METHODS ENGINEERING AND
OPERATIONS ANALYSIS
 Methods engineering is the analysis and design
of work methods and systems, including the
tooling, equipment, technologies, workplace
layout, plant layout, and work environment
 Other names for methods engineering:
 Work study
 Work simplification
 Methods study
 Process re-engineering
 Business process re-engineering
Objectives in Methods Engineering
 Increase productivity and efficiency
 Reduce cycle time
 Reduce product cost
 Reduce labor content
Other Objectives
 Improve customer satisfaction
 Improve product and/or service quality
 Reduce lead times and improve work flow
 Increase flexibility of work system
 Improve worker safety
 Apply more ergonomic work methods
 Enhance the environment (both inside and outside the
facility)
Operations Analysis
Study of an operation or group of related operations for
the purpose of analyzing their efficiency and
effectiveness so that improvements can be developed
relative to specified objectives.
Objectives in operations analysis
 Increase productivity
 Reduce time and cost
 Improve safety and quality
 Methods engineering and operations analysis are very
similar, except that methods engineering places more
emphasis on design.
Methods Engineering
Can be divided into two areas:
Methods analysis and Methods design.
Methods analysis is concerned with the study of an
existing method or process.
Objectives:
 Eliminate unnecessary and non-value-adding
work elements
 Combine elements and operations
 Rearrange elements into more logical sequence
 Simplify remaining elements and operations
Methods design is concerned with either of the
following situations:
1. Design of a new method or process
 Required for new product or service and
there is no existing standard
 Method must be designed from scratch, using
best existing practice for similar operations
2. Redesign of an existing method or process
based on a previous methods analysis.
HOW TO APPLY METHODS
ENGINEERING
Systematic Approach in Methods Engineering
 has its basis in the scientific method used in science,
research and development, engineering design, and
other problem areas.
 The systematic approach in methods engineering
consists of the steps described below.
Step 1: Define the Problem and Objectives. The problem in
methods engineering study may be low productivity, high
cost, inefficient methods, or the need for a new method or a
new operation. The objective is the desired improvement or
new methods design. Possible objectives are to increase
productivity, reduce labor content and cost, improve safety,
or develop a new method or new operation.
Step 2: Analyze the Problem. Data collection and analysis
activities for the type of problem being studied.
 Activities often used in this step include the following:
 Identify the basic function of the operation.
 Gather background information.
 Observe the existing process or observe similar
processes if the problem involves a new work design.
 Collect data on the existing operation and document the
details in a format that provides itself to examination.
 Conduct experiments on the process.
 Develop a mathematical model of the process or utilize
an existing mathematical model
 Perform a computer simulation of the process.
 Use charting techniques.
Step 3: Formulate Alternatives. There are always multiple
ways to perform a task or accomplish a process, some of
which are more efficient and effective than others.
 The purpose of this step in the problem-solving approach
that is not to identify the best alternative but to formulate
all of the alternatives that are feasible.
Step 4: Evaluate Alternatives and Select the Best. This step
consists of a systematic assessment of the alternatives
and the selection of the best solution among them, based
on the original definition of the problem and objectives.
Step 5: Implement the Best Method. Implementation means
installing the selected solution: introducing the changes proposed in
the existing method or operation, or installing the new method or
process.
 This may involve pilot studies or trials of the new or revised
 Implementation also includes complete documentation of the new or
revised method and replacement of the previous documentation
Step 6: Audit the Study. Perform an audit or follow-up on the
methods engineering project.
 How successful was the project in terms of the original problem
definition and objectives?
 What were the implementation issues?
 What should be done differently in the next methods engineering study?
For an organization committed to continuous improvement, answers to
these kinds of questions help to fine-tune its problem-solving and
decision-making skills.
Techniques of Methods
Engineering
 Data gathering and statistical tools
 Charting and diagramming techniques
 Motion study and work design
 Facility layout planning
 Work measurement techniques
 New approaches
Charting & Diagramming
Techniques
 Network diagrams These are used for analyzing work flow,
assembly line balancing, and project scheduling.
 Traditional industrial engineering charting
techniques These are used to symbolize and summarize the details of
an existing operation or sequence of operations. The traditional charting
techniques can be used to analyze the activities of one human worker,
groups of workers, worker-machine systems, materials, parts, and products.
 Operation charts
 Process charts
 Flow diagrams
 Block diagrams These diagrams represent alternative ways of
illustrating processes.
Motion Study and Work Design
 Concerned with basic motions of a human worker
while performing a given task
 Examples of basic motion elements:
 Reach
 Grasp
 Move
 Release
 Guidelines for work design include “principles of
motion economy” that is guidelines for work design in three
categories: (1) use of the human body in developing the standard method, (2)
workplace layout, and (3) design of the tooling and equipment used in the
task.
Facility Layout Planning
What is Facility Layout?
 Refers to the size and shape of a facility, the arrangement of the
different functions and/or departments in it, and the way the
equipment is positioned.
 Plays a significant role in determining the overall efficiency of the
operations accomplished in the facility.
 Objectives are to maximize
 Customer satisfaction
 Utilization of space, equipment, & people
 Efficient flow of information, material, & people
 Employee morale & safety
 Problem area includes:
 Design of a new facility
 Installing new equipment, retiring old equipment
 Expanding (or contracting) an existing facility
How do you conduct a plant layout
project?
1. Define or redefine the goals of the facility.
2. Specify the activities to be performed in accomplishing the
goals
3. Determine the interrelationships among all activities
4. Determine the space requirements for all activities
5. Generate alternative facility layouts
6. Evaluate alternative facility layouts
7. Select a facility layout
8. Implement facility layouts
9. Maintain and adapt the facility layout
Work Measurement Techniques
 Four basic work measurement techniques:
1. Direct time study
2. Predetermined motion time systems (PMTS)
3. Standard data systems
4. Work sampling
 PMTS and work sampling can be often used in methods
engineering to make improvements in the work methods
 Predetermined motion time system (PMTS) is a database of
basic motion elements and their associated normal time values, and
it includes procedures for applying the database to analyze manual
tasks and establish standard times for the tasks.
 The principal application of a PMTS is to determine standard times.
 Work sampling is a statistical technique for determining
the proportions of time spent by workers or machines in
various categories of activity.
 It can be applied to determine machine utilization, worker
utilization, and the average time spent performing various
types of activities. As such it can be a useful tool in
methods engineering for identifying areas that need
attention.
 For example, if a work sampling study finds that workers in
a facility spend large amounts of their time waiting for
work, then this is a management problem that should be
addressed.
Basic Data Collection & Analysis
Tools
1. Histograms
2. Pareto charts
3. Pie charts
4. Check sheets
5. Defect concentration diagrams
6. Scatter diagrams
7. Cause and effect diagrams
Histogram
 A histogram is a statistical graph consisting of bars
representing different values or ranges of values, in
which the length of each bar is proportional to the
frequency or relative frequency of the value.
 A useful tool because the analyst can quickly
visualize the features of the data, such as:
(1) the shape of the distribution,
(2) any central trend exhibited by the distribution,
(3) approximations of the mean and mode of the distribution,
(4) the amount of scatter or spread in the data.
Histogram for Data Display
Pareto Chart
Special form of histogram in which attribute data are arranged
according to some criterion such as cost or value
 Based on Pareto’s Law: “the very important few and the
unimportant many”
 Often identified as the 80%-20% rule
 80% of a nation’s wealth is owned by 20% of the
population
 80% of sales are accounted for by 20% of the Stock
Keeping Units
 80% of a factory’s production output is concentrated in
only 20% of its product models.
Pareto Distribution
Pie Charts
Example: Annual sales revenues and customer distributions
for two years
Cause and Effect Diagram
A graphical-tabular chart used to list and analyze the potential
causes of a given problem
 Can be used to identify which causes are most significant and
how to take corrective action against them
 Also known as a “fishbone diagram”
 In application, cause and effect diagrams are often developed
by worker teams who study operational problems.
 The diagram provides a graphical means for discussing and
analyzing a problem and listing its possible causes in an
organized and understandable way.
 As a starting point in identifying the causes of the problem, six
general categories of causes are often used because they are the
factors that affect performance of most production and service
processes. They are called the 5Ms and 1P
 Machines. This refers to the equipment and tooling used in the process.
 Materials. These are the starting materials in the process.
 Methods. This refers to the procedures, sequence of activities, motions,
and other aspects of the method used in the process.
 Mother Nature. This is for environmental factors such as temperature
and humidity that might affect the process.
 Measurement. This relates to the validity and accuracy of the data
collection procedures.
 People. This is the human factor.
Does the worker bring the necessary skills to the process?
Cause and Effect Diagram
Methods Engineering and
Automation
 USA Principle
 Ten Strategies for Automation
 Automation Migration Strategy.
 The USA principle is a common sense approach to automation
projects. USA stands for three steps in the analysis and design
procedure:
 Understand the existing process.
 Simplify the process.
 Automate the process.
Understand the Existing Process
 What are the inputs?
 What are the outputs?
 What exactly happens to the work unit
between input and output?
 What is the function of the process?
 How does it add value to the product?
Simplify the Process
 What is the purpose of this operation or this transport?
 Can this step be eliminated?
 Is the most appropriate technology being used?
 How can this step be simplified?
 Can steps be combined?
 Can steps be performed simultaneously?
 Can steps be integrated into a manually operated
production line?
Automate the Process
The USA Principle is a good first step in any automation
evaluation project.
 If automation seems a feasible solution to improve productivity,
quality, or another measure of performance, then the following
ten strategies provide a road map to search for these
improvements.
 The ten strategies constitute a checklist of the possibilities for
improving the work system though automation or simplification.
 For many situations, multiple strategies can be implemented in
one improvement project.
Ten Strategies for Automation
1. Specialization of operations
2. Combined operations
3. Simultaneous operations
4. Integration of operations
5. Increased flexibility
6. Improved material handling and storage
7. On-line inspection
8. Process control and optimization
9. Plant operations control
10. Computer integrated manufacturing (CIM)

More Related Content

Similar to Methods_Engineering_and_Operations_Analysis.pdf

1 work study as per amravati university syllabus
1 work study as per amravati university syllabus1 work study as per amravati university syllabus
1 work study as per amravati university syllabusrahulmeshram14
 
Lecture 1 work study as per Amravati University Syllabus
Lecture 1 work study as per Amravati University SyllabusLecture 1 work study as per Amravati University Syllabus
Lecture 1 work study as per Amravati University Syllabusrahulmeshram14
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layouthomeworkping3
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServicesahmad bassiouny
 
Operations-research in quantitative math
Operations-research in quantitative mathOperations-research in quantitative math
Operations-research in quantitative mathronielynLacay1
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materialssmumbahelp
 
Unit.1 . introduction to oprational research
Unit.1 . introduction to oprational researchUnit.1 . introduction to oprational research
Unit.1 . introduction to oprational researchDagnaygebawGoshme
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management proceduresselinasimpson1201
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Quality operations management
Quality operations managementQuality operations management
Quality operations managementselinasimpson1901
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyIRJET Journal
 
Rational Unified Process(Rup)
Rational Unified Process(Rup)Rational Unified Process(Rup)
Rational Unified Process(Rup)pawanonline83
 

Similar to Methods_Engineering_and_Operations_Analysis.pdf (20)

1 work study as per amravati university syllabus
1 work study as per amravati university syllabus1 work study as per amravati university syllabus
1 work study as per amravati university syllabus
 
Lecture 1 work study as per Amravati University Syllabus
Lecture 1 work study as per Amravati University SyllabusLecture 1 work study as per Amravati University Syllabus
Lecture 1 work study as per Amravati University Syllabus
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServices
 
Operations-research in quantitative math
Operations-research in quantitative mathOperations-research in quantitative math
Operations-research in quantitative math
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
Unit.1 . introduction to oprational research
Unit.1 . introduction to oprational researchUnit.1 . introduction to oprational research
Unit.1 . introduction to oprational research
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
Work Study
Work Study Work Study
Work Study
 
Methodstudy
MethodstudyMethodstudy
Methodstudy
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Quality operations management
Quality operations managementQuality operations management
Quality operations management
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
Sdlc1
Sdlc1Sdlc1
Sdlc1
 
Rational Unified Process(Rup)
Rational Unified Process(Rup)Rational Unified Process(Rup)
Rational Unified Process(Rup)
 
or intro.pptx
or intro.pptxor intro.pptx
or intro.pptx
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

Methods_Engineering_and_Operations_Analysis.pdf

  • 1. METHODS ENGINEERING AND OPERATIONS ANALYSIS  Methods engineering is the analysis and design of work methods and systems, including the tooling, equipment, technologies, workplace layout, plant layout, and work environment  Other names for methods engineering:  Work study  Work simplification  Methods study  Process re-engineering  Business process re-engineering
  • 2. Objectives in Methods Engineering  Increase productivity and efficiency  Reduce cycle time  Reduce product cost  Reduce labor content Other Objectives  Improve customer satisfaction  Improve product and/or service quality  Reduce lead times and improve work flow  Increase flexibility of work system  Improve worker safety  Apply more ergonomic work methods  Enhance the environment (both inside and outside the facility)
  • 3. Operations Analysis Study of an operation or group of related operations for the purpose of analyzing their efficiency and effectiveness so that improvements can be developed relative to specified objectives. Objectives in operations analysis  Increase productivity  Reduce time and cost  Improve safety and quality  Methods engineering and operations analysis are very similar, except that methods engineering places more emphasis on design.
  • 4. Methods Engineering Can be divided into two areas: Methods analysis and Methods design. Methods analysis is concerned with the study of an existing method or process. Objectives:  Eliminate unnecessary and non-value-adding work elements  Combine elements and operations  Rearrange elements into more logical sequence  Simplify remaining elements and operations
  • 5. Methods design is concerned with either of the following situations: 1. Design of a new method or process  Required for new product or service and there is no existing standard  Method must be designed from scratch, using best existing practice for similar operations 2. Redesign of an existing method or process based on a previous methods analysis.
  • 6. HOW TO APPLY METHODS ENGINEERING Systematic Approach in Methods Engineering  has its basis in the scientific method used in science, research and development, engineering design, and other problem areas.  The systematic approach in methods engineering consists of the steps described below. Step 1: Define the Problem and Objectives. The problem in methods engineering study may be low productivity, high cost, inefficient methods, or the need for a new method or a new operation. The objective is the desired improvement or new methods design. Possible objectives are to increase productivity, reduce labor content and cost, improve safety, or develop a new method or new operation.
  • 7. Step 2: Analyze the Problem. Data collection and analysis activities for the type of problem being studied.  Activities often used in this step include the following:  Identify the basic function of the operation.  Gather background information.  Observe the existing process or observe similar processes if the problem involves a new work design.  Collect data on the existing operation and document the details in a format that provides itself to examination.  Conduct experiments on the process.  Develop a mathematical model of the process or utilize an existing mathematical model  Perform a computer simulation of the process.  Use charting techniques.
  • 8. Step 3: Formulate Alternatives. There are always multiple ways to perform a task or accomplish a process, some of which are more efficient and effective than others.  The purpose of this step in the problem-solving approach that is not to identify the best alternative but to formulate all of the alternatives that are feasible. Step 4: Evaluate Alternatives and Select the Best. This step consists of a systematic assessment of the alternatives and the selection of the best solution among them, based on the original definition of the problem and objectives.
  • 9. Step 5: Implement the Best Method. Implementation means installing the selected solution: introducing the changes proposed in the existing method or operation, or installing the new method or process.  This may involve pilot studies or trials of the new or revised  Implementation also includes complete documentation of the new or revised method and replacement of the previous documentation Step 6: Audit the Study. Perform an audit or follow-up on the methods engineering project.  How successful was the project in terms of the original problem definition and objectives?  What were the implementation issues?  What should be done differently in the next methods engineering study? For an organization committed to continuous improvement, answers to these kinds of questions help to fine-tune its problem-solving and decision-making skills.
  • 10. Techniques of Methods Engineering  Data gathering and statistical tools  Charting and diagramming techniques  Motion study and work design  Facility layout planning  Work measurement techniques  New approaches
  • 11. Charting & Diagramming Techniques  Network diagrams These are used for analyzing work flow, assembly line balancing, and project scheduling.  Traditional industrial engineering charting techniques These are used to symbolize and summarize the details of an existing operation or sequence of operations. The traditional charting techniques can be used to analyze the activities of one human worker, groups of workers, worker-machine systems, materials, parts, and products.  Operation charts  Process charts  Flow diagrams  Block diagrams These diagrams represent alternative ways of illustrating processes.
  • 12. Motion Study and Work Design  Concerned with basic motions of a human worker while performing a given task  Examples of basic motion elements:  Reach  Grasp  Move  Release  Guidelines for work design include “principles of motion economy” that is guidelines for work design in three categories: (1) use of the human body in developing the standard method, (2) workplace layout, and (3) design of the tooling and equipment used in the task.
  • 13. Facility Layout Planning What is Facility Layout?  Refers to the size and shape of a facility, the arrangement of the different functions and/or departments in it, and the way the equipment is positioned.  Plays a significant role in determining the overall efficiency of the operations accomplished in the facility.  Objectives are to maximize  Customer satisfaction  Utilization of space, equipment, & people  Efficient flow of information, material, & people  Employee morale & safety  Problem area includes:  Design of a new facility  Installing new equipment, retiring old equipment  Expanding (or contracting) an existing facility
  • 14. How do you conduct a plant layout project? 1. Define or redefine the goals of the facility. 2. Specify the activities to be performed in accomplishing the goals 3. Determine the interrelationships among all activities 4. Determine the space requirements for all activities 5. Generate alternative facility layouts 6. Evaluate alternative facility layouts 7. Select a facility layout 8. Implement facility layouts 9. Maintain and adapt the facility layout
  • 15. Work Measurement Techniques  Four basic work measurement techniques: 1. Direct time study 2. Predetermined motion time systems (PMTS) 3. Standard data systems 4. Work sampling  PMTS and work sampling can be often used in methods engineering to make improvements in the work methods  Predetermined motion time system (PMTS) is a database of basic motion elements and their associated normal time values, and it includes procedures for applying the database to analyze manual tasks and establish standard times for the tasks.  The principal application of a PMTS is to determine standard times.
  • 16.  Work sampling is a statistical technique for determining the proportions of time spent by workers or machines in various categories of activity.  It can be applied to determine machine utilization, worker utilization, and the average time spent performing various types of activities. As such it can be a useful tool in methods engineering for identifying areas that need attention.  For example, if a work sampling study finds that workers in a facility spend large amounts of their time waiting for work, then this is a management problem that should be addressed.
  • 17. Basic Data Collection & Analysis Tools 1. Histograms 2. Pareto charts 3. Pie charts 4. Check sheets 5. Defect concentration diagrams 6. Scatter diagrams 7. Cause and effect diagrams
  • 18. Histogram  A histogram is a statistical graph consisting of bars representing different values or ranges of values, in which the length of each bar is proportional to the frequency or relative frequency of the value.  A useful tool because the analyst can quickly visualize the features of the data, such as: (1) the shape of the distribution, (2) any central trend exhibited by the distribution, (3) approximations of the mean and mode of the distribution, (4) the amount of scatter or spread in the data.
  • 20. Pareto Chart Special form of histogram in which attribute data are arranged according to some criterion such as cost or value  Based on Pareto’s Law: “the very important few and the unimportant many”  Often identified as the 80%-20% rule  80% of a nation’s wealth is owned by 20% of the population  80% of sales are accounted for by 20% of the Stock Keeping Units  80% of a factory’s production output is concentrated in only 20% of its product models.
  • 22. Pie Charts Example: Annual sales revenues and customer distributions for two years
  • 23. Cause and Effect Diagram A graphical-tabular chart used to list and analyze the potential causes of a given problem  Can be used to identify which causes are most significant and how to take corrective action against them  Also known as a “fishbone diagram”  In application, cause and effect diagrams are often developed by worker teams who study operational problems.  The diagram provides a graphical means for discussing and analyzing a problem and listing its possible causes in an organized and understandable way.
  • 24.  As a starting point in identifying the causes of the problem, six general categories of causes are often used because they are the factors that affect performance of most production and service processes. They are called the 5Ms and 1P  Machines. This refers to the equipment and tooling used in the process.  Materials. These are the starting materials in the process.  Methods. This refers to the procedures, sequence of activities, motions, and other aspects of the method used in the process.  Mother Nature. This is for environmental factors such as temperature and humidity that might affect the process.  Measurement. This relates to the validity and accuracy of the data collection procedures.  People. This is the human factor. Does the worker bring the necessary skills to the process?
  • 25. Cause and Effect Diagram
  • 26. Methods Engineering and Automation  USA Principle  Ten Strategies for Automation  Automation Migration Strategy.  The USA principle is a common sense approach to automation projects. USA stands for three steps in the analysis and design procedure:  Understand the existing process.  Simplify the process.  Automate the process.
  • 27. Understand the Existing Process  What are the inputs?  What are the outputs?  What exactly happens to the work unit between input and output?  What is the function of the process?  How does it add value to the product?
  • 28. Simplify the Process  What is the purpose of this operation or this transport?  Can this step be eliminated?  Is the most appropriate technology being used?  How can this step be simplified?  Can steps be combined?  Can steps be performed simultaneously?  Can steps be integrated into a manually operated production line?
  • 29. Automate the Process The USA Principle is a good first step in any automation evaluation project.  If automation seems a feasible solution to improve productivity, quality, or another measure of performance, then the following ten strategies provide a road map to search for these improvements.  The ten strategies constitute a checklist of the possibilities for improving the work system though automation or simplification.  For many situations, multiple strategies can be implemented in one improvement project.
  • 30. Ten Strategies for Automation 1. Specialization of operations 2. Combined operations 3. Simultaneous operations 4. Integration of operations 5. Increased flexibility 6. Improved material handling and storage 7. On-line inspection 8. Process control and optimization 9. Plant operations control 10. Computer integrated manufacturing (CIM)