1. PRIMARY RESPONSIBILITIES:
Equipment Engineering for GCB, IPBD, Power Transformers, Medium Voltage Switchgear,
Distribution Transformers and LV Switchgear,
Preparation of cable schedule for HT and LT side and Control Cable.
Preparing the Interconnection Cable Schedule.
Designing of Cable/ Bus duct routing layout.
Designing of Earthing Calculation and earthing layout.
Designing of Plant lighting distribution Scheme and their Layouts.
Relay coordination for overall Plant.
ELECTRICAL SOFTWARE:
DIALux: Lighting calculation.
ETAP: One Line Diagrams - Short Circuit Analysis-Load flow Analysis & relay coordination –
Preparation of output Report.
AutoCAD
PROJECTS HANDLED:
Taji Power Plant – Detailed Earthing, Cabling and Lighting engineering services for 4 x 52MVA
Gas Turbine Power Plant
Al Dur Forwarding station - Detailed Earthing, Lighting, LV Transformer equipment engineering
services and relay Coordination for Pumping Station Plant.
Al Mansurya Power Plant - Detailed BOP engineering services for Gas Turbine Power Plant.
ALBA PS3 Upgrade – Detailed DC System engineering services for 6 x 114MVA Gas Turbine
Power Plant and 2 x 154.575MVA Steam Turbine Power Plant.
Azzour south and Sabiya OCGT – Equipment Engineering – GCB and LV Switchgear.
PROJECTS HANDLING:
Mirfa Independent Power and Water Project – Equipment Engineering for GCB and VSD and
Relay Coordination for Power Plant.
Basrah Water supply Improvement project – Project Lead and Equipment Engineering for
Medium voltage Switchgear.