estimating all material of project. 2 Controlling the quality of work according to design and specification. 3 Preparing schedule for project. 4 Sharing preparatory meeting in the site with corps of engineering. 5 Preparing daily work paln . 6 preparing prepatory meeting with sub contractors. 7 Inspection of all activities of project . CONSTRUCTION MANAGER WITH Global Trust Construction (GTCC) CONSTRUCTION COMPANY IN CORPS OF ENGINEERING PROJECT ON RMTC PROJECT IN MAZAR-E- SHARIF 06/06/2010-Up to 05/05/2013 Responsibilities: 1 Estimating all material of project. 2 Controlling the quality of work according to design and specification. 3 Preparing schedule for project. 4 Sharing preparatory meeting in the site with corps of engineering. 5 Preparing daily work paln . 6 preparing prepatory meeting with sub contractors. 7 Inspection of all activities of project. PROJECT MANAGER WITH Global Trust Construction (GTCC) CONSTRUCTION COMPANY IN AFCE PROJECTS IN CAMP PHOENIX ON WEST EXPANSION RLB BUILDINGS PROJECT IN KABUL AFGHANISTAN 06/05/2013-Up to 09/10/2013 1 Estimating all material of project. 2 Controlling the quality of work according to design and specification. 3 Preparing schedule for project. 4 Sharing preparatory meeting in the site with corps of engineering. 5 Preparing daily work paln . 6 preparing prepatory meeting with sub contractors. 7 Inspection of all activities of project. Hakmal – CV 2/4
  • 3. PROJECT MANAGER WITH ITALIAN AFGHAN CONSTRUCTION LLC (IAC) IN CORPS OF ENGINEERING PROJECT ON NATIONAL TRAINING CENTER PROJECT IN KARATOG TAJIKISTAN 15/10/2013-Up to 15/11/2014. 1 Estimating all material of project. 2 Controlling the quality of work according to design and specification. 3 Preparing schedule for project. 4 Sharing preparatory meeting in the site with corps of engineering. 5 Preparing daily work paln . 6 preparing prepatory meeting with sub contractors. 7 overall management of project. PROJECT MANAGER WITH GLOBAL TRUST CONSTRUCTION COMPANY IN MINISTRY OF URBAN DEVELOPMENT AFFAIRS AFGHANISTAN, NANGARHAR PROVINCE 16/11/2014-Up to NOW. 1 Estimating all material of project. 2 Controlling the quality of work according to design and specification. 3 Preparing schedule for project. 4 Sharing preparatory meeting in the site with corps of engineering. 5 Preparing daily work paln . 6 preparing prepatory meeting with sub contractors. 7 overall management of project. Trainings: Auguest 2007 • One month Building Design workshop in university organised by IRC Nangarhar,Afghanistan. September 2007 • 10 days Training workshop of NSP monitoring Survey organised by MRRD/WFP;Kabul,Afghanistan. December 2007 • Training workshop of GPS (Geographical Position System) organised by WFP;Kabul,Afghanistan. JULY 2010- SEPTEMBER 2010 • Training of Auto Cad, Eagle point , SAP , Etabs,Safe ,primavera, 3d Max organised by Haris Institute ;Peshawar,Pakistan. MAY 2011 • Training of 35 hours of Auto CAD 2011 and training as part of the construction management training program with all honors and privileges belonging thereto. In faculty of engineering Nangarhar University. Aug 2012 • Completed the US Army corps of engineers Training course of construction Quality Management for contractors. LANGUAGES  Dari Mother tongue Hakmal – CV 3/4
  • 4.  Pashto Excellent  English Very Good  Urdu Good  Arabic Fair sComputer Skills  Windows, Office (Word, Excel, and power point and Ms Projrect)  Autocad 2D,3D  SAP(Structure Analyse Program)  Eaglepoint (Road design Program)  Etabs(Structure frame design Program)  Safe (Structur Slab and foundition design)  3D studio MAX (3d solid modelling)  Primavera ( project management sotwere) REFERENCES  Providing on request Hakmal – CV 4/4