Good practices for materials handling in production lines
• Use line pick-up trays to feed garment bundles into the production line.
• Use movable wheel carts to transport materials to the workstation (Figures 1 and 2).
• Use hanging-rails on wheels to prevent crumpling of ready-to-deliver products
and make transportation of finished items safer (Figure 3).
Benefits
✓ Reduces the amount of time spent on materials handling.
✓ Improves product quality.
✓ Reduces the amount of storage space needed
for finished goods and materials.
How
• Trays and hangers can be found locally in commercial markets.
Costs: $
Good Practices
Materials Handling in the Production Line
A more efficient workplace is more profitable. Introducing tools or systems which
make the production line more efficient is often very cost effective. Simple measures
which improve the efficiency of the production line include using wheel carts and
hanging-rails on wheels.
Figure 1
Figure 2
Figure 3
If you have any questions, contact the
Better Work team at info@betterwork.org$ Low cost $$ Moderate cost $$$ High cost

More Related Content

What's hot

Transformation process of a Photolab
Transformation process of a PhotolabTransformation process of a Photolab
Transformation process of a PhotolabAbhishek Kushwaha
 
Production planning for weaving process
Production planning for weaving processProduction planning for weaving process
Production planning for weaving processlutuf Ullah
 
PPC-ALL UNITS-PPT
PPC-ALL UNITS-PPTPPC-ALL UNITS-PPT
PPC-ALL UNITS-PPTdinesh babu
 
Materialshandling 121206214859-phpapp02 (3) (1)
Materialshandling 121206214859-phpapp02 (3) (1)Materialshandling 121206214859-phpapp02 (3) (1)
Materialshandling 121206214859-phpapp02 (3) (1)LinguLingeswariM
 
Break even-point
Break even-point Break even-point
Break even-point Aditi Gadia
 
Study to construct a new pvc coated fabric manufacturing plant
Study to construct a new pvc coated fabric manufacturing plantStudy to construct a new pvc coated fabric manufacturing plant
Study to construct a new pvc coated fabric manufacturing plantRakhi Pal
 
Methods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionMethods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionHarinadh Karimikonda
 
Optimizing profit with linear programming model
Optimizing profit with linear programming modelOptimizing profit with linear programming model
Optimizing profit with linear programming modelAmit Deshmukh
 
curled-metal case study analysis
curled-metal case study analysiscurled-metal case study analysis
curled-metal case study analysisancientsoul90
 
Notes material handling
Notes material handlingNotes material handling
Notes material handlingVIKKYsing
 
Tn11 facility location
Tn11 facility locationTn11 facility location
Tn11 facility locationvideoaakash15
 

What's hot (20)

Transformation process of a Photolab
Transformation process of a PhotolabTransformation process of a Photolab
Transformation process of a Photolab
 
Rangadurai Resume 2016
Rangadurai Resume 2016Rangadurai Resume 2016
Rangadurai Resume 2016
 
Unit 5
Unit 5Unit 5
Unit 5
 
09 March 09 Report
09 March 09 Report09 March 09 Report
09 March 09 Report
 
Production planning for weaving process
Production planning for weaving processProduction planning for weaving process
Production planning for weaving process
 
PPC-ALL UNITS-PPT
PPC-ALL UNITS-PPTPPC-ALL UNITS-PPT
PPC-ALL UNITS-PPT
 
Materialshandling 121206214859-phpapp02 (3) (1)
Materialshandling 121206214859-phpapp02 (3) (1)Materialshandling 121206214859-phpapp02 (3) (1)
Materialshandling 121206214859-phpapp02 (3) (1)
 
Unit 3
Unit 3Unit 3
Unit 3
 
Break even-point
Break even-point Break even-point
Break even-point
 
costing process
costing processcosting process
costing process
 
Study to construct a new pvc coated fabric manufacturing plant
Study to construct a new pvc coated fabric manufacturing plantStudy to construct a new pvc coated fabric manufacturing plant
Study to construct a new pvc coated fabric manufacturing plant
 
Methods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionMethods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass Productiion
 
Adbag
AdbagAdbag
Adbag
 
Optimizing profit with linear programming model
Optimizing profit with linear programming modelOptimizing profit with linear programming model
Optimizing profit with linear programming model
 
curled-metal case study analysis
curled-metal case study analysiscurled-metal case study analysis
curled-metal case study analysis
 
Facility location
Facility locationFacility location
Facility location
 
Notes material handling
Notes material handlingNotes material handling
Notes material handling
 
Tn11 facility location
Tn11 facility locationTn11 facility location
Tn11 facility location
 
Job costing slides
Job costing slidesJob costing slides
Job costing slides
 
Facilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysisFacilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysis
 

Viewers also liked

Emergency plans-and-equipment
Emergency plans-and-equipmentEmergency plans-and-equipment
Emergency plans-and-equipmentAgus Witono
 
Patris
PatrisPatris
Patristf9
 
Computerized lmis
Computerized lmisComputerized lmis
Computerized lmisAgus Witono
 
เฉลย Onet 51
เฉลย Onet 51เฉลย Onet 51
เฉลย Onet 51A-ae Rcna
 
Pollito amarillo 04
Pollito amarillo 04Pollito amarillo 04
Pollito amarillo 04Mila Esteban
 
Pacte logement liste des communes signataires
Pacte logement liste des communes signatairesPacte logement liste des communes signataires
Pacte logement liste des communes signatairesLuxemburger Wort
 
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral moderna
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral modernaJVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral moderna
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral modernaSúmate a la Diferencia
 
Itp program-key-points
Itp program-key-pointsItp program-key-points
Itp program-key-pointsncodeit123
 

Viewers also liked (11)

Emergency plans-and-equipment
Emergency plans-and-equipmentEmergency plans-and-equipment
Emergency plans-and-equipment
 
Patris
PatrisPatris
Patris
 
Computerized lmis
Computerized lmisComputerized lmis
Computerized lmis
 
Com turismo1
Com turismo1Com turismo1
Com turismo1
 
Manaj gudang
Manaj gudangManaj gudang
Manaj gudang
 
เฉลย Onet 51
เฉลย Onet 51เฉลย Onet 51
เฉลย Onet 51
 
Pollito amarillo 04
Pollito amarillo 04Pollito amarillo 04
Pollito amarillo 04
 
Pacte logement liste des communes signataires
Pacte logement liste des communes signatairesPacte logement liste des communes signataires
Pacte logement liste des communes signataires
 
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral moderna
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral modernaJVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral moderna
JVM: Apoyo a PyMEs, crear nuevas empresas e impulsar una reforma laboral moderna
 
Itp program-key-points
Itp program-key-pointsItp program-key-points
Itp program-key-points
 
Ull d'osiris
Ull d'osirisUll d'osiris
Ull d'osiris
 

Similar to Materials handling-in-the-production-l ine

My Research Project: "PROCESS RE- ENGINEERING"
My Research Project: "PROCESS RE- ENGINEERING"My Research Project: "PROCESS RE- ENGINEERING"
My Research Project: "PROCESS RE- ENGINEERING"anupamshri
 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET Journal
 
unitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptxunitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptxChandrasen Sharma
 
Itb solutions presentation 3.7.22
Itb solutions presentation   3.7.22Itb solutions presentation   3.7.22
Itb solutions presentation 3.7.22ITB Packaging LLC
 
Facility layout
Facility layoutFacility layout
Facility layoutJassi Dutt
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET Journal
 
BIN PACKING ALGORITHM IN GOLANG
BIN PACKING ALGORITHM IN GOLANGBIN PACKING ALGORITHM IN GOLANG
BIN PACKING ALGORITHM IN GOLANGIRJET Journal
 
Material Handling
Material HandlingMaterial Handling
Material Handlingvishakeb
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Haileyesus Wondwossen
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxCaptainPats
 
ITB Packaging LLC solutions presentation
ITB Packaging LLC solutions presentation   ITB Packaging LLC solutions presentation
ITB Packaging LLC solutions presentation ITB Packaging LLC
 
Material handling systems & Advancements
Material handling systems & AdvancementsMaterial handling systems & Advancements
Material handling systems & AdvancementsShreya Anand
 
Material handling equipment presentation
Material handling equipment  presentationMaterial handling equipment  presentation
Material handling equipment presentationyugandharbabu3
 
Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006samjune
 

Similar to Materials handling-in-the-production-l ine (20)

My Research Project: "PROCESS RE- ENGINEERING"
My Research Project: "PROCESS RE- ENGINEERING"My Research Project: "PROCESS RE- ENGINEERING"
My Research Project: "PROCESS RE- ENGINEERING"
 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
 
Material handling
Material handling Material handling
Material handling
 
unitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptxunitiiimtrlhandlingmodif-181029120211.pptx
unitiiimtrlhandlingmodif-181029120211.pptx
 
Itb solutions presentation 3.7.22
Itb solutions presentation   3.7.22Itb solutions presentation   3.7.22
Itb solutions presentation 3.7.22
 
Presentation1
Presentation1Presentation1
Presentation1
 
Facility layout
Facility layoutFacility layout
Facility layout
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
 
BIN PACKING ALGORITHM IN GOLANG
BIN PACKING ALGORITHM IN GOLANGBIN PACKING ALGORITHM IN GOLANG
BIN PACKING ALGORITHM IN GOLANG
 
Plant layout
Plant layout Plant layout
Plant layout
 
Material Handling
Material HandlingMaterial Handling
Material Handling
 
Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...Addis Ababa City Administration Technical, Vocational, Education And Training...
Addis Ababa City Administration Technical, Vocational, Education And Training...
 
Material handling
Material handling Material handling
Material handling
 
IV. System Design and Optimization .pptx
IV. System Design and Optimization .pptxIV. System Design and Optimization .pptx
IV. System Design and Optimization .pptx
 
ITB Packaging LLC solutions presentation
ITB Packaging LLC solutions presentation   ITB Packaging LLC solutions presentation
ITB Packaging LLC solutions presentation
 
Machine safety
Machine safetyMachine safety
Machine safety
 
material handling systems
material handling systemsmaterial handling systems
material handling systems
 
Material handling systems & Advancements
Material handling systems & AdvancementsMaterial handling systems & Advancements
Material handling systems & Advancements
 
Material handling equipment presentation
Material handling equipment  presentationMaterial handling equipment  presentation
Material handling equipment presentation
 
Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006Material handling piyush 12mt07ind006
Material handling piyush 12mt07ind006
 

More from Agus Witono

Hazwoper hazardous waste site 40 hour student initial course manual
Hazwoper hazardous waste site 40 hour student initial course manualHazwoper hazardous waste site 40 hour student initial course manual
Hazwoper hazardous waste site 40 hour student initial course manualAgus Witono
 
Protap dalkarhutlah sumsel 2007
Protap dalkarhutlah sumsel 2007Protap dalkarhutlah sumsel 2007
Protap dalkarhutlah sumsel 2007Agus Witono
 
Digital 20297367 s-sri rezeki
Digital 20297367 s-sri rezekiDigital 20297367 s-sri rezeki
Digital 20297367 s-sri rezekiAgus Witono
 
Emergency response planning guide for public wastewater syst
Emergency response planning guide for public wastewater systEmergency response planning guide for public wastewater syst
Emergency response planning guide for public wastewater systAgus Witono
 
Fireemergegencyman 2
Fireemergegencyman 2Fireemergegencyman 2
Fireemergegencyman 2Agus Witono
 
Digital 114001 [-konten_]-m.82.bagian 3
Digital 114001 [-konten_]-m.82.bagian 3Digital 114001 [-konten_]-m.82.bagian 3
Digital 114001 [-konten_]-m.82.bagian 3Agus Witono
 
Bnpb update on lombok earthquake
Bnpb update on lombok earthquakeBnpb update on lombok earthquake
Bnpb update on lombok earthquakeAgus Witono
 
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4Agus Witono
 
190371290 tanggap-darurat
190371290 tanggap-darurat190371290 tanggap-darurat
190371290 tanggap-daruratAgus Witono
 
155112208201011561
155112208201011561155112208201011561
155112208201011561Agus Witono
 
Tanggap darurat-di-gedung-perkantoran
Tanggap darurat-di-gedung-perkantoranTanggap darurat-di-gedung-perkantoran
Tanggap darurat-di-gedung-perkantoranAgus Witono
 
Training & konsultasi_hse
Training & konsultasi_hseTraining & konsultasi_hse
Training & konsultasi_hseAgus Witono
 
Osha 3114-hazwoper
Osha 3114-hazwoperOsha 3114-hazwoper
Osha 3114-hazwoperAgus Witono
 
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasional
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasionalPetunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasional
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasionalAgus Witono
 
Social compliance manual
Social compliance manualSocial compliance manual
Social compliance manualAgus Witono
 
Better work-indonesia-synthesis-report-en
Better work-indonesia-synthesis-report-enBetter work-indonesia-synthesis-report-en
Better work-indonesia-synthesis-report-enAgus Witono
 

More from Agus Witono (20)

Hazwoper hazardous waste site 40 hour student initial course manual
Hazwoper hazardous waste site 40 hour student initial course manualHazwoper hazardous waste site 40 hour student initial course manual
Hazwoper hazardous waste site 40 hour student initial course manual
 
Ar2011
Ar2011Ar2011
Ar2011
 
Trblgn25
Trblgn25Trblgn25
Trblgn25
 
9100 mhav
9100 mhav9100 mhav
9100 mhav
 
Protap dalkarhutlah sumsel 2007
Protap dalkarhutlah sumsel 2007Protap dalkarhutlah sumsel 2007
Protap dalkarhutlah sumsel 2007
 
Digital 20297367 s-sri rezeki
Digital 20297367 s-sri rezekiDigital 20297367 s-sri rezeki
Digital 20297367 s-sri rezeki
 
Emergency response planning guide for public wastewater syst
Emergency response planning guide for public wastewater systEmergency response planning guide for public wastewater syst
Emergency response planning guide for public wastewater syst
 
Fireemergegencyman 2
Fireemergegencyman 2Fireemergegencyman 2
Fireemergegencyman 2
 
Digital 114001 [-konten_]-m.82.bagian 3
Digital 114001 [-konten_]-m.82.bagian 3Digital 114001 [-konten_]-m.82.bagian 3
Digital 114001 [-konten_]-m.82.bagian 3
 
Bnpb update on lombok earthquake
Bnpb update on lombok earthquakeBnpb update on lombok earthquake
Bnpb update on lombok earthquake
 
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4
Tanggap darurat-dan-pencehagan-kebakaran-pertemuan-4
 
190371290 tanggap-darurat
190371290 tanggap-darurat190371290 tanggap-darurat
190371290 tanggap-darurat
 
Bencana11
Bencana11Bencana11
Bencana11
 
155112208201011561
155112208201011561155112208201011561
155112208201011561
 
Tanggap darurat-di-gedung-perkantoran
Tanggap darurat-di-gedung-perkantoranTanggap darurat-di-gedung-perkantoran
Tanggap darurat-di-gedung-perkantoran
 
Training & konsultasi_hse
Training & konsultasi_hseTraining & konsultasi_hse
Training & konsultasi_hse
 
Osha 3114-hazwoper
Osha 3114-hazwoperOsha 3114-hazwoper
Osha 3114-hazwoper
 
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasional
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasionalPetunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasional
Petunjuk perusahaan rekomendasi izin pengumpulan limbah b3 skala nasional
 
Social compliance manual
Social compliance manualSocial compliance manual
Social compliance manual
 
Better work-indonesia-synthesis-report-en
Better work-indonesia-synthesis-report-enBetter work-indonesia-synthesis-report-en
Better work-indonesia-synthesis-report-en
 

Materials handling-in-the-production-l ine

  • 1. Good practices for materials handling in production lines • Use line pick-up trays to feed garment bundles into the production line. • Use movable wheel carts to transport materials to the workstation (Figures 1 and 2). • Use hanging-rails on wheels to prevent crumpling of ready-to-deliver products and make transportation of finished items safer (Figure 3). Benefits ✓ Reduces the amount of time spent on materials handling. ✓ Improves product quality. ✓ Reduces the amount of storage space needed for finished goods and materials. How • Trays and hangers can be found locally in commercial markets. Costs: $ Good Practices Materials Handling in the Production Line A more efficient workplace is more profitable. Introducing tools or systems which make the production line more efficient is often very cost effective. Simple measures which improve the efficiency of the production line include using wheel carts and hanging-rails on wheels. Figure 1 Figure 2 Figure 3 If you have any questions, contact the Better Work team at info@betterwork.org$ Low cost $$ Moderate cost $$$ High cost