2. VME through the years
1986
• VME Group was founded
• One of the pioneers in mechanization of
earthwork using excavators and other
sophisticated equipment
3. 1992
• Ventured into building bridges for
the Tamil Nadu State Highways
based on Precast Technology
• Won an accolade from World
Bank team for quality and also
speedy execution for the very
first bridge
4. 1998
• A bow string girder bridge at Katpadi
for Southern Railways which won a
National Award by the Indian
Institute of Bridge Engineers
• Entire span of 42 meters weighing
750 tons was cast separately and
placed in position
5. 2008
• Set up India’s First Completely
Automated Precast Factory along
with global associates VaBe and
Elematic of Finland
6. 2010
• Diversified into Real Estate domain
with VME Realty
• Launched its First Project –
Lakeside in August 2010 for which
the entire construction is done using
precast technology
7. The group has over the last 25 years focused on
planning, execution and transfer of specialized
projects in the field of construction like road
over bridges, railway bridges and other
prestigious highway projects
8. Award Winning Project – Most Outstanding
Bridge
ROB at Katpadi RailwayJunction for Southern Railway – Each Bowstring
Girder of 42m span weighing 750 tons were cast and placed in position
9. Testimonies that have stood the
test of time
Ekkaduthangal – Bridge across
Adyar River, Chennai
84 Precast prestressed beams
were cast and placed in just 3
months in the year 1992
10. Moorad Bridge – Railway Bridge
in the back waters of Kerala
Specific sacrificial caisson were
used for Well foundation and each
well weighing 300Mt were placed
in position after casting for the
first time in Southern Railway