SlideShare a Scribd company logo
1 of 11
PRODUCTION PLANNING
AND PROCESS
PLANNING
Unit-3
PRODUCT PLANNING
โ€ข Product Planning is the ongoing process of
identifying and articulating market
requirements that define a productโ€™s feature
set.
โ€ข Product planning serves as the basis for
decisions about price, distribution and
promotion.
EXTENDING ORIGINAL PRODUCT
INFORMATION
VALUE ANALYSIS
โ€ข Value, as defined, is the ratio of function
to cost. Value can therefore be increased by
either improving the function or reducing
the cost
LACK OF PRODUCT PLANNING
โ€ข Unsatisfied customer
โ€ข Durability deteriaration
โ€ข Lack of quality
โ€ข Loss of brand name., Etc
PROCESS PLANNING
ROUTING
SCHEDULING
DISPATCHING
FOLLOW UP
PROCESS PLANNING โ€“ INPUT INFO.
โ€ข PRODUCT
โ€ข PROCESS
โ€ข CAPACITY
โ€ข ORDERS
โ€ข DUE DATES
โ€ข RESOURCES
โ€ข ETC.,
STEPS IN PROCESS PLANNING
โ€ข Analyzing environment
โ€ข Establishing objectives or goals
โ€ข Seeking necessary Information
QUANTITY DETERMINATION โ€“
BATCH PRODUCTION
โ€ข Economic batch quantity (EBQ), also called "optimal batch
quantity" or economic production quantity, is a measure used
to determine the quantity of units that can be produced at
minimum average costs in a given batch or production run.
โ€ข Economic Production Quantity model (also known as the EPQ
model) is an extension of the Economic Order Quantity
model. The Economic Batch Quantity model, or production
lot-size model, is similar to the EOQ model in that an optimum
is to be calculated for the batch quantity to be produced.
EBQ
In working with this EBQ model, principal assumptions are:
โ€ข The demand (D) is known and constant within a certain period of time
โ€ข The unit cost of the inventory item (U) is constant
โ€ข The annual holding-cost per unit (Ch) is constant
โ€ข The setup-cost per batch (C) is constant
โ€ข The production time (tp) is known and constant
โ€ข there is one kind of product
โ€ข There is no interaction with other products
โ€ข The aspect of time does not play a role, just the setup time does
โ€ข The setup cost is constant and does not act upon the batch quantity.
Variables
โ€ข K = setup cost
โ€ข D = demand rate
โ€ข F = holding cost
โ€ข T = cycle length
โ€ข P = production rate
Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)

More Related Content

What's hot

Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costs
Nallasamy Mohanraj
ย 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable location
Salamat Ali
ย 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
Victor Molina
ย 
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRANOver head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
Dinesh Piran-Gdp
ย 

What's hot (20)

Product costing part5-actual costs
Product costing part5-actual costsProduct costing part5-actual costs
Product costing part5-actual costs
ย 
COST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSSCOST ACCOUNTING CONCEPTSSSSS
COST ACCOUNTING CONCEPTSSSSS
ย 
plant location
plant locationplant location
plant location
ย 
Plant location
Plant locationPlant location
Plant location
ย 
5 need for selecting a suitable location
5 need for selecting a suitable location5 need for selecting a suitable location
5 need for selecting a suitable location
ย 
Facilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysisFacilities planning _lay_out_and_location_analysis
Facilities planning _lay_out_and_location_analysis
ย 
Facilities Planning and Design 01
Facilities Planning and Design 01Facilities Planning and Design 01
Facilities Planning and Design 01
ย 
Standard cost
Standard costStandard cost
Standard cost
ย 
Facility location
Facility locationFacility location
Facility location
ย 
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRANOver head expensions IN process planning & cost estimation by G.DINESHPIRAN
Over head expensions IN process planning & cost estimation by G.DINESHPIRAN
ย 
unit-vii material management -ABC analysis ppt
unit-vii  material management -ABC  analysis pptunit-vii  material management -ABC  analysis ppt
unit-vii material management -ABC analysis ppt
ย 
The EOQ Model
The EOQ ModelThe EOQ Model
The EOQ Model
ย 
Eoq model advantage
Eoq model advantageEoq model advantage
Eoq model advantage
ย 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
ย 
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
EOQ-complete, Just in Time (JIT), Lead time analysis, Inventory models (detai...
ย 
Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)Inventory 100410143732-phpapp02 (1)
Inventory 100410143732-phpapp02 (1)
ย 
COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]COMPONENT OF COST BY G.DINESHPIRAN [DP]
COMPONENT OF COST BY G.DINESHPIRAN [DP]
ย 
Plant layout
Plant layoutPlant layout
Plant layout
ย 
cost accounting complete
cost accounting completecost accounting complete
cost accounting complete
ย 
Manufacturing systems
Manufacturing systemsManufacturing systems
Manufacturing systems
ย 

Similar to Unit 3

ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ahirwarrajeev198
ย 

Similar to Unit 3 (20)

UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNINGUNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
UNIT 3 - PRODUCTION PLANNING AND PROCESS PLANNING
ย 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
ย 
Unit 1
Unit 1Unit 1
Unit 1
ย 
Unit 1
Unit 1Unit 1
Unit 1
ย 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
ย 
unit 1.pptx
unit 1.pptxunit 1.pptx
unit 1.pptx
ย 
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
ย 
PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1PRODUCTION PLANNING AND CONTROL-Unit 1
PRODUCTION PLANNING AND CONTROL-Unit 1
ย 
Unit 1 PPC
Unit 1 PPCUnit 1 PPC
Unit 1 PPC
ย 
ACCA
ACCAACCA
ACCA
ย 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ย 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
ย 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
ย 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
ย 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
ย 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
ย 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
ย 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
ย 
Standard costing
Standard costingStandard costing
Standard costing
ย 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
ย 

Recently uploaded

Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
dharasingh5698
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Netaji Nagar, Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 

Unit 3

  • 2. PRODUCT PLANNING โ€ข Product Planning is the ongoing process of identifying and articulating market requirements that define a productโ€™s feature set. โ€ข Product planning serves as the basis for decisions about price, distribution and promotion.
  • 3.
  • 5. VALUE ANALYSIS โ€ข Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost
  • 6. LACK OF PRODUCT PLANNING โ€ข Unsatisfied customer โ€ข Durability deteriaration โ€ข Lack of quality โ€ข Loss of brand name., Etc
  • 8. PROCESS PLANNING โ€“ INPUT INFO. โ€ข PRODUCT โ€ข PROCESS โ€ข CAPACITY โ€ข ORDERS โ€ข DUE DATES โ€ข RESOURCES โ€ข ETC.,
  • 9. STEPS IN PROCESS PLANNING โ€ข Analyzing environment โ€ข Establishing objectives or goals โ€ข Seeking necessary Information
  • 10. QUANTITY DETERMINATION โ€“ BATCH PRODUCTION โ€ข Economic batch quantity (EBQ), also called "optimal batch quantity" or economic production quantity, is a measure used to determine the quantity of units that can be produced at minimum average costs in a given batch or production run. โ€ข Economic Production Quantity model (also known as the EPQ model) is an extension of the Economic Order Quantity model. The Economic Batch Quantity model, or production lot-size model, is similar to the EOQ model in that an optimum is to be calculated for the batch quantity to be produced.
  • 11. EBQ In working with this EBQ model, principal assumptions are: โ€ข The demand (D) is known and constant within a certain period of time โ€ข The unit cost of the inventory item (U) is constant โ€ข The annual holding-cost per unit (Ch) is constant โ€ข The setup-cost per batch (C) is constant โ€ข The production time (tp) is known and constant โ€ข there is one kind of product โ€ข There is no interaction with other products โ€ข The aspect of time does not play a role, just the setup time does โ€ข The setup cost is constant and does not act upon the batch quantity. Variables โ€ข K = setup cost โ€ข D = demand rate โ€ข F = holding cost โ€ข T = cycle length โ€ข P = production rate Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)