TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
Production calender
1. SAT MON TUE WED THU FRI SAT
1 2
3 4 5 PRE-PRODUCTION
• Begin drawing up
the storyboard
• Horror mood board
6 PRE-PRODUCTION
• Construct
equipment list
• Assess risks,
produce the
assessment
7 PRE-PRODUCTION
Complete budget list
8 9
10 11PRE-PRODUCTION
• Storyboard deadline
• begin narrative
structure
12PRE-PRODUCTION
Narrative structure
deadline
13PRE-PRODUCTION
Begin character
analysis
14PRE-PRODUCTION
Begin title ideas
15 16
17 18PRE-PRODUCTION
Title ideas deadline
19PRE-PRODUCTION
• Complete character
analysis
• Cast auditions
20PRE-PRODUCTION
• equipment list
deadline
• risk assessment
deadline
21PRE-PRODUCTION
Shooting script
deadline
22 23
24 25PRE-PRODUCTION
Create production
company logo design
26PRE-PRODUCTION
• Research diegetic
and non diegetic
sound effects
• Research
27PRE-PRODUCTION
Create title with
animations
28 PRE-PRODUCTION
Camera test deadline
29 30
2. SUN MON TUE WED THU FRI SAT
1 2 PRODUCTION
Shoot preliminary
shots/test (camera test
shots)
3 PRODUCTION
• Continue filming
Preliminary test
shots
• Upload footage
4 POST PRODUCTION
• Begin editing test
shoots
• Editing software
tests and practice
5 POST PRODUCTION
Deadline preliminary
task editing
6 7
8 9 PRODUCTION
Film scenes 8-14 at
Bedfont Lakes
10 POST PRODUCTION
Upload footage
11POST PRODUCTION
Begin editing scenes 8-
14 footage
12 PRODUCTION
Film 1-4 scenes at car
park
13 14 PRODUCTION
Film scenes 5-8 and14-
20 at Bedfont Lakes
15 16 POST PRODUCTION
• Upload footage
• Rough edit
17 POST PRODUCTION
Edit footage
Upload sound
18 POST PRODUCTION
Edit footage
Edit sound
19 POST PRODUCTION
Deadline final edit
20 21
22 23 24 25 26 27 28
29 30 31